HomeMy WebLinkAbout2011-05-24; City Council; Resolution 2011-099Exhibit 1
1
RESOLUTION NO. 2011-099
2
A RESOLUTION OF THE CITY COUNCIL OF THE
3 CITY OF CARLSBAD, CALIFORNIA, INITIATING
PROCEEDINGS FOR THE ANNUAL LEVY OF
4 ASSESSMENTS AND ORDERING THE
5 PREPARATION OF AN ENGINEER'S REPORT FOR A
SPECIAL ASSESSMENT DISTRICT
6
7
WHEREAS, the City Council of the City of Carlsbad, California previously formed
8
a special assessment district pursuant to the terms of the Landscaping and Lighting Act
9
of 1972, (Division 15, Part 2 of the State Streets and Highways Code, commencing with
10
Section 22500), the special assessment district is known and designated as Street
11
Lighting and Landscaping District No. 1 (hereinafter referred to as the "Assessment
12
District"); and
13
WHEREAS, the Assessment District is an existing assessment district in which
14
assessments are not proposed to be increased, and is therefore exempt from the
15
procedures and requirements pursuant to California Constitution Article XIIID § 5 (a);
16
and
17
WHEREAS, the City Council wishes to initiate proceedings to provide for the
18
annual levy of assessments for the next ensuing fiscal year to provide for the annual
19
costs for maintenance of improvements defined as existing street lighting, median
20
landscaping and street trees ("Improvements"), within the Assessment District.
NOW, THEREFORE, IT IS HEREBY RESOLVED AS FOLLOWS:
22
RECITALS
23 SECTION 1. That the above recitals are true and correct.
DECLARATION OF INTENTION
25
SECTION 2. That the public interest and convenience requires, and it is the
26 intention of this legislative body to levy and collect assessments to pay the annual costs
27
28
Exhibit 1
1 and expenses for the maintenance and/or servicing of the Improvements for the
2 Assessment District, with the Improvements generally described as follows:
3 The maintenance of certain street lighting improvements, street trees, and
4 median landscaping improvements, as set forth and described in the Engineer's Report
5 (the "Report") attached as Exhibit 2 and incorporated herein by this reference. The
6 proposed new improvements to be maintained and serviced caused generally by new
j
7 development within the Assessment District are described as follows:
8 The maintenance of certain additional street lighting improvements and additional
9 landscaping improvements, including replacement of street trees and median
10 landscaping improvements, all as set forth and described in the Report.
11 REPORT OF ENGINEER
12 SECTION 3. That the Improvements are hereby referred to Harris & Associates,
13 who is hereby directed to make and file the Report generally containing the following:
14 A. Plans and specifications describing the general nature, location and extent
15 of the Improvements within the Assessment District;
16 B. A diagram for the Assessment District, showing the area and properties
17 proposed to be assessed;
18 C. An estimate of the cost of the maintenance and/or servicing of the
19 Improvements for the Assessment District for the Fiscal Year 2011-12;
20 D. An assessment of the estimated costs of the maintenance and/or
21 servicing, assessing the net amount upon all assessable lots and/or parcels within the
22 Assessment District in proportion to the benefits received.
23
24
25
26
27
i.
Exhibit 1
1 That upon completion of the Report, the original shall be filed with the City Clerk,
2 who shall then submit the same to the City Council for its immediate review and
3 consideration which is hereby ordered to be kept on file and open for public inspection
4 in the Office of the City Clerk.
5 FISCAL YEAR
6 SECTION 4. That the Report shall include all costs and expenses of said
7 maintenance and/or servicing relating to the fiscal year commencing July 1, 2011 and
8 ending June 30, 2012.
9
10 //
11 //
12 //
13 //
14 //
15 //
16 //
17 //
18 „
19 „
20 „
21 //
22 //
23 „
24 //
25 „
26 //
27 //
28 -7
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council
of the City of Carlsbad on the 24th day of May , 2011, by the following vote to wit:
AYES: Council Members Hall, Kulchin, Blackburn, Douglas, Packard.
NOES: None.
ABSENT: None.
