Loading...
HomeMy WebLinkAbout2005-06-21; City Council; Resolution 2005-1981 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Exhibit 7 RESOLUTION NO. 2005-198 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ADOPTING CHANGES TO THE MASTER FEE SCHEDULE ~ WHEREAS, the City Council of the City of Carlsbad has the authority to establish fees for City services; and WHEREAS, from time-to-time said fees are reviewed and evaluated to maintain an adequate fee structure recovering costs for City services; and WHEREAS, the City Council has determined the cost of providing general and development-related services; and WHEREAS, the City Council finds it necessary to recover the costs for City services; and WHEREAS, the City Council has held the necessary public hearing and allowed for public comment on the establishment of said fees. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the changes to the Master Fee Schedule for the fees shown in Exhibit 7- A-H, attached hereto, are hereby adopted. 2. That all other general City fees and development-related fees as shown in Resolution 2004-1 83, except as specifically amended, shall remain in full force and effect. Ill Ill Ill Ill Ill Ill Ill Ill I 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Exhibit 7 3. This resolution shall become effective on August 1, 2005 for General City fees and September 01, 2005 for the Development-related fees. PASSED, APPROVED, AND ADOPTED at a regular meeting of the Carlsbad City Council held on the 21st day of JUNE , 2005 by the following vote, to wit: AYES: NOES: None Council Members Lewis, Hall, Kulchin, Packard, Sigafoose ABSENT: None ATTEST (SEAL) Exhibit 7-A FACILITY FEE SCHEDULE AND CLASSIFICATIONS Fees are based on an hourly rate, with a two-hour minimum. An extra staffing fee of $15.00 per hour, for all recreation usages other than regular operation hours. For the Swim Complex, if clean up or m required, a staffing fee of $20 per hour per staff is charged. required uards are CATEGORIES FACILlTIES A B C D E F -S r€ Pi ($500 deposit required) Day Use N/C N/C 15 20 25 30 Light (Night) Use N/C 5 25 30 35 40 CLINICS/C AMPS A B C D E F Field N/C 35 510 15 20 25 Lights N/C 910 15 20 25 30 TOURNAMENTS ($500 deposit required) A B C D E F Field N/C N/C 510 -515 720 325 Lights N/C 419 15 20 25 30 NOTES: 1. There is a two-hour minimum for use of all facilities and a three-hour minimum for Park & Picnic Rentals. 2. Day Use for the softball fields and tennis courts is from 8:OO a.m. until dark. An additional amount is charged for lights. 3. Building rentals include use of tables, chairs, P.A. and kitchen facilities when appropriate. 4. A minimum of two-hour staffing fee charge will be assessed for field preparation, and subject to staff availability. 5. A $5 fee will be assessed each non-resident player on teams and/or organizations in classifications “B” and “C” that reserve ballfields in excess of 30 calendar days per season. n-residents when a rental includes an inflatable ast us chedule a Other General Fee Changes Current Fee Proposed Fee Cancellation Check Processing Fee new $20 Exhibit 7-A CLASSIFICATION OF APPLICANTS AND FEES Each application will be reviewed by the Recreation Supervisor and classified into a group depending on the type of organization and the intended use. The Recreation Department activities have first priority for the use of the facilities. The classifications are listed in order or priority with classification “A” first, classification “B” second, etc. The City attempts to accommodate all groups; however, there is a limited number of facilities. Unfortunately, the demand exceeds the supply. For that reason, a priority classification system for use had to be established. A. B. C. D. E. F. Parks and Recreation activities; Co-sponsored activities; other City departments Examples: Friends of the Library, Carlsbad Book Fair, Recreation and Lap Swim, Swim Lessons, Masters Swim Program Carlsbad resident not-for-profit, civic, social organizations (non-paid management - no voting board member can be paid); any organization sponsoring a public forum or candidates night; public education Examples: Carlsbad Rotary, La Costa Youth Organization, Carlsbad Softball Association, Carlsbad Youth Baseball, Boy Scouts, Carlsbad Homeowner’s Associations, Carlsbad Unified School District Carlsbad resident not-for-profit, civic, social organizations (paid management); private