RESOLUTION NO. 2013-271
1
2
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
3 APPROVING THE GENERATING FACILITY INTERCONNECTION
AGREEMENT (CONTINUOUS EXPORT) WITH SAN DIEGO GAS &
ELECTRIC COMPANY FOR THE PRESSURE CONTROL HYDROLECTRIC
5 FACILITY AT MAERKLE RESERVOIR. PROJECT NO. 5025
6 WHEREAS, on August 27, 2013 through Resolution No. 1477 the Board of the Carlsbad
Municipal Water District awarded a contract to Environmental Construction Inc. to construct the
Pressure Control Hydroelectric Facility (PCHF) at Maerkle Reservoir, Project No. 5025; and
WHEREAS, It is necessary to enter into a Generating Facility Interconnection Agreement
(Continuous Export) to enable the Electrical Producer to interconnect and operate a Generating
12 Facility In parallel with San Diego Gas & Electric Company's (SDG&E) Distribution System and sell
13 energy produced by such Generating Facility directly to SDG&E pursuant to Rule 21 of SDG&E's
tariffs; and
WHEREAS, the City of Carlsbad will be designated the Electrical Producer.
NOW, THEREFORE, BE IT RESOLVED by the City Council ofthe City of Carlsbad, California,
as follows that:
14
15
16
17
18
19 1. The above recitations are true and correct.
20
21
22
23
24
25 ///
That the Generating Facility Interconnection Agreement (Continuous Export)
between San DIego Gas & Electric Company and City of Carlsbad is hereby
approved, and the City Manager or the Public Works Director Is authorized to
execute the agreement on behalf ofthe City of Carlsbad.
///
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the Carlsbad City
Council and Carlsbad Municipal Water District Board of Directors, held on the 19*^ day of
November, 2013, by the following vote:
AYES: Council Members Hall, Packard, Wood, Blackburn and Douglas.
NOES: None.
ABSENT: None.
MATT HALL, Mayor
ATTEST:
BARBARA ENGLESON,City Clerk