MATT 'flALL'Mayor
ATTEST:
(SEAL)
INE M. WOOD, City Clerk
Exhibit 2
DRAFT
CITY OF CARLSBAD
STREET LIGHTING AND LANDSCAPING DISTRICT NO. 1
ANNUAL ENGINEER'S REPORT
FISCAL YEAR 2011-12
Prepared by:
Mav 5. 2011
Joan E. Cox, PE
Harris & Associates
RCE41965 Exp. 3/31/12
Date
City of Carlsbad DRAFT May 5,2011
Street Lighting and Landscaping District No. 1
Final Annual Engineer's Report - FY 2011-12 Page 1
INTRODUCTION
This report constitutes the Engineer's Report for City of Carlsbad Street Lighting and
Landscaping District No. 1 ("Assessment District") and was prepared at the Direction of the
Carlsbad City Council pursuant to the requirements of the Landscaping and Lighting Act of
1972, being Division 15, Part 2 of the Streets and Highways Code of the State of California,
commencing with Section 22500 ("Act").
The report applies to Fiscal Year 2011-12 commencing July 1, 2011 and ending on June 30,
2012 ("Fiscal Year"). The report has been prepared in three parts corresponding to the three
special improvement zones within the Assessment District; Street Lighting, Street Trees and
Median Landscaping. Pursuant to the requirements of the Act, each part contains the following
four components:
1. PLANS AND SPECIFICATIONS FOR THE IMPROVEMENTS. The plans and specifications
describe the general nature, location and extent of the improvements to be maintained.
2. A DIAGRAM FOR THE ASSESSMENT DISTRICT. The diagram shows the exterior
boundaries of the Assessment District, the boundaries of the specified improvement zone
within the Assessment District, and the lines and dimensions of each lot or parcel within the
District. Each lot or parcel is identified by a distinctive number or letter. The lines and
dimensions of each lot conform to those shown on the San Diego County Assessor's maps.
For purposes of clarity, only a generalized diagram is included within the report. The
detailed assessment diagram is on file at the City Engineering Department.
3. AN ESTIMATE OF THE COSTS OF THE IMPROVEMENTS. The estimate of costs of the
improvements contains estimates for the following:
a. The total cost of maintaining and servicing the improvements for the specified
improvement zone including all incidental expenses for the fiscal year.
b. The amount of any surplus or deficit in the improvement fund to be carried over from the
preceding fiscal year.
c. The amount of any contributions to be made from sources other than assessments
levied pursuant to the Assessment District.
d. The amount, if any, of the annual installment for the fiscal year where the City Council
has ordered an assessment for the estimated cost of any improvements to be levied and
collected in annual installments.
e. The net amount to be assessed upon assessable lands within the Assessment District,
being the total improvement costs referred to in sub-section a, increased or decreased,
as the case may be, by any of the amounts referred to in sub-sections b, c or d.
4. AN ASSESSMENT OF THE ESTIMATED COSTS OF THE IMPROVEMENTS. The
assessment shall refer to the new fiscal year and shall do all of the following:
a. State the net amount to be assessed upon the assessable lands within the Assessment
District.
b. Describe each assessable lot or parcel of land within the Assessment District. Due to
the large number of parcels within the Assessment District, the City uses the assessor's
parcel number from San Diego County records assessment rolls for a description of the
lots. A copy of the assessment roll including such description is kept on file at the City
Engineering Department.
\0
City of Carlsbad DRAFT May 5,2011
Street Lighting and Landscaping District No. 1
Final Annual Engineer's Report - FY 2011-12 Page 2
c. Assess the net amount upon all assessable lots or parcels of land within the
Assessment District by apportioning that amount among the several lots or parcels in
proportion to the estimated benefits to be received by each lot or parcel from the
improvements.
PART 1 - STREET LIGHTING IMPROVEMENT ZONE
PLANS AND SPECIFICATIONS: The improvement work consists of maintenance and servicing
of the 7,126 street lights within the boundaries of the Assessment District including all
supporting poles, mast arms, pull boxes, wiring, conduits and other appurtenances. The total
number of street lights maintained and serviced includes 716 streetlights that were repaired and
13 new streetlights added to the street light inventory during Fiscal Year 2010-11. The general
location of the street light improvements are as shown on the City's full-scale map titled "Street
Lighting Improvement Zone and Lighting Facilities Location Diagram for Fiscal Year 2011-12"
on file at the Engineering Department. A reduced copy of the map is included as Figure 1 in this
report.
DIAGRAM OF THE ASSESSMENT DISTRICT: The diagram of the Assessment District is as
shown on the City's full scale map titled "Street Lighting Improvement Zone and Lighting
Facilities Location Diagram for Fiscal Year 2011-12" on file at the Engineering Department. A
reduced copy of the map is included as Figure 1 in this report. The lines and dimensions of
each lot or parcel within the Street Lighting Improvement Zone and the distinctive assessor's
parcel number are shown on the San Diego County Assessor's map which is also on file at the
Engineering Department.
