Loading...
HomeMy WebLinkAbout2013-09-24; City Council; Resolution 2013-233EXHIBIT 1 1 RESOLUTION NO. 2013-233 3 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING SELECTION CRITERIA AND PERFORMANCE SPECIFICATIONS AND AUTHORIZING DESIGN 4 BUILDER REQUEST FOR PROPOSALS FOR A PHOTOVOLTAIC SYSTEM AT ALGA NORTE COMMUNITY PARK, PROJECT NO. 3925 5 AND 3837 26 27 28 WHEREAS, the City of Carlsbad, California has shown its commitment to sustainability and lowering the long term operational costs of city owned facilities, and WHEREAS, Alga Norte Community Park and Aquatic Center was designed to achieve the 6 7 8 9 JQ appropriate balance between investment in energy efficiency and operational savings, and 11 WHEREAS, a feasibility study conducted In February 2013 by Alternative Energy Systems 12 Consulting determined Alga Norte Community Park to be an excellent site for a large scale solar 13 photovoltaic system, and 14 WHEREAS, the study also confirmed that system would be capable of generating 15 approximately 600,000-800,000 kilowatts of energy annually, offsetting much of Alga Norte 16 Community Park's annual electricity consumption, and 18 WHEREAS, City of Carlsbad staff developed selection criteria and the consulting firm of 1^ Alternative Energy Systems Consulting, Inc. prepared the performance specifications needed to 20 issue a request for proposals from parties interested in designing and building a solar 21 photovoltaic system at Alga Norte Community Park, and 22 WHEREAS, the Alga Norte Community Park project was originally approved by the 24 Planning Commission with a Negative Declaration, on March 1, 2006 (Planning Commission 25 Resolution No. 6039). Planning staff has reviewed the proposed photovoltaic panel project (Consistency Determination) and the City Planner has determined that the proposed project is 1 within the scope of the prior environmental documents and that no further environmental documentation is required per CEQA Guideline Sections 15162, and WHEREAS, the necessary funds have been allocated to the Alga Norte Community Park Capital Improvement Program budget for the future development of a solar photovoltaic system; 7 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, 8 California, as follows: 1. The above recitations are true and correct. 2. The selection criteria and performance specifications are approved and City of Carlsbad staff is authorized to solicit design builder request for proposals for the 13 development of a solar photovoltaic system at Alga Norte Community Park and to 14 evaluate the proposals and make recommendations to the Carlsbad City Council regarding future development of a photovoltaic system at Alga Norte Community Park. 9 10 11 12 15 16 17 18 19 20 // 23 24 25 26 27 28 // // 21 // 22 // // // // s 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Regular Meeting ofthe City Council of the City of Carlsbad on the 24*^ day of September, 2013, by the following vote to wit: AYES: NOES: Council Members Hall, Packard, Wood, Blackburn and Douglas. None. ABSENT: None. 7/4 MATT H^LL, Mayor ATTEST: BARBARA ENGLESON/plty Clerk