RESOLUTION NO. 2012-107
1
2 „
A RESOLUTION OF THE CITY COUNCIL OF THE
3 CITY OF CARLSBAD, CALIFORNIA, INITIATING
PROCEEDINGS FOR THE ANNUAL LEVY OF
ASSESSMENTS AND ORDERING THE
5 PREPARATION OF AN ENGINEER'S REPORT FOR A
SPECIAL ASSESSMENT DISTRICT
WHEREAS, the City Council ofthe City of Carlsbad, California previously formed
a special assessment district pursuant to the terms of the Landscaping and Lighting Act
of 1972, (Division 15, Part 2 ofthe State Streets and Highways Code, commencing with
Section 22500), the special assessment district is known and designated as Street
Lighting and Landscaping District No. 1 (hereinafter referred to as the "Assessment
District"); and
WHEREAS, the Assessment District is an existing assessment district in which
assessments are not proposed to be increased, and is therefore exempt from the
procedures and requirements pursuant to California Constitution Article XIIID § 5 (a);
and
WHEREAS, the City Council wishes to initiate proceedings to provide for the
annual levy of assessments for the next ensuing fiscal year to provide for the annual
costs for maintenance of improvements defined as existing street lighting, median
landscaping and street trees ("Improvements"), within the Assessment District.
NOW, THEREFORE, IT IS HEREBY RESOLVED AS FOLLOWS:
RECITALS
SECTION 1. That the above recitals are true and correct.
DECLARATION OF INTENTION
SECTION 2. That the public interest and convenience requires, and it is the
intention of this legislative body to levy and collect assessments to pay the annual costs
Exhibit 1
1 and expenses for the maintenance and/or servicing of the Improvements for the
2 Assessment District, with the Improvements generally described as follows:
3 The maintenance of certain street lighting improvements, street trees, and
4 median landscaping improvements, as set forth and described in the Engineer's Report
5 (the "Report") attached as Exhibit 2 and incorporated herein by this reference. The
6 proposed new improvements to be maintained and serviced caused generally by new
7 development within the Assessment District are described as follows:
8 The maintenance of certain additional street lighting improvements and additional
9 landscaping improvements, including replacement of street trees and median
10 landscaping improvements, all as set forth and described in the Report.
11 REPORT OF ENGINEER
12 SECTION 3. That the Improvements are hereby referred to Harris & Associates,
13 who is hereby directed to make and file the Report generally containing the following:
14 A. Plans and specifications describing the general nature, location and extent
15 of the Improvements within the Assessment District;
16 B. A diagram for the Assessment District, showing the area and properties
17 proposed to be assessed;
18 C. An estimate of the cost of the maintenance and/or servicing of the
19 Improvements for the Assessment District for the Fiscal Year 2012-13;
20 D. An assessment of the estimated costs of the maintenance and/or
21 servicing, assessing the net amount upon all assessable lots and/or parcels within the
22 Assessment District in proportion to the benefits received.
23
24
25
26
27
28
1
2
3
4
5
6
7
8
9
10 //
11 //
12 //
13 //
14 //
15 //
16 //
17 //
18 //
19 //
20 //
21 //
22 //
23 //
24 //
25 //
26 //
27 //
28
Exhibit 1
That upon completion of the Report^ the original shall be filed with the City Clerk,
who shall then submit the same to the City Council for its immediate review and
consideration which is hereby ordered to be kept on file and open for public inspection
in the Office ofthe City Clerk.
FISCAL YEAR
SECTION 4. That the Report shall include all costs and expenses of said
maintenance and/or servicing relating to the fiscal year commencing July 1, 2012 and
ending June 30, 2013.
7
1 PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council
2 of the City of Carlsbad on the 22"^ day of May, 2012, by the following vote to wit:
3
4
5
6
7
8
9
10
11 MATY'h^LL, Mayor
12
13
14
15
16
AYES: Council Members Hall, Kulchin, Blackburn, Douglas and Packard.
NOES: None.
ABSENT: None.
ATTEST:
DDRRAINE M. WOOD, City Clerk
(SEAL) ^^,,.„,,^
18
19
20 '"n7^n^^^^''
21
22
23
24
25
26
27
28
Exhibit 2
DRAFT
CITY OF CARLSBAD
STREET LIGHTING AND LANDSCAPING DISTRICT NO. 1
FINAL
ANNUAL ENGINEER'S REPORT
FISCAL YEAR 2012-13
Prepared by:
K. Dennis Klingelhofer, PE
Harris & Associates
RCE 50255 Exp. 6/30/13
Mav 2. 2012
Date
CityofCarlsbad DRAFT May 2,2012
Street Lighting and Landscaping District No. 1
Final Annual Engineer's Report - FY 2012-13 Page 1
INTRODUCTION
This report constitutes the Engineer's Report for City of Carlsbad Street Lighting and
Landscaping District No. 1 ("Assessment District") and was prepared at the Direction of the
Carlsbad City Council pursuant to the requirements of the Landscaping and Lighting Act of
1972, being Division 15, Part 2 of the Streets and Highways Code of the State of California,
commencing with Section 22500 ("Act").