ESTIMATE OF THE COST OF THE IMPROVEMENTS: The estimated total cost of maintaining
and servicing the City's inventory of public street lighting improvements is $1,067,692.
The estimated total cost includes the furnishing of all services and materials for the ordinary
and usual operation, maintenance and servicing of installed streetlights and the provision of
electric current. Additionally, the estimated total costs for five years include debt service
payments for a one-percent low interest loan from the California Energy Commission. This loan
was obtained during Fiscal Year 2010-11 as part of the streetlight retrofit project. The
streetlight retrofit project changes out all existing streetlights to high efficiency streetlights.
Energy savings derived from the new lights are being used to pay the debt service. For
budgetary purposes, the costs are segregated into three categories of Personnel, Maintenance
and Operations, and Capital Improvements. No Costs are shown for Capital Improvements, as
the debt service payments are included under "Maintenance and Operation" These three
categories include the following services and expenditures:
City staff assigned to Street Lighting services, City administration (updating expenditures
and segregation of the assessments), engineering and legal expenses, five years of debt
service payments for the streetlight retrofit project, coordination between citizens and City
staff for the maintenance of City street lights, providing expertise to City inspectors during
inspection of lighting systems, coordinating underground service alert mark-outs for
various City departments, performing mark-outs for street light systems, maintaining as-
built records of City street light system for future maintenance, updating of the street
lighting mapping and inventory database, performing routine night surveillance, checking
proposed improvement plans for conformance with City standards regarding street lights,
coordinating with Planning, Engineering and Engineer's of Work to ensure that
City of Carlsbad
Street Lighting and Landscaping District No. 1
Final Annual Engineer's Report - FY 2011-12
DRAFT MayS, 2011
Page 3
departmental needs are met, the provision of electrical current and the cost for purchase
of capital equipment and new street light facilities.
The following table shows the breakdown of the estimated total costs into the three budgetary
categories.
TOTAL ESTIMATED FY 2011-12
STREET LIGHTING MAINTENANCE & SERVICE COSTS
Personnel
Maintenance & Operations
Total Cost Estimate
$147,107
$920,585
$1,067,692
The net assessable amount to be levied upon the assessable lands within the Assessment
District is $729,689. This amount is derived by subtracting the amounts of the current
improvement fund surplus and contributions from other funding sources from the total cost
estimate. The following table shows how the net assessable amount is derived:
FY 2011-12
NET ASSESSABLE AMOUNT - STREET LIGHTING MAINTENANCE
Total Cost Estimate
Less:
Contribution for Services Public Parcels
Contribution from LLD No. 2
General Benefit Contribution
Interest Earned
Fund Balance from Previous Fiscal Year
Plus:
Estimated Fund Reserve at end of Fiscal Year
Net Assessable Amount
$1,067,692
$28,000
$66,446
$149,516
$13,785
$689,240
$608,984
$ 729,689
The contribution for services to public parcels has been estimated at $28,000. This contribution
is made since public parcels are non-assessable on the County tax rolls. The City's General
Fund will contribute $28,000.
Any share of the benefits received from an improvement that does not provide a special benefit
to the assessed properties is considered to be a general benefit provided by the improvements.
The cost of such general benefit is not to be assessed to the properties in the Assessment
District, but instead is contributed by the City from the General Fund. For street lighting the City
has determined that general benefit is derived exclusively along the City's arterial roads. The
amount of general benefit is established by multiplying the number of arterial street lights by the
difference between the average annual cost to maintain a light on an arterial street and a local
street. The table on the following page shows the calculation of the cost estimate for general
benefit for Street Lights.
City of Carlsbad
Street Lighting and Landscaping District No. 1
Final Annual Engineer's Report - FY 2011-12
DRAFT MayS, 2011
Page 4
COST ESTIMATE FOR GENERAL BENEFIT
STREET LIGHT SUMMARY PER SAN DIEGO GAS & ELECTRIC CO.
