HomeMy WebLinkAbout2014-06-17; City Council; Resolution 2014-1343
4
7
8
9
10
11
12
13
18
19
20
21
22
23
24
27
28
Exhibit 7
RESOLUTION NO. 2014-134
2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF CARLSBAD, CALIFORNIA, ADOPTING CHANGES TO
THE MASTER FEE SCHEDULE.
5 WHEREAS, the City Council of the City of Carlsbad has the authority to establish
6 fees for City services; and
WHEREAS, from time-to-time said fees are reviewed and evaluated to maintain
an adequate fee structure recovering costs for City services; and
WHEREAS, the City Council has determined the cost of providing general and
development-related services; and
WHEREAS, the City Council believes it is necessary for the City Manager to
have the authority to adjust the parks and recreation and library and arts program and
classes fees from time to time to remain competitive and within the market pricing for
15 like programs and classes; and
16 WHEREAS, the City Council finds it necessary to recover the costs for City
17 services; and
WHEREAS, the City Council has held the necessary public hearing and allowed
for public comment on the establishment of said fees.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Carlsbad, California, as follows:
1. That the above recitations are true and correct.
2. That the changes to the Master Fee Schedule are for the fees shown in
25 Exhibit 7-A attached hereto, and as amended by determinations of the City
26 Council at its meeting of Tuesday, June 17, 2014, as set forth in the minutes
gd
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20 ///
21 ///
22 ///
23 ///
24 ///
25
///
26
///
27
28
Exhibit 7
of that meeting, and as memorialized by subsequent resolution of the City
Council.
3. The City Council hereby authorizes the City Manager or his/her designee to
set parks and recreation and library and cultural arts program, rental, and
class fees that are included in the Community Services Guide. The fee shall
not exceed the fully burdened (direct and indirect) costs of providing the
program, rental, and class but shall be no less (except in the case of
introductory, discount or promotional pricing) than the lowest fee charged for
like kind programs or classes in similarly benchmarked Southern California
cities.
4. The City Council hereby authorizes the City Manager or his/her designee to
change parking violation fees at the time, and by the same amount, as the
state changes their portion of the fee. Any changes to these fees will be
made to the current Master Fee Schedule.
5. This resolution shall become effective on August 1, 2014 for General city
fees, and September 1, 2014 for the Development-related service fees and
Development impact fees.
/
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the City Council of the
City of Carlsbad, the Carlsbad Municipal Water District Board of Directors, the Carlsbad
Community Development Commission, and the City of Carlsbad as Successor Agency to the
Redevelopment Agency on the 17*'^ day of June 2014, by the following vote to wit:
AYES:
NOES:
ABSENT:
Council Members Hall, Packard, Wood, Schumacher, Blackburn.
None.
None.
ATTEST:
,„R-ffRBARA ENGLESON/yty Clerk
- O
EXHIBIT 7A
CITY OF CARLSBAD
MASTER FEE SCHEDULES
June 2014
General City Service fee increases approved by Council on
June 17, 2014 will go into effect August 1, 2014.
Development Related Service fee increases approved by Council on
June 17, 2014 will go into effect September 1, 2014.
Development Impact fee increases approved by Council on
June 17, 2014 will go into effect September 1, 2014.
83
EXHIBIT 7A
TABLE OF CONTENTS
Section 1 - General City Service Fees
i\/liscellaneous Fees -)
Alga Norte Facility 2
Safety Center Facility Rental 6
Section 2 - Development Related Service Fees
Miscellaneous Fees 10
Fire Protection System Installation Fees 18
Grading Plan Check Fees 20
Grading Permit Fees 21
Improvement Construction Inspection Fees 22
Improvement Plan Review Fees 23
Street Light Energizing Fees 24
Landscape Inspection Fees 25
Landscape Plan Check Fees 26
Building Permit Fees 27
Plumbing Permit Unit Fees 28
Electrical Permit Fees 29
Mechanical Permit Fees 30
Building Valuation Multipliers 31
Section 3 - Development Impact Fees
Miscellaneous Fees 36
Park In Lieu Fees 37
Planned Local Drainage Area Fees 38
Sewer Benefit Area Fees 39
Habitat Mitigation Fees 40
EXHIBIT 7A
CITY OF CARLSBAD
MASTER FEE SCHEDULES
SECTION 1
GENERAL CITY SERVICE FEES
June 2014
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION NOTES FY 2013-14 FEE FY 2014-15
PROPOSED FEE
GENERAL CAO Appeal City Council - Miscellaneous S 159 $ 162
GENERAL CAO Hearing Disposition Services for Parking Citations - Personal Hearings s s
GENERAL CAO Hearing Disposition Services for Parking Citations - Written Review s s
GENERAL CED Bond Search S 32 S 32
GENERAL CED Campaign Sign Permit $ 58 S 59
GENERAL CED Planning Commission Agenda and Minutes (tpostage) copy charge copy charge
GENERAL CITY CLERK City Clerk - CD Copy S 3 S 3
GENERAL CITY CLERK City Clerk - Certification Charge (per document) S 21 S 22
GENERAL CITY MANAGER Publications - As Determined by the City Manager
Determined by City
Manager
Determined by City
Manager
GENERAL
COMMUNICATI
ONS Cable Channel Administration Fee SllO/Hour SllO/Hour
GENERAL
COMMUNICATI
ONS Communications - DVD Copy $ 21 S 21
GENERAL POLICE Administrative Fee - DUI S 18 S 19
GENERAL FINANCE Administrative Fee for 1915 Act Bond Call -1% of principal being repaid (4) $50 min/S500 max Sso min/S500 max
GENERAL FINANCE Business License - master list of active business licenses S 35 S 35
GENERAL FINANCE Business License - monthly list of new licenses S 5 5 5
GENERAL FINANCE Check Processing Fee for Cancellation (Customer Initiated) S 21 S 22
GENERAL FINANCE Returned Check Fee S 35 S 35
GENERAL FIRE Ambulance Fee-Advanced Life Support l-Assessment S 156.38 S 200.00
GENERAL FIRE Ambulance Fee BLS- Base Rate - Resident S 938.26 S 938.26
GENERAL FIRE Ambulance Fee BLS- Base Rate Non-Resldent $ 938.26 S 938.26
GENERAL FIRE
Ambulance Fee-Advanced Life Support 1-Resldent-plus Level 1 or Level II Supplies &
Medications S 1,150
GENERAL FIRE
Ambulance Fee-Advanced Life Support 1-Non Resident-plus Level 1 or Level 11 Supplies &
Medications S 1,250
GENERAL FIRE Ambulance Fee-Advanced Life Support 2-Resident-plus Level II Supplies & Medications $ 1,250
GENERAL FIRE
Ambulance Fee-Advanced Life Support 2-Non Resident-plus Level II Supplies &
Medications S 1,350
GENERAL FIRE Ambulance Fee - Mileage Charge - per mile S 17.72 S 23
GENERAL FIRE Ambulance Fee - Oxygen Charge 5 67.76 S 75
GENERAL FIRE Ambulance Transport-Community Paramedicine BLS-Resident S 938.26
GENERAL FIRE Ambulance Transport-Community Paramedicine ALS-Resident-Plus Level 1 or Level II
Supplies and Medications S 1,150
GENERAL FIRE Ambulance Transport Including Community Paramedicine -Level 1 Supplies & Medications S 125
GENERAL FIRE Ambulance Transport Including Community Paramedicine-Level II Supplies & Medications S 250
GENERAL FIRE Bicycle Licenses (5) S 3 S 3
GENERAL FIRE Bicycle Licenses - Replacement or Transfer (5) S 1 S 1
GENERAL FIRE NSPECTION nspection-Reinspection for a previously failed Inspection S 69 S 70
GENERAL FIRE NSPECTION Fire Clearance Inspection-State Lie. 1-6 Individuals/Per Establishment S 245 S 249
GENERAL FIRE NSPECTION Fire Clearance Initial Inspection-State Lie. 7-24 Individuals/Per Establishment S 312 S 317
GENERAL FIRE NSPECTION Fire Clearance Annual Inspection-State Lie. 7-24 Individuals/Per Establishment $ 387 $ 393
GENERAL FIRE NSPECTION Fire Clearance Initial Inspection-State Lie. 25 + Individuals/Per Establishment S 434 S 440
GENERAL FIRE NSPECTION Fire Clearance Annual Inspection-State Lie. 26-50 Beds Individuals/Per Establishment $ 624 S 633
GENERAL FIRE NSPECTION Fire Clearance Annual Inspection-State Lie. 50 + Beds Individuals/Per Establishment S 1,003 S 1,018
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION NOTES FY 2013-14 FEE FY 2014-15
PROPOSED FEE
GENERAL FIRE INSPECTION Fire Inspection - R-1 Occupancy 6-14 D.U.'s $ 198 $ 201
GENERAL FIRE INSPECTION Fire Inspection - R-1 Occupancy 15-50 D.U.'s S 490 S 497
GENERAL FIRE PREVENTION Fire - Hydrant Water Flow Test S 55 S 55
GENERAL FIRE INSPECTION Inspection-Initial Occupancy Inspection-New Business S 245 S 245
GENERAL FIRE PREVENTION Fire - Weed Abatement (charge per parcel) S 158 $ 160
GENERAL FIRE INSPECTION Inspection $ 122.50 S 122.50
GENERAL FIRE INSPECTION Inspection -Interim S 191 S 194
GENERAL FIRE Fire Nuisance Alarm - 1st response In 12 month period S $
GENERAL FIRE Fire Nuisance Alarm - 2nd response in 12 month period $ 80 S 81
GENERAL FIRE Fire Nuisance Alarm - 3rd response In 12 month period $ 159 S 162
GENERAL FIRE Fire Nuisance Alarm - each additional response thereafter S 313 $ 318
GENERAL FIRE Fire Nuisance Alarm - each billing S 11 S 11
GENERAL FIRE PREVENTION Fire- Special Event - per fire personnel per hour (consistent with City payroll records) Actual Cost Actual Cost
GENERAL FIRE PREVENTION Permit/Inspection - Hazardous Materials and Processes - Assembly S 120 S 121
GENERAL LIBRARY Copies - Black & White (each) S 0.20 S 0.20
GENERAL UBRARY Copies - Color (each) S 1 S 1
GENERAL LIBRARY Library Account Collection Fee S 10 S 10
GENERAL LIBRARY Library Book Non Pickup Fee (per item) S 1 S 1
GENERAL LIBRARY Library Borrowing - Audio Visual Equipment (per Item, per day) S 5 S 5
GENERAL LIBRARY Library Borrowing - Audio Visual Insurance fee - Per DVD S 1 S 1
GENERAL LIBRARY Library Borrowing - Mobile Device Loan Late Fee (Per Item, Per Hour) $ 5 S 5
GENERAL LIBRARY Library Card Replacement S 2 S 2
GENERAL LIBRARY Library Fines - DVD (per day per Item} S 1 S 1
GENERAL LIBRARY Library Fines - Juvenile (per day per item) $ 0.10 S 0.10
GENERAL LIBRARY Library Fines (per day per Item) S 0.25 S 0.25
GENERAL LIBRARY Library History Room Photo Fee (vendor cost of duplicating historical photos) Direct Cost Direct Cost
GENERAL LIBRARY Library Interlibrary Loan S 5 S 5
GENERAL LIBRARY Library Lost Item Processing Fee S 5 S 5
GENERAL LIBRARY Lost/Damaged beyond repair book/audio item
List price+S40 If out of
print
List price+$40 if out of
print
GENERAL LIBRARY Lost/Damaged Library Materials Variable up to list price Variable up to list price
GENERAL LIBRARY Lost/Damaged DVD 20% of list price 20% of list price
GENERAL
PARKS &
RECREATION DROP IN PER ADMISSION Alga Norte-Drop In Per Admission-Youth Teen 17 & Under-Non Resident 3 3
GENERAL
PARKS St
RECREATION DROP IN PER ADMISSION Alga Norte-Drop In Per Admission-Adult-Non Resident 6 6
GENERAL
PARKS &
RECREATION DROP IN PER ADMISSION Alga Norte-Drop In Per Admission-Adult-Resldent 5 5
GENERAL
PARKS &
RECREATION DROP IN PER ADMISSION Alga Norte-Spectator/Observer Entry (Not charged for swim lesson parents/guardians) 2 2
GENERAL
PARKS &
RECREATION AQUATIC DISCOUNT PASSES Alga Norte - Aquatic Discount Passes -1 Month Individual - Non Resident - Peak Time 65 65
GENERAL
PARKS &
RECREATION AQUATIC DISCOUNT PASSES Alga Norte - Aquatic Discount Passes -1 Month Individual - Non Resident - Off Peak Time 55 55
GENERAL
PARKS &
RECREATION AQUATIC DISCOUNT PASSES Alga Norte - Aquatic Discount Passes -1 Month 1 ndividual -Resident - Peak Time 55 55
GENERAL
PARKS &
RECREATION AQUATIC DISCOUNT PASSES Alga Norte - Aquatic Discount Passes -1 Month Individual - Resident - Off Peak Time 45 45
^7
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION NOTES FY 2013-14 FEE FY 2014-15
PROPOSED FEE
GENERAL
PARKS &
RECREATION AQUATIC DISCOUNT PASSES Alga Norte - Aquatic Discount Passes -1 Month Family - Non Resident - Peak Time 95 95
GENERAL
PARKS &
RECREATION AQUATIC DISCOUNT PASSES Alga Norte - Aquatic Discount Passes -1 Month Family - Non Resident - Off Peak Time 85 85
GENERAL
PARKS &
RECREATION AQUATIC DISCOUNT PASSES Alga Norte - Aquatic Discount Passes -1 Month Family - Resident - Peak Time 75 75
GENERAL
PARKS &
RECREATION AQUATIC DISCOUNT PASSES Alga Norte - Aquatic Discount Passes -1 Month Family - Resident - Oft Peak Time 65 65
GENERAL
PARKS &
RECREATION AQUATIC DISCOUNT PASSES Alga Norte - Aquatic Discount Passes - 4 Month Individual - Non Resident - Peak Time 130 130
GENERAL
PARKS &
RECREATION AQUATIC DISCOUNT PASSES Alga Norte - Aquatic Discount Passes - 4 Month Individual - Non Resident - Off Peak Time 120 120
GENERAL
PARKS &
RECREATION AQUATIC DISCOUNT PASSES Alga Norte - Aquatic Discount Passes - 4 Month Individual -Resident - Peak Time 120 120
GENERAL
PARKS &
RECREATION AQUATIC DISCOUNT PASSES Alga Norte - Aquatic Discount Passes - 4 Month Individual - Resident - Off Peak Time 110 110
GENERAL
PARKS &
RECREATION AQUATIC DISCOUNT PASSES Alga Norte - Aquatic Discount Passes - 4 Month Family - Non Resident - Peak Time 270 270
GENERAL
PARKS &
RECREATION AQUATIC DISCOUNT PASSES Alga Norte - Aquatic Discount Passes - 4 Month Family - Non Resident - Off Peak Time 250 250
GENERAL
PARKS &
RECREATION AQUATIC DISCOUNT PASSES Alga Norte - Aquatic Discount Passes - 4 Month Family - Resident - Peak Time 250 250
GENERAL
PARKS &
RECREATION AQUATIC DISCOUNT PASSES Alga Norte - Aquatic Discount Passes - 4 Month Family - Resident - Off Peak Time 230 230
GENERAL
PARKS a
RECREATION AQUATIC DISCOUNT PASSES Alga Norte -10 Swim Punch Card 10 X per Admission Fee 10 X per Admission Fee
GENERAL
PARKS &
RECREATION POOL RENTAL
Alga Norte Pool Rental- Instructional and Competitive Pool Peak Hours (per lane per hour)
- Resident Non Profit 20 20
GENERAL
PARKS &
RECREATION POOL RENTAL
Alga Norte Pool Rental- Instructional and Competitive Pool Peak Hours (per lane per hour)
- Non Resident Non Profit 22 22
GENERAL
PARKS &
RECREATION POOL RENTAL
Alga Norte Pool Rental- Instructional and Competitive Pool Peak Hours (per lane per hour)
- Resident 23 23
GENERAL
PARKS &
RECREATION POOL RENTAL
Alga Norte Pool Rental- Instructional and Competitive Pool Peak Hours (per lane per hour)