The report applies to Fiscal Year 2012-13 commencing July 1, 2011 and ending on June 30,
2012 ("Fiscal Year"). The report has been prepared in three parts corresponding to the three
special improvement zones within the Assessment District; Street Lighting, Street Trees and
Median Landscaping. Pursuant to the requirements of the Act, each part contains the following
four components:
1. PLANS AND SPECIFICATIONS FOR THE IMPROVEMENTS. The plans and specifications
describe the general nature, location and extent of the improvements to be maintained.
2. A DIAGRAM FOR THE ASSESSMENT DISTRICT. The diagram shows the exterior
boundaries of the Assessment District, the boundaries of the specified improvement zone
within the Assessment District, and the lines and dimensions of each lot or parcel within the
District. Each lot or parcel is identified by a distinctive number or letter. The lines and
dimensions of each lot conform to those shown on the San Diego County Assessor's maps.
For purposes of clarity, only a generalized diagram is included within the report. The
detailed assessment diagram is on file at the City Engineering Department.
3. AN ESTIMATE OF THE COSTS OF THE IMPROVEMENTS. The estimate of costs of the
improvements contains estimates for the following:
a. The total cost of maintaining and servicing the improvements for the specified
improvement zone including all incidental expenses for the fiscal year.
b. The amount of any surplus or deficit in the improvement fund to iDe carried over from the
preceding fiscal year.
c. The amount of any contributions to be made from sources other than assessments
levied pursuant to the Assessment District.
d. The amount, if any, of the annual installment for the fiscal year where the City Council
has ordered an assessment for the estimated cost of any improvements to be levied and
collected in annual installments.
e. The net amount to be assessed upon assessable lands within the Assessment District,
being the total improvement costs referred to in sub-section a, increased or decreased,
as the case may be, by any of the amounts referred to in sub-sections b, c or d.
4. AN ASSESSMENT OF THE ESTIMATED COSTS OF THE IMPROVEMENTS. The
assessment shall refer to the new fiscal year and shall do all of the following:
a. State the net amount to be assessed upon the assessable lands within the Assessment
District.
b. Describe each assessable lot or parcel of land within the Assessment District. Due to the
large number of parcels within the Assessment District, the City uses the assessor's
parcel number from San Diego County records assessment rolls for a description of the
lots. A copy of the assessment roll including such description is kept on file at the City
Engineering Department.
in
City of Carlsbad DRAFT May 16,2012
Street Lighting and Landscaping District No. 1
Final Annual Engineer's Report - FY 2012-13 Page 2
c. Assess the net amount upon all assessable lots or parcels of land within the Assessment
District by apportioning that amount among the several lots or parcels in proportion to
the estimated benefits to be received by each lot or parcel from the improvements.
PART 1 - STREET LIGHTING IMPROVEMENT ZONE
PLANS AND SPECIFICATIONS: The improvement work consists of maintenance and servicing
of the 7,142 street lights within the boundaries of the Assessment District including all
supporting poles, mast arms, pull boxes, wiring, conduits and other appurtenances. The total
number of street lights maintained and serviced includes 1,085 streetlights that were repaired
and 16 new streetlights added to the street light inventory during Fiscal Year 2012-13. The
general location of the street light improvements are as shown on the City's full-scale map titled
"Street Lighting Improvement Zone and Lighting Facilities Location Diagram for Fiscal Year
2012-13" on file at the Engineering Department. A reduced copy of the map is included as
Figure 1 in this report.
DIAGRAM OF THE ASSESSMENT DISTRICT: The diagram of the Assessment District is as
shown on the City's full scale map titled "Street Lighting Improvement Zone and Lighting
Facilities Location Diagram for Fiscal Year 2012-13" on file at the Engineering Department. A
reduced copy of the map is included as Figure 1 in this report. The lines and dimensions of
each lot or parcel within the Street Lighting Improvement Zone and the distinctive assessor's
parcel number are shown on the San Diego County Assessor's map which is also on file at the
Engineering Department.
ESTIMATE OF THE COST OF THE IMPROVEMENTS: The estimated total cost of maintaining
and servicing the City's inventory of public street lighting improvements is $1,092,173.