educational institutions . Examples: Boy’s and Girl’s Club &, Property Management Associations, €a&ba&h ., CM Non-resident not-for-profit, educational, civic and social organizations; resident private parties; and locally organized groups whose normal place of meeting is located in the City of Carlsbad. Examples: North County AA, YMCA, resident religious and political groups, Mira Costa Resident commercial, business, profit making organization, non-resident private party activities Examples: Carlsbad Inn, non-resident parties, weddings or receptions Non-resident commercial, business, political, profit making and religious organizations Examples: Trade shows, company training, meetings, seminars, scuba shops, commercials or photo shoots IN ORDER TO QUALIFY AS CLASSIFICATION “B” NON-PROFlT USER, THE ORGANIZATION MUST MEET ALL OF THE FOLLOWING CRITERIA: 1. The organization must be registered as a not-for-profit corporation with the State of California; or, if not registered with the State, must be a Carlsbad Chapter and have a constitution or by-laws that clearly state that the objectives of the organization are of a non-profit, non-commercial nature. 2. The organization must be comprised of volunteers, and 70% of which its membership and participants must be Carlsbad residents. Exception: Classification assignment for sports organizations utilizing athletic fields will be based on player rosters, including player addresses, must have 70% of the players residing in Carlsbad to qualify for “B” classification. Verification of residency may be required. Non-profit sports organizations requesting athletic field use are required to submit player rosters, verified for authenticity by the league’s board of officers, which will be used to determine classification status. Player addresses with a post office box number will not be accepted. Recreation staff will return rosters once classification is determined. Once the classification determination has been made by staff and approved by the Recreation Director, the decision is final. 1. The organization must submit the following: a. If incorporated, submit State incorporation papers and by-laws; if not incorporated, submit constitution and by- laws. b. Financial verification of organization’s exemption from income tax. (Department of the Treasury form 990 or 501(c)(3) determination letter may be used.) c. A signed statement verifying item “2” above. Exhibit 7-8 Summary of Proposed Fee Increases Agua Hedionda Lagoon Permit Fees June 2005 Current Proposed $ % - Fee - Fee Increase Increase Annual Fees Resident - Power Vessels over 8' Non-Resident - Power Vessels over 8' Resident - Board/Sail Boats under 8' & Passives Non-Resident - Passive Vessels under 8' Dailv Fees Resident - Power Vessels over 8' Non-Resident - Power Vessels over 8' Resident - Passive Vessels under 8' Non-Resident - Passive Vessels under 8' 70.00 80.00 10.00 14.3% 90.00 100.00 10.00 11.1% 30.00 35.00 5.00 16.7% 45.00 50.00 5.00 11.1% 14.00 15.00 1-00 7.1% 18.00 23.00 5.00 27.8% 6.00 7.00 1 .oo 16.7% 9.00 12.00 3.00 33.3% Exhibit 7-C Summary of Proposed Fee Increases Ambulance Fees June 2005 Treat & Treat & Release Release Fee Resident Non-Resident Mileage Oxygen Resident Non-Resident Current Rate $430 $623 $1 1 $43 $1 39 $1 39 Recommended $51 5 $745 $1 5 $50 $1 50 $1 50 $ increase $85 $1 22 $4 $7 $1 1 $1 1 % increase 19.8% 19.6% 36.4% 16.3% 7.9% 7.9% Zone Average $742 $862 SD Region Ave. $64 1 $744 $1 6 $70 $1 29 $1 41 Exhibit 7-D Size of Bin Cost-Current Cost-Proposed SOLID WASTE SERVICE FEES RECOMMENDED FEE INCREASES JUNE 2005 Residential Service Rates: Current Proposed Monthly Curbside Service: $1 6.47 $1 7.50 Monthly Backyard Service: $21.65 $23.00 Commercial Service Rates: 2Yd 3Yd 4Yd 5Yd 6Yd $29.93 $40.29 $48.34 $56.40 $64.46 $32.08 $43.19 $51.82 $60.46 $69.10 I Added Cost Der Bin Dump --I Current Proposed Curbside service 1 X per week: $28.89 $30.97 Curbside service 2 X per week: $57.78 $61.94 Curbside service 3 X per week: $86.67 $92.91 Commercial Can Service: (Up to (4) 32 gallon cans) Backyard service 1 X per week: Backyard service 2 X per week: $41.09 $44.05 $82.18 $88.10 Recycling: Non-residential Commercial Accounts $13.41 $14.37 (per month per container) rt Exhibit 7-D Number of 3yd Bins 1 lx per 2x per Week Week Current $84.86 $150.29 2 I (Prouosedl $181.21 I $322.21 I Proposed $90.97 $16 1.1 1 Current $169.04 $300.57 3 Current $253.55 $450.86 Proposed $271.81 $483.32 No. Bins 1 2 Number of Pick-ups per Week 1 2 3 4 5 Current $58.70 $98.99 $139.27 $179.56 $214.09 Proposed $62.93 $106.1 1 $149.30 $192.48 $229.50 Current $1 17.40 $197.97 $278.54 $359.1 1 $428.17 Pronosed $125.85 $212.23 $298.60 $384.97 $459.00 Exhibit 7-E Uniform Sewer Rates Recommended Unit Cost I Uniform Rate ($/hcf of water) Group I Residential Single Family Multi-Family' $1.85 Mobile Home' Group II Commercial Group Ill Commercial Group IV Commercial * Group V Institutional $1.85 $1.53 $2.01 $3.17 Schools per ADA3 Elementary * Junior * High Boarding * __- $0.20 $0.39 $0.59 $2.92 -_- $0.21 $0.41 $0.61 -_- $3.04 (based on volume and -_- wastewater strengths) Group VI Large Volume (based on volume and wastewater strengths) 1 * Non-residential wastewater flow is 95 percent of metered water use. Wastewater flow is 90 percent of metered water use. Schools: assumes a 200-day working year; ADA: average daily attendance. * Denotes charge per student based on ADA. CITY OF CARLSBAD FEE SCHEDULE DEVELOPMENT RELATED SERVICE FEES JUNE 2005 Exhibit 7-F Fee Description Adjustment Plat Appeal - City Council (+ noticing costs) - fee is refundable if appeal is won Appeal - Housing and Redevelopment Commission (+ noticing costs) fee is refundable if appeal is WOI Appeal - Planning Commission (+ noticing costs) fee is refundable if appeal is won Appeal - Redev. Design Review Board (+ noticing costs) fee is refundable if appeal is won Building Permit Fees (55% of 2001 UBC 1-A) Building Plan Check - 65% of Bldg Permit (8% discount on repetitive plan checks) Certificate of Compliance Certificate of Compl. in lieu of Parcel Map Certificate of Correction Community Facilities District Annexation Construction Change Review - Minor (fee plus $155 per sheet) Construction Change Review - Major (fee plus $245 per sheet) Coastal Development Permit (CDP) - Single Family Lot CDP - 2 - 4 unit or lot subdivision (per unit or lot whichever is greater) CDP - 5 or more unit or lot subdivision (per permit) CDP Emergency CDP Exemption Coastal Dev. Permit - Non-RDA - Minor Coastal Dev. Permit- Non-RES (fee plus $.lo per square foot) Coastal Development Permit - Major & Minor RP's Conditional Use Permit (25% discount may apply) CUP - Amendment CUP - Bio Habitat Preserve CUP - Extension -Regular DayCare Permit DayCare Permit -Center Admin Pmt. DayCare Permit - Extension Duplicate Tracing Fees - Final Parcel and Tract Maps - per sheet (+ $32 per sheet) Easement or Offer to Dedicate or Improve EIA - All Others EIA - Single Family EIR Review (+ fbhr after the first 160 hrs of project planner or 40 hrs of Project Engineer) EIR - Addendum (+ fbhr after 1st 10 hrs of project planner) EIR - FocusedBupplemental (+ fbhr after 100 hrs of project planner or 20 hrs Proj Engineer) Encroachment Agreement Processing General Plan Amendment - 0 - 5 Acres General Plan Amendment - Over 5 Acres Grading Permit Application Grading Permit Hillside Dev Permit - Single Family Lot Hillside Dev Permit - Other (Multiple Lots) Hillside Dev Permit Amendment - Single Family Lot Hillside Dev Permit Amendment - Other (Multiple Lots) Improvement Agreement Extension - see Secured Agreement Proc. Ext. Improvement Construction inspection Fee Improvement Plan Review (Plan Check) Inspection Overtime-per Hour (On Request) - each additional hour at $70 Inspection - Additional Planning Landscape Plan Check Current I Recommended1 Unit Fee I Fee I cost 970 1070 1,406 760 510 500 510 790 2,850 620 1,035 370 520 815 1,710 2,680 335 180 675 760 510 3,395 1,825 635 685 160 320 70 13 495 1,310 715 15,180 1,900 10,630 255 3,230 4,660 940 1,900 530 1,635 90 65 835 560 550 560 870 3,135 680 1,140 41 0 570 900 1,880 2,950 370 200 740 835 560 3,735 2,010 700 755 175 350 80 15 545 1,440 790 16,700 2,090 11,640 280 3,555 5,125 1035 2,090 585 1,800 100 75 2,103 1,042 1,397 949 1,039 3,240 763 1,470 822 1,063 1,198 1,898 3,473 438 240 925 3,200 1,281 4,317 2,316 3,939 936 1,829 1,835 1,425 46 700 1,785 1,020 19,465 2,453 11,649 303 4,228 6,175 1,285 2,215 746 2,641 1 76 96 $ Subsidy 336 1,268 482 847 389 169 105 83 330 412 493 298 18 523 68 40 185 2,365 721 582 306 3,239 181 1,654 1,485 1,345 31 155 345 230 2,765 363 9 23 673 ,050 250 125 161 841 76 21 June 2005 lozf CITY OF CARLSBAD FEE SCHEDULE DEVELOPMENT RELATED SERVICE FEES JUNE 2005 Landscape Inspection Local Coastal Plan - Amendment Master Plan (+ fbhr after 1st 200 hrs of project planner or 100 hrs project engineer) Master Plan Pre-Submittal Master Plan Amendment - (Minor) (+ fbhr after I” 20 Project Planner or 7 hrs Project Engineer) Neighborhood Improvement Agreements PD/Condo - Residential Additional Permit PDICondo - Admin Amendment PD/Condo - Minor Amendment PD Res. Amendment - 4 or less PD Res. Amendment - 5 to 50 PD Res. Amendment - 51 or more PD Amendment- Non-Res - 4 or less PD Amendment - Non-Res - 5 to 50 PD Amendment - Non-Res - 51 or more PD Res. - 4 or less PD Res. - 5 to 50 PD Res. - 51 or more PD - Non-Res - 4 or less PD - Non-Res - 5 to 50 PD - Non-Res - 51 or more Planned Industrial Permit Planned Industrial Permit - Amendment Planning Commission Determination - Single Family Planning Commission Determination - Other Planning Commission Discussion Item Precise Development Plan Precise Development Plan - Amendment Pre-Grading Request Preliminary Plan Review - Consistency Determination Preliminary Plan Review - Major Preliminary Plan Review - Minor Quitclaim of Easement Redevelopment Permit Extension (Minor) Redevelopment Permit Extension (Major) Redevelopment Noticing Fee (Minor) - plus postage Redevelopment Noticing Fee (Major) - plus postage Redevelopment Permit (Admin.) Redevelopment Permit (Minor) - plus noticing costs Redevelopment Permit (Major) - plus noticing costs Redevelopment Permit Amendment (Admin) Redevelopment Permit Amendment (Minor) - plus noticing costs Redevelopment Permit Amendment (Major) - plus noticing costs Right of Way Permit - Minor Right of Way Permit With Encroachment - See Encroachment Agreement Processing Right of Way Permit - Utility (+ actual costs for Insp. and Sr. Imp. time) Right of Way Permit - Utility (By Contract) Satellite Antenna Permit Secured Agreement Pmc. Extension Secured Agreement Proc. Replace -+ improvement plan revision fees if required Sidewalk Sign/Outdoor Display Permit, Redevelopment Area Sign Program Sign Prcgram Permit, Redevelopment Area Sign Program Permit Amendment, Redevelopment Area Site Development Plan - Res. c- 4 unitshots Exhibit 7-F ~ ~~~~~~ Fee Description June 2005 Current Recommended Unit TLqT 4,935 31,625 5,380 1,265 360 290 300 560 1,230 4,680 6,315 1,390 5,030 6,810 2,280 6,325 9,995 2,280 6,325 9,995 3,520 1,580 760 1,330 505 5,760 3,130 610 530 530 150 520 575 660 175 345 335 1,245 2,280 130 445 1,095 265 560 560 320 320 575 40 825 225 50 3,380 5,375 34,790 5,920 1,390 400 320 305 615 1,355 5,150 6,950 1,530 5,535 7,490 2,510 6,960 10,995 2,510 6,960 10,995 3,875 1,740 835 1,360 555 6,335 3,445 655 585 585 165 570 635 725 195 380 370 1,370 2,508 145 490 1,205 290 615 615 350 350 635 45 91 0 250 55 3,720 5,381 39,02‘ 7,02t 4,267 509 422 306 653 1,490 5,524 7,966 1,731 6,188 8,477 2,793 8,734 13,381 2,840 7,599 12,326 12,326 2,081 1,019 1,762 1,362 7,557 4,037 658 1,238 1,958 885 757 675 768 221 41 1 2,318 5,316 12,319 446 1,942 4,749 381 1,024 1,024 405 352 659 285 1,076 602 358 4,018 $ Subsidy 6 4,234 1,106 2,877 109 1 02 1 38 135 374 1,016 20 1 653 987 283 1,774 2,386 330 639 1,331 8,451 34 1 184 402 807 1,222 592 3 653 1,373 720 187 40 43 26 31 1,948 3,946 9,811 301 1,452 3,544 91 409 409 55 2 24 240 166 352 303 298 CITY OF CARLSBAD FEE SCHEDULE DEVELOPMENT RELATED SERVICE FEES JUNE 2005 Current Fee Fee Description Site Development Plan Site Development Plan Amendment (Minor) Site Development Plan Amendment (Major) Special Use Permit - Scenic Corridor Special Use Permit - Flood Plain Special Use Permit - Flood Plain, Coastal High Hazard Area Special Use Permit Amendment - Flood Plain Special Use Permit Amendments - All Other Specific Plan Amendment (Major) (+ fbhr after 180 hr proj planner or 30hrs Proj eng) Specific Plan Amendment (Minor) (+ fbhr after 20 hr proj planner or 7hrs Proj eng) Specific Plan (+ mr after 1st 200 hrs project planner or 60 hrs project engineer) Street Name Change Street Vacation - Regular Street Vacation - Summary Structure Relocation - Use Planning Commission Determination Substantial Conformance Exhibit Rev. Tentative Map Revision - 5- 49 UnitdLots + $40ea 5+ (whichever is greater) Tentative Map Revision - 50+ UnitdLots + $15ea 49+ (whichever is greater) Tentative Parcel Map Processing Fee (Minor Subdivision) Tentative Parcel Map 1 yr Extension (per application) Parcel Map (Minor Subdivision) - Final Tentative Tract Map - 5 -49 Lotdunits + $1 1Oea. > 5 (whichever is