Lamp Size
(Watts)
Number
Lights
Monthly
Rate
Monthly
Amount
Annual
Amount
Avg Annual
Cost per Light
Low wattage (9,500 lumen) lights for collector streets:
70
100
150
Subtotal-1
1,433
3,456
107
4,996
$4.10
$5.72
$7.83
$5,875.30
$19,768,32
$837.81
$70,503.60
$237,219.84
$10,053.72
$317,777.16 $63.61
High wattage (22,000 lumen) lights for arterial streets:
200
250
400
Subtotal-2
1,234
889
7
2,130
$9.98
$12.71
$19.33
$12,315.32
$11,299.19
$135.31
$147,783.84
$135,590.28
$1,623.72
$284,997.84 $133.80
Total 7,126 $602,775.00
$70.20Annual Amount Difference Between Subtotal-1 & Subtotal-2
General Benefit =
Annual Amount Difference Times No. of High Wattage Lights $149,516.38
Total Est. Cost Less Public Parcel Contribution* $1,039,692
General Benefit Percentage 14.4%
* Based on preliminary budget estimates
AN ASSESSMENT OF THE ESTIMATED COSTS OF THE IMPROVEMENTS: The lighting and
the orderly circulation of traffic directly benefit the developments within the District. The
improvements and annexation into the Street Lighting Zone are required for the approval of,
and as a consequence of, new development, and thus benefit the respective developments.
The lighting is of benefit to abutting parcels as it provides increased property protection,
personal safety, visibility, traffic safety, and enhances those areas fronting upon the illuminated
street.
All of the parcels within the Assessment District are located within the City of Carlsbad and are
approved developments or are in the final stages of obtaining approval for a proposed
development. As a condition of approval, the developer is required by the City to provide
certain standard street lighting for the entire area within the development and pay the energy
costs for the initial 18-month period. The units in a development are assessed the following
fiscal year after the street lights are energized.
Two Zones of benefit have been created within the citywide Street Lighting Zone as follows:
Zone 1 - City owned and maintained street lights
Zone 2 - Undeveloped property - non-benefiting, not assessed
Zone 1 consists of the following eight sub-codes.
CODE A1* Street lights at intersections only (residential)
\3
City of Carlsbad DRAFT May 5,2011
Street Lighting and Landscaping District No. 1
Final Annual Engineer's Report- FY 2011-12 Page 5
CODE B1* Street lights at intersections and mid-block (residential)
CODE C1* Street light spacing at current City engineering standards (residential)
CODE D1* City owned street lights on surrounding streets, private lighting within
development (single-family residential, only adjacent City lights will be
calculated for code assessment cost)
CODE E2** Street light spacing at current City standard, condos and apartment buildings,
ten units and above
CODE F2** Street light spacing at current City standard, commercial and industrial parcels
CODE G2** Special lighting and spacing standard, downtown redevelopment area
CODE H1*** Street light spacing at current City standard, time shares only
* The unit rate of assessment for these codes was based on equal shares of cost of
maintenance and operation of the total lights within each code at the time of formation.
** The unit rate of assessment for these codes at the time of formation was based on the
share of cost of maintenance and operation of total lights as determined by front footage
percentage of each parcel in relation to total footage within each code.
*** The unit rate of assessment for this code at the time of formation was based on a flat rate
per unit.
The method of assessment for codes within Zone 1 is based on units as shown in the following
table. In the case of codes A1, B1, C1, and D1, a residential dwelling is equal to one benefit
unit. In Code E2 condominium dwelling units or apartment buildings with ten units and above
are assigned units based on the front footage of these developments. In Code F2 commercial
and industrial parcels are assigned units based on the front footage of these developments.
Code G2 includes the downtown redevelopment area and units in this code are also based on
front footage. Code H1 only includes time share units, which are all assigned the same cost per
unit.
METHOD OF ASSESSMENT FOR STREET LIGHTING
Street Lighting Code Benefit Unit
A1, B1, C1, D1 Residential dwelling unit = one benefit unit
E2
FP Commercial, residential and redevelopment area = one front foot of
PP street frontage = one benefit unit
H1 Time shares = $0.20 per weekly unit
The Street Lighting Zone assessments will not increase in Fiscal Year 2011-12, and will remain
at the same unit rates as assessed in the last fifteen fiscal years. All new assessors' parcels,
which by petition of the property owner(s) have been added to the Street Lighting Zone, will be
calculated at the same unit rates as used in the last fifteen fiscal years.
City of Carlsbad
Street Lighting and Landscaping District No. 1
Final Annual Engineer's Report - FY 2011-12
DRAFT May5, 2011
PageS
The rate per assessment unit for Fiscal Year 2011-12 in each of the eight codes is shown in the
following table.
STREET LIGHTING ASSESSMENT UNIT RATES
Street Lighting Code
A-1
B-1
C-1
D-1
H-1
E-2
F-2
G-2
Rate per Unit
$14.84 / Unit
$23.94 / Unit
$26.00 / Unit
$6.90 / Unit
$0.20 / Unit
$0.372765 / Foot
$0.580858 / Foot
$2.690464 / Foot
For the specific assessment on each parcel, reference is made to the Assessment Roll on file
at the Engineering Department, which is incorporated herein by this reference as though set
forth in full.