The estimated total cost includes the furnishing of all services and materials for the ordinary and
usual operation, maintenance and servicing of installed streetlights and the provision of electric
current. Additionally, the estimated total costs for five years include debt service payments for a
one-percent low interest loan from the California Energy Commission. This loan was obtained
during Fiscal Year 2010-11 as part of the streetlight retrofit project. The streetlight retrofit
project changes out all existing streetlights to high efficiency streetlights. Energy savings
derived from the new lights are being used to pay the debt service. For budgetary purposes, the
costs are segregated into three categories of Personnel, Maintenance and Operations, and
Capital Improvements. No Costs are shown for Capital Improvements, as the debt service
payments are included under "Maintenance and Operation" These three categories include the
following services and expenditures:
City staff assigned to Street Lighting services, City administration (updating expenditures
and segregation of the assessments), engineering and legal expenses, five years of debt
service payments for the streetlight retrofit project, coordination between citizens and City
staff for the maintenance of City street lights, providing expertise to City inspectors during
inspection of lighting systems, coordinating underground service alert mark-outs for
various City departments, performing mark-outs for street light systems, maintaining as-
built records of City street light system for future maintenance, updating of the street
lighting mapping and inventory database, performing routine night surveillance, checking
proposed improvement plans for conformance with City standards regarding street lights,
coordinating with Planning, Engineering and Engineer's of Work to ensure that
departmental needs are met, the provision of electrical cun-ent and the cost for purchase
of capital equipment and new street light facilities.
City of Carlsbad
Street Lighting and Landscaping District No. 1
Final Annual Engineer's Report - FY 2012-13
DRAFT May 16, 2012
Pages
The following table shows the breakdown of the estimated total costs into the three budgetary
categories.
TOTAL ESTIMATED FY 2012-13
STREET LIGHTING MAINTENANCE & SERVICE COSTS
Personnel $162,183
Maintenance & Operations $610,291
Streetlight Retrofit Project (Loan Repayment) $319,699
Total Cost Estimate $1,092,173
The net assessable amount to be levied upon the assessable lands within the Assessment
District is $730,557. This amount is derived by subtracting the amounts of the current
improvement fund surplus and contributions from other funding sources from the total cost
estimate. The following table shows how the net assessable amount is derived:
FY 2012-13
NET ASSESSABLE AMOUNT - STREET LIGHTING MAINTENANCE
Total Cost Estimate $1,092,173
Less:
Contribution for Services Public Parcels $28,000
Contribution from LLD No. 2 $66,752
General Benefit Contribution $113,387
Interest Earned $12,230
Fund Balance from Previous Fiscal Year $611,406
Plus:
Estimated Fund Reserve at end of Fiscal Year $470,159
Net Assessable Amount $ 730,557
The contribution for services to public parcels has been estimated at $28,000. This contribution
is made since public parcels are non-assessable on the County tax rolls. The City's General
Fund will contribute $28,000.
Any share of the benefits received from an improvement that does not provide a special benefit
to the assessed properties is considered to be a general benefit provided by the improvements.
The cost of such general benefit is not to be assessed to the properties in the Assessment
District, but instead is contributed by the City from the General Fund. For street lighting the City
has determined that general benefit is derived exclusively along the City's arterial roads. The
amount of general benefit is established by multiplying the number of arterial street lights by the
difference between the average annual cost to maintain a light on an arterial street and a local
street. The table on the following page shows the calculation of the cost estimate for general
benefit for Street Lights.
City of Carlsbad
Street Lighting and Landscaping District No. 1
Final Annual Engineer's Report-FY 2012-13
DRAFT May 2, 2012
Page 4
COST ESTIMATE FOR GENERAL BENEFIT
STREET LIGHT SUMMARY PER SAN DIEGO GAS & ELECTRIC CO.