- Non Resident 26 26
GENERAL
PARKS &
RECREATION POOL RENTAL
Alga Norte Pool Rental- Instructional and Competitive Pool Off Peak Hours (per lane per
hour) - Resident Non Profit 18 18
GENERAL
PARKS &
RECREATION POOL RENTAL
Alga Norte Pool Rental- Instructional and Competitive Pool Off Peak Hours (per lane per
hour) - Non Resident Non Profit 20 20
GENERAL
PARKS &
RECREATION POOL RENTAL
Alga Norte Pool Rental- Instructional and Competitive Pool Off Peak Hours (per lane per
hour) - Resident 22 22
GENERAL
PARKS &
RECREATION POOL RENTAL
Alga Norte Pool Rental- Instructional and Competitive Pool Off Peak Hours (per lane per
hour) - Non Resident 24 24
GENERAL
PARKS &
RECREATION POOL RENTAL
Alga Norte Pool Rental- Instructional and Competitive Pool Super Off Peak Hours (per lane
per hour) - Resident Non Profit 16 16
GENERAL
PARKS &
RECREATION POOL RENTAL
Alga Norte Pool Rental- Instructional and Competitive Pool Super Off Peak Hours (per lane
per hour) - Non Resident Non Profit 18 . 18
GENERAL
PARKS &
RECREATION POOL RENTAL
Alga Norte Pool Rental- Instructional and Competitive Pool Super Off Peak Hours (per lane
per hour) - Resident 20 20
GENERAL
PARKS &
RECREATION POOL RENTAL
Alga Norte Pool Rental- Instructional and Competitive Pool Super Off Peak Hours (per lane
per hour) - Non Resident 22 22
GENERAL
PARKS &
RECREATION POOL RENTAL
Alga Norte Pool Rental - Outside of Regular Operating Hours - minimum of 70% of pool -
summer - Resident Non Profit 27 27
GENERAL
PARKS &
RECREATION POOL RENTAL
Alga Norte Pool Rental - Outside of Regular Operating Hours - minimum of 70% of pool -
summer - Non Resident Non Profit 30 30
GENERAL
PARKS &
RECREATION POOL RENTAL
Alga Norte Pool Rental - Outside of Regular Operating Hours - minimum of 70% of pool -
summer - Resident 27 27
GENERAL
PARKS a
RECREATION POOL RENTAL
Alga Norte Pool Rental - Outside of Regular Operating Hours - minimum of 70% of pool -
summer - Non Resident 30 30
GENERAL
PARKS a
RECREATION POOL RENTAL
Alga Norte Pool Rental - Outside of Regular Operating Hours - minimum of 70% of pool -
non summer - Resident Non Profit 32 32
GENERAL
PARKS &
RECREATION POOL RENTAL
Alga Norte Pool Rental - Outside of Regular Operating Hours - minimum of 70% of pool -
non summer - Non Resident Non Profit 35 35
GENERAL
PARKS &
RECREATION POOL RENTAL
Alga Norte Pool Rental - Outside of Regular Operating Hours - minimum of 70% of pool -
non summer - Resident 36 36
GENERAL
PARKS &
RECREATION POOL RENTAL
Alga Norte Pool Rental - Outside of Regular Operating Hours - minimum of 70% of pool -
non summer - Non Resident 40 40
GENERAL
PARKS a
RECREATION THERAPUETIC POOL RENTAL Alga Norte Whole Therapeutic Pool Rental - Peak Hours - Non Profit Resident 41 41
GENERAL
PARKS a
RECREATION THERAPUETIC POOL RENTAL Alga Norte Whole Therapeutic Pool Rental - Peak Hours - Non Profit Non Resident 45 45
GENERAL
PARKS a
RECREATION THERAPUETIC POOL RENTAL Alga Norte Whole Therapeutic Pool Rental - Peak Hours - Resident 46 46
GENERAL
PARKS a
RECREATION THERAPUETIC POOL RENTAL Alga Norte Whole Therapeutic Pool Rental - Peak Hours - Non Resident 50 50
GENERAL
PARKS a
RECREATION THERAPUETIC POOL RENTAL Alga Norte Whole Therapeutic Pool Rental - Off Peak Hours - Non Profit Resident 36 36
GENERAL
PARKS a
RECREATION THERAPUETIC POOL RENTAL Alga Norte Whole Therapeutic Pool Rental - Off Peak Hours - Non Profit Non Resident 40i 40
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION NOTES FY 2013-14 FEE FY 2014-15
PROPOSED FEE
GENERAL
PARKS a
RECREATION THERAPUETIC POOL RENTAL Alga Norte Whole Therapeutic Pool Rental - Off Peak Hours - Resident 41 41
GENERAL
PARKS a
RECREATION THERAPUETIC POOL RENTAL Alga Norte Whole Therapeutic Pool Rental - Off Peak Hours - Non Resident 45 45
GENERAL
PARKS a
RECREATION THERAPUETIC POOL RENTAL Alga Norte Whole Therapeutic Pool Rental - Super Off Peak Hours - Non Profit Resident 32 32
GENERAL
PARKS a
RECREATION THERAPUETIC POOL RENTAL
Alga Norte Whole Therapeutic Pool Rental - Super Off Peak Hours - Non Profit Non
Resident 35 35
GENERAL
PARKS &
RECREATION THERAPUETIC POOL RENTAL Alga Norte Whole Therapeutic Pool Rental - Super Oft Peak Hours - Resident 36 36
GENERAL
PARKS a
RECREATION THERAPUETIC POOL RENTAL Alga Norte Whole Therapeutic Pool Rental - Super Oft Peak Hours - Non Resident 40 40
GENERAL
PARKS a
RECREATION THERAPUETIC POOL RENTAL
Alga Norte Whole Therapeutic Pool Rental - Outside of regular operating hours - add on to
other pool use - Non Prof it Resident 52 52
GENERAL
PARKS a
RECREATION THERAPUETIC POOL RENTAL
Alga Norte Whole Therapeutic Pool Rental - Outside ot regular operating hours - add on to
other pool use - Non Profit Non Resident 55 55
GENERAL
PARKS a
RECREATION THERAPUETIC POOL RENTAL
Alga Norte Whole Therapeutic Pool Rental - Outside of regular operating hours - add on to
other pool use - Resident 56 56
GENERAL
PARKS a
RECREATION THERAPUETIC POOL RENTAL
Alga Norte Whole Therapeutic Pool Rental - Outside of regular operating hours - add on to
other pool use - Non Resident 60 60
GENERAL
PARKS a
RECREATION POOL RENTAL Alga Norte Pool Rental - Time System Setup, Operation and Takedown per hour 55 55
GENERAL
PARKS a
RECREATION POOL RENTAL Alga Norte Pool Rental - On Deck Team Storage - Per Month Per Square Foot 3.25 3.25
GENERAL
PARKS a
RECREATION POOL RENTAL
Alga Norte Pool Rental - Aquatics Staff Costs - City Provided Services (Per
Supervisor/Manager - Per Hr.) 35 35
GENERAL
PARKS a
RECREATION POOL RENTAL
Alga Norte Pool Rental - Aquatics Staff Costs - City Provided Services (Per Guard/Instructor
- Per Hr.) 25 25
GENERAL
PARKS a
RECREATION POOL RENTAL Alga Norte Pool Rental - Competitive Events - Per Day Per Event Additional Fee $250-SlOOO $250-$1000
GENERAL
PARKS a
RECREATION CLASSES a PROGRAMS Alga Norte Classes a Programs - Group Learn To Swim Lessons Per Hour 14 14
GENERAL
PARKS a
RECREATION CLASSES a PROGRAMS Alga Norte Classes a Programs - Group Lessons Per Class Fee Resident Discount -1 -1
GENERAL
PARKS a
RECREATION CLASSES a PROGRAMS
Alga Norte Classes a Programs - Programs/Classes/Camps - (Masters, Diving, Synchro
Swim, Etc.) Per Hour S6-S9 S6-S9
GENERAL
PARKS a
RECREATION CLASSES a PROGRAMS
Alga Norte Classes a Programs - Programs/Classes/Camps - (Masters, Diving, Synchro
Swim, Etc.) Per Hour - Resident Discount -1 -1
GENERAL
PARKS a
RECREATION CLASSES a PROGRAMS Alga Norte Classes a Programs - Individualized Instruction - Basic Swimming Per Hour 70 70
GENERAL
PARKS a
RECREATION CLASSES a PROGRAMS
Alga Norte Classes a Programs - Individualized Instruction - Basic Swimming Per Hour -
Resident Discount -10 -10
GENERAL
PARKS a
RECREATION CLASSES a PROGRAMS
Alga Norte Classes & Programs - Individualized Instruction - Advanced
Instruction/Coaching - Per Hour 80 SO
GENERAL
PARKS a
RECREATION CLASSES a PROGRAMS
Alga Norte Classes a Programs - Individualized Instruction - Advanced
Instruction/Coaching - Per Hour - Resident Discount -10 -10
GENERAL
PARKS a
RECREATION CLASSES a PROGRAMS
Alga Norte Specialty Programs - Birthday Party Packages - Basic package includes
admission for 10 kids plus parents, cake a drinks a staff member S200-S300 S200-S300
GENERAL
PARKS a
RECREATION CLASSES a PROGRAMS
Alga Norte Specialty Programs - Recreation Department/Aquatics Special Events - (ie.
Friday Night Lites) not including admission $5-520 S5-$20
GENERAL POLICE Police - Public Dump Permit - Fee per acre $ 202 S 202
GENERAL POLICE Police - Audio/Visual Copy $ 51 S 51
GENERAL POLICE
Police - Burglary Alarm Response - Second Occurence (no charge for 1st response If
permitted) (3) S 30 S 30
GENERAL POUCE Police - Burglary Alarm Response - Each Additional Occurence (3) S 60 $ 60
GENERAL POLICE Police - False Robbery - Panic Alarm Response • Each Additional Occurence (3) S 100 S 100
GENERAL POLICE
Police - False Robbery - Panic Alarm Response - Second Occurrence (no charge for 1st
response) (3) $ 100 S 100
GENERAL POLICE Police - Second Call per Police Employee per hour (consistent with City payroll records) Actual Cnit Actual Cost
GENERAL POLICE Police - Entertainment License (6) $ 212 S 215
GENERAL POLICE Police - Copy Investigation Tapes (+ cost of duplicating the tape) $ 54 S 54
GENERAL POLICE Police - Dispatch Historical Searches (per month searched) S 21 $ 22
GENERAL POLICE Police - Fingerprinting Fees $ 25 $ 25
GENERAL POLICE Police - Photograph Copy (fee plus reproduction costs) $ 27 $ 25
GENERAL POLICE Police - Proof of Correction Certification - all others S 15 S 15
GENERAL POLICE Police - Proof of Correction Certification - Carlsbad Resident or person with CPD citation S S
9
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION NOTES FY 2013-14 FEE FY 2014-15
PROPOSED FEE
GENERAL POLICE Police - Report Copy Fee (Free to Victim) plus cost of reproduction S 16 $ 10
GENERAL POLICE Police - Verification Letter s 14 $ 14
GENERAL POLICE Police - Special Business Permit (plus fingerprint fee) $ 122 $ 124
GENERAL POLICE
Police - Special Event Application - Major (3 or more lntersections)(fee plus services
rendered) $ 350 $ 356
GENERAL POLICE
Police - Special Event Application - Minor (2 or less lntersections)(fee plus services
rendered) s 117 S 119
GENERAL POLICE Police - Special Event Application - Third party Vendor Fee (2nd Day) s 105 s 107
GENERAL POLICE Police - Special Event Application - Third party Vendor Fee (Each day thereafter) $ 79 $ 80
GENERAL POLICE Police - Special Event Application -Third party Vendor Fee (1st Day) $ 131 s 133
GENERAL POLICE Police - Special Event City Services - Staff Time (2) Actual Cost Actual Cost
GENERAL POUCE PARKING VIOLATION 21113 (a) - Veh/Anim public on grounds S 38 S 38
GENERAL POLICE PARKING VIOLATION 21211 - Bike lane $ 50 S 50
GENERAL POLICE PARKING VIOLATION 22500 (a) - In intersection $ 38 S 38
GENERAL POLICE PARKING VIOLATION 22500(b)-In cross walk S 38 S 38
GENERAL POLICE PARKING VIOLATION 22500 (d) - Fire station driveway $ 38 S 38
GENERAL POLICE PARKING VIOLATION 22500 (e) - Driveway S 38 $ 38
GENERAL POLICE PARKING VIOLATION 22500 (f) - Sidewalk s 38 s 38
GENERAL POLICE PARKING VIOLATION 22500 (g) - Obstructing traffic s 38 s 38
GENERAL POLICE PARKING VIOLATION 22500 (h) - Double parking $ 38 $ 38
GENERAL POLICE PARKING VIOLATION 22500 (1) - Bus zone s 260 s 260
GENERAL POLICE PARKING VIOLATION 22500 (J) - Tube or tunnel s 38 $ 38
GENERAL POLICE PARKING VIOLATION 22500 (k) - Bridge s 38 $ 38
GENERAL POLICE PARKING VIOLATION 22500 (1) - Blocking Disabled $ 320 S 320
GENERAL POLICE PARKING VIOLATION 22500 c - Red curb $ 38 $ 38
GENERAL POLICE PARKING VIOLATION 22500.1 - Fire lane s 50 $ 50
GENERAL POLICE PARKING VIOLATION 22502 - 18" from curb/wrong way $ 38 $ 38
GENERAL POLICE PARKING VIOLATION 22507 (a) - Oversize Vehicle S 50 S 50
GENERAL POLICE PARKING VIOLATION 22507,8 - Disable space/block access $ 340 S 340
GENERAL POLICE PARKING VIOLATION 22514-Fire hydrant 5 38 $ 38
GENERAL POLICE PARKING VIOLATION 22515 - Unattended vehicle $ 38 s 38
GENERAL POLICE PARKING VIOLATION 22516 - Locked vehicle/passgr inside s 50 $ 50
GENERAL POLICE PARKING VIOLATION 22517 - Open/close door in traffic s 50 s 50
GENERAL POLICE PARKING VIOLATION 22520 - Stopping on freeway s 38 s 38
GENERAL POLICE PARKING VIOLATION 22520,5 - Vending from Hwy $ 50 $ 50
GENERAL POLICE PARKING VIOLATION 22521 - > 7.5ft from RR tracks s 38 s 33
GENERAL POLICE PARKING VIOLATION 22522 - 3ft from handicap ramp $ 320 $ 320
GENERAL POLICE PARKING VIOLATION 22523 - Abandoned vehicle s 128 $ 123
GENERAL POLICE PARKING VIOUTION 22526 - Blocking intersection $ 68 S 68
GENERAL POLICE PARKING VIOLATION 23226 - Store open container/pass comp s 50 5 50
GENERAL POLICE PARKING VIOLATION 23333 - Stop/park in vehicle crossing s 38 $ 33
3D
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION NOTES FY 2013-14 FEE FY 2014-15
PROPOSED FEE
GENERAL POLICE PARKING VIOLATION 24003 - Veh. w/unlawful lighting device S 38 $ 38
GENERAL POLICE PARKING VIOLATION 24401 - Dimmed lights on parked veh s 44 S 44
GENERAL POLICE PARKING VIOLATION 24604 - Lamp or flag on projections s 38 $ 38
GENERAL POLICE PARKING VIOLATION 24607 - Reflectors on rear s 33 $ 38
GENERAL POLICE PARKING VIOLATION 24608 - Reflectors on front and sides $ 33 $ 33
GENERAL POLICE PARKING VIOLATION 25250 - Unlawful flashing lights $ 44 s 44
GENERAL POLICE PARKING VIOLATION 25251 - Flashing lights required $ 44 s 44
GENERAL POLICE PARKING VIOLATION 25300 Warn device disabled, parked veh $ 44 $ 44
GENERAL POLICE PARKING VIOLATION 26451 - Set parking brake $ 33 $ 33
GENERAL POLICE PARKING VIOLATION 27155 - Fuel tank caps S 38 S 38
GENERAL POLICE PARKING VIOLATION 4462 (b) - Wrong veh reg S 100 S 100
GENERAL POLICE PARKING VIOLATION 5200- Plates front/back $ 38 s 33
GENERAL POLICE PARKING VIOLATION 5201 - Position ot plate S 38 S 38
GENERAL POLICE PARKING VIOLATION 5204 (a)-Tabs S 38 $ 38
GENERAL POLICE PARKING VIOLATION 72 hr parking $ 68 $ 68
GENERAL POLICE PARKING VIOLATION Alley parking s 50 $ 50
GENERAL POLICE PARKING VIOLATION Comm veh in resd area $ 50 $ 50
GENERAL POLICE Police -Storage / Impounded Vehicle Administrative Charge s 69 $ 70
GENERAL POLICE Police/Fire - Emergency Response DUI Traffic Collision (max $12,000 per incident) Direct Cost Direct Cost
GENERAL POLICE PARKING VIOLATION Repair veh in street $ 50 S 50
GENERAL POLICE PARKING VIOLATION Safety zone 5 50 $ 50
GENERAL PEM RENTAL RATES FOR STC Safety Training Center -1 Shooting Range - Half Day S312-$524 $312-$524
GENERAL PEM RENTAL RATES FOR STC Safety Training Center -1 Shooting Range - Full Day $678-51,102 $678 Sl,102
GENERAL PEM RENTAL RATES FOR STC Safety Training Center - 2 Shooting Ranges - Half Day $401-$645 $401-5645
GENERAL PEM RENTAL RATES FOR STC Safety Training Center - 2 Shooting Ranges - Full Day $763-Sl,239 $763-51,239
GENERAL PEM RENTAL RATES FOR STC Safety Training Center - Classroom - Half Day S 296 $ 296
