Loading...
HomeMy WebLinkAbout2010-06-29; City Council; Resolution 2010-175Exhibit 8 1 RESOLUTION NO.2010-175 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY 3 OF CARLSBAD, CALIFORNIA, DETERMINING THAT THE FY 2010-2011 CAPITAL IMPROVEMENT PROGRAM 4 BUDGET IS CONSISTENT WITH THE GENERAL PLAN ON PROPERTY GENERALLY LOCATED CITYWIDE. 6 WHEREAS, the City Council of the City of Carlsbad, California has reviewed the 7 Capital Improvement Program for FY 2010-11 and has held such public hearings as are 8 necessary prior to adoption of the Capital Improvement Program Budget; and WHEREAS, on June 29, 2010 the City Council made a finding of General Plan j j Consistency for all projects receiving an allocation of funds for FY 2010-11 pursuant to 12 Carlsbad Municipal Code Section 2.24.065 (b); and 13 WHEREAS, at said hearing, upon hearing and considering all testimony and 14 arguments, if any, of all persons desiring to be heard, said Council considered all factors relating to the City Council Determination; and 16 NOW, THEREFORE, BE IT HEREBY RESOLVED by the City Council as follows: 17 A) That the foregoing recitations are true and correct. 18 B) That based on the evidence presented at the hearing, the City Council 20 determines that the Capital Improvement Program for FY 2010-11 is 21 consistent with the General Plan based on the following findings: 22 Findings: 23 1. The projects are consistent with the goals, objectives, and policies of the city's 24 General Plan in that the projects are required to ensure the provision of adequate public 25 facilities and services concurrent with or prior to need. 26 27 Exhibits 1 2. The projects are consistent with applicable goals, objectives, and policies of the Land 2 Use, Circulation, Parks & Recreation, and Public Safety Elements of the General Plan, as described in Exhibit 8A. 4 3. As required by the General Plan, the proposed improvements are consistent with the 5 City's Growth Management Plan in that the projects ensure that the necessary 6 improvements are provided for parks, drainage, sewer, water distribution, traffic signals, streets, and miscellaneous projects in accordance with the performance standards o 9 contained in the City's Growth Management regulations. 10 4. That the projects listed as "exempt" in Exhibit 8A have been found by the Planning 11 Director to be exempt within the meaning of CEQA, and a Notice of Exemption will be 12 filed by the Planning Director for those projects where categorical or statutory exemptions are applicable upon final approval of those projects as part of the FY 2010- 14 2011 CIP Budget. 15 5. That the projects not found to be exempt from CEQA in Exhibit 8A" will not be 16 implemented until all required CEQA actions have been completed. 17 6. That one project listed in Exhibit 8A does not meet the definition of a "project" under18 19 CEQA and is identified as "not a project," and no future CEQA review will be required 20 for that project. 21 /// 22 /// 23 /// 24 /// 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the Carlsbad City Council, Carlsbad Municipal Water District Board of Directors and Carlsbad Housing and Redevelopment Commission, held on the 29th day of June, 2010, by the following vote to wit: AYES' COUNCIL MEMBERS LEWIS, KULCHIN, HALL, PACKARD AND BLACKBURN. NOES: NONE. ABSENT: NONE. L0RRAI/NE M. vyOOZTCity Clerk (SEAL) Exhibit 8A FY 2010-2011 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTIONS, GENERAL PLAN CONSISTENCY, AND ENVIRONMENTAL REVIEW 02^ ff\ CAPITAL PROJECT DESCRIPTION NORTHWEST QUADRANT PARKS - PINE PARK (MADISON PROPERTIES PHASE I) PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Pine Park along Madison Street between Chestnut Avenue and Walnut Avenue. PROJECT DESCRIPTION: Remove foundations, install perimeter landscaping and mulch the future park areas for weed control, visual effect and reduced storm water runoff. PROJECT NEED: This phase of park development along Madison Street will beautify the vacant lots and install landscape materials in their ultimate configuration in advance of the construction of the full improvements along Madison Street. FINANCING: Purpose Design/Construction Design/Construction Total Cost = GENERAL PLAN CONSISTENCY: Estimated Cost $34,000 $36,000 $70,000 Funding Source PIL-NW PIL-NW To provide for existing and future park facilities with a balance of active and passive recreational opportunities. Parks & Recreation Element, Park Development, Objective B.6. ANTICIPATED ENVIRONMENTAL REVIEW: Categorically Exempt per Section 15304. PINE PARK - MADISON PROPERTIES CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - KELLY DRIVE CHANNEL REPLACEMENT PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Parallel to Kelly Drive between Hillside Drive and Park Drive per DWG 157-4. PROJECT DESCRIPTION: Reconstruct 710' of concrete lined trapezoidal channel that was constructed in 1968 and is nearing its useful life. PROJECT NEED: This portion of the existing concrete channel is showing signs of degradation. FINANCING: Purpose Estimated Cost Funding Source Permits Design Construction Total Cost = $43,500 $120,000 $1,606,000 $1,769,500 IRF IRF IRF GENERAL PLAN CONSISTENCY: A City which maintains a system of public facilities adequate for the projected population. Land Use Element, Growth Management & Public Facilities, Goal A.2. Also, a City which minimizes injury, loss of life, and damage to property resulting from the occurrence of floods. Public Safety Element, Flood Hazards, Goal A. ANTICIPATED ENVIRONMENTAL REVIEW: Categorically Exempt per Section 15302. KELLY DRIVE CHANNEL REPLACEMENT CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - BATIQUITOS DRIVE SLOPE STABILIZATION STUDY PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: o PROJECT LOCATION: East side of Batiquitos Drive near the intersection with Poppy Lane. PROJECT DESCRIPTION: Prepare a report on the stability of the slope along the west side of Batiquitos Drive and develop a proposed solution to address slope failure and deposition of sediment on the public right of way. PROJECT NEED: Maintenance worker notification of slope issues and the need for routine maintenance to remove sediment from the public right of way. FINANCING: Purpose Studies Total Cost = Estimated Cost $40,100 $40,100 Funding Source Gas Tax GENERAL PLAN CONSISTENCY: A City which maintains a system of public facilities adequate for the projected population. Land Use Element, Growth Management & Public Facilities, Goal A.2. Also, a City with an adequate circulation infrastructure to serve the projected population. Circulation Element, Streets & Traffic Control, Goal A.2. ANTICIPATED ENVIRONMENTAL REVIEW: Categorically Exempt per Section 15262. BATIQUITOS DRIVE SLOPE STABILIZATION CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - RETROREFLECTIVITY SIGN REPLACEMENT PROJECT NO PROGRAM PROJECT NAME PROJECT LOCATION MAP: Retrorefl«ctiv!ty Sign Replacement Progr PROJECT LOCATION: Various locations throughout the City. PROJECT DESCRIPTION: Before 2018 replace approximately 16,000 signs to comply with MUTCD regulations. PROJECT NEED: To improve the retroreftectivity of signs throughout the City to enhance their visibility and to comply with the Federal Rule and the MUTCD regulations. FINANCING: Purpose Study/Design Construction Total Cost = Estimated Cost Funding Source $100,000 $2,220,000 $2,320,000 Gas Tax Gas Tax GENERAL PLAN CONSISTENCY: A City with properly maintained, smooth functioning and safe traffic control systems. Circulation Element, Streets & Traffic Control, Goal A.4. ANTICIPATED ENVIRONMENTAL REVIEW: Categorically Exempt per Section 15301. RETROREFLECTIVITY SIGN REPLACEMENT PROGRAM CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - LA COSTA AVENUE AND QUINTA STREET PROJECT NO PROJECT NAME PROJECT LOCATION MAP PROJECT LOCATION: Intersection of La Costa Avenue and Quinta Street. PROJECT DESCRIPTION: Installation of a 3-leg, fully actuated traffic signal including a type 170 controller, 200 SA local intersection control program, video detection, battery back-up, signal interconnect conduit and appurtenant striping and signing. PROJECT NEED: California MUTCD traffic signal warrants have been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2010 Traffic Signal Evaluation Policy. The installation of the traffic signal will assign the right-of- way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Design Construction Total Cost = Estimated Cost Funding Source $8,000 $182,000 $190,000 Gas Tax Gas Tax GENERAL PLAN CONSISTENCY: Provide traffic control devices along all roadway segments and at intersections. Circulation Element, Streets & Traffic Control, Policy C.7. ANTICIPATED ENVIRONMENTAL REVIEW: Categorically Exempt per Section 15301. TRAFFIC SIGNAL LA COSTA AVE AND QUINTA ST CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - ARMADA DRIVE AND FLEET STREET SOUTH PROJECT NO PROJECT NAME PROJECT LOCATION MAP: CD 00 PROJECT LOCATION: Intersection of Armada Drive and Fleet Street South. PROJECT DESCRIPTION: Installation of a 3-leg, fully actuated traffic signal including a type 170 controller, 200 SA local intersection control program, video detection, battery back-up, signal interconnect conduit and appurtenant striping and signing. PROJECT NEED: California MUTCD traffic signal warrants have been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2010 Traffic Signal Evaluation Policy. The installation of the traffic signal will assign the right-of- way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Design Construction Estimated Cost Funding Source $8,000 $182,000 Gas Tax Gas Tax Total Cost = $190,000 GENERAL PLAN CONSISTENCY: Provide traffic control devices along all roadway segments and at intersections. Circulation Element, Streets & Traffic Control, Policy C.7. ANTICIPATED ENVIRONMENTAL REVIEW: Categorically Exempt per Section 15301. TRAFFIC SIGNAL ARMADA DRIVE AND FLEET STREET SOUTH CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - TRAFFIC MANAGEMENT CENTER AND ATMS PROJECT NO PROJECT NAME PROJECT LOCATION MAP: Traffic Management Center and ATMS TRAFFIC MANAGEMENT CENTER AND ATMS PROJECT LOCATION: Faraday Center and connected citywide to traffic signal system. PROJECT DESCRIPTION: Install Automated Traffic Management System (ATMS) software at the Traffic Management Center (TMC) located in the Faraday Center. After completing a test case/pilot study linking the TMC to the intersection of Palomar Airport Road and El Camino Real using wireless and/or fiber optic equipment and providing a video feed the city website, systematically link traffic signals along the major roadway corridors to the TMC. PROJECT NEED: Project is in response to the City Council workshop on traffic congestion and traffic signals. Staff was asked to identify a project to implement the creation of a TMC. The ATMS needs to be linked to traffic signals to be of any value. FINANCING: Purpose Construction Total Cost = Estimated Cost Funding Source $912,000 Gas Tax $912,000 GENERAL PLAN CONSISTENCY: To design streets for the safe and efficient movement of people, goods and services within and through the City in the most environmentally sound and aesthetically pleasing manner possible. Circulation Element, Streets & Traffic Control, Objective B.2. ANTICIPATED ENVIRONMENTAL REVIEW: Categorically Exempt per Section 15303. CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - STREET NAME SIGN REPLACEMENT PROJECT NO PROGRAM PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Various locations throughout the City. PROJECT DESCRIPTION: Before January 2012 replace 4-inch letter street name signs on 25+ mph streets and 40+ mph streets with MUTCD compliant 6-inch and 8-inch letter street name signs to comply with MUTCD regulations. PROJECT NEED: To improve the readability of street name signs throughout the City in compliance with the Federal Rule and the MUTCD regulations. FINANCING: Purpose Construction Total Cost = Estimated Cost $260,000 $260,000 GENERAL PLAN CONSISTENCY: Funding Source Gas Tax A City with properly maintained, smooth functioning and safe traffic control systems. Circulation Element, Streets & Traffic Control, Goal A.4. ANTICIPATED ENVIRONMENTAL REVIEW: Categorically Exempt per Section 15301. STREET NAME SIGN REPLACEMENT PROGRAM CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - TRAFFIC IMPACT FEE UPDATE PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Citywide fee program. PROJECT DESCRIPTION: Update the Traffic Impact Fee program. Work tasks will include an analysis of the roadway network, required improvements and future development to determine the appropriate fee and then conducting a public hearing as part of the City Council's approval/adoption