Lamp Size
(Watts)
Number
Lights
Monthly
Rate
Monthly
Amount
Annual
Amount
Avg Annual
Cost per Light
Low wattage lights for collector s treets:
40 4,852 $1.53 $7,423.56 $89,082.72
Subtotal-1 4,852 $89,082.72 $18.36
High wattage lights for arterial streets:
80 0 $3.04 $0.00 $0.00
100 1,528 $3.80 $5,806.40 $69,676.80
150 534 $5.70 $3,043.80 $36,525.60
200 209 $7.60 $1,588.40 $19,060.80
250 19 $9.51 $180.69 $2,168.28
Subtotal-2 2,290 $127,431.48 $55.65
Total 7,142 $216,514.20
Annual Amount Difference Between Subtotal-1 & Subtotal-2
General Benefit =
Annual Amount Difference Times No. of High Wattage Lights
Total Est. Cost Less Public Parcel Contribution*
General Benefit Percentage
* Based on preliminary budget estimates
$37.29
$85,387.08
$1,063,553
8.0%
AN ASSESSMENT OF THE ESTIMATED COSTS OF THE IMPROVEMENTS: The lighting and
the orderly circulation of traffic directly benefit the developments within the District. The
improvements and annexation into the Street Lighting Zone are required for the approval of, and
as a consequence of, new development, and thus benefit the respective developments. The
lighting is of benefit to abutting parcels as it provides increased property protection, personal
safety, visibility, traffic safety, and enhances those areas fronting upon the illuminated street.
All of the parcels within the Assessment District are located within the City of Carlsbad and are
approved developments or are in the final stages of obtaining approval for a proposed
development. As a condition of approval, the developer is required by the City to provide
certain standard street lighting for the entire area within the development and pay the energy
costs for the initial 18-month period. The units in a development are assessed the following
fiscal year after the street lights are energized.
Two Zones of benefit have been created within the citywide Street Lighting Zone as follows:
Zone 1 - City owned and maintained street lights
Zone 2 - Undeveloped property - non-benefiting, not assessed
Zone 1 consists of the following eight sub-codes.
CODE A1* Street lights at intersections only (residential)
City of Carisbad DRAFT May 2,2012
Street Lighting and Landscaping District No. 1
Final Annual Engineer's Report - FY 2012-13 Page 5
CODE Bl* Street lights at intersections and mid-block (residential)
CODE 01* Street light spacing at current City engineering standards (residential)
CODE Dl* City owned street lights on surrounding streets, private lighting within
development (single-family residential, only adjacent City lights will be
calculated for code assessment cost)
CODE E2** Street light spacing at current City standard, condos and apartment buildings,
ten units and above
CODE F2** Street light spacing at current City standard, commercial and industrial parcels
CODE 02** Special lighting and spacing standard, downtown redevelopment area
CODE HI*** Street light spacing at current City standard, time shares only
* The unit rate of assessment for these codes was based on equal shares of cost of
maintenance and operation of the total lights within each code at the time of formation.
** The unit rate of assessment for these codes at the time of formation was based on the share
of cost of maintenance and operation of total lights as determined by front footage
percentage of each parcel in relation to total footage within each code.
*** The unit rate of assessment for this code at the time of formation was based on a flat rate
per unit.
The method of assessment for codes within Zone 1 is based on units as shown in the following
table. In the case of codes Al, Bl, 01, and Dl, a residential dwelling is equal to one benefit
unit. In Code E2 condominium dwelling units or apartment buildings with ten units and above
are assigned units based on the front footage of these developments. In Code F2 commercial
and industrial parcels are assigned units based on the front footage of these developments.
Code G2 includes the downtown redevelopment area and units in this code are also based on
front footage. Code H1 only includes time share units, which are all assigned the same cost per
unit.
METHOD OF ASSESSMENT FOR STREET LIGHTING
Street Lighting Code Benefit Unit
Al, Bl, 01, Dl Residential dwelling unit = one benefit unit
E2
F2
G2
Commercial, residential and redevelopment area = one front foot of
street frontage = one benefit unit
H1 Time shares = $0.20 per weekly unit
The Street Lighting Zone assessments will not increase in Fiscal Year 2012-13, and will remain
at the same unit rates as assessed in the last sixteen fiscal years. All new assessors' parcels,
which by petition of the property owner(s) have been added to the Street Lighting Zone, will be
calculated at the same unit rates as used in the last sixteen fiscal years.
City of Carlsbad
Street Lighting and Landscaping District No. 1
Final Annual Engineer's Report - FY 2012-13
DRAFT May 16, 2012
Pages
The rate per assessment unit for Fiscal Year 2012-13 in each of the eight codes is shown in the
following table.
STREET LIGHTING ASSESSMENT UNIT RATES
Street Lightmg Code Rate per Unit
A-1 $14.84 / Unit
B-1 $23.94 / Unit
C-1 $26.00 / Unit
D-1 $6.90 / Unit
H-1 $0.20 / Unit
E-2 $0.372765 / Foot
F-2 $0.580858 / Foot
G-2 $2.690464 / Foot
For the specific assessment on each parcel, reference is made to the Assessment Roll on file at
the Engineering Department, which is incorporated herein by this reference as though set forth
in full.