PART 2 - STREET TREE IMPROVEMENT ZONE
PLANS AND SPECIFICATIONS: The existing number of trees within the public right of way
that the City has maintenance responsibility for is approximately 10,955 trees. The work
consists of maintenance to all the City accepted and inventoried trees within the public right-of-
ways. Tree maintenance includes planting, pruning, watering, root pruning, removing and
replacing. The district annually responds to approximately 600 street tree work orders and
requests and provides storm or other emergency assistance as necessary. The district also
funds a Block Pruning Program where every tree within the district is inspected/pruned on a 4 -
4 1/2 year cycle and selective genus (e.g. Eucalyptus, Ficus) are also pruned on a supplemental
2 - 2 % year cycle. The general location of the street tree improvements are as shown on the
City's full-scale map titled "Street Tree Improvement Zone Location Diagram for Fiscal Year
2011-12" on file at the Engineering Department. A reduced copy of the map is included as
Figure 2 in this report.
DIAGRAM OF THE ASSESSMENT DISTRICT: The diagram of the Assessment District is as
shown on the City's full-scale map titled "Street Tree Improvement Zone Location Diagram for
Fiscal Year 2011-12" on file at the Engineering Department. A reduced copy of the map is
included as Figure 2 in this report. The lines and dimensions of each lot or parcel within the
Street Tree Improvement Zone and the distinctive assessor's parcel number are shown on the
San Diego County Assessor's map which is also on file at the Engineering Department.
ESTIMATE OF THE COST OF THE IMPROVEMENTS: The estimated total cost of maintaining
and servicing the City's inventory of public street tree improvements is $687,192.
The estimated total cost includes the furnishing of all services and materials for the ordinary
and usual maintenance and servicing of street trees. For budgetary purposes, the costs are
segregated into three categories of Personnel, Maintenance and Operations, and Capital
Improvements. These three categories include the following services and expenditures:
City staff assigned to Street Tree services, City administration (updating expenditures and
segregation of the assessments), engineering and legal expenses, coordination between
citizens and City staff for the maintenance of City street trees, providing expertise to City
inspectors during inspection of the trees, maintaining as-built records of City street tree
City of Carlsbad
Street Lighting and Landscaping District No. 1
Final Annual Engineer's Report- FY 2011-12
DRAFT MayS, 2011
Page?
system for future maintenance, updating of the street tree mapping and inventory
database, checking proposed improvement plans for conformance with City standards
regarding street trees, coordinating with Planning, Engineering and Engineer's of Work to
ensure that departmental needs are met, the provision of supplies such as pesticides,
fertilizer, and water, and the cost for purchase of capital equipment and new/replacement
street trees.
The following table shows the breakdown of the estimated total costs into the three budgetary
categories.
TOTAL ESTIMATED FY 2011-12
STREET TREE MAINTENANCE & SERVICE COSTS
Personnel
Maintenance & Operations
Total Cost Estimate
$366,089
$321,103
$687,192
The net assessable amount to be levied upon the assessable lands within the Assessment
District is $465,269. This amount is derived by subtracting the amounts of the current
improvement fund surplus and contributions from other funding sources from the total cost
estimate. The following table shows how the net assessable amount is derived:
FY 2011-12
NET ASSESSABLE AMOUNT - STREET TREE MAINTENANCE
Total Cost Estimate
Less:
Contribution from LLD No. 2
Interest Earned
Fund Balance from Previous Fiscal Year
General Fund Loan
Plus:
Estimated Fund Reserve at end of Fiscal Year
Net Assessable Amount
$687,192
$28,542
$1,550
$78,376
$113,455
$0
465,269
Any share of the benefits received from an improvement that does not provide a special benefit
to the assessed properties is considered to be a general benefit provided by the improvements.
The cost of such general benefit is not to be assessed to the properties in the Assessment
District, but instead is contributed by the City from the General Fund. For street trees, the City
has determined that there is no general benefit.
AN ASSESSMENT OF THE ESTIMATED COSTS OF THE IMPROVEMENTS: The existing
number of trees within the public right of way that the City only has maintenance responsibility
for is approximately 10,955 trees.