greater) Tentative Tract Map - 50+ LotdUnits + $15ea 49+ (whichever is greater) Tentative Tract Map Extension- 5 to 49 Final Tract Map (+ $5 per Acre) Third Party Review - plus consultant cost Variance - Administrative Redevelopment Variance - Redevelopment Variance - Engineering Variance - Planning Variance - Administrative (Planning) Variance - Administrative (Planning) Recreational Vehicle Admin. Varianc Zone Change - 5 or fewer acres Zone Change - 5.1 or more acres Zone Code Amendment Zoning Compliance Letter Notes: (1) - See attached schedules and rate tables. (2) - Based on number of units or lots whichever is greater (4) - Any Permit Amendment not identified assessed at 50% of original cost. Recommended Unit Fee cost 8,570 2,255 5,810 2,645 2,920 2,120 2,530 1,835 17,000 1,100 26,565 1,240 3,150 2,370 760 3,165 5,760 2,875 1,120 2,850 6,200 12,460 2,185 5,660 560 140 320 570 2140 570 570 3,710 5,030 4,785 9,430 2,480 6,390 2,910 3,215 2,330 2,785 2,020 18,700 1,210 29,220 1,365 3,465 2,580 835 3,480 6,335 3,165 1,230 3,025 6,820 13,705 2,405 6,225 61 5 155 350 630 2355 630 630 4,080 5,535 5,265 10,951 2,619 7,089 3,540 3,882 2,813 3,576 2,556 20,056 4,266 30,191 1,680 4,152 2,587 91 9 6,616 1 0,480 3,648 1,387 3,031 10,607 18,817 2,894 6,543 724 539 1,435 713 3,185 713 675 4,641 6,336 5,995 60) 651 210 Exhibit 7-F $ Subsidy 1,521 139 699 630 667 483 791 536 1,356 3,056 97 1 315 687 7 84 3,136 4,145 483 157 6 3,787 5,112 489 318 109 384 1,085 83 830 83 45 561 801 730 145 (5) - Plus Fish and Game department fee, if any. Currently set at $1,250 for Negative Declaration and $850 for EIR.. (6) - Fees set by State Statute. (7) - For all Assessment Districts using 1915 Act Bonds. (8) - A 25% discount may apply when submitted with another application (9) - A 25% discount will apply when submitted with a General Plan Amendment June 2005 Exhibit 7-F 'IRE PROTECTION SYSTEM INSTALLA iutomatic Sprinkler Systems - Residential System - Commercial System - 1st riser 1st floor - Tenant Improvement - ea add'l riser -ire Alarm Systems - 1 to 25 Devices - 26 or more Devices Ither Fixed Fire Systems - Hood and Duct - Halon - Special Chemical Agent - Standpipe - Paint Spray Booth Repeated Inspection on new construction FIRE PROTECTION SYSTEM INSTALLA' 4utomatic Sprinkler Systems - Residential System - Commercial System - 1 st riser 1 st floor - Tenant Improvement - ea add'l riser Fire Alarm Systems - 1 to 25 Devices - 26 or more Devices 3ther Fixed Fire Systems - Hood and Duct , - Halon - Special Chemical Agent - Standpipe - Paint Spray Booth qepeated Inspection on new construction 3N FEES - Current Schedule #l Plan Inspection Fees Total Review No. I cost Fee $55 55 $50 minimum 90 55 60 55 70 70 3 at $55 each $220 1,150 565 1 at 60 each 115 1 at 2 at $55 each 55 each $1 05 200 1 at 60 each 115 2 at 50 each 160 1 at 60 each 115 2 at 55 each 180 2 at 55 each 180 1 at 65 each 65 ON FEES Recommended Schedule #I Plan Inspection Fees Total I Review No. I cost Fee 1 $60 60 3 at $60 each $240 1,150 565 1 at 60 each 120 $55 minimum 1 at $60 each $115 95 2 at 60 each 21 5 60 60 60 75 75 1 at 60 each 120 2 at 50 each 160 1 at 60 each 120 2 at 60 each 195 2 at 60 each 195 1 at 70 each 70 June 2005 Exhibit 7-F ZRADJNG PERMIT APPLICATlON FEES - Current 4mount Fee 100 CY* or less $320 Schedule #2 101 to 1,000 CY 1,001 to 10,000 CY 10,001 to 100,000 CY 100,001 to 200,000 CY 200,001 CY or more $635 for the first 100 cubic yards plus $1 15.00 for each additional 100 cubic yards or fraction thereof. $1,900 for the first 1,000 cubic yards plus $1 15.00 for each additional 1,000 cubic yards or fraction thereof. $2,990 for the first 10,000 cubic yards plus $175.00 for each additional 10,000 cubic yards or fraction thereof. $4,565 for the first 100,000 cubic yards plus $275.00 for each additional 10,000 cubic yards or fraction thereof. $7,315 for the first 200,000 cubic yards plus $125.00 for each additional 100,000 cubic yards or fraction thereof. CY = Cubic Yards SRADING PERMIT APPLICATION FEES - Recommended imount Fee Schedule #2 _. . __ 100 CY or less $350 101 to 1,000 CY 1,001 to 10,000 CY 10,001 to 100,000 CY 100,001 to 200,000 CY 200,001 CY or more $700 for the first 100 cubic yards plus $1 15.00 for each additional 100 cubic yards or fraction thereof. $2,090 for the first 1,000 cubic yards plus $1 15.00 for each additional 1,000 cubic yards or fraction thereof. $3,290 for the first 10,000 