PART 2 - STREET TREE IMPROVEMENT ZONE
PLANS AND SPECIFICATIONS: The existing number of trees within the public right of way that
the City has maintenance responsibility for is approximately 6,720 trees. The work consists of
maintenance to all the City accepted and inventoried trees within the public right-of-ways. Tree
maintenance includes planting, pruning, watering, root pruning, removing and replacing. The
district annually responds to approximately 500 street tree requests/work orders and provides
storm or other emergency assistance as necessary. The district also funds a Block Pruning
Program where every tree within the district is inspected/pruned on a 4 - 4 year cycle and
selective genus (e.g. Eucalyptus, Ficus, Podocarpus, Pyrus, Washingtonia) are also pruned on
a supplemental 2 - 2 % year cycle. The general location of the street tree improvements are as
shown on the City's full-scale map titled "Street Tree Improvement Zone Location Diagram for
Fiscal Year 2012-13" on file at the Engineering Department. A reduced copy of the map is
included as Figure 2 in this report.
DIAGRAM OF THE ASSESSMENT DISTRICT: The diagram of the Assessment District is as
shown on the City's full-scale map titled "Street Tree Improvement Zone Location Diagram for
Fiscal Year 2012-13" on file at the Engineering Department. A reduced copy of the map is
included as Figure 2 in this report. The lines and dimensions of each lot or parcel within the
Street Tree Improvement Zone and the distinctive assessor's parcel number are shown on the
San Diego County Assessor's map which is also on file at the Engineering Department.
ESTIMATE OF THE COST OF THE IMPROVEMENTS: The estimated total cost of maintaining
and servicing the City's inventory of public street tree improvements is $698,359.
The estimated total cost includes the furnishing of all services and materials for the ordinary and
usual maintenance and servicing of street trees. For budgetary purposes, the costs are
segregated into three categories of Personnel, Maintenance and Operations, and Capital
Improvements. These three categories include the following services and expenditures:
City staff assigned to Street Tree services. City administration (updating expenditures and
segregation of the assessments), engineering and legal expenses, coordination between
citizens and City staff for the maintenance of City street trees, providing expertise to City
inspectors during inspection of the trees, maintaining as-built records of City street tree
system for future maintenance, updating of the street tree mapping and inventory
City of Carlsbad
Street Lighting and Landscaping District No. 1
Final Annual Engineer's Report - FY 2012-13
DRAFT May 16, 2012
Page 7
database, checking proposed improvement plans for conformance with City standards
regarding street trees, coordinating with Planning, Engineering and Engineer's of Work to
ensure that departmental needs are met, the provision of supplies such as pesticides,
fertilizer, and water, and the cost for purchase of capital equipment and new/replacement
street trees.
The following table shows the breakdown of the estimated total costs into the three budgetary
categories.
TOTAL ESTIMATED FY 2012-13
STREET TREE MAINTENANCE & SERVICE COSTS
Personnel $369,302
Maintenance & Operations $329,057
Total Cost Estimate $698,359
The net assessable amount to be levied upon the assessable lands within the Assessment
District is $465,269. This amount is derived by subtracting the amounts of the current
improvement fund surplus and contributions from other funding sources from the total cost
estimate. The following table shows how the net assessable amount is derived:
FY 2012-13
NET ASSESSABLE AMOUNT - STREET TREE MAINTENANCE
Total Cost Estimate $698,359
Less:
Contribution from LLD No. 2 $46,927
Interest Earned $0
Fund Balance from Previous Fiscal Year $40,282
General Fund Loan $149,657
Plus:
Estimated Fund Reserve at end of Fiscal Year $0
Net Assessable Amount $461,493
Any share of the benefits received from an improvement that does not provide a special benefit
to the assessed properties is considered to be a general benefit provided by the improvements.
The cost of such general benefit is not to be assessed to the properties in the Assessment
District, but instead is contributed by the City from the General Fund. For street trees, the City
has determined that there is no general benefit.
AN ASSESSMENT OF THE ESTIMATED COSTS OF THE IMPROVEMENTS: The existing
number of trees within the public right of way that the City only has maintenance responsibility
for is approximately 6,720 trees.
Street trees that are in the street right-of-way are generally located between the curb and
sidewalk and/or property line in the areas of the City as shown in Figure 2. Each property within
the Street Tree Improvement Zone receives approximately the same degree of benefit to their
property. Therefore, staff established a benefit formula in which each zoned parcel is given an
equivalent dwelling unit (EDU) based on the average size of a single-family residential lot in the
City of Carlsbad (7,500 square feet or 0.17 acres). Thus, each single-family parcel is given an
EDU of 1.0, while most other parcels, as shown on the following table, are given assessments
based on acreage to establish an EDU value based on the following formula: Acreage of parcel
City of Carlsbad
Street Lighting and Landscaping District No. 1
Final Annual Engineer's Report - FY 2012-13
DRAFT May 2, 2012
Page 8
divided by 0.17 acres = EDUs.
regular meeting.