Street trees that are in the street right-of-way are generally located between the curb and
sidewalk and/or property line in the areas of the City as shown in Figure 2. Each property within
the Street Tree Improvement Zone receives approximately the same degree of benefit to their
property. Therefore, staff established a benefit formula in which each zoned parcel is given an
equivalent dwelling unit (EDU) based on the average size of a single-family residential lot in the
City of Carlsbad (7,500 square feet or 0.17 acres). Thus, each single-family parcel is given an
EDU of 1.0, while most other parcels, as shown on the following table, are given assessments
City of Carlsbad
Street Lighting and Landscaping District No. 1
Final Annual Engineer's Report - FY 2011-12
DRAFT May5, 2011
Page8
based on acreage to establish an EDU value based on the following formula: Acreage of parcel
divided by 0.17 acres = EDUs. This formula was approved by City Council at the June 6, 1989
regular meeting.
STREET TREE BENEFIT UNITS AND LAND USE CODES
BEN. ;,
UNITS
Formula
.1/DU
.1/DU
1.0
1.0
.5/DU
.1/DU
.1/DU
.1/DU
.1/DU
.1/DU
.1/DU
.1/DU
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
•; L.U. ,=.rCODE^
00
07
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
49
^LA%' USE DESCRIPTION • ' ''
Unzoned
Timeshare
Mobile home
Vacant residential
Single-family residence
Duplex or double
Res. 2-4 units/2 houses
Res. 5-15 units
Res. 16-60 units
Res. 61 units and up
Condominium
Co-op
Misc. residential
Vacant commercial
1-3 story misc. store bldgs.
4 story & up office/store
Regional shopping ctr.
Community shopping ctr.
Neighborhood shopping ctr.
Hotel, motel
Service station
Med., dental, animal hospital
Con. Hospital, rest home
Office condominiums
Parking lot, garage, used cars
Trailer park
Theater
Bowling alley
Restaurant
Car wash
Large chain grocery/drug
Auto sales/service agency
Misc. comm., radio stn., bank
Vacant industrial
Factory - light manufacturer
Factory - heavy manufacturer
Warehouse - proc. Or stor.
Bulk storage (tanks, etc.)
Extractive & mining
Small automotive garage
Industrial condos
Spec./misc. industrial
, BEN.
UNITS
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
0.0
0.0
0.0
0.0
0.0
0.0
Formula
Formula
Formula
Formula
Formula
Formula
Formula
0.0
0.0
0.0
0.0
Formula
0.0
LU.
CODE
50
51
52
53
54
55
56
57
58
59
61
62
63
64
65
70
71
72
73
74
75
77
79
80
81
82
83
84
85
86
87
88
89
90
, •• '*.-,.>*.;•+••**,:,- 1.-'.- ',,?;-;-. >' •
'' LAND USE DESCRIPTION
Vacant irrigated
Citrus
Avocados
Vines
Misc. trees
Livestock
Poultry
Misc. irrigated crops
Growing houses
Special/misc. irrigated
Non-irrigated 1-10 AC
Non-irrigated 1 1 -40 AC
Non-irrigated 41-160 AC
Non-irrigated 161-360 AC
Non-irrigated 361 & up AC
Vacant institutional
Church
Church parking/related
Cemetery
Mausoleum
Mortuary
Hospital
Spec./misc. institutional
Vacant recreational
Meeting hall, gym
Golf course
Marine, dock
Recreational camps
Non-tax recreational
Open space easements
Agr. Preserve (no contract)
Agr. Preserve (contract)
Spec./misc. recreational
Vacant tax. Govt. property
Formula: If acres < .20, then Benefit Units (BU) = 1.0, otherwise BU = 5.9 x Acres (i.e. Acres/0.17)
\1
City of Carlsbad DRAFT May 5,2011
Street Lighting and Landscaping District No. 1
Final Annual Engineer's Report-FY 2011-12 Page 9
The Street Tree Improvement Zone assessments will not increase in Fiscal Year 2011-12, and
will remain at the same unit rate of $36.10 per EDU as assessed in the last fifteen fiscal years.
All new assessor's parcels, that by petition of the property owner(s) have been added to the
Street Tree Improvement Zone, will be calculated at the same unit rate as used in the last
fifteen fiscal years.
This unit assessment is applied to 14,235 parcels in the Street Tree Improvement Zone. The
total number of EDUs for these parcels amounts to approximately 12,889.52 EDUs. The
revenue generated by these parcels amounts to $465,269.32. For the specific assessment on
each parcel, reference is made to the Assessment Roll at the Engineering Department, which is
incorporated herein by this reference as though set forth in full.