GENERAL PEM RENTAL RATES FOR STC Safety Training Center - Class Room - Full Day S 528 $ 528
GENERAL PEM RENTAL RATES FOR STC Safety Training Center - Grinder - Half Day $ 236 $ 236
GENERAL PEM RENTAL RATES FOR STC Safety Training Center - Grinder - Full Day $ 418 S 418
GENERAL PEM RENTAL RATES FOR STC Safety Training Center - Grinder/Residential Prop (No Fire Ops) - Halt Day $ 327 S 327
GENERAL PEM RENTAL RATES FOR STC Safety Training Center - Grinder/Residential Prop (No Fire Ops) - Full Day s 599 $ 599
GENERAL PEM RENTAL RATES FOR STC Safety Training Center - Grinder/Commercial Prop (no Fire Ops) - Half Day s 327 S 327
GENERAL PEM RENTAL RATES FOR STC Safety Training Center - Grinder/Commercial Prop (no Fire Ops) - Full Day s 599 $ 599
GENERAL PEM RENTAL RATES FOR STC Safety Training Center - Streetscape - Half Day $ 100 S 100
GENERAL PEM RENTAL RATES FOR STC Safety Training Center - Streetscape - Full Day $ 145 S 145
GENERAL UTILITIES WATER RATES Agricultural Water Rate s 3.70 S 3.70
GENERAL UTILITIES Backflow 2nd Notice S 8 S 8
GENERAL UTILITIES Backflow 3rd Notice S 23 S 23
GENERAL UTILITIES WATER DISTRICT SERVICE FEES
Backflow Inspection - California Department of Environmental Health (CDEH) (invoice
total from CDEH) Actual Cost Actual Cost
31
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION NOTES FY 2013-14 FEE FY 2014-15
PROPOSED FEE
GENERAL UTILITIES WATER DISTRICT SERVICE FEES Backflow Preventer Charge (per month, each account) $ 3 S 3
GENERAL UTILITIES Backflow Reinspectlon (Consistent with City payroll records) Actual Cost Actual Cost
GENERAL UTILITIES WATER DISTRICT SERVICE FEES Blueprinting ot Standard Size (24" x 36") Improvement Plan Sheet (Cost tor each) $ 5 $ 5
GENERAL UTILITIES WATER RATES Cost of Delivery Charge (per month) - 5/8" meter $ 21.38 S 21.38
GENERAL UTILITIES WATER RATES Cost of Delivery Charge (per month) - 3/4" meter $ 26.97 $ 26.97
GENERAL UTILITIES WATER RATES Cost of Delivery Charge (per month) -1" meter $ 33.52 $ 38,52
GENERAL UTILITIES WATER RATES Cost of Delivery Charge (per month) -11/2" meter S 67.60 $ 67,60
GENERAL UTILITIES WATER RATES Cost of Delivery Charge (per month) - 2" meter $ 102.27 $ 102,27
GENERAL UTILITIES WATER RATES Cost of Delivery Charge (per month) - 2 1/2" meter $ 147.80 $ 147,80
GENERAL UTILITIES WATER RATES Cost of Delivery Charge (per month) - 3" meter S 194.72 $ 194,72
GENERAL UTILITIES WATER RATES Cost of Delivery Charge (per month) - 4" meter $ 298.75 $ 298.75
GENERAL UTILITIES WATER RATES Cost of Delivery Charge (per month) - 6" meter $ 588.03 S 588,03
GENERAL UTILITIES WATER RATES Cost of Deliverv Charge (per month) - 8" meter S 934,71 S 934,71
GENERAL UTILITIES WATER RATES Cost of Delivery Charge (per month) -10" meter S 1,339,61 $ 1,339.61
GENERAL UTILITIES WATER RATES Cost of Delivery Charge (per Month) Multi-Family Unit
GENERAL UTILITIES WATER RATES Irrigation Water Rate $ 4,15 S 4.15
GENERAL UTILITIES WATER RATES Potable Water Rate - Multi-Family Rate Tier 1 (cost per unit 0-5 units ot water) $ 2.71 $ 2.71
GENERAL UTILITIES WATER RATES Potable Water Rate - Multi-Family Rate Tier 2 (cost per unit 6-10 units ot water) S 3.05 $ 3.05
GENERAL UTILITIES WATER RATES Potable Water Rate - Multi-Family Rate Tier 3 (cost per unit 11+ units ot water) $ 3.64 $ 3,64
GENERAL UTILITIES WATER RATES Potable Water Rate - Non-Residential Rate (cost per unit) $ 3.70 S 3,70
GENERAL UTILITIES WATER RATES Potable Water Rate - Single Family Rate Tier 1 (cost per unit 0-12 units of water) $ 3.20 $ 3,20
GENERAL UTILITIES WATER RATES Potable Water Rate - Single Family Rate Tier 2 (cost per unit 13-20 units ot water) $ 4.13 $ 4,13
GENERAL UTILITIES WATER RATES Potable Water Rate - Single Family Rate Tier 3 (cost per unit 21+ units of water) $ 5.62 $ 5,62
GENERAL UTILITIES WATER DISTRICT SERVICE FEES Potable, Reclaimed and Sewer Standards and Specifications (Cost tor each) Actual Cost Actual Cost
GENERAL UTILITIES WATER RATES Reclaimed Water Cost Per Unit S 3.53 S 3.53
GENERAL UTILITIES Water Meter - Construction Meter Relocation S 29 S 29
GENERAL UTILITIES Water Meter - Construction Meter Installation/Removal $ 103 $ 103
GENERAL UTILITIES WATER DISTRICT SERVICE FEES Water Meter Deposit - Construction Meters $ 877 S 890
GENERAL UTILITIES WATER DISTRICT SERVICE FEES Water Service Fee - Accounts scheduled for termination for non-payment S 14 S 14
GENERAL UTILITIES Water Service Fee - After Hour Turn-on $ 114 S 114
GENERAL UTILITIES WATER DISTRICT SERVICE FEES Water Service Fee - Continuity of Service $ 11 $ U
GENERAL UTILITIES Water Service Fee - Door Hanger Paper $ 10 S 10
GENERAL UTILITIES Water Service Fee - Door Hanger Electronic $ 1.35 $ 1
GENERAL UTILITIES Water Service Fee - Next Scheduled Day Service Turn on $ 29 $ 29
GENERAL UTILITIES WATER DISTRICT SERVICE FEES Water Service Fee - Per New Account - Service Turn on $ 34 $ 35
GENERAL UTILITIES Water Service Fee - Same Day Turn-on (Not Scheduled for That Day) $ 86 S 86
GENERAL UTILITIES SEWER SERVICE CHARGES Group 1 - Residential - Multi-Family Residence rate per unit, 90% ot water used (1) $ 2,83 $ 2.88
GENERAL UTILITIES SEWER SERVICE CHARGES Group 1 - Residential - Single Family Residence (Flat Rate) (1) $ 25,02 $ 25.02
GENERAL UTILITIES SEWER SERVICE CHARGES Group II - Commercial - Rate per hundred cubic feet, min $24.53 per month (1) $ 2.35 5 2.35
RX
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION NOTES FY 2013-14 FEE FY 2014-15
PROPOSED FEE
GENERAL UTILITIES SEWER SERVICE CHARGES Group III - Commercial - Rate per hundred cubic feet, min $24.53 per month $ 3.56 S 3,56
GENERAL UTILITIES SEWER SERVICE CHARGES Group IV - Commercial - Rate per hundred cubic feet, min $24,53 per month (1) $ 6.60 $ 6,60
GENERAL UTILITIES SEWER SERVICE CHARGES
Group V Institutions/Schools - Boarding School - rate per student per month; min $24,53
per month (1) $ 5.32 $ 5,32
GENERAL UTILITIES SEWER SERVICE CHARGES
Group V Institutions/Schools - Elementary School - rate per student per month, min
$24,53 per month (1) S 0.51 5 0,51
GENERAL UTILITIES SEWER SERVICE CHARGES
Group V Institutions/Schools - High School - rate per student per month; min $24,53 per
month (1) $ 1.02 $ 1,02
GENERAL UTILITIES SEWER SERVICE CHARGES
Group V institutions/Schools - Junior High School - rate per student per month; mm
$24.53 per month (1) $ 0.75 $ 0,75
GENERAL UTILITIES SEWER SERVICE CHARGES Group V Institutions/Schools - Other - Institutions (1) $ 2.23 $ 2,23
GENERAL UTILITIES SOLID WASTE Solid Waste Fee (AB939) - 2.0% ot Basic Trash Rate (1) 2% of Basic Trash Rate 2% of Basic Trash Rate
GENERAL UTILITIES SOLID WASTE Special City Services - Billed at Cost (1) Billed at Cost Billed at Cost
GENERAL UTILITIES SOLID WASTE Special Pick-ups of Solid Waste - Delivery charge for roll-oft boxes (per box) $ 53.56 $ 54.19
GENERAL UTILITIES SOLID WASTE
Special Pick-ups of Solid Waste - Door-to-door household hazardous waste collection
(HHW) (1) $ 10.00 $ 10.00
GENERAL UTILITIES SOLID WASTE
Special Pickups of Solid Waste - Service charge for all classes of roll-off boxes (per
collection + landfill disposal fees) $ 252.40 $ 255.33
GENERAL UTILITIES SOLID WASTE Trash Collection - Residential - per month - 64 or 96 Gallon Cart $ 20,20 5 20.40
GENERAL UTILITIES SOLID WASTE Trash Collection - Residential - per month (35 gallon trash) $ 18,27 S 18.44
GENERAL UTILITIES SOLID WASTE Trash Collection - Residential - per month (backyard service) S 25,71 S 25.97
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - five pick-ups per week (2-yard bin) $ 310.34 $ 313.81
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - five pick-ups per week (3-yard bin) $ 448.94 $ 453.22
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - five pick-ups per week (4-yard bin) $ 623.12 S 629.07
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - five pick-ups per week (5-yard bin) $ 797,33 $ 804.94
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - four pick-ups per week (2-yard bin) $ 252.28 $ 254.68
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - tour pick-ups per week (3-yard bin) $ 362.31 $ 366.27
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - tour pick-ups per week {4-yard bin) $ 502.15 $ 506.94
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - four pick-ups per week (5-yard bin) 5 641.51 $ 647.63
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - one pick-up per week (2-yard bin) 5 76.78 S 77.52
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - one pick-up per week (3-yard bin) $ 104.40 S 105.40
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - one pick-up per week (4-yard bin) $ 139.23 S 140.57
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - one pick-up per week (5-yard bin) $ 174.07 $ 175.74
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - six pick-ups per week (2-vard bin) $ 369.36 5 372.89
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - six pick-ups per week (3-vard bin) $ 535.09 $ 540.19
GENERAL UTILITIES SOLID WASTE Trash Collection • Commercial per bin - six pick-ups per week (4-yard bin) $ 744.09 S 751.19
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - six pick-ups per week (5-yard bin) $ 953.15 S 962.25
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - three pick-ups per week (2-yard bin) $ 193.83 $ 195,68
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - three pick-ups per week (3-yard bin) S 276.63 $ 279,31
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - three pick-ups per week {4-yard bin) S 381.19 $ 384,83
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - three pick-ups per week {5-yard bin) S 485.70 $ 490,34
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - two pick-ups per week (2-yard bin) $ 135.30 S 135.69
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - two pick-ups per week (3-yard bin) $ 190.56 S 192.37
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - two pick-ups per week (4-yard bin) S 260.19 S 262.68
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - two pick-ups per week (5-yard bin) $ 329.90 $ 333.05
93
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION NOTES FY 2013-14 FEE FY 2014-15
PROPOSED FEE
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - one pick-up per week (split bin) $ 84.00 $ 84.81
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - two pick-ups per week (split bin) S 153.42 $ 154.89
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - three pick-ups per week (split bin) $ 222.32 S 224,96
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - tour pick-ups per week (split bin) $ 292,21 S 295,02
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - five pick-ups per week (split bin) $ 361,60 $ 365,07
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial per bin - six pick-ups per week (split bin) $ 431,02 $ 435,15
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial Recycling - one pick-up per week (3 yard bin) $ 74,90 $ 75.63
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial Recycling - two pick-ups per week (3 yard bin) $ 126,70 $ 127.94
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial Recycling - three pick-ups per week (3 yard bin) $ 178,50 $ 130.25
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial Recycling - tour pick-ups per week (3 yard bin) $ 230,30 S 232.55
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial Recycling - five pick-ups per week (3 yard bin) $ 274,89 $ 277,58
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial Recycling - six pick-ups per week (3 yard bin) $ 329.65 $ 332,88
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial Yard Waste - one pick-up per week (3 yard bin) $ 106,43 $ 107,46
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial Yard Waste - two pick-ups per week (3 yard bin) S 138,44 S 190,26
GENERAL VARIOUS Copies - each $ 0,15 $ 0,15
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial Can - One pick-up per week (up to four (4) 32 gal) $ 35.60 $ 35,94
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial Can - Two pick-ups per week (up to four (4) 32 gal) $ 71.22 $ 71,91
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial Can - Three pick-ups per week (up to four (4) 32 gal) S 106.32 $ 107,85
GENERAL UTILITIES SOLID WASTE
Trash Collection - Commercial Can Backyard Service - One pick-up per week (up to tour (4)
32 gal) $ 50.92 $ 51,41
GENERAL UTILITIES SOLID WASTE
Trash Collection - Commercial Can Backyard Service - Two pick-ups per week (up to four
(4) 32 gal) S 101.82 $ 102,81
GENERAL UTILITIES SOLID WASTE Trash Collection - Construction Bin Rate - One pick-up per week (3 yard bin) $ 235.48 S 238,23
GENERAL UTILITIES SOLID WASTE Trash Collection - Construction Bin Rate - Two pick-ups per week (3 yard bin) $ 409.95 S 414,74
GENERAL UTILITIES SOLID WASTE Trash Collection - Construction Bin Rate - Three pick-ups per week (3 yard bin) $ 584.42 $ 591,26
GENERAL UTILITIES SOLID WASTE Trash Collection - Construction Bin Rate - Four pick-ups per week (3 yard bin) $ 758.33 $ 767,76
GENERAL UTILITIES SOLID WASTE Trash Collection - Construction Bin Rate - Five pick-ups per week (3 yard bin) $ 933.36 S 944.27
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial Yard Waste- one pick-up per week (96 gal cart) S 19,89 S 20.08
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial Recycling- one pick-up per week (96 gal cart) $ 17,04 $ 17,21
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial Recycling- two pick-ups per week (96 gal cart) $ 34,08 $ 34,42
GENERAL UTILITIES SOLID WASTE Trash Collection - Commercial Recycling- three pick-ups per week (96 gal cart) $ 51.13 $ 51,63
GENERAL UTILITIES SOLID WASTE Trash Collection-Commercial/Muiti Family Scout Service Fee $ 46.31 $ 47,30
(1) - Nonresidential sewer rates are calculated based on flow, strength and
pretreatment requirements.