This formula was approved by City Council at the June 6, 1989
STREET TREE BENEFIT UNITS AND LAND USE CODES
BEN. LU. BEN. L.U.
UNITS CODE LAND USE DESCRIPTION UNITS CODE LAND USE DESCRIPTION
Formula 00 Unzoned 1.0 50 Vacant irrigated
1.0 51 Citrus
.1/DU 07 Timeshare 1.0 52 Avocados
.1/DU 09 Mobile home 1.0 53 Vines
1.0 10 Vacant residential 1.0 54 Misc. trees
1.0 11 Single-family residence 1.0 55 Livestock
.5/DU 12 Duplex or double 1.0 56 Poultry
.1/DU 13 Res. 2-4 units/2 houses 1.0 57 Misc. irrigated crops
.1/DU 14 Res. 5-15 units 1.0 58 Growing houses
.1/DU 15 Res. 16-60 units 1.0 59 Special/misc. irrigated
.1/DU 16 Res. 61 units and up
.1/DU 17 Condominium 1.0 61 Non-irrigated 1-10 AC
.1/DU 18 Co-op 1.0 62 Non-irrigated 11-40 AC
.1/DU 19 Misc. residential 1.0 63 Non-irrigated 41-160 AC
1.0 64 Non-irrigated 161-360 AC
Formula 20 Vacant commercial 1.0 65 Non-irrigated 361 & up AC
Formula 21 1-3 story misc. store bidgs.
Formula 22 4 story & up office/store 0.0 70 Vacant institutional
Formula 23 Regional shopping ctr. 0.0 71 Church
Formula 24 Community shopping ctr. 0.0 72 Church parking/related
Formula 25 Neighborhood shopping ctr. 0.0 73 Cemetery
Formula 26 Hotel, motel 0.0 74 Mausoleum
Formula 27 Service station 0.0 75 Mortuary
Formula 28 Med., dental, animal hospital
Formula 29 Con. Hospital, rest home Formula 77 Hospital
Formula 79 Spec./misc. institutional
Formula 30 Office condominiums
Formula 31 Parking lot, garage, used cars Formula 80 Vacant recreational
Formula 32 Trailer park Formula 81 Meeting hall, gym
Formula 33 Theater Formula 82 Golf course
Formula 34 Bowling alley Formula 83 Marine, dock
Formula 35 Restaurant Formula 84 Recreational camps
Formula 36 Car wash 0.0 85 Non-tax recreational
Formula 37 Large chain grocery/drug 0.0 86 Open space easements
Formula 38 Auto sales/service agency 0.0 87 Agr. Preserve (no contract)
Formula 39 Misc. comm., radio stn., bank 0.0 88 Agr. Preserve (contract)
Formula 89 Spec./misc. recreational
Formula 40 Vacant industrial
Formula 41 Factory - light manufacturer 0.0 90 Vacant tax. Govt, property
Formula 42 Factory - heavy manufacturer
Formula 43 Warehouse - proc. Or stor.
Formula 44 Bulk storage (tanks, etc.)
Formula 45 Extractive & mining
Formula 46 Small automotive garage
Formula 47 Industrial condos
Formula 49 Spec./misc. industrial
Formula: If acres < .20, then Benefit Units (BU) = 1.0, otherwise BU = 5.9 x Acres (i.e. Acres/0.17)
n
CityofCarlsbad DRAFT May 16,2012
Street Lighting and Landscaping District No. 1
Final Annual Engineer's Report - FY 2012-13 Page 9
The Street Tree Improvement Zone assessments will not increase in Fiscal Year 2012-13, and
will remain at the same unit rate of $36.10 per EDU as assessed in the last sixteen fiscal years.
All new assessor's parcels, that by petition of the property owner(s) have been added to the
Street Tree Improvement Zone, will be calculated at the same unit rate as used in the last fifteen
fiscal years.
This unit assessment is applied to 14,251 parcels in the Street Tree Improvement Zone. The
total number of EDUs for these parcels amounts to approximately 12,784.95 EDUs. The
revenue generated by these parcels amounts to $461,493.06. For the specific assessment on
each parcel, reference is made to the Assessment Roll at the Engineering Department, which is
incorporated herein by this reference as though set forth in full.