PART 3 - MEDIAN LANDSCAPING IMPROVEMENT ZONE
PLANS AND SPECIFICATIONS:
The Street Median program provides weekly landscape maintenance and litter control to all City
medians and to Redevelopment Landscape improvement areas. It includes maintenance on a
weekly basis of approximately 65 acres of landscaped medians and 8 acres of planter boxes,
parkways, and landscape pockets. Maintenance includes trash pick-up, weed control, pruning,
planting, pesticide/fertilizer application, removals, replanting, irrigation repair/adjustment, and
hardscape cleaning. A contractual median maintenance program provides for contracting,
administering and overseeing median maintenance for approximately 65 acres of City medians.
The general location of the median landscaping improvements are as shown on the City's full
scale map titled "Street Median Improvement Zone and Median Facilities Location Diagram for
Fiscal Year 2011-12" on file at the Engineering Department. A reduced copy of the map is
included as Figure 3 in this report.
DIAGRAM OF THE ASSESSMENT DISTRICT: The diagram of the Assessment District is as
shown on the City's full scale map titled "Street Median Improvement Zone and Median
Facilities Location Diagram for Fiscal Year 2011-12" on file at the Engineering Department. A
reduced copy of the map is included as Figure 3 in this report. The lines and dimensions of
each lot or parcel within Median Landscaping Improvement Zone and the distinctive assessor's
parcel number are shown on the San Diego County Assessor's map which is also on file at the
Engineering Department.
ESTIMATE OF THE COST OF THE IMPROVEMENTS: The estimated total cost of maintaining
and servicing the City's inventory of public street median improvements is $846,312.
The estimated total cost includes the furnishing of all services and materials for the ordinary
and usual maintenance and servicing of the median landscaping. For budgetary purposes, the
costs are segregated into three categories of Personnel, Maintenance and Operations, and
Capital Improvements. These three categories include the following services and expenditures:
City staff assigned to Median Landscaping services, City administration (updating
expenditures and segregation of the assessments), engineering and legal expenses,
coordination between citizens and City staff for the maintenance of City medians,
providing expertise to City inspectors during inspection of the medians, maintaining as-
built records of City street median system for future maintenance, updating of the median
mapping and inventory database, checking proposed improvement plans for conformance
with City standards regarding medians, coordinating with Planning, Engineering and
City of Carlsbad
Street Lighting and Landscaping District No. 1
Final Annual Engineer's Report - FY 2011-12
DRAFT May5, 2011
Page 10
Engineer's of Work to ensure that departmental needs are met, the provision of supplies
such as pesticides, fertilizer, and water, and the cost for purchase of capital equipment
and refurbishment of the medians.
The following table shows the breakdown of the estimated total costs into the three budgetary
categories.
TOTAL ESTIMATED FY 2011-12
MEDIAN LANDSCAPING MAINTENANCE & SERVICE COSTS
Personnel
Maintenance & Operations
Total Cost Estimate
$206,161
$640,151
$846,312
The net assessable amount to be levied upon the assessable lands within the Assessment
District is $359,174. This amount is derived by subtracting the amounts of the current
improvement fund surplus and contributions from other funding sources from the total cost
estimate. The following table shows how the net assessable amount is derived:
FY 2011-12
NET ASSESSABLE AMOUNT - MEDIAN MAINTENANCE
Total Cost Estimate $846,312
Less:
LLD #2 Contribution
Fund Balance from Previous Fiscal Year
General Fund Loan
Plus:
Estimated Fund Reserve at end of Fiscal Year
Net Assessable Amount
$115,886
$11,766
$359,486
$0
359,174
Any share of the benefits received from an improvement that does not provide a special benefit
to the assessed properties is considered to be a general benefit provided by the improvements.
The cost of such general benefit is not to be assessed to the properties in the Assessment
District, but instead is contributed by the City from the General Fund. For median landscaping,
the City has determined that there is no general benefit.
The beginning fund balance from the 2010-11 Fiscal Year was created from deferring costs
from the irrigation retrofit and tree replanting in the medians of College Blvd, and from cost
savings achieved by the District in the 2010-11 Fiscal Year.
AN ASSESSMENT OF THE ESTIMATED COSTS OF THE IMPROVEMENTS: This service
generally benefits all parcels and residents within the City boundaries. Thus, all parcels in the
City boundary share in the cost of median maintenance using the same EDU formula as in
effect for the Street Tree Improvement Zone. City staff established the benefit formula in which
each zoned parcel is given an equivalent dwelling unit (EDU) based on the average size of a
single-family residential lot in the City of Carlsbad (7,500 square feet or 0.17 acres). Thus, each
single-family parcel is given an EDU of 1.0, while most other parcels, as shown on the following
table, are given assessments based on acreage to establish an EDU value based on the
following formula: Acreage of parcel divided by 0.17 acres = EDUs. This formula was
approved by City Council at the June 6, 1989 regular meeting.