cubic yards plus $175.00 for each additional 10,000 cubic yards or fraction thereof. $5,020 for the first 100,000 cubic yards plus $275.00 for each additional 10,000 cubic yards or fraction thereof. $8,050 for the first 200,000 cubic yards plus $125.00 for each additional 100,000 cubic yards or fraction thereof. CY = Cubic Yards June 2005 Exhibit 7-F GRADING PERMIT FEES = Current Schedule #3 Amount Fee 100 Cubic Yards (CY) or less $320 101 to 1 .ooo CY 1,001 to 10,000 CY 10,001 to 100,000 CY 100,001 to 200,000 CY 200,001 to 400,000 CY ~00,000 to 1,000,000 CY $320 for the first 100 CY plus $65 for each additional 100 CY or fraction thereof. $905 for the first 1,000 CY plus $65 for each additional 1,000 CY or fraction thereof, $1,490 for the first 10,000 CY plus $125 for each additional 10,000 CY or fraction thereof. $2,615 for the first 100,000 CY plus $125 for each additional 10,000 CY or fraction thereof. $3,865 for the first 200,000 CY plus $190 for each additional 10,000 CY or fraction thereof. $7,665 for the first 400,000 CY plus $950 for each additional 100,000 CY or fraction thereof. 1,000,001 CY or more $1 3,365 for the first 1,000,000 CY plus $685 for each additional 100,000 CY or fraction thereof. SRADING PERMIT FEES - Recommended \mount Fee IO0 Cubic Yards (CY) or less $350 Schedule #3 101 to 1,000 CY I ,001 to 10,000 CY 10,001 to 100,000 CY I00,001 to 200,000 CY ?00,001 to 400,000 CY 100,000 to 1,000,000 CY $350 for the first 100 CY plus $65 for each additional 100 CY or fraction thereof. $995 for the first 1,000 CY plus $65 for each additional 1,000 CY or fraction thereof. $1,640 for the first 10,000 CY plus $125 for each additional 10,000 CY or fraction thereof. $2,880 for the first 100,000 CY plus $125 for each additional 10,000 CY or fraction thereof. $4,250 for the first 200,000 CY plus $190 for each additional 10,000 CY or fraction thereof. $8,430 for the first 400,000 CY plus $950 for each additional 100,000 CY or fraction thereof. I,OOO,OOl CY or more $1 4,700 for the first 1,000,000 CY plus $685 for each additional 100,000 CY or fraction thereof. \ y'7 June 2005 Exhibit 7-F IMPROVEMENT CONSTRUCTION INSPECTION FEES - Current Cost of Improvements Fee $0 to $20,000 Schedule #4 5.5% - $315 Minimum $20,001 to $50,000 $50,001 to $100,000 $100,001 to $250,000 $250,001 to $500,000 $500,001 to $1,000,000 $1,265 for the first $20,000 plus $250 for each additional $10,000 or fraction thereof $2,530 for the first $50,000 plus $125 for each additional $10,000 or fraction thereof $3,165 for the first $1 00,000 plus $100 for each additional $1 0,000 or fraction thereof $4,680 for the first $250,000 plus $105 for each additional $10,000 or fraction thereof $7,340 for the first $500,000 plus $105 for each additional $10,000 or fraction thereof $1,000,001 or more $12,525 for the first $1,000,000 plus $105 for each additional $10,000 or fraction thereof _- - ~- IMPROVEMENT CONSTRUCTION INSPECTION FEES - Recommended Cost of Improvements Fee $0 to $20,000 Schedule #4 5.5% - $345 Minimum $20,001 to $50,000 $50,001 to $1 00,000 F100,OOl to $250,000 §250,001 to $500,000 §500,001 to $1,000,000 61,000,001 or more $1,390 for the first $20,000 plus $250 for each additional $10,000 or fraction thereof $2,780 for the first $50,000 plus $125 for each additional $10,000 or fraction thereof $3,480 for the first $100,000 plus $100 for each additional $10,000 or fraction thereof $5,150 for the first $250,000 plus $105 for each additional $1 0,000 or fraction thereof $8,075 for the first $500,000 plus $1 05 for each additional $1 0,000 or fraction thereof $1 3,780 for the first $1,000,000 plus $1 05 for each additional $1 0,000 or fraction thereof June 2005 Exhibit 7-F IMPROVEMENT PLAN REVIEW FEES - Current Cost of Improvements Fee $0 to $20,000 $20,001 to $50,000 $50,001 to $100,000 $1 00,001 to $250,000 $250,001 to $500,000 $500,001 to $1,000,000 Over $1,000,000 (Improvement Plan Check Fees are based on the current City of San Diego unit prices. This includes the cost of curbs, gutters, sidewalks, asphalt or concrete paving, storm drains, etc.) IMPROVEMENT PLAN REVIEW FEES - Recommended Cost of Improvements Fee $0 to $20,000 $20,001 to $50,000 Schedule #5 $1,015 plus 5% of value of improvements $1,290 plus 4% of value of improvements - $2,440 minimum $1,660 plus 3% of value of improvements - $4,040 minimum $1,875 plus 2.5% of value of improvements - $6,120 minimum $5,670 plus 2% of value of improvements - $1 3,250 minimum $9,995 plus 1.5% of value of improvements - $20,660 minimum $10,250 plus 0.75% of value of improvements - $31,980 minimum Schedule #5 $1,115 plus 5% of value of improvements $1,420 plus 4% of value of improvements - $2,440 minimum )$SO,OOl to $1 00,000 $100,001 to $250,000 $1,825 plus 3% of value of improvements - $4,040 minimum $2,065 plus 2.5% of value of improvements - $6,120 minimum $250,001 to $500,000 $500,001 to $1,000,000 Over $1,000,000 (Improvement Plan Check Fees are based on the current City of San Diego unit prices. This includes the cost of curbs, gutters, sidewalks, asphalt or concrete paving, storm drains, etc.) $6,240 plus 2% of value of improvements - $1 3,250 minimum $1 0,995 plus 1.5% of value of improvements - $20,660 minimum $1 1,275 plus 0.75% of value of improvements - $31,980 minimum June2005 ' Exhibit 7-F 'LANDSCAPE INSPECTION FEES - Recommended Cost of Improvements Fee $0 to $20,000 $490 Schedule #7 (LANDSCAPE INSPECTION FEES - Current Schedule #7 Cost of Improvements Fee $0 to $20,000 $445 $20,001 to $50,000 $50,001 to $100,000 $100,001 to$250,000 $250,001 to $750,000 $630 for the first $20,000 of improvements plus $20 for each additional $1 0,000 or fraction thereof $885 for the first $50,000 of improvements plus $20 for each additional $1 0,000 or fraction thereof $1,265 for the first $100,000 of improvements plus $150 for each additional $1 00,000 or fraction thereof $1,520 for the first $250,000 of improvements plus $150 for each additional $1 00,000 or fraction thereof $2,400 for the first $750,000 of improvements plus $150 for each additional $1 00,000 or fraction thereof 1$20,001 to $50,000 ($50,001 to $100,000 $1 00,001 to$250,000 $250,001 to $750,000 1$750,001 and Over $695 for the first $20,000 of improvements plus $20 for each additional $10,000 or fraction thereof $975 for the first $50,000 of improvements plus $20 for each additional $10,000 or fraction thereof $1,390 for the first $100,000 of improvements plus $150 for each additional $100,000 or fraction thereof $1,670 for the first $250,000 of improvements plus $150 for each additional $100,000 or fraction thereof $2,640 for the first $750,000 of improvements plus $150 for each additional $100,000 or fraction thereof \ June 2005 Exhibit 7-F $20,001 to $50,000 $50,001 to $100,000 $1 00,001 to $250,000 $250,001 to $500,000 $500,001 to $1,000,000 'Over $1,000,000 $635 plus 3.0% over $20,000 $1,835 plus 1.5% over $50,000 $2,780 plus 0.2% over $100,000 $3,420 plus 0.1 5% over $250,000 $4,175 plus 0.1 % over $500,000 $6,325 plus 0.07% over $1,000,000 LANDSCAPE PLAN CHECK FEES - Current Cost of Improvements Fee $0 to $20,000 $445 Schedule #8 LANDSCAPE PLAN CHECK FEES - Recommended Cost of Improvements Fee $0 to $20,000 490 Schedule #8 $20,001 to $50,000 $50,001 to $1 00,000 $100,001 to $250,000 $250,001 to $500,000 $500,001 to $1,000,000 Over $1,000,000 $700 plus 3.0% over $20,000 $2,020 plus 1.5% over $50,000 $3,060 plus 0.2% over $100,000 $3,760 plus 0.15% over $250,000 $4,590 plus 0.1% over $500,000 $6,960 plus 0.07% over $1,000,000 +'\ June 2005 Exhibit 7-F BUILDING PERMIT FEES Schedule #9 (55% of the 2001 Uniform Building Code Table 1-A fee schedule) Fees are based on the April 2005, Building Valuation Multipliers published by the San Diego Area Chapter of the International Code Council. Total Valuation Fee $1 .OO to $500.00 $12.93 $501 .OO to $2,000.00 $12.93 for the first $500.00 plus $1.68 for each additional $1 00.00, or fraction thereof, to and including $2,000.00 $38.09 for the first $2,000.00 plus $7.70 for $2,001 .OO to $25,000.00 each additional $1,000.00, or fraction thereof, to and including $25,000.00 $215.19 for the first $25,000.00 plus $5.56 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 $354.06 for the first $50,000.00 plus $3.85 for each additional $1,000.00, or fraction $25,001 .OO to $50,000.00 $50,001 .OO to $1 00,000.00 thereof, to and including $100,000.00 $546.56 for the first $100,000.00 plus $3.08 for $100,001 .OO to $500,000.00 I each additional $1,000.00, or fraction thereof, to and including $500,000.00 $1 778.56 for the first $500,000.00 plus $2.61 $500,001 .OO to $1,000,000.00 I for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00 $3,084.81 for the first $1,000,000.00 plus $1,000,001 .OO and up $2.01 for each additional $1,000.00 or fraction thereof Other