PART 3 - MEDIAN LANDSCAPING IMPROVEMENT ZONE
PLANS AND SPECIFICATIONS:
The Street Median program provides weekly landscape maintenance and litter control to all City
medians and to Redevelopment Landscape improvement areas. It includes maintenance on a
weekly basis of approximately 65 acres of landscaped medians and 8 acres of planter boxes,
parkways, and landscape pockets. Maintenance includes trash pick-up, weed control, pruning,
planting, pesticide/fertilizer application, removals, replanting, irrigation repair/adjustment, and
hardscape cleaning. A contractual median maintenance program provides for contracting,
administering and overseeing median maintenance for approximately 65 acres of City medians.
The general location of the median landscaping improvements are as shown on the City's full
scale map titled "Street Median Improvement Zone and Median Facilities Location Diagram for
Fiscal Year 2012-13" on file at the Engineering Department. A reduced copy of the map is
included as Figure 3 in this report.
DIAGRAM OF THE ASSESSMENT DISTRICT: The diagram of the Assessment District is as
shown on the City's full scale map titled "Street Median Improvement Zone and Median
Facilities Location Diagram for Fiscal Year 2012-13" on file at the Engineering Department. A
reduced copy of the map is included as Figure 3 in this report. The lines and dimensions of
each lot or parcel within Median Landscaping Improvement Zone and the distinctive assessor's
parcel number are shown on the San Diego County Assessor's map which is also on file at the
Engineering Department.
ESTIMATE OF THE COST OF THE IMPROVEMENTS: The estimated total cost of maintaining
and servicing the City's inventory of public street median improvements is $852,360.
The estimated total cost includes the furnishing of all services and materials for the ordinary and
usual maintenance and servicing of the median landscaping. For budgetary purposes, the costs
are segregated into three categories of Personnel, Maintenance and Operations, and Capital
Improvements. These three categories include the following services and expenditures:
City staff assigned to Median Landscaping services. City administration (updating
expenditures and segregation of the assessments), engineering and legal expenses,
coordination between citizens and City staff for the maintenance of City medians,
providing expertise to City inspectors during inspection of the medians, maintaining as-
built records of City street median system for future maintenance, updating of the median
mapping and inventory database, checking proposed improvement plans for confonnance
with City standards regarding medians, coordinating with Planning, Engineering and
Engineer's of Work to ensure that departmental needs are met, the provision of supplies
City of Carlsbad
Street Lighting and Landscaping District No. 1
Final Annual Engineer's Report - FY 2012-13
DRAFT May 16, 2012
Page 10
such as pesticides, fertilizer, and water, and the cost for purchase of capital equipment
and refurbishment of the medians.
The following table shows the breakdown of the estimated total costs into the three budgetary
categories.
TOTAL ESTIMATED FY 2012-13
MEDIAN LANDSCAPING MAINTENANCE & SERVICE COSTS
Personnel $207,092
Maintenance & Operations $645,268
Total Cost Estimate $852,360
The net assessable amount to be levied upon the assessable lands within the Assessment
District is $359,174. This amount is derived by subtracting the amounts of the current
improvement fund surplus and contributions from other funding sources from the total cost
estimate. The following table shows how the net assessable amount is derived:
FY 2012-13
NET ASSESSABLE AMOUNT - MEDIAN MAINTENANCE
Total Cost Estimate $852,360
Less:
LLD #2 Contribution $116,602
Fund Balance from Previous Fiscal Year ($360)
General Fund Loan $378,089
Plus:
Estimated Fund Reserve at end of Fiscal Year $0
Net Assessable Amount $358,029
Any share of the benefits received from an improvement that does not provide a special benefit
to the assessed properties is considered to be a general benefit provided by the improvements.
The cost of such general benefit is not to be assessed to the properties in the Assessment
District, but instead is contributed by the City from the General Fund. For median landscaping,
the City has determined that there is no general benefit.
AN ASSESSMENT OF THE ESTIMATED COSTS OF THE IMPROVEMENTS: This service
generally benefits all parcels and residents within the City boundaries. Thus, all parcels in the
City boundary share in the cost of median maintenance using the same EDU fonnula as in
effect for the Street Tree Improvement Zone. City staff established the benefit formula in which
each zoned parcel is given an equivalent dwelling unit (EDU) based on the average size of a
single-family residential lot in the City of Carlsbad (7,500 square feet or 0.17 acres). Thus, each
single-family parcel is given an EDU of 1.0, while most other parcels, as shown on the following
table, are given assessments based on acreage to establish an EDU value based on the
following formula: Acreage of parcel divided by 0.17 acres = EDUs. This formula was approved
by City Council at the June 6,1989 regular meeting.