(2) - See Carlsbad IMunidpal Code Section 8.17.070
(3) - Per section g.50.080(e), Ord NS-230 phl,2,1993; Ord -53 ph 3,1989: Ord. 1278 ph 1
(part) 1985)
(4) - For all Assessment Districts using 1915 Act Bonds.
(5) - Code Section 10.56.070 and 10.56.100
(6) - Code Section 8.09.070
9V
EXHIBIT 7A
CITY OF CARLSBAD
MASTER FEE SCHEDULES
SECTION 2
DEVELOPMENT-RELATED
SERVICE FEES
June 2014
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION FY 2013-14 FEE FY 2014-15
PROPOSED FEE
DEV REL SVC CED Adjustment Plat 5 1,268 S 1,287
DEV REL SVC CED Affordable Housing Impact Fee (per unit) $ 2,915 $ 2,915
DEV RELSVC CED Affordable Housing In-Lieu Fee (per market rate unit) S 4,515 S 4,515
DEV RELSVC CED Appeal - City Council (+ noticing costs) - fee is refundable if appeal is won $ 1,062 $ 1,077
DEV RELSVC CED Appeal - Planning Commission (+ noticing costs) fee is refundable if appeal is won $ 651 $ 661
DEV RELSVC CED Building Permit Fees (63% of 2001 UBC 1-A)
DEV RELSVC CED Building Plan Check - 70% of BIdg Permit (8% discount on repetitive plan checks)
DEV RELSVC CED CDP - 2 - 4 unit or lot subdivision (per unit or lot whichever is greater) $ 2,149 S 2,181
DEV RELSVC CED CDP - 5 or more unit or lot subdivision (per permit) $ 3,499 $ 3,550
DEV RELSVC CED CDP - Non-Redevelopment Area - Minor Permit $ 843 $ 856
DEV REL SVC CED CDP - Village Review Area - Major a Minor RP's $ 653 $ 663
DEV REL SVC CED CDP Amendment
50% Current Permit
Cost
50% Current Permit
Cost
DEV RELSVC CED CDP Emergency $ 435 $ 442
DEV RELSVC CED CDP Exemption $ 239 $ 243
DEV REL SVC CED CDP Extensions
25% Current Permit
Cost
25% Current Permit
Cost
DEV REL SVC CED CDP Non-Residential + 10 cents per square foot $ 952 $ 966
DEV REL SVC CED Certificate of Compl, in lieu of Parcel Map S 3,580 $ 3,000
DEV RELSVC CED Certificate of Compliance $ 1,028 $ 1,044
DEV RELSVC CED Certificate of Correction $ 800 S 812
DEV RELSVC CED Coastal Development Permit (CDP) - Single Family Lot $ 1,061 S 1,077
DEV RELSVC CED Coastal Development Permit-SCCRA $ 421 S 427
DEV REL SVC CED Conditional Use Permit (25% discount may apply) $ 4,418 $ 4,484
DEV RELSVC CED Construction Change Review - Major (fee plus $245 per sheet) $ 675 S 685
DEV REL SVC CED Construction Change Review - Minor (fee plus $155 per sheet) $ 479 $ 486
DEV REL SVC CED CUP - Amendment $ 2,378 S 2,413
DEV REL SVC CED CUP - Bio Habitat Preserve $ 832 $ 845
DEV RELSVC CED CUP - Extension -Regular $ 892 $ 906
DEV REL SVC CED CUP - Minor $ 740 S 751
DEV REL SVC CED Curb Cafe Permit-Village Review Area $ 349 $ 349
DEV REL SVC CED Daycare Permit $ 207 $ 210
DEV REL SVC CED
Developer Agreements - Deposit $10,000 increments (Consistent with City payroll records
+ overhead) Actual cost Actual cost
DEV RELSVC CED Duplicate Tracing Fees - Final Parcel Maps - per sheet (+ $32 per sheet) $ 22 $ 23
DEV REL SVC CED Duplicate Tracing Fees - Final Tract Maps - per sheet (+ $32 per sheet) S 22 $ 23
DEV REL SVC CED Easement Document Processing and Recording S 642 $ 652
DEV RELSVC CED Easement Document Processing and Recording (Minor) $ 115 $ 115
DEV RELSVC CED EIA-All Others S 1,703 S 1,728
DEV REL SVC CED EIA - Single Family $ 937 S 951
DEV REL SVC CED EIR - Addendum (+ fbhr after 1st 10 hrs of project planner) $ 2,476 $ 2,512
Page 10 90'
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION FY 2013-14 FEE FY 2014-15
PROPOSED FEE
DEV RELSVC CED
EIR - Focused/Supplemental (Requiring a Public Hearing) - (+ fbhr after the 1st 100 hrs of
project planner or 20 hrs of project engineer) $ 13,298 $ 13,495
DEV RELSVC CED EIR Review (+ fbhr after the first 160 hrs of project planner or 40 hrs of Project Engineer) $ 19,767 $ 20,060
DEV RELSVC CED Encroachment Agreement Processing $ 332 $ 337
DEV RELSVC CED Environmental Monitoring Fee $ 210 $ 214
DEV REL SVC CED Final Tract Map (+ $5 per Acre) $ 7,367 S 7,476
DEV RELSVC CED General Plan Amendment - 0 - 5 Acres $ 4,206 $ 4,268
DEV RELSVC CED General Plan Amendment - Over 5 Acres $ 6,067 $ 6,157
DEV REL SVC CED Grading Permit Extension Fee 25% permit tee 25% permit fee
DEV RELSVC CED Grading Permit Investigation Fee (Consistent with City payroll records plus overhead) Actual cost Actual cost
DEV REL SVC CED Green Building Standards Plancheck and Inspection $ 158 $ 160
DEV REL SVC CED Hillside Dev Permit - Other (Multiple Lots) $ 2,476 $ 2,512
DEV REL SVC CED Hillside Dev Permit-Minor $ 1,224 S 1,242
DEV REL SVC CED Hillside Dev Permit Amendment - Other (Multiple Lots) S 2,122 S 2,153
DEV REL SVC CED Hillside Dev Permit Amendment-Minor $ 696 $ 707
DEV RELSVC CED Amendment to the HMP Document Major (+ fbhr after first 20 hours of project planner) $ 5,267 $ 5,345
DEV RELSVC CED Amendment to Habitat Management Plan Document (Minor) $ 3,384 S 3,435
DEV RELSVC CED HMP - Permit - Amendment - Major (no onsite habitat to be preserved) 75% Original Fee 75% Original Fee
DEV REL SVC CED HMP Permit Amendment Minor 75% Original Fee 75% Original Fee
DEV RELSVC CED HMP - Permit - Amendment - Single Family Residence 75% Original fee 75% Original fee
DEV REL SVC CED HMP - Permit - Major $ 3,351 $ 3,909
DEV REL SVC CED HMP - Permit - Minor (no on site habitat to be preserved) $ 544 $ 552
DEV REL SVC CED HMP - Permit - Single Family 50% Minor Fee 50% Minor Fee
DEV REL SVC CED Improvement Construction Inspection Fee
DEV RELSVC CED Inspection - Additional Planning S 91 $ 93
DEV REL SVC CED Inspection Overtime-per Hour (On Request) - each additional hour at $70 $ 114 S 116
DEV RELSVC CED Landscape Inspection
DEV RELSVC CED Landscape Plan Check
DEV REL SVC CED Local Coastal Plan - Amendment $ 6,148 $ 6,240
DEV REL SVC CED Local Facilities Management Fees - As established by Council Full Cost Full Cost
DEV RELSVC CED Major Trail Plan Check > 1 mile $ $ 1,400
DEV RELSVC CED Minor Trail Plan Check < 1 mile s $ 700
DEV RELSVC CED Master Plan (+ fbhr after 1st 200 hrs project planner or 100 hrs project engineer) S 41,177 $ 41,788
DEV REL SVC CED Master Plan Amendment - (Minor) (+ fbhr after 1st 20 hrs Proj, Planner or 7 hrs Proj. Eng.) $ 1,643 $ 1,668
DEV REL SVC CED
Master Plan Amendment - Major (+ fbhr after 1st 100 hrs project planner or 40 hrs of
project engineer) $ 25,763 $ 26,145
DEV REL SVC CED Master Plan Pre-Submittal $ 7,003 $ 7,106
DEV REL SVC CED Neighborhood Improvement Agreements $ 157 S 157
DEV REL SVC CED Non Conforming Permit $ $ 697
DEV RELSVC CED Noticing Service (plus postage) $ 310 S 315
31
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION FY 2013-14 FEE FY 2014-15
PROPOSED FEE
DEV RELSVC CED Oversize Load Permit -1 trip (fee set by State) 5 16 S 16
DEV REL SVC CED Oversize Load Permit - Annual (fee set by State) $ 90 $ 90
DEV RELSVC CED Parcel Map (Minor Subdivision) - Final $ 3,307 $ 3,356
DEV RELSVC CED Park In Lieu Fee - Village Area $ 11,803 $ 11,978
DEV REL SVC CED PD - Non-Res - 4 or less $ 2,971 $ 3,015
DEV REL SVC CED PD - Non-Res - 5 to 50 $ 8,238 $ 8,360
DEV RELSVC CED PD - Non-Res - 51 or more $ 13,015 $ 13,208
DEV RELSVC CED PD Amendment - Non-Res - 5 to 50 $ 6,545 $ 6,643
DEV RELSVC CED PD Amendment - Non-Res - 51 or more $ 8,863 $ 8,995
DEV RELSVC CED PD Amendment- Non-Res - 4 or less $ 1,817 S 1,844
DEV REL SVC CED PD Res - 4 or less $ 2,971 S 3,015
DEV RELSVC CED PD Res - 5 to 50 $ 8,238 $ 8,360
DEV RELSVC CEO PD Res - 51 or more $ 13,015 S 13,208
DEV RELSVC CED PD Res. Amendment - 4 or less $ 1,600 $ 1,623
DEV RELSVC CED PD Res. Amendment - 5 to 50 S 6,102 S 6,192
DEV REL SVC CED PD Res. Amendment - 51 or more $ 8,227 S 8,349
DEV REL SVC CED Permit Amendments Not Specifically Identified 50% of original cost 50% of original cost
DEV RELSVC CED Planning Commission Determination - Other $ 1,611 $ 1,634
DEV RELSVC CED Planning Commission Determination - Single Family S 996 $ 1,010
DEV REL SVC CED Planning Commission Discussion Item $ 653 $ 663
DEV RELSVC CED Precise Development Plan $ 7,498 $ 7,609
DEV RELSVC CED Precise Development Plan - Amendment S 4,081 $ 4,141
DEV REL SVC CED Preliminary Plan Review - Consistency Determination $ 696 $ 707
DEV REL SVC CED Preliminary Plan Review - Major $ 696 $ 707
DEV RELSVC CED Preliminary Plan Review - Minor S 196 S 199
DEV REL SVC CED Preliminary Review - Redevelopment - Major $ 348 $ 353
DEV REL SVC CED Preliminary Review - Redevelopment - Minor S 196 S 199
DEV REL SVC CED Quitclaim of Easement $ 675 S 685
DEV REL SVC CED
Reversion to Acreage - (Consistent with City payroll records charged against a $3,100
deposit) Actual Cost Actual Cost
DEV RELSVC CED Right of Way Permit - Minor - Construction $ 343 $ 348
DEV RELSVC CED Right of Way Permit - Mlnor-Non Construction $ 169 S 171
DEV RELSVC CED Right of Way Permit - Utility (+ actual costs for Insp. and Sr. Insp. time) $ 729 $ 740
DEV RELSVC CED Right ot Way Permit - Utility (By Contract) S 729 $ 740
DEV RELSVC CED Satellite Antenna Permit $ 414 $ 420
DEV RELSVC CED SCCRA Amendment (Major) $ 1,447 $ 1,469
DEV REL SVC CED SCCRA Permit (Admin.) $ 666 $ 676
DEV RELSVC CED SCCRA Permit (Major) $ 3,438 $ 3,489
DEV REL SVC CED SCCRA Permit (Minor) $ 1,583 $ 1,606
9g
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION FY 2013-14 FEE FY 2014-15
PROPOSED FEE
DEV RELSVC CED SCCRA Permit Amendment (Admin.) $ 143 $ 145
DEV REL SVC CED SCCRA Permit Amendment (Minor) S 613 $ 622
DEV REL SVC CED SCCRA Permit Appeal - City Council $ 614 $ 623
DEV RELSVC CED SCCRA Permit Appeal - Planning S 556 $ 564
DEV RELSVC CED SCCRA Permit Extension (Major) $ 272 $ 276
DEV RELSVC CED SCCRA Permit Extension (Minor) $ 233 $ 237
DEV REL SVC CED SCCRA Permit Variance (Minor or Major) $ 408 S 415
DEV REL SVC CED SCCRA Permit Variance Administrative $ 140 $ 142
DEV RELSVC CED SCCRA Sidewalk Sign/Outdoor Display $ 59 $ 60
DEV RELSVC CED SCCRA Sign Program $ 124 $ 126
DEV REL SVC CED SCCRA Sign Program Amendment S 81 $ 82
DEV REL SVC CED School Fees - (Set by School Districts, State Mandates Limits) Set by School Districts Set by School Districts
DEV REL SVC CED Secured Agreement Proc. Extension $ 403 $ 409
DEV REL SVC CED Secured Agreement Proc. Replace -+ Improvement plan revision fees it required $ 740 $ 751
DEV REL SVC CED
Segregation of Assessments -1- 4 lots (Consistent with City payroll records plus overhead,
consultant cost and recording fee) Actual Cost Actual Cost
DEV REL SVC CED
Segregation of Assessments - 5 lots or more - fee plus $20 per lot (Consistent with City
payroll records plus overhead, consultant cost and recording fee) Actual Cost Actual Cost
DEV RELSVC CED
Service Installation Fee - Fire Hydrant Lateral and Assembly (staff time consistent with City
payroll records) Actual Cost Actual Cost
DEV REL SVC CED
Service Installation Fee - Fire Sprinkler Lateral (staff time consistent with City payroll
records) Actual Cost Actual Cost
DEV RELSVC CED Sidewalk Tables and Chairs-Village Review Area $ 59 $ 60
DEV RELSVC CED Sign Permit $ 60 S 61
DEV RELSVC CED Sign Program Amendment, Non RDA $ 626 $ 635
DEV REL SVC CED Sign Program, Non RDA $ 1,039 S 1,055
DEV REL SVC CED Site Development Plan (Minor) S 4,402 $ 4,467
DEV REL SVC CED Site Development Plan (Major) S 11,165 $ 11,331
DEV RELSVC CED Site Development Plan Amendment (Major) $ 7,563 S 7,675
DEV REL SVC CED Site Development Plan Amendment (Minor) $ 2,938 $ 2,982
DEV REL SVC CED Special Use Permit - Scenic Corridor $ 3,439 S 3,490
DEV RELSVC CED Special Use Permit - Flood Plain $ 3,809 S 3,865
DEV RELSVC CED Special Use Permit - Flood Plain, Coastal High Hazard Area $ 2,753 S 2,794
DEV RELSVC CED Special Use Permit Amendment - Flood Plain $ 3,303 S 3,352
DEV RELSVC CED Special Use Permit Amendments - All Other $ 2,389 $ 2,424
DEV RELSVC CED Specific Plan (+ fbhr after 1st 200 hrs project planner or 60 hrs project engineer) $ 34,392 $ 34,903
DEV RELSVC CED Specific Plan Amendment (Major) (+ fbhr after 180 hr proj planner or 30hrs Proj eng) S 22,134 S 22,462
DEV RELSVC CED Specific Plan Amendment (Minor) (+ fbhr after 20 hr proj planner or 7hrs Proj eng) $ 1,431 $ 1,452
DEV REL SVC CED Street Name Change $ 1,611 S 1,634
DEV RELSVC CED Street/Public Service Easement Vacation Regular S 3,291 $ 3,340
DEV REL SVC CED Street/Public Service Easement Vacation Summary $ 1,306 $ 1,325
DEV REL SVC CED Substantial Conformance Exhibit Rev. $ 996 $ 1,010
Page 13 99
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION FY 2013-14 FEE FY 2014-15
PROPOSED FEE
DEV REL SVC CED Tentative Map Revision - 5- 49 Units/Lots + S40ea 5+ (whichever is greater) $ 4,054 $ 4,114
DEV REL SVC CED Tentative Map Revision - 50+ Units/Lots + $15ea 49+ (whichever is greater) S 7,498 $ 7,609