Inspections and Fees: 1. Inspections outside of normal business hours $60.00 per hour* (minimum charge - 2 hours) 2. Reinspection fees assessed under provisions of Section 305 (9) $60.00 per hour* 3. Inspections for which no fee is specifically indicated $60.00 per hour* (minimum charge - one-half hour) 4. Additional plan review required by changes, additions or revisions to approved plans $60.00 per hour* (minimum charge - one-half hour) * This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. Notwithstanding other provisions of this section, the building permit fee for factory built housing shall be 25% of the fee shown in Schedule #9, and the plan check fee shall be 65% of the building permit fee. June 2005 \\?'" Exhibit 7-G I Quadrant District 1 - NW Single Family Detached & Duplex Attached (4 units or less) Attached (5 units or more) Mobile Home District 2 - NE Single Family Detached & Duplex Attached (4 units or less) Attached (5 units or more) Mobile Home District 3 - SW Single Family Detached & Duplex Attached (4 units or less) Attached (5 units or more) Mobile Home District 4 - SE Single Family Detached & Duplex Attached (4 units or less) Attached (5 units or more) Mobile Home Value Per Acre ~ ~~ $400,000 300,000 300,000 300,000 Current Fee Per Unit $3,251 2,639 2,435 2,087 2,436 1,977 1,825 1,564 2,436 1,977 1,825 1,564 2,436 1,977 1,825 1,564 (The Park Fee ordinance establishs a method of determining park land values in each quadrant Fee Per Unit Quadrant 3strict 1 - NW Single Family Detached & Duplex Attached (4 units or less) Attached (5 units or more) Mobile Home Iistrict 2 - NE Single Family Detached & Duplex Attached (4 units or less) Attached (5 units or more) Mobile Home listrict 3 - SW Single Family Detached & Duplex Attached (4 units or less) Attached (5 units or more) Mobile Home listrict 4 - SE Single Family Detached & Duplex Attached (4 units or less) Attached (5 units or more) Mobile Home Value Per Acre $977,000 732,000 732,000 732,000 $7,649 6,414 6,190 4,934 5,728 4,804 4,636 3,696 5,728 4,804 4,636 3,696 5,728 4,804 4,636 3,696 ~ he Park Fee ordinance establishs a method of determining park land values in each quadrant *Assumes new density per dwelling unit of the parkland dedication formula presented to Council on June 7, June 2005 ExhibR 7-H Fee per gross acre Area I Basin Name CITY OF CARLSBAD PROPOSED REVISIONS TO THE MASTER FEE SCHEDULES JUNE 2005 Current Revised Low High Low High Runoff Runoff Runoff Runoff FOR INFORMATIONAL PURPOSES ONLY These fees are increased annually based upon an index as stated in the resolutions or ordinances establishing the fees. -- Current Revised Chanae Affordable housing credit $43,000 $45,000 $2.000 License Tax on New Constructionmobile homes $1,582 $1,721 $139 A Buena Vista Lagwn B Agua Hedionda Lagwn C Encinas Creek D Batiquitos Lagoon Traffic Impact -- Current Revised Chanae $1.866 $3.052 $2.029 $3,321 4.009 6,560 4.363 7.138 2,997 4.905 3,261 5.338 41 67 45 73 ~ Traffic Impact Fee ~ Residnrl Cost Per Trip (Out of CFD) $101 $1 07 6 Traffic Impact Fee ~ Residnrl Cost Per Tnp (Inside CFD) 66 70 4 Traffic Impact Fee. Commrc'Vlndust Cost Per Trip (Out of CFD) 41 43 2 Traffic Impact Fee ~ Commrc'Vlndust Cost Per Trip (Inside CFD) 26 28 2 Sewer Benefit Area Fees -- Current Revised Chanae Area A Area B Area C Area D Area E Area F Area G Area H Area I Area J Area K Area L $ 384 675 1.675 1.678 2,475 2.488 105 808 392 1.351 2.725 1.067 ~~ 5 418 735 1,799 1.803 2.658 2,673 114 859 427 1,470 2.965 1,161 $ 34 60 1 24 125 183 165 9 51 35 119 240 94 Bridge 8 Thoroughfare District #2 Fees Current Revised Change Zone 5 $246 $262 $16 Zone 20 1.278 1,359 81 Zone 21 1,032 1,097 65 Bridge 8 Thoroughfare District #3 Fees Current Revised Change Fee per ADT $140 $152 $12 Agricultural Mitigation Fees Current Revised Change $9.744 $10,716 $974 Water Connection Fees Current Revised Change Dieolacement meter 518" $2.999 $3.188 $189 314" $4.274 $4,544 $270 $12,746 $13,550 $804 1 In. T $19.194 $20,405 $1.211 3" $33.739 $35.868 $2.129 4" $52.483 $55.794 $3.311 6" $97.468 5103.618 $6.150 8" $115.2~ $122.469 $7,269 1' $6,748 $7.174 $426 Turbo iirriaation meters) 1 In" $14.964 $15,908 $944 2 $23.992 $25,553 $1.514 3" 552.483 $55.794 $3.311 4" S149.9Y) $159,411 $9.481 $299.900 $318.822 $18.922 6- 8" P420,WO $446,502 $26,502 4" $89.970 195.647 55.677 6" 1187,438 $199,264 $11,826 S216,Wa $229,630 $13,630 8" Turbine Meter