11
City of Carlsbad
Street Lighting and Landscaping District No. 1
Final Annual Engineer's Report - FY 2012-13
DRAFT May 2, 2012
Page 11
LANDSCAPE MAINTENANCE BENEFIT UNITS AND LAND USE CODES
BEN. L.U. BEN. L.U.
UNITS CODE LAND USE DESCRIPTION UNITS CODE LAND USE DESCRIPTION
Formula 00 Unzoned 1.0 50 Vacant irrigated
1.0 51 Citrus
.1/DU 07 Timeshare 1.0 52 Avocados
.1/DU 09 Mobile home 1.0 53 Vines
1.0 10 Vacant residential 1.0 54 Misc. trees
1.0 11 Single-family residence 1.0 55 Livestock
.5/DU 12 Duplex or double 1.0 56 Poultry
.1/DU 13 Res. 2-4 units/2 houses 1.0 57 Misc. irrigated crops
.1/DU 14 Res. 5-15 units 1.0 58 Growing houses
.1/DU 15 Res. 16-60 units 1.0 59 Special/misc. irrigated
.1/DU 16 Res. 61 units and up
.1/DU 17 Condominium 1.0 61 Non-irrigated 1-10 AC
.1/DU 18 Co-op 1.0 62 Non-irrigated 11-40 AC
.1/DU 19 Misc. residential 1.0 63 Non-irrigated 41-160 AC
1.0 64 Non-irrigated 161-360 AC
Formula 20 Vacant commercial 1.0 65 Non-irrigated 361 & up AC
Formula 21 1-3 story misc. store bidgs.
Formula 22 4 story & up office/store 0.0 70 Vacant institutional
Formula 23 Regional shopping ctr. 0.0 71 Church
Formula 24 Community shopping ctr. 0.0 72 Church parking/related
Formula 25 Neighborhood shopping ctr. 0.0 73 Cemetery
Formula 26 Hotel, motel 0.0 74 Mausoleum
Formula 27 Service station 0.0 75 Mortuary
Formula 28 Med., dental, animal hospital
Formula 29 Con. Hospital, rest home Formula 77 Hospital
Formula 79 Spec./misc. institutional
Formula 30 Office condominiums
Formula 31 Parking lot, garage, used cars Formula 80 Vacant recreational
Formula 32 Trailer park Formula 81 Meeting hall, gym
Formula 33 Theater Formula 82 Golf course
Formula 34 Bowling alley Formula 83 Marine, dock
Formula 35 Restaurant Formula 84 Recreational camps
Formula 36 Car wash 0.0 85 Non-tax recreational
Formula 37 Large chain grocery/drug 0.0 86 Open space easements
Formula 38 Auto sales/service agency 0.0 87 Agr. Preserve (no contract)
Formula 39 Misc. comm., radio stn., bank 0.0 88 Agr. Preserve (contract)
Formula 89 Spec./misc. recreational
Formula 40 Vacant industrial
Formula 41 Factory - light manufacturer 0.0 90 Vacant tax. Govt, property
Formula 42 Factory - heavy manufacturer
Formula 43 Warehouse - proc. Or stor.
Formula 44 Bulk storage (tanks, etc.)
Formula 45 Extractive & mining
Formula 46 Small automotive garage
Formula 47 Industrial condos
Formula 49 Spec./misc. industrial
Formula: If acres < .20, then Benefit Units (BU) = 1.0, otherwise BU = 5.9 x Acres (i.e. Acres/0.17)
The Median Landscaping Improvement Zone assessments will not increase in Fiscal Year
2012-13, and will remain at the same unit rate of $8.34 per EDU as assessed in the last sixteen
fiscal years. All new assessors' parcels that have been added within the City boundaries are
20
CityofCarlsbad DRAFT May 2,2012
Street Lighting and Landscaping District No. 1
Final Annual Engineer's Report - FY 2012-13 Page 12
automatically added to the Median Landscaping Improvement Zone and will be calculated at the
same unit rate as used in the last sixteen fiscal years.
This unit assessment is applied to 50,120 parcels in the Median Landscaping Improvement
Zone. The total number of EDUs for these parcels amounts to approximately 42,973.31 EDUs.
The revenue generated by these parcels amounts to $358,028.80. For the specific assessment
on each parcel, reference is made to the Assessment Roll on file at the Engineering
Department, which is incorporated herein by this reference as though set forth in full.
Exhibit A contains a list the parcels that were incorporated into Street Lighting and Landscaping
District No. 2 and are therefore being exempted from this Street Lighting and Landscaping
District No. 1. These parcels were previously assessed for median benefit.