DEV REL SVC CED Tentative Parcel Map lyr Extension (per application) $ 1,453 $ 1,474
DEV RELSVC CED Tentative Parcel Map Processing Fee (Minor Subdivision) S 3,749 $ 3,804
DEV REL SVC CED Tentative Tract Map - 5 -49 Lots/Units + $110ea. > 5 (whichever is greater) $ 8,118 S 8,238
DEV RELSVC CED Tentative Tract Map - 50+ Lots/Units + $15ea 49+ (whichever is greater) $ 16,225 S 16,466
DEV REL SVC CED Tentative Tract Map Extension- 5 to 49 S 2,846 $ 2,888
DEV RELSVC CED Third Party Review - plus consultant cost $ 735 $ 745
DEV REL SVC CED
STORM WATER POLLUTION
PREVENTION PLAN REVIEW Tier Level 1 - Per Site - Low Inspection Priority $ 48 $ 48
DEV RELSVC CED
STORM WATER POLLUTION
PREVENTION PLAN INSPECTION Tier Level 1 - Per Site - Low Inspection Priority $ 57 $ 58
DEV REL SVC CED
STORM WATER POLLUTION
PREVENTION PLAN REVIEW Tier Level 1 - Per Site - Medium Inspection Priority $ 52 $ 53
DEV RELSVC CED
STORM WATER POLLUTION
PREVENTION PLAN INSPECTION Tier Level 1 - Per Site - Medium Inspection Priority $ 221 S 224
DEV RELSVC CED
STORM WATER POLLUTION
PREVENTION PLAN REVIEW Tier Level 2 - Per Site - High Inspection Priority $ 344 S 349
DEV RELSVC CED
STORM WATER POLLUTION
PREVENTION PLAN INSPECTION Tier Level 2 - Per Site - High Inspection Priority $ 1,221 $ 1,239
DEV RELSVC CEO
STORM WATER POLLUTION
PREVENTION PLAN REVIEW Tier Level 2 - Per Site - Medium Inspection Priority S 344 $ 349
DEV REL SVC CED
STORM WATER POLLUTION
PREVENTION PLAN INSPECTION Tier Level 2 - Per Site - Medium Inspection Priority $ 839 $ 851
DEV REL SVC CED
STORM WATER POLLUTION
PREVENTION PLAN REVIEW Tier Level 3 - Each Subsequent Acre Or Portion Over One Acre - High Inspection Priority $ 80 $ 81
DEV RELSVC CED
STORM WATER POLLUTION
PREVENTION PLAN INSPECTION Tier Level 3 - Each Subsequent Acre Or Portion Over One Acre - High Inspection Priority $ 337 $ 342
DEV RELSVC CED
STORM WATER POLLUTION
PREVENTION PLAN REVIEW
Tier Level 3 - Each Subsequent Acre Or Portion Over One Acre - Medium Inspection
Priority $ 64 $ 65
DEV REL SVC CED
STORM WATER POLLUTION
PREVENTION PUN INSPECTION
Tier Level 3 - Each Subsequent Acre Or Portion Over One Acre - Medium Inspection
Priority S 209 $ 212
DEV REL SVC CED
STORM WATER POLLUTION
PREVENTION PLAN REVIEW Tier Level 3 - Up to 1 Acre - High Inspection Priority S 691 $ 701
DEV REL SVC CED
STORM WATER POLLUTION
PREVENTION PLAN INSPECTION Tier Level 3 - Up to 1 Acre - High Inspection Priority $ 2,066 $ 2,097
DEV REL SVC CED
STORM WATER POLLUTION
PREVENTION PLAN REVIEW Tier Level 3 - Up to 1 Acre - Medium Inspection Priority $ 533 $ 541
DEV RELSVC CED
STORM WATER POLLUTION
PREVENTION PLAN INSPECTION Tier Level 3 - Up to 1 Acre - Medium Inspection Priority $ 1,217 $ 1,235
DEV REL SVC
PARKS &
RECREATION Trails Inspection $ S 300
DEV RELSVC CED Variance - Administrative (Planning) $ 740 $ 751
DEV REL SVC CED Variance - Administrative (Planning) Recreational Vehicle Admin. Variance $ 742 $ 753
DEV RELSVC CED Variance - Engineering $ 740 $ 751
DEV RELSVC CED Variance - Planning $ 2,786 $ 2,827
DEV RELSVC CED Village Area Noticing Fee (Minor) - plus postage $ 217 S 217
DEV REL SVC CED Village Area Permit Amendment (Minor) - plus noticing costs $ 582 $ 591
DEV RELSVC CED Village Area Review (Major) - plus noticing costs $ 2,971 $ 3,015
DEV REL SVC CED Village Area Review (Minor) - plus noticing costs $ 1,621 S 1,645
DEV REL SVC CED Village Area Review Permit Amendment (Admin) $ 171 $ 174
DEV REL SVC CED Village Area Sidewalk Outdoor Dining and Curb Cafe (max of 2 parking spaces) Annual $ 1,200 S 1,200
DEV REL SVC CED Village Area Sign Program S 293 S 297
DEV REL SVC CED Village Area Sign Program Amendment $ 71 $ 72
DEV RELSVC CED Village Permit Appeal-City Council (+ noticing costs) fee is refundable if appeal is won $ 663 $ 673
100
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION FY 2013-14 FEE FY 2014-15
PROPOSED FEE
DEV REL SVC CED
Village Permit Appeal-Planning Commission (+ noticing costs) fee is refundable if appeal is
won $ 663 $ 673
DEV RELSVC CED Village Review Amendment (Major) - plus noticing costs $ 1,428 S 1,449
DEV REL SVC CED Village Review Area Sidewalk Sign/Outdoor Display Permit $ 60 $ 61
DEV RELSVC CED Village Review Permit (Admin.) $ 435 $ 442
DEV REL SVC CED Village Review Permit Extension (Major) - plus noticing costs $ 691 $ 701
DEV REL SVC CED Village Review Permit Extension (Minor) - plus noticing costs $ 595 $ 603
DEV RELSVC CED Village Review Permit Noticing Fee (Major) - plus postage $ 407 $ 407
DEV REL SVC CED Village Review Permit Variance - Administrative $ 185 $ 188
DEV REL SVC CED Village Review Permit Variance (Minor or Major) $ 414 S 420
DEV REL SVC CED
Zone Change - 5 or fewer acres - 25% discount will apply when submitted with a General
Plan Amendment $ 4,832 S 4,903
DEV REL SVC CED
Zone Change - 5.1 or more acres - 25% discount will apply when submitted with a General
Plan Amendment S 6,545 $ 6,643
DEV REL SVC CED Zone Code Amendment $ 6,230 $ 6,322
DEV REL SVC CED Zoning Compliance Letter $ 82 $ 83
DEV RELSVC CED
STORM WATER MANAGEMENT
PLAN Inspection Fee - For Each Subsequent Acre Or Portion Over One Half Acre $ 109 $ 111
DEV RELSVC CED
STORM WATER MANAGEMENT
PLAN Inspection Fee - Up to One Half Acre $ 275 $ 279
DEV RELSVC CED License Tax on New Construction - Mobile Homes $ 2,159 S 2,255
DEV RELSVC CED Plumbing, Electrical and Mechanical Permit (not combined with Building Permits) S 160 $ 160
DEV REL SVC CED Improvement Agreement Extension - see Secured Agreement Proc. Ext. S $
DEV REL SVC CED Lighting and Landscape District #2 Annexation $ 5,400 $ 5,400
DEV RELSVC CED Minor Grading Plan Review $ 952 $ 952
DEV REL SVC CED
STORM WATER MANAGEMENT
PLAN Plan Review Fee - For Each Subsequent Acre Or Portion Over One Halt Acre S 118 $ 120
DEV REL SVC CED
STORM WATER MANAGEMENT
PLAN Plan Review Fee - Up To One Half Acre $ 327 $ 332
DEV REL SVC CED Reapportionment Fees for 1911 Act Assessment Districts Actual Cost Actual Cost
DEV RELSVC CED Street Light Energizing Fee
DEV REL SVC CED Retaining Wall Plancheck (Valuation $250,000+)
0.5% of Engineer's
Estimate ($2,000 min.)
0.5% of Engineer's
Estimate ($2,000 min.)
DEV REL SVC CED Retaining Wall Plancheck (Valuation $50,001-$250,000)
$500 + 0.5% of
Engineer's Estimate
$500 + 0.5% of
Engineer's Estimate
DEV REL SVC CED Retaining Wall Plancheck (Valuation=0-$50,000) $ 525 $ 533
DEV RELSVC CED Tentative Tract Map Litigation Stay 25% of original tee 25% of original fee
DEV RELSVC CED Agricultural Mitigation Fee $ 10,000 S 10,000
DEV REL SVC CED Fish & Wildlife Fee - EIR - Set by Dept. of Fish and Wildlife $3,045.25 $3,079.75
DEV RELSVC CED Fish & Wildlife Fee - Negative Declaration - Set by Dept. of Fish and Wildlife $ 2,206.25 $ 2,231,25
DEV REL SVC CED Hillside Development Permit Extension - Other (Multiple Lots) 25% of original fee 25% of original fee
DEV RELSVC CED Hillside Development Permit Extension - Single Family Lot 25% of original fee 25% of original fee
DEV RELSVC CED Major Site Development Plan (Non Res) Extension 25% of original fee 25% of original fee
DEV REL SVC CED Minor Conditional Use Permit - Amendment S 563 S 571
DEV REL SVC CED Minor Conditional Use Permit Extension 50% of original fee 50% of original fee
DEV REL SVC CED Minor Site Development Plan Extension 25% of original tee 25% of original fee
DEV RELSVC CED PD - Non-Res - 4 or less Extension 25% of original fee 25% of original fee
10/
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION FY 2013-14 FEE FY 2014-15
PROPOSED FEE
DEV RELSVC CED PD - Non-Res - 5 to 50 Extension 25% of original tee 25% of original fee
DEV RELSVC CED PD - Non-Res - 51 or more Extension 25% of original fee 25% of original fee
DEV REL SVC CED PD Res - 4 or less Extension 25% of original fee 25% ot original fee
DEV REL SVC CED PD Res - 51 or more Extension 25% ot original fee 25% of original fee
DEV RELSVC CED PD Res 5 to 50 Extension 25% of original fee 25% of original fee
DEV REL SVC CED Special Use Permit - Extension 25% of original fee 25% of original fee
DEV RELSVC CED Wireless Communication 3rd Party Review (vendor costs) Actual Cost Actual Cost
DEV REL SVC FINANCE Community Facilities District Annexation $ 1,752 $ 1,752
DEV RELSVC FIRE Expedited Fire Plan Review Service Fee Actual Cost + $25 Actual Cost + $25
DEV RELSVC FIRE
FIRE PROTECTION SYSTEM
INSTALLATION FEES Fire Protection System Installation S $
DEV REL SVC HNS Affordable Housing Credit Per Unit (Northwest Quadrants) $ 142,000 $ 142,000
DEV REL SVC HNS Affordable Housing Credit Per Unit-Villa Loma (Southeast and Southwest quadrants) $ 48,000 $ 48,000
DEV RELSVC HNS Affordable Housing Credit Per Unit-Cassia Heights (Southeast and Southwest quadrants) $ 55,636 $ 56,462
DEV REL SVC HNS Code Enforcement Court costs Court costs
DEV REL SVC IT GIS Digital Data Delivery (per hour Technician plus overhead) Actual Cost Actual Cost
DEV REL SVC IT GIS Production ot new documents (per hour Technician plus materials and overhead) Actual Cost Actual Cost
DEV REL SVC IT GIS Reproduction of Existing Documents (per hour Technician plus material and overhead) Direct cost Direct cost
DEV REL SVC IT GIS Technical Services (per hour Manager plus overhead) Actual Cost Actual Cost
DEV REL SVC IT GIS Technical Services (per hour Technician plus overhead) Actual Cost Actual Cost
DEV RELSVC UTILITIES WATER DISTRICT SERVICE FEES
Preliminarv Potable Water, Reclaimed Water, Sewer Analysis Review - (Use Improvement
Plan Review Fees) $ $
DEV REL SVC UTILITIES WATER DISTRICT SERVICE FEES Hydraulic Analysis Only - Included in Improvement Plan Review Fees S s
DEV REL SVC UTILITIES WATER DISTRICT SERVICE FEES Water Meter Installation - 6" (Consistent with City payroll records plus overhead) Actual Cost Actual Cost
DEV RELSVC UTILITIES WATER DISTRICT SERVICE FEES Water Meter Installation-1" $ 317 $ 317
DEV RELSVC UTILITIES WATER DISTRICT SERVICE FEES Water Meter Installation -1-1/2" $ 574.50 $ 574.50
DEV RELSVC UTILITIES WATER DISTRICT SERVICE FEES Water Meter Installation -1-1/2" - Turbo $ 961.20 $ 961.20
DEV RELSVC UTILITIES WATER DISTRICT SERVICE FEES Water Meter Installation - 2" $ 771.60 S 771.60
DEV RELSVC UTILITIES WATER DISTRICT SERVICE FEES Water Meter Installation -2" -Turbo $ 987.11 S 987,11
DEV REL SVC UTILITIES WATER DISTRICT SERVICE FEES Water Meter Installation - 3" (Consistent with City payroll records plus overhead) Actual Cost Actual Cost
DEV REL SVC UTILITIES WATER DISTRICT SERVICE FEES Water Meter Installation - 3/4" $ 301 $ 301
DEV RELSVC UTILITIES WATER DISTRICT SERVICE FEES Water Meter Installation- 4" (Consistent with City payroll records plus overhead) Actual Cost Actual Cost
DEV REL SVC UTILITIES WATER DISTRICT SERVICE FEES Water Meter Installation - 5/8" $ 268 $ 268
DEV RELSVC UTILITIES WATER DISTRICT SERVICE FEES Water Meter Installation - 8" (Consistent with City payroll records plus overhead) Actual Cost Actual Cost
DEV RELSVC UTILITIES WATER DISTRICT SERVICE FEES Water Meter Installation Fee - Fire Protection
Meter Fee-Use Rate
Sheet
Meter Fee-Use Rate
Sheet
DEV REL SVC UTILITIES WATER DISTRICT SERVICE FEES
Potable, Reclaimed and Sewer Improvement Plan Review - Use Improvement Plan Review
Fees
DEV RELSVC UTILITIES WATER DISTRICT SERVICE FEES Potable, Reclaimed and Sewer Standards and Specifications (available on Internet) N/C N/C
DEV RELSVC UTILITIES WATER DISTRICT SERVICE FEES Reclaimed Water Landscape Review - Use Improvement Plan Review fees
DEV RELSVC UTILITIES WATER DISTRICT SERVICE FEES San Diego County Water Auth. Capacity Charge - Set by SDCWA Set by SDCWA Set by SDCWA
DEV RELSVC UTILITIES WATER DISTRICT SERVICE FEES Utility Standards and Specifications (actual cost of reproduction) Actual Cost Actual Cost
103
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION FY 2013-14 FEE FY 2014-15
PROPOSED FEE
DEV REL SVC UTILITIES SEWER Waste Water Discharge Permit $ 42 $ 42
DEV REL SVC UTILITIES SEWER Waste Water Pretreatment - Class 1 - One time fee for new users $ 284 S 288
DEV RELSVC UTILITIES SEWER Waste Water Pretreatment - Class 1 (per month) - Existing user $ 210 $ 213
DEV REL SVC UTILITIES SEWER Waste Water Pretreatment - Class II - One time fee for new users S 284 S 288
DEV RELSVC UTILITIES SEWER Waste Water Pretreatment - Class II (per month) - Existing user S 200 $ 202
DEV REL SVC UTILITIES SEWER Waste Water Pretreatment - Class III - One time tee for new users $ 84 5 85
DEV REL SVC UTILITIES SEWER Waste Water Pretreatment - Class III (per month) - Existing user $ 32 S 32
(7) - See attached schedules and rate tables.