City of Carlsbad
Street Lighting and Landscaping District No. 1
Final Annual Engineer's Report - FY 2011-12
DRAFT May5, 2011
Page 11
LANDSCAPE MAINTENANCE BENEFIT UNITS AND LAND USE CODES
BEN.
UNITS1
Formula
.1/DU
.1/DU
1.0
1.0
.5/DU
.1/DU
.1/DU
.1/DU
.1/DU
.1/DU
.1/DU
.1/DU
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
Formula
, »-%;,,"CODE1
00
07
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
49
•'HjijjvKv: •:««€-- *v*iiK'o- • -.:••••- :,., .*'3% LAND USE DESCRIPTION " •
Unzoned
Timeshare
Mobile home
Vacant residential
Single-family residence
Duplex or double
Res. 2-4 units/2 houses
Res. 5-15 units
Res. 16-60 units
Res. 61 units and up
Condominium
Co-op
Misc. residential
Vacant commercial
1-3 story misc. store bldgs.
4 story & up office/store
Regional shopping ctr.
Community shopping ctr.
Neighborhood shopping ctr.
Hotel, motel
Service station
Med., dental, animal hospital
Con. Hospital, rest home
Office condominiums
Parking lot, garage, used cars
Trailer park
Theater
Bowling alley
Restaurant
Car wash
Large chain grocery/drug
Auto sales/service agency
Misc. comm., radio stn., bank
Vacant industrial
Factory - light manufacturer
Factory - heavy manufacturer
Warehouse - proc. Or stor.
Bulk storage (tanks, etc.)
Extractive & mining
Small automotive garage
Industrial condos
Spec./misc. industrial
-9Bfe£- UNITS*
1.0
1.0
1.0
1.0
1.0
1.0,
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
0.0
0.0
0.0
0.0
0.0
0.0
Formula
Formula
Formula
Formula
Formula
Formula
Formula
0.0
0.0
0.0
0.0
Formula
0.0
f LU-•-CODE'
50
51
52
53
54
55
56
57
58
59
61
62
63
64
65
70
71
72
73
74
75
77
79
80
81
82
83
84
85
86
87
88
89
90
• -, .^&^:*&lfa&i&<..
'••: LAND USE DESCRIPTION
Vacant irrigated
Citrus
Avocados
Vines
Misc. trees
Livestock
Poultry
Misc. irrigated crops
Growing houses
Special/misc. irrigated
Non-irrigated 1-10 AC
Non-irrigated 11 -40 AC
Non-irrigated 41-160 AC
Non-irrigated 161-360 AC
Non-irrigated 361 & up AC
Vacant institutional
Church
Church parking/related
Cemetery
Mausoleum
Mortuary
Hospital
Spec./misc. institutional
Vacant recreational
Meeting hall, gym
Golf course
Marine, dock
Recreational camps
Non-tax recreational
Open space easements
Agr. Preserve (no contract)
Agr. Preserve (contract)
Spec./misc. recreational
Vacant tax. Govt. property
Formula: If acres < .20, then Benefit Units (BU) = 1.0, otherwise BU = 5.9 x Acres (i.e. Acres/0.17)
The Median Landscaping Improvement Zone assessments will not increase in Fiscal Year
2011-12, and will remain at the same unit rate of $8.34 per EDU as assessed in the last fifteen
fiscal years. All new assessors' parcels that have been added within the City boundaries are
City of Carlsbad DRAFT May 5,2011
Street Lighting and Landscaping District No. 1
Final Annual Engineer's Report - FY 2011-12 Page 12
automatically added to the Median Landscaping Improvement Zone and will be calculated at the
same unit rate as used in the last fifteen fiscal years.
This unit assessment is applied to 50,772 parcels in the Median Landscaping Improvement
Zone. The total number of EDUs for these parcels amounts to approximately 43,111.50 EDUs.
The revenue generated by these parcels amounts to $359,174.46. For the specific assessment
on each parcel, reference is made to the Assessment Roll on file at the Engineering
Department, which is incorporated herein by this reference as though set forth in full.
Exhibit A contains a list the parcels that were incorporated into Street Lighting and Landscaping
District No. 2 and are therefore being exempted from this Street Lighting and Landscaping
District No. 1. These parcels were previously assessed for median benefit.