process. PROJECT NEED: The Traffic Impact Fee program needs to be updated on a regular basis to ensure adequate and equitable funding of roadway improvements are provided by future development activities in the City. The last update was approved/adopted in March of 2008. FINANCING: Purpose Study Total Cost = Estimated Cost $200,000 $200,000 Funding Source TIF GENERAL PLAN CONSISTENCY: To implement and regularly update developer fee programs for financing of circulation facilities. Circulation Element, Streets & Traffic Control, Objective B.6. ANTICIPATED ENVIRONMENTAL REVIEW: Not a project as defined under CEQA. -TRAFFIC IMPACT FEE UPDATE CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - NCTD ROW UTILITY PROTECTION/RELOCATION PROJECT NO PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Various locations within the NCTD right-of-way between Cannon Road and Oak Avenue. PROJECT DESCRIPTION: Construct additional protection systems and/or relocate utilities in concert with the construction of a new railroad track in accordance with the NCTD project requirements. PROJECT NEED: NCTD & Amtrak will be constructing a second track and therefore the City/CMWD utilities within the project area will need to be protected and/or relocated to accommodate the project construction in accordance with the terms of the license agreements between NCTD and the City/CMWD. FINANCING: Purpose Construction Total Cost = Estimated Cost $120,000 $120,000 Funding Source Sewer Replacement GENERAL PLAN CONSISTENCY: A City which supports the improvement and modernization of railroad facilities within Carlsbad and the region. Land Use Element, Transportation Corridor, Goal A. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Negative Declaration or Mitigated Negative Declaration. SEWER- NCTD UTILITIES PROTECTON/RELOCATION CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - BUENA VISTA SEWER LIFT STATION IMPROVEMENTS PROJECT NO PROJECT NAME PROJECT LOCATION MAP Buena Vista Sewer Lift Station Improvement* PROJECT LOCATION: Buena Vista Lift Station located near the intersection of SR 78 and Jefferson Street along the Vista/Carlsbad Interceptor sewer system. PROJECT DESCRIPTION: Increase the pumping capacity of the existing lift station and replace worn materials and equipment. Perform a condition assessment, define modifications needed to increase pumping capacity and identify improvements needed to improve the safety and reliability of the lift station. Costs will be shared with the City of Vista. PROJECT NEED: The existing lift station does not have adequate pumping capacity to meet ultimate flow projections for the sewer basin, which includes flow from the City's of Vista and Carlsbad. The project will also identify and incorporate needed safety and reliability upgrades. FINANCING: Purpose Studies Design Construction Total Cost = Estimated Cost Funding Source $75,000 $175,000 $800,000 $1,050,000 Sewer Replacement Sewer Replacement Sewer Replacement GENERAL PLAN CONSISTENCY: A City which maintains a system of public facilities adequate for the projected population. Land Use Element, Growth Management & Public Facilities, Goal A.2. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Negative Declaration or Mitigated Negative Declaration. BUENA VISTA LIFT STATION IMPROVEMENTS CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - NCTD ROW UTILITY PROTECTION/RELOCATION PROJECT NAME PROJECT NO. PROJECT LOCATION MAP PROJECT LOCATION: Various locations within the NCTD right-of-way between Cannon Road and Oak Avenue. PROJECT DESCRIPTION: Construct additional protection systems and/or relocate utilities in concert with the construction of a new railroad track in accordance with the NCTD project requirements. PROJECT NEED: NCTD & Amtrak will be constructing a second track and therefore the City/CMWD utilities within the project area will need to be protected and/or relocated to accommodate the project construction in accordance with the terms of the license agreements between NCTD and the City/CMWD. FINANCING: Purpose Construction Total Cost = Estimated Cost $ 80,000 $ 80,000 Funding Source Water Replacement GENERAL PLAN CONSISTENCY: A City which supports the improvement and modernization of railroad facilities within Carlsbad and the region. Land Use Element, Transportation Corridor, Goal A. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Negative Declaration or Mitigated Negative Declaration. WATER- NCTD UTILITIES PROTECTON/RELOCATION CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - SANTA FE II RESERVOIR SITE IMPROVEMENTS PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Santa Fe II Reservoir site located off Rock Point Way. PROJECT DESCRIPTION: Grade the site to repair erosion damage, install new drainage pipes and inlets and repair an existing crib wall. PROJECT NEED: The existing drainage system is no longer working properly. Erosion has caused the brow ditch to settle and voids have started to appear behind the existing crib wall. If left unattended the erosion my cause the wall to fail thereby putting the reservoir at risk of being damaged. FINANCING: Purpose Studies Environmental Design Construction Total Cost = Estimated Cost Funding Source $30,000 $5,000 $60,000 $550,000 Water Replacement Water Replacement Water Replacement Water Replacement $645,000 GENERAL PLAN CONSISTENCY: Require installation of appropriate siltation and erosion control measures on proposed building and development sites wherever there is a potential for soil erosion. Public Safety Element, Geology and Seismic Safety, Implementing Policies and Action Programs C-12. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Negative Declaration or Mitigated Negative Declaration. SANTA FE II RESERVOIR SITE IMPROVEMENTS CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - PARK DRIVE WATERLINE AND STREET IMPROVEMENTS PROJECT NO PROJECT NAME PROJECT LOCATION MAP: PARK DRIVE WATERLINE AND STREET IMPROVEMENTS PROJECT LOCATION: Park Drive from Adams Street to approximately 200 feet south of Cove Drive. PROJECT DESCRIPTION: Replacement of failed water line and roadway repair associated with damage caused by the failure. PROJECT NEED: The water pipeline ruptured and a temporary pipeline has been installed. The roadway has been temporarily repaired and requires reconstruction and stabilization. FINANCING: Purpose Studies Environmental Design Construction Total Cost = Estimated Cost Funding Source $20,000 $60,000 $235,000 $685,000 $1,000,000 Water Replacement Water Replacement Water Replacement Water Replacement GENERAL PLAN CONSISTENCY: A City which maintains a system of public facilities adequate for the projected population. Land Use Element, Growth Management & Public Facilities, Goal A.2. Also, a City with an adequate circulation infrastructure to serve the projected population. Circulation Element, Streets & Traffic Control, Goal A.2. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Negative Declaration or Mitigated Negative Declaration. CAPITAL PROJECT DESCRIPTION RECYCLED WATER PROJECTS - PALOMAR BUSINESS PARK RECYCLED WATER PIPELINES PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: Palomar Business Park Recycled Water Pipelines PROJECT LOCATION: Pipelines along Corte Del Abeto, Corte Del Nogal, Yarrow Drive, Corte De La Pina and Las Palmas Drive in the Palomar Buisness Park. PROJECT DESCRIPTION: Construct approximately 3,500 feet of 4-inch and 4,000 feet of 6-inch PVC recycled water pipelines and service laterals. PROJECT NEED: As part of the Recycled Water Phase II project a 12-inch recycled water main was constructed along Camino Vida Roble including water services. However, the City/CMWD is not able to connect these customers due to County Health Department requirements that adjacent properties must also use recycled water or have concrete barriers installed. This project will provide the pipelines needed to provide service to the remaining/adjacent properties. FINANCING: Purpose Environmental Design Construction Total Cost = Estimated Cost Funding Source $5,000 $115,000 $990,000 $1,110,000 Water Replacement Water Replacement Water Replacement GENERAL PLAN CONSISTENCY: A City which ensures the timely provision of adequate public facilities and services to preserve the quality of life of residents. Land Use Element, Growth Management & Public Facilities, Goal A.1. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Negative Declaration or Mitigated Negative Declaration. PALOMAR BUSINESS PARK RECYCLED WATER PIPELINES