(8) - Streets and Higliways Code Section 8760-8769
(9) - Based on number of units or lots whichever is greater
(10) - Plus Fish and Wildlife Department fee, if any. Environmental filing fees are set by
Fish and Wildlife Code 711.4
(11) - A 25% discount may apply when submitted with another application
(12) - A 25% discount vyill apply when submitted with a General Plan Amendment
IDS
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION NOTES FY 2013-14 FEE FY 2014-15
PROPOSED FEE
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit - High-Piled Combustible Storage S 326 $ 331
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit - Hazardous Materials Use and Storage $ 261 $ 265
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit - Brazing, Soldering and Welding S 120 $ 121
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit - Temporary Use - Tents (Major) S 288 $ 293
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit - Temporary Use - Tents (Minor) $ 131 $ 133
SCHEDULE 01 FIRE ADMINISTRATIVE Inspection-Weed Abatement Compliance Certificate $ 117 S 119
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit - Motor Vehicle Repair Garages s 172 S 174
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit - Combustible Fiber Use and Storage $ 185 S 138
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit - Misc, Combustible Storage/Tires Facility $ 174 S 177
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit - Compressed Gases/Cryogen Storage Use $ 120 S 1P1
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit - Dry Cleaning $ 185 S 1RR
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit - Dust Producing Operations S 135 S 188
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit - Flammable and Combustible Liquids Dispensing, Use, Storage Tanks $ 131 $ 133
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit - Flammable Finishes $ 120 $ 121
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit - Temporary Use - Carnivals and Fairs $ 261 S 265
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit - Pyrotechnics or Special Effects, Aerial Fireworks (per event or day) S 343 S 346
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit - Industrial Ovens-Kilns $ 180 S 182
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit - Refrigeration Equipment Install or Operate $ 185 S 188
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit- Medical Gas Dispensing System $ 256 S 2 fin
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit- Liquefied Petroleum Gas $ 131 $ 133
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit - Covered Mall $ 120 $ 121
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit - Candles or Open Flame - Public Assembly $ 120 $ 121
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit- Aerosol Use/Storage s 120 S 171
SCHEDULE 01 FIRE
FIRE PROTECTION SYSTEM
INSTALLATION FEES Permit-Automatic Sprinkler System - Commercial System 13-R - Plan Check s 1.274 S 1
SCHEDULE 01 FIRE
FIRE PROTECTION SYSTEM
INSTALLATION FEES
Permit-Automatic Sprinkler System - Commercial System - each additional riser - Plan
Check $ 637 $ 646
SCHEDULE 01 FIRE
FIRE PROTECTION SYSTEM
INSTALLATION FEES Permit-Automatic Sprinkler System - Residential System 13-D - Plan Review S 69 S 70
SCHEDULE 01 FIRE
FIRE PROTECTION SYSTEM
NSTALLATION FEES Permit-Automatic Sprinkler System - Tenant Improvement - Plan Review S 69 $ 70
SCHEDULE 01 FIRE
FIRE PROTECTION SYSTEM
NSTALLATION FEES Permit-Fire Alarm Systems -1 to 25 devices - Plan Review Minimum $ 64 S 65
SCHEDULE 01 FIRE
FIRE PROTECTION SYSTEM
NSTALLATION FEES Permit-Fire Alarm Systems - 26 or more - Plan Review $ 106 S 103
SCHEDULE 01 FIRE
FIRE PROTECTION SYSTEM
NSTALLATION FEES Permit-Other Fixed Fire Systems - Hood and Duct S 69 $ 70
SCHEDULE 01 FIRE
FIRE PROTECTION SYSTEM
NSTALLATION FEES Permit-Other Fixed Fire Systems - Paint Spray Booth Plan Review s 139 S 141
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit-Spray Booth S 152 $ . 155
SCHEDULE 01 FIRE
FIRE PROTECTION SYSTEM
NSTALLATION FEES Permit-Other Fixed Fire Systems - Special Chemical Agent 5 69 $ 70
SCHEDULE 01 FIRE
FIRE PROTECTION SYSTEM
NSTALLATION FEES Permit-Other Fixed Fire Systems - Standpipe S 85 $ 86
SCHEDULE 01 FIRE NSPECTION nspection-Repeated Inspection on New Construction $ 80 S ai
SCHEDULE 01 FIRE ADMINISTRATIVE PERMIT-Flrewatch $ 245 5
SCHEDULE 01 FIRE ADMINISTRATIVE Alternative Materials and Methods $ 1.668 S 1 fifiR
SCHEDULE 01 FIRE ADMINISTRATIVE Fire Safety Standby S 245 S
SCHEDULE 01 FIRE NSPECTION nspection-Underground Fire Protection Service Main Repair-Inspection Only $ 529 S 537
/
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION NOTES FY 2013-14 FEE FY 2014-15
PROPOSED FEE
SCHEDULE 01 FIRE INSPECTION Inspection-Underground Storage Tanks-New Inspection Only $ 284 $ 284
SCHEDULE 01 FIRE
FIRE PROTECTION SYSTEM
INSTALLATION FEES
Permit-Underground Fire Protection Service Main: Single Hydrant or Single Riser
Connection. $ 624 S 624
SCHEDULE 01 FIRE INSPECTION Permit-Underground Fire Protection Service Main Repair $ 435 S 441
SCHEDULE 01 FIRE INSPECTION Inspectlon-Knox System $ 16Si $ 169
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit-Emergency and Standby Power Systems $ 434 $ 434
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit-Battery Systems S 624 S 624
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit-Wood Products $ 245 S 245
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit-Miscellaneous Combustible Storage $ 529 S 529
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit-Above Ground Storage Tanks $ 529 $ 529
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit-Underground Storage Tanks-(Single Site Multi Tanks) S 1,098 $ 1,098
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit-Vapor Expansion Tank Retrofit-UST/AST $ 529 $ 529
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit-Assembly Occupancy A-1 $ 529 $ 529
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit Assembly Occupancy A-2 $ 340 $ 340
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit Assembly Occupancy A-3 $ 245 $ 245
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit-Child Day Care, E or 1-4 $ 245 S 245
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit-Fumigation or Thermal Insecticidal Fogging $ 245 5 245
SCHEDULE 01 FIRE OPERATIONAL PERMIT Permit-Exhibits and Trade Shows-Public Assembly $ 435 $ 435
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION NOTES FY 2013-14 FEE FY 2014-15
PROPOSED FEE
SCHEDULE 02 CED GRADING PLANCHECK FEES 100 Cubic Yards or Less $ 417 $ 423
SCHEDULE 02 CED GRADING PLANCHECK FEES
101 to 1,000 Cubic Yards - tor the first 100 CY plus $120 for each additional 100 CY or
fraction thereof $ 834 S 847
SCHEDULE 02 CED GRADING PLANCHECK FEES
1,001 to 10,000 Cubic Yards - for the first 1,000 CY plus $120 for each additional 1,000 CY
or fraction thereof S 2,497 $ 2,534
SCHEDULE 02 CED GRADING PLANCHECK FEES
10,001 to 100,000 Cubic Yards - for the first 10,000 CY plus $180 for each additional
10,000 CY or traction thereof $ 3,930 S 3,989
SCHEDULE 02 CED GRADING PLANCHECK FEES
100,001 to 200,000 Cubic Yards - tor the first 100,000 CY plus $285 for each additional
10,000 CY or fraction thereof $ 5,994 $ 6,083
SCHEDULE 02 CED GRADING PLANCHECK FEES
200,001 Cubic Yards or more - for the first 200,000 CY plus $130 tor each additional
100,000 CY or fraction thereof $ 9,616 $ 9,759
/Dip
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION FY 2013-14 FEE FY 2014-15
PROPOSED FEE
SCHEDULE 03 CED GRADING PERMIT FEES 100 Cubic Yards or Less $ 417 s 423
SCHEDULE 03 CED GRADING PERMfT FEES
101 to 1,000 Cubic Yards - for the first 100 CY plus $65 for each additional 100 CY or
fraction thereof $ 423 $ 429
SCHEDULE 03 CED GRADING PERMIT FEES
1,001 to 10,000 Cubic Yards - for the first 1,000 CY plus $65 for each additional 1,000 CY
or fraction thereof $ 1,186 $ 1,203
SCHEDULE 03 CED GRADING PERMfT FEES
10,001 to 100,000 Cubic Yards - for the first 10,000 CY plus $130 for each additional
10,000 CY or fraction thereof $ 1,960 $ 1,989
SCHEDULE 03 CED GRADING PERMrr FEES
100,001 to 200,000 Cubic Yards - for the first 100,000 CY plus $130 for each additional
10,000 CY or traction thereof $ 3,436 $ 3,486
SCHEDULE 03 CED GRADING PERMIT FEES
200,001 TO 400,000 Cubic Yards - for the first 200,000 CY plus $195 for each additional
10,000 CY or fraction thereof $ 5,072 $ 5,147
SCHEDULE 03 CED GRADING PERMIT FEES
400,000 to 1,000,000 Cubic Yards - for the first 400,000 CY plus $980 for each additional
100,000 CY or fraction thereof $ 10,067 $ 10,216
SCHEDULE 03 CED GRADING PERMIT FEES
1,000,001 Cubic Yards or More - for the first 1,000,000 CY plus $710 for each additional
100,000 CY or fraction thereof s 17,564 s 17,825
107
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION FY 2013-14 FEE FY 2014-15
PROPOSED FEE
SCHEDULE 04 CED
IMPROVEMENT CONSTRUCTION
INSPECTION FEES Cost of Improvements $0 to $20,000 5.5%-$375 Minimum 5.5%-$375 Minimum
SCHEDULE 04 CED
IMPROVEMENT CONSTRUCTION
INSPECTION FEES
Cost of Improvements - $20,001 to $50,000 - for the first $20,000 plus $250 for each
additional $10,000 or fraction thereof S 1,657 $ 1,682
SCHEDULE 04 CED
IMPROVEMENT CONSTRUCTION
INSPECTION FEES
Cost of Improvements - $50,001 to $100,000 - for the first $50,000 plus $125 for each
additional $10,000 or fraction thereof S 3,321 S 3,370
SCHEDULE 04 CED
IMPROVEMENT CONSTRUCTION
INSPECTION FEES
Cost of Improvements - $100,001 to $250,000 - for the first $100,000 plus $100 for each
additional $10,000 or fraction thereof $ 4,150 $ 4,212
SCHEDULE 04 CED
IMPROVEMENT CONSTRUCTION
INSPECTION FEES
Cost of improvements - $250,001 to $500,000 - for the first $250,000 plus $105 for each
additional $10,000 or fraction thereof $ 6,147 $ 6,238
SCHEDULE 04 CED
IMPROVEMENT CONSTRUCTION
INSPECTION FEES
Cost ot Improvements - $500,001 to $1,000,000 - for the first $500,000 plus $105 for each
additional $10,000 or fraction thereof $ 9,978 S 10,127
SCHEDULE 04 CED
IMPROVEMENT CONSTRUCTION
INSPECTION FEES
Cost of Improvements - $1,000,001 or more - for the first $1,000,000 plus $105 for each
additional $10,000 or fraction thereof. S 15,917 $ 16,154
Page 22
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION FY 2013-14 FEE FY 2014-15
PROPOSED FEE
SCHEDULE 05 CED IMPROVEMENT PLAN REVIEW FEES Cost of Improvements - $0 to $20,000 - plus 5% of value of improvements $ 1,333 $ 1,353
SCHEDULE 05 CED IMPROVEMENT PLAN REVIEW FEES
Cost of improvements - $20,001 to $50,000 - plus 4% of value of improvements - $2,470
minimum S 1,702 $ 1,727
SCHEDULE 05 CED IMPROVEMENT PLAN REVIEW FEES
Cost of Improvements - $50,001 to $ 100,000 - plus 3% of value ot improvements - $4,090
minimum $ 2,195 S 2,228
SCHEDULE 05 CED IMPROVEMENT PLAN REVIEW FEES
Cost of Improvements - $100,001 to $250,000 - plus 2.5% of value of improvements -
$5,840 minimum $ 2,464 $ 2,501
SCHEDULE 05 CED IMPROVEMENT PLAN REVIEW FEES
Cost ot improvements - $250,001 to $500,000 - plus 2% of value of improvements -
$13,910 minimum S 7,454 $ 7,564
SCHEDULE 05 CED IMPROVEMENT PLAN REVIEW FEES
Cost of Improvements - $500,001 to $1,000,000 - plus 1.5% of value of improvements -
$23,840 minimum S 13,173 $ 13,368
SCHEDULE 05 CED IMPROVEMENT PLAN REVIEW FEES
Cost of Improvements - Over $1,000,0000 - plus 0.75% of value ot improvements -
$31,630 minimum $ 13,464 $ 13,664
Page 23 /e9
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION NOTES FY 2013-14 FEE FY 2014-15
PROPOSED FEE
SCHEDULE 06 CED STREET UGHT ENERGIZING FEES 100 Watts -13,700 Lumens $ 100.20 $ 111.90
SCHEDULE 06 CED STREET UGHT ENERGIZING FEES 150 Watts - 20,600 Lumens $ 135.30 $ 152.22
SCHEDULE 06 CED STREET LIGHT ENERGIZING FEES 250 Watts - 34,200 Lumens $ 205.50 $ 233.94
SCHEDULE 06 CED STREET LIGHT ENERGIZING FEES 40 Watts - 5,500 Lumens $ 58.08 $ 62.58
SCHEDULE 06 CED STREET LIGHT ENERGIZING FEES 80 Watts - 9,600 Lumens $ 86.16 $ 95.34
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION FY 2013-14 FEE FY 2014-15
PROPOSED FEE
SCHEDULE 07 CED LANDSCAPE INSPECTION FEES Cost of Improvements - $0 to $20,000 $ 582 $ 590
SCHEDULE 07 CED LANDSCAPE INSPECTION FEES
Cost of Improvements - $20,001 to $50,000 - for the first $20,000 of improvements plus
$20 for each additional $10,000 or fraction thereof $ 822 S 834
SCHEDULE 07 CED LANDSCAPE INSPECTION FEES
Cost of Improvements - $50,001 to $100,000 - for the first $50,000 of improvements plus
$20 for each additional $10,000 or traction thereof $ 1,154 $ 1,171
SCHEDULE 07 CED LANDSCAPE INSPECTION FEES
Cost of improvements - $100,001 to $250,000 - for the first $100,000 of improvements
plus $150 for each additional $100,000 or fraction thereof S 1,643 $ 1,668
SCHEDULE 07 CED LANDSCAPE INSPECTION FEES
Cost of Improvements - $250,001 to $750,000 - for the first $250,000 of improvements
plus $150 for each additional $100,000 or fraction thereof S 1,975 $ 2,004
SCHEDULED? CED LANDSCAPE INSPECTION FEES
Cost of Improvements - $750,001 and Over - for the first $750,000 of improvements plus
$150 for each additional $100,000 or fraction thereof $ 3,123 $ 3,170
Page IS
11/
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION FY 2013-14 FEE FY 2014-15
PROPOSED FEE
SCHEDULE 08 CED LANDSCAPE PLAN CHECK FEES Cost of Improvements - $0 to $20,000 $ 582 $ 590
SCHEDULE 08 CED LANDSCAPE PLAN CHECK FEES Cost of improvements - $20,001 to $50,000 - Plus 3.0% over $20,000 $ 827 $ 839
SCHEDULE 08 CED LANDSCAPE PLAN CHECK FEES Cost of Improvements - $50,001 to $100,000 - Plus 1.5% over $50,000 $ 2,389 S 2,424
SCHEDULE 08 CED LANDSCAPE PUN CHECK FEES Cost of Improvements - $100,001 to $250,000 - Plus 2% over $100,000 $ 3,513 $ 3,513
SCHEDULE 08 CED LANDSCAPE PLAN CHECK FEES Cost of Improvements - $250,001 to $500,000 - Plus 0.15% over $250,000 $ 4,412 $ 4,412
SCHEDULE 08 CED UNDSCAPE PLAN CHECK FEES Cost of Improvements - $500,001 to $1,000,000 - Plus 0.1 over $500,000 S 5,436 $ 5,516
SCHEDULE 08 CED LANDSCAPE PUN CHECK FEES Cost of improvements - Over $1,000,000 - plus 0.07% over $1,000,000 $ 8,237 $ 8,360
112
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION FY 20U-14 FEE FY 2014-15
PROPOSED FEE
SCHEDULE 09 CED BUILDING PERMIT FEES
Additional plan review required by changes, additions or revisions to approved plans - per
hour - (minimum charge - one half hour) $ 65 $ 65
SCHEDULE 09 CED BUILDING PERMIT FEES
Inspections for which no fee is specifically indicated - per hour - (minimum charge - one
half hour) $ 65 $ 65
SCHEDULE 09 CED BUILDING PERMIT FEES Inspections outside of normal business hours - per hour - (minimum charge - 2 hours) $ 65 $ 65
SCHEDULE 09 CED BUILDING PERMIT FEES Reinspectlon fees - per hour $ 65 $ 65
SCHEDULE 09 CED BUILDING PERMIT FEES Total Valuation - $1 to $500 $ 16.45 $ 14.81
SCHEDULE 09 CED BUILDING PERMIT FEES
Total Valuation - $501 to $2,000 - for the first $500 plus $1.93 tor each additional $100 or
fraction thereof, to and Including $2,000 $ 16.45 $ 14.81
SCHEDULE 09 CED BUILDING PERMIT FEES
Total Valuation - $2,001 to $25,000 - for the first $2,000 plus $8.82 for each additional
$1,000, or fraction thereof, to and including $25,000 $ 48.47 5 43.63
SCHEDULE 09 CED BUILDING PERMIT FEES
Total Valuation - $25,001 to $50,000 - for the first $25,000 plus $6.36 for each additional
$1,000, or fraction thereof, to and including $50,000 S 273.87 $ 246.49
SCHEDULE 09 CED BUILDING PERMIT FEES
Total Valuation - $50,001 to $100,000 - for the first $50,000 plus $4.41 for each additional
$1,000, or fraction thereof, to and including $100,000 $ 450.62 S 405.56
SCHEDULE 09 CED BUILDING PERMIT FEES
Total Valuation - $100,001 to $500,000 - for the first $100,000 plus $3,53 for each
additional $1,000, or fraction thereof, to and including $500,000. $ 695.62 $ 626.06
SCHEDULE 09 CED BUILDING PERMIT FEES
Total Valuation - $500,001 to $1,000,000 - for the first $500,000 plus $3.00 for each
additional $1,000, or traction thereof, to and including $1,000,000 $ 2,263.62 $ 2,037.26
SCHEDULE 09 CED BUILDING PERMIT FEES
Total Valuation - $1,000,001 and up - for the first $1,000,000 plus $1.99 for each
additional $1,000 or fraction thereof $ 3,926.12 $ 3,533.51
(14) Notwithstanding the provisions of this section, the building permit fee for factory
built housing shall be twenty-five percent of the fee shown in Schedule #9, and the
plan check fee shall be seventy percent of the building permit fee.
113
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION NOTES FY 2013-14 FEE FY 2014-15
PROPOSED FEE
SCHEDULE 10 CED
PLUMBING PERMIT OTHER
INSPECTIONS FEES
Additional plan review required by changes, additions or revisions to approved plans,
(minimum charge - one half hour) $ 32 S 32
SCHEDULE 10 CED
PLUMBING PERMIT UNIT FEE
SCHEDULE For atmospheric-type vacuum breakers not Included in above item: 1 to 5 $ 5 $ 5
SCHEDULE 10 CED
PLUMBING PERMIT UNIT FEE
SCHEDULE For atmospheric-type vacuum breakers not included in above item: Over 5 each $ 1 S 1
SCHEDULE 10 CED
PLUMBING PERMIT UNIT FEE
SCHEDULE For each additional gas-piping system outlet, per outlet $ 1 S 1
SCHEDULE 10 CED
PLUMBING PERMIT UNIT FEE
SCHEDULE
For each backflow protective device other than atmospheric type vacuum breakers: 2 inch
diameter and smaller $ 7 $ 7
SCHEDULE 10 CED
PLUMBING PERMIT UNIT FEE
SCHEDULE
For each backflow protective device other than atmospheric type vacuum breakers: Over
2 inch diameter $ 16 $ 16
SCHEDULE 10 CED
PLUMBING PERMIT UNIT FEE
SCHEDULE For each building sewer and each trailer park sewer $ 16 $ 16
SCHEDULE 10 CED
PLUMBING PERMIT UNIT FEE
SCHEDULE For each cesspool (where permitted) $ 26 $ 27
SCHEDULE 10 CED
PLUMBING PERMIT UNIT FEE
SCHEDULE For each gas-piping system one to five outlets S 5 $ 5
SCHEDULE 10 CED
PLUMBING PERMIT UNIT FEE
SCHEDULE
For each industrial waste pretreatment interceptor Including its trap and vent, excepting
kitchen-type grease interceptors functioning as fixture traps $ 7 S 7
SCHEDULE 10 CED
PLUMBING PERMIT UNIT FEE
SCHEDULE
For each installation, alteration or repair of water piping and/or water treating
equipment, each S 7 S 7
SCHEDULE 10 CED
PLUMBING PERMIT UNIT FEE
SCHEDULE
For each lawn sprinkler system on any one meter including backflow protection devices
therefore S 7 S 7
SCHEDULE 10 CED
PLUMBING PERMIT UNIT FEE
SCHEDULE
For each plumbing fixture on one trap or a set ot fixtures on one trap (Including water,
drainage piping and backflow protection therefore) S 7 $ 7
SCHEDULE 10 CED
PLUMBING PERMIT UNIT FEE
SCHEDULE For each private sewage disposal system $ 42 $ 43
SCHEDULE 10 CED
PLUMBING PERMIT UNIT FEE
SCHEDULE For each repair or alteration of drainage or vent piping, each fixture S 7 S 7
SCHEDULE 10 CED
PLUMBING PERMIT UNIT FEE
SCHEDULE For each water heater and/or vent $ 7 $ 7
SCHEDULE 10 CED
PLUMBING PERMIT OTHER
INSPECTIONS FEES Inspections tor which no fee is specifically Indicated S 32 S 32
SCHEDULE 10 CED
PLUMBING PERMIT OTHER
INSPECTIONS FEES Inspections outside of normal business hours $ 32 S 32
SCHEDULE 10 CED
PLUMBING PERMIT UNIT FEE
SCHEDULE Rainwater systems - per drain (inside building) $ 7 $ 7
SCHEDULE 10 CED
PLUMBING PERMIT OTHER
INSPECTIONS FEES Reinspectlon Fee $ 32 S 32
SCHEDULE 10 CED PLUMBING PERMIT FEES ndividual Plumbing Permit S 158 $ 160
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION NOTES FY 2013-14 FEE FY 2014-15
PROPOSED FEE
SCHEDULE 11 CED ELECTRICAL PERMIT FEES Individual Electrical Permit $ 158 S 160
SCHEDULE 11 CED ELECTRICAL PERMIT FEES
New construction tor each ampere ot main service, switch, fuse or breaker - Per ampere,
480 three-phase S 1 S 1
SCHEDULE 11 CED ELECTRICAL PERMIT FEES
New construction tor each ampere of main service, switch, fuse or breaker - Per ampere,
single phase $ 0.26 S 0.27
SCHEDULE 11 CED ELECTRICAL PERMIT FEES
New construction for each ampere ot main service, switch, fuse or breaker - Per ampere,
three phase $ 0.53 $ 0.53
SCHEDULE 11 CED ELECTRICAL PERMIT FEES Remodel, alteration, no change in service - Or minimum $ 5 $ 5
SCHEDULE 11 CED ELECTRICAL PERMIT FEES Remodel, alteration, no change In service - Per ampere $ 0.26 S 0.27
SCHEDULE 11 CED ELECTRICAL PERMIT FEES
Service upgrade on existing building - For each ampere or increase in main service, switch,
fuse or breaker - Per ampere, 480 three-phase $ 1 $ 1
SCHEDULE 11 CED ELECTRICAL PERMIT FEES
Service upgrade on existing building - For each ampere or Increase in main service, switch,
fuse or breaker - Per ampere, single phase $ 0.26 S 0.27
SCHEDULE 11 CED ELECTRICAL PERMIT FEES
Service upgrade on existing building - For each ampere or increase In main service, switch,
fuse or breaker - Per ampere, three-phase $ 0.53 $ 0.53
SCHEDULE 11 CED ELECTRICAL PERMIT FEES Temporary service over 200 amperes - plus $10.00 per each 100 amperes over 200 $ 11 $ 11
SCHEDULE 11 CED ELECTRICAL PERMIT FEES Temporary service up to and Including 200 amperes $ 11 S U
SCHEDULE 11 CED ELECTRICAL PERMIT FEES Test Meter $ 26 $ 27
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION NOTES FY 2013-14 FEE FY 2014-15
PROPOSED FEE
SCHEDULE 12 CED MECHANICAL PERMIT FEES Boiler/Compressor to 15 HP (each) S 17,33 S 17.53
SCHEDULE 12 CED MECHANICAL PERMIT FEES Exhaust Fan (each) $ 6.83 $ 6.93
SCHEDULE 12 CED MECHANICAL PERMIT FEES Fireplace (each) $ 6.83 S 6.93
SCHEDULE 12 CED MECHANICAL PERMIT FEES Furnace, Ducts, Heat Pumps (each) $ 9.45 $ 9.59
SCHEDULE 12 CED MECHANICAL PERMIT FEES Hood (each) S 6.83 S 6.93
SCHEDULE 12 CED MECHANICAL PERMIT FEES Individual Mechanical Permit $ 158 $ 160
SCHEDULE 12 CED MECHANICAL PERMIT FEES Install/relocate vent (each) $ 4.73 $ 4.80
I/if
SCHEDULE 13
TABLE 1 - VALUATION MULTIPLIERS
USE TYPE OF CONSTRUCTION COST PER SQ FT
Apartment Houses
AfDartment Houses
Apartment Houses
Apartment Houses
Banks
Banks
Banks
Banks
Banks
Banks
Banks
Car Washes
Car Washes
Car Washes
Car Washes
Churches
Churches
Churches
Churches
Churches
Churches
Churches
Convalescent Hospitals
Convalescent Hospitals
Convalescent Hospitals
Convalescent Hospitals
Dwellings
Dw/ellings
Dwellings
Dwellings
Dwellings
Dwellings
Dwellings
Fire Stations
Fire Stations
Fire Stations
Fire Stations
Fire Stations
Fire Stations
Fire Stations
Fitness Centers
Hospitals
Hospitals
Hospitals
Hotels & Motels
Hotels & Motels
Hotels & Motels
Type I or I B.
Type V or III (Masonry)
Type V Wood Frame
Type I Basement Garage
Type I or I B
Type IIA
Type II B
Type III A
Type NIB
Type V A
Type V B
Type III A
Type III B
Type V A
Type V B
Type I or I B
Type II A
Type II B
Type III A
Type III B
Type V A
Type V B
Type I or IB
Type II A
Type III A
Type V A
Type V Adobe
Type V Masonry
Type V Wood Frame
Basements (semi-finished)
Additions - Wood Frame
Solariums
jCabana - Pool House (Type V)
Type I or I B
Type II A
Type II B
Type III A
Type III B
Type V A
Type V B
Same values as Office Buildings
Type I A or IB
Type III A
Type V A
Type I A or IB
Type III A
Type III B
$156.45
$127.14
$117.70
$54.54
$212.43
$156.45
$152.14
$172.24
$166.50
$156.45
$150.71
$100.47
$96.17
$86.12
$80.38
$142.10
$107.65
$101.91
$116.26
$110.52
$109.08
$101.91
$199.51
$139.22
$142.10
$133.48
$175.11
$139.22
$132.05
$33.01
$157.88
$133.48
$123.44
$163.63
$107.65
$101.91
$117.70
$113.39
$110.52
$104.78
$233.96
$193.77
$185.15
$144.97
$126.31
$119.13
Page 31 1/7
SCHEDULE 13
TABLE 1 - VALUATION MULTIPLIERS
USE TYPE OF CONSTRUCTION COST PER SQ FT,
Hotels & Motels
Hotels & Motels
Industrial Plants
Industrial Plants
Industrial Plants
Industrial Plants
Industrial Plants
Industrial Plants
Industrial Plants
Industrial Plants
Medical Offices
Medical Offices
Medical Offices
Medical Offices
Medical Offices
Medical Offices
Medical Offices
Offices
Offices
Offices
Offices
Offices
Offices
Offices
Private Garages
Private Garages
Private Garages
Private Garages
Public Buildings
Public Buildings
Public Buildings
Public Buildings
Public Buildings
Public Buildings
Public Buildings
Public Garages
Public Garages
Public Garages
Public Garages
Public Garages
Public Garages
Restaurants
Restaurants
Restaurants
Restaurants
Schools
Schools
Type V A
Type V B
Type I A or IB
Type II A
Type II B (Stock)
Type III A
Type III B
Tilt-up
Type V A
Type V B
Type I A or IB
Type II A
Ty p e II B
Type III A
fype'lll B
Type V A
Type V B
Type I or I B
Type II A
Type II B
Type III A
Type III B
Type V A
Ty p e V B
Wood Frame - Finished
Wood Frame - Unfinished
Masonry
Open Carports
Type I or I B
Type II A
Type II B
Type III A
Type III B
Type V A
Type V B
Type I or I B
Type I or II Open Parking
Type II B
Type III A
Type III B
Type V A
Type III A
Type III B
Type V A
Type V B
Type I or I B
Type II A
$109.08
$107.65
$81.81
$57.41
$53.11
$63.15
$58.85
$43.06
$58.85
$54.54
$172.24
$132.05
$126.31
$143.53
$133.48
$129.18
$124.87
$153.58
$103.34
$97.60
$110.52
$106.21
$103.34
$97.60
$34.45
$34.45
$40.19
$24.40
$176.54
$143.53
$137.79
$149.27
$143.53
$136.35
$132.05
$70.33
$53.11
$40.19
$53.11
$47.37
$48.80
$140.66
$134.92
$127.74
$123.44
$159.32
$109.08
Page 32 I/?
SCHEDULE 13
TABLE 1 - VALUATION MULTIPLIERS
USE TYPE OF CONSTRUCTION COST PER SQ FT
Schools
Schools
Schools
Schools
Service Stations
Service Stations
Service Stations
Service Stations
Stores
Stores
Stores
Stores
Stores
Stores
Stores
Stores
Theatres
Theatres
Theatres
Theatres
Theatres
Warehouses
Warehouses
Warehouses
Warehouses
Warehouses
Warehouses
Warehouses
Type III A
Type III B
Type V A
Type V B
Type II !B_^^
Type III A
Type V A
Pumpjsland Canopies
Type I or I B
Type II A
Type II B
Type III A
Type III B
Type V A
Type V B
Retail Garden Center (Type V B)
Type I or I B
Type^l
Type I
I A
IB
Type V A
Type V B
Type I or I B
Ty p e II A
Type II B
Type III A
Type III B
Type V A
Type V B
$116.26
$111.95
$109.08
$104.78
$96.17
$100.47
$86.12
$40.19
$117.70
$71.77
$70.33
$87.55
$83.25
$74.64
$68.89
$57.10
$157.88
$114.82
$109.08
$107.65
$101.91
$70.33
$41.62
$40.19
$47.37
$45.93
$41.62
$40.19
Page 33 1/9
SCHEDULE 13
TABLE 1 - VALUATION MULTIPLIERS
USE ITYPE OF CONSTRUCTION 1 COST PER SQ FT.
SHELL BUILDINGS
Banks Type 1 or 1 B $169.94
Banks Type II A $125.16
Banks Type II B $121.71
Banks Type III A $137.79
Banks Type III B $133.20
Banks Type V A $125.16
Banks Type V B $120.57
Medical Offices Type 1 or 1 B $137.79
Medical Offices Type II A $105.65
Medical Offices Type II B $101.05
Medical Offices Type III A $114.82
Medical Offices Type III B $106.79
Medical Offices Type V A $103.34
Medical Offices Type V B $99.90
Offices Type 1 or 1 B $122.86
Offices Type II A $82.67
Offices Type II B $78.08
Offices Type III A $88.42
Offices Type III B $84.97
Offices Type V A $82.67
Offices Type V B $78.08
Restaurants Type III A $112.53
Restaurants Type III B $107.94
Restaurants Type V A $102.19
Restaurants Type V B $98.75
Stores Type 1 or 1B $94.16
Stores Type II A $57.41
Stores Type II B $56.26
Stores _ _ Iy,Pe'l'A $70.04
Stores Type III B $66.60
Stores Type V A $59.71
Stores Type V B $55.12
Page 34
SCHEDULE 13
TABLE 1 - VALUATION MULTIPLIERS
USE [TYPE OF CONSTRUCTION 1 COST PER SQ FT.
MISCELLANEOUS ITEMS
Residential Additions $157.88
Remodels/lofts $68.98
Pool House/cabana $132.05
Garages-finished and unfinished (Sunrooms/Solariums) $34.45
Patio, covered porch & carport $11.48
Enclosed patio $18.66
Balconies, decks & stairs $18.66
Retaining wall - concrete, masonry $22.96
Pools, spas $48.80
Te n a nt 1 m provem e nts/stores/off ices $43,32
Tenant improvements/medical, restaurants, H occupancies $60.29
COST PER
SQUARE: 1
RE-ROOF SQUARE = 100 SF
Built up $175.11
Composition shingles $163.63
Fiberglass shingles $163.63
Asbestos cement shingles $388.97
Aluminum shingles $587.04
Clay tile $492.31
Concrete tile $416.24
Roof structure repair $18.66
Greenhouse $7.18
GENERAL ADDITIONS AND MODIFIERS COST PER SQ FT.
Fire sprinkler system
Air conditioning-commercial
Air conditioning-residential
Fireplace - concrete/masonry
Fireplace - prefabricated metal
$3.73
$6.03
$5.02
$4,621.70
$3,141.89
Page 35 1^/
EXHIBIT 7A
CITY OF CARLSBAD
MASTER FEE SCHEDULES
SECTION 3
DEVELOPMENT-IMPACT FEES
June 2014
I3;i
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION NOTES FY 2013-14 FEE FY 2014-15
PROPOSED FEE
DEV IMPACT CED
FEES SUBJECT TO SECTION 66000
OF THE CALIFORNIA GOVERNMENT Bridge 8i Thoroughfare - all other - per Avg. Daily Trip (Outside CFD| $ 25 $ 26
DEV IMPACT CED
FEES SUBJECT TO SECTION 66000
OF THE CALIFORNIA GOVERNMENT Bridge & Thoroughfare - per Apartment Unit (Outside CFD) $ 355 $ 371
DEV IMPACT CED
FEES SUBJECT TO SECTION 66000
OF THE CALIFORNIA GOVERNMENT Bridge & Thoroughfare - per Condominium Unit (Outside CFD) $ 474 S 494
DEV IMPACT CED
FEES SUBJECT TO SECTION 66000
OF THE CALIFORNIA GOVERNMENT Bridge & Thoroughfare - per Single Family Unit (Outside CFD) S 592 $ 618
DEV IMPACT CED
FEES SUBJECT TO SECTION 66000
OF THE CALIFORNIA GOVERNMENT Bridge & Thoroughfare District »2 - Zone 20 $ 1,692 $ 1,765
DEV IMPACT CED
FEES SUBJECT TO SECTION 66000
OF THE CALIFORNIA GOVERNMENT Bridge & Thoroughfare District #2 - Zone 21 $ 1,366 S 1,425
DEV IMPACT CED
FEES SUBJECT TO SECTION 66000
OF THE CALIFORNIA GOVERNMENT Bridge & Thoroughfare District #2 - Zone 5 $ 326 $ 340
DEV IMPACT CED
FEES SUBJECT TO SECTION 66000
OF THE CALIFORNIA GOVERNMENT Bridge & Thoroughfare District #3 - Fee per ADT S 191 $ 200
DEV IMPACT CED
FEES SUBJECT TO SECTION 66000
OF THE CALIFORNIA GOVERNMENT Local Facilities Mngt Plan/Amendment - fee + deposit in min. increments of $5,000 $ 10,000 S 10,000
DEV IMPACT CED
FEES SUBJECT TO SECTION 66000
OF THE CALIFORNIA GOVERNMENT Public Facilities Fees -1.82% of BIdg Permit Value (Inside CFD)
1.82% of BIdg Permit
Value
1.82% of BIdg Permit
Value
DEV IMPACT CED
FEES SUBJECT TO SECTION 66000
OF THE CALIFORNIA GOVERNMENT Public Facilities Fees - 3.5% of BIdg Permit Value (Outside CFD)
3,5% of BIdg Permit
Value
3,5% of BIdg Permit
Value
DEV IMPACT
TRANSPORT
ATION
FEES SUBJECT TO SECTION 66000
OF THE CALIFORNIA GOVERNMENT Traffic Impact Fee - Apartment (Inside of CFD 1) per ADT $ 243 $ 263
DEV IMPACT
TRANSPORT
ATION
FEES SUBJECT TO SECTION 66000
OF THE CALIFORNIA GOVERNMENT Traffic Impact Fee - Apartment (Outside of CFD 1) per ADT $ 287 $ 310
DEV IMPACT
TRANSPORT
ATION
FEES SUBJECT TO SECTION 66000
OF THE CALIFORNIA GOVERNMENT Traffic Impact Fee - Commrc'l/lndust Cost Per Trip (Inside CFD) $ 97 $ 104
DEV IMPACT
TRANSPORT
ATION
FEES SUBJECT TO SECTION 66000
OF THE CALIFORNIA GOVERNMENT Traffic Impact Fee - Commrc'l/lndust Cost Per Trip (Out of CFD) $ 115 S 124
DEV IMPACT
TRANSPORT
ATION
FEES SUBJECT TO SECTION 66000
OF THE CALIFORNIA GOVERNMENT Traffic Impact Fee - Condominium (Inside of CFD 1) per ADT $ 243 S 263
DEV IMPACT
TRANSPORT
ATION
FEES SUBJECT TO SECTION 66000
OF THE CALIFORNIA GOVERNMENT Traffic Impact Fee - Condominium (Outside of CFD 1) per ADT $ 287 $ 310
DEV IMPACT
TRANSPORT
ATION
FEES SUBJECT TO SECTION 66000
OF THE CALIFORNIA GOVERNMENT Traffic Impact Fee - Single Family (Inside of CFD 1) per ADT $ 243 $ 263
DEV IMPACT
TRANSPORT
ATION
FEES SUBJECT TO SECTION 66000
OF THE CALIFORNIA GOVERNMENT Traffic Impact Fee - Single Family (Outside of CFD 1) per ADT $ 287 $ 310
DEV IMPACT UTILITIES
FEES SUBJECT TO SECTION 66012
OF THE CAUFORNIA GOVERNMENT Sewer Connection (General Capacity all areas plus Sewer Benefit Area Fees) $ 842 $ 842
DEV IMPACT UTILITIES WATER DISTRICT FEES
Major Facility Fee - Potable and Reclaimed Water Connection Fees: Meter Size 5/8" -
Displacement $ 3,549 $ 3,931
DEV IMPACT UTILITIES WATER DISTRICT FEES
Major Facility Fee - Potable and Reclaimed Water Connection Fees; Meter Size 1" -
Displacement $ 7,988 $ 8,845
DEV IMPACT UTILITIES WATER DISTRICT FEES
Major Facility Fee - Potable and Reclaimed Water Connection Fees: Meter Size 1-1/2" -
Displacement $ 15,088 $ 16,707
DEV IMPACT UTILITIES WATER DISTRICT FEES
Major Facility Fee - Potable and Reclaimed Water Connection Fees: Meter Size 1-1/2" -
Turbo S $ 19,614
DEV IMPACT UTILITIES WATER DISTRICT FEES
Major Facility Fee - Potable and Reclaimed Water Connection Fees: Meter Size 2" -
Displacement $ 22,771 $ 25,161
DEV IMPACT UTILITIES WATER DISTRICT FEES Major Facility Fee - Potable and Reclaimed Water Connection Fees: Meter Size 2" - Turbo S S 31,449
DEV IMPACT UTILITIES WATER OlSTRICT FEES
Major Facility Fee - Potable and Reclaimed Water Connection Fees: Meter Size 3" -
Displacement S 39,938 5 44,227
DEV IMPACT UTILITIES WATER DISTRICT FEES Major Facility Fee - Potable and Reclaimed Water Connection Fees: Meter Size 3" - Turbo S 5 68,797
DEV IMPACT UTILITIES WATER DISTRICT FEES
Major Facility Fee - Potable and Reclaimed Water Connection Fees: Meter Size 3/4" -
Displacement $ 5,060 S 5,604
DEV IMPACT UTILITIES WATER DISTRICT FEES
Major Facility Fee - Potable and Reclaimed Water Connection Fees: Meter Size 4" -
Displacement $ 62,125 S 68,797
DEV IMPACT UTILITIES WATER DISTRICT FEES Major Facility Fee - Potable and Reclaimed Water Connection Fees: Meter Size 4" - Turbo $ 177,501 $ 196,564
DEV IMPACT UTILITIES WATER DISTRICT FEES
Major Facility Fee - Potable and Reclaimed Water Connection Fees: Meter Size 6" -
Displacement $ 115,376 S 127,766
DEV IMPACT UTILITIES WATER DISTRICT FEES Major Facility Fee - Potable and Reclaimed Water Connection Fees: Meter Size 6" - Turbo $ 355,000 S 393,122
DEV IMPACT UTILITIES WATER DISTRICT FEES
Major Facility Fee - Potable and Reclaimed Water Connection Fees: Meter Size 8" -
Displacement $ 136,367 $ 151,010
DEV IMPACT UTILITIES WATER DISTRICT FEES Major Facility Fee - Potable and Reclaimed Water Connection Fees: Meter Size 8" - Turbo $ 497,167 $ 550,559
DEV IMPACT UTILITIES WATER DISTRICT FEES Major Facility Fee - Potable Water per EDU
17^3
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION NOTES FY 2013-14 FEE FY 2014-15
PROPOSED FEE
IMPACT
SCHEDULE A CED PARK IN-LIEU FEES District 1 NW - Value per Acre 977,000 - Attached (5 units or more) $ 6,190 5 6,190
IMPACT
SCHEDULE A CED PARK IN-LIEU FEES District 1 NW - Value per Acre 977,000 - Mobile Home $ 4,934 S 4,934
IMPACT
SCHEDULE A CED PARK IN-LIEU FEES District 1 NW - Value per Acre 977,000 -Attached (4 units or less) $ 6,414 $ 6,414
IMPACT
SCHEDULE A CED PARK IN-UEU FEES District 1 NW - Value per Acre 977,000 -Single Family Detached & Duplex $ 7,649 $ 7,649
IMPACT
SCHEDULE A CED PARK IN-LIEU FEES District 2 NE - Value per Acre 732,000 - Attached (4 units or less) $ 4,804 $ 4,804
IMPACT
SCHEDULE A CED PARK IN-LIEU FEES District 2 NE - Value per Acre 732,000 - Attached (5 units or more) S 4,636 S 4,636
IMPACT
SCHEDULE A CED PARK IN-LIEU FEES District 2 NE - Value per Acre 732,000 - Mobile Home $ 3,696 $ 3,696
IMPACT
SCHEDULE A CED PARK IN-LIEU FEES District 2 NE - Value per Acre 732,000 - Single Family Detached & Duplex $ 5,728 S 5,728
IMPACT
SCHEDULE A CED PARK IN-LIEU FEES District 3 SW - Value per Acre 732,000 - Attached (5 units or more) $ 4,636 $ 4,636
IMPACT
SCHEDULE A CED PARK IN-LIEU FEES District 3 SW - Value per Acre 732,000 - Mobile Home $ 3,696 S 3,696
IMPACT
SCHEDULE A CED PARK IN-LIEU FEES District 3 SW - Value per Acre 732,000 -Attached (4 units or less) $ 4,804 $ 4,804
IMPACT
SCHEDULE A CED PARK IN-LIEU FEES District 3 SW - Value per Acre 732,000 -Single Family Detached & Duplex $ 5,728 $ 5,728
IMPACT
SCHEDULE A CED PARK IN-UEU FEES District 4 SE - Value per Acre 732,000 - Attached (5 units or more) $ 4,636 $ 4,636
IMPACT
SCHEDULE A CED PARK IN-UEU FEES District 4 SE - Value per Acre 732,000 - Mobile Home $ 3,696 $ 3,696
IMPACT
SCHEDULE A CED PARK IN-UEU FEES District 4 SE - Value per Acre 732,000 -Attached (4 units or less) $ 4,804 $ 4,804
IMPACT
SCHEDULE A CED PARK IN-UEU FEES District 4 SE - Value per Acre 732,000 -Single Family Detached & Duplex S 5,728 S 5,728
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION NOTES FY 2013-14 FEE FY 2014-15
PROPOSED FEE
IMPACT
SCHEDULE B CED
PLANNED LOCAL DRAINAGE AREA
FEES Area A - Buena Vista Lagoon - High Runoff $ 25,139 5 26,262 IMPACT
SCHEDULE B CED
PLANNED LOCAL DRAINAGE AREA
FEES Area A - Buena Vista Lagoon - Low Runoff $ 5,801 $ 6,060 IMPACT
SCHEDULE B CED
PLANNED LOCAL DRAINAGE AREA
FEES Area A - Buena Vista Lagoon - Medium Runoff $ 11,536 $ 12,052 IMPACT
SCHEDULE B CED
PLANNED LOCAL DRAINAGE AREA
FEES Area B - Aqua Hedionda Lagoon - High Runoff $ 9,395 S 9,815 IMPACT
SCHEDULE B CED
PLANNED LOCAL DRAINAGE AREA
FEES Area B - Aqua Hedionda Lagoon - Low Runoff $ 2,169 $ 2,265
IMPACT
SCHEDULE B CED
PLANNED LOCAL DRAINAGE AREA
FEES Area B - Aqua Hedionda Lagoon - Medium Runoff $ 4,180 $ 4,367
IMPACT
SCHEDULE B CED
PLANNED LOCAL DRAINAGE AREA
FEES Area C - Encinas Creek - High Runoff $ 9,122 S 9,530 IMPACT
SCHEDULE B CED
PLANNED LOCAL DRAINAGE AREA
FEES Area C - Encinas Creek - Low Runoff $ 2,105 S 2,199 IMPACT
SCHEDULE B CED
PLANNED LOCAL DRAINAGE AREA
FEES Area C - Encinas Creek - Medium Runoff S 2,978 S 3,111 IMPACT
SCHEDULE B CED
PLANNED LOCAL DRAINAGE AREA
FEES Area D - Batiquitos Lagoon - High Runoff $ 8,649 S 9,035
IMPACT
SCHEDULE B CED
PLANNED LOCAL DRAINAGE AREA
FEES Area D - Batiquitos Lagoon - Low Runoff $ 1,996 S 2,085 IMPACT
SCHEDULE B CED
PLANNED LOCAL DRAINAGE AREA
FEES Area D - Batiquitos Lagoon - Medium Runoff $ 3,265 $ 3,411
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION NOTES FY 2013-14 FEE FY 2014-15
PROPOSED FEE
IMPACT
SCHEDULE C CED SEWER BENEFIT AREA FEES Sewer Benefit Area Fee - Area A S 1,006 $ 1,049
IMPACT
SCHEDULE C CED SEWER BENEFIT AREA FEES Sewer Benefit Area Fee - Area B $ 1,145 $ 1,194
IMPACT
SCHEDULE C CED SEWER BENEFIT AREA FEES Sewer Benefit Area Fee - Area C $ 2,109 S 2,200
IMPACT
SCHEDULE C CED SEWER BENEFIT AREA FEES Sewer Benefit Area Fee - Area D $ 2,113 S 2,205
IMPACT
SCHEDULE C CED SEWER BENEFIT AREA FEES Sewer Benefit Area Fee - Area E $ 3,117 $ 3,252
IMPACT
SCHEDULE C CED SEWER BENEFIT AREA FEES Sewer Benefit Area Fee - Area F $ 3,134 $ 3,269 IMPACT
SCHEDULE C CED SEWER BENEFIT AREA FEES Sewer Benefit Area Fee - Area G $ 632 $ 659 IMPACT
SCHEDULE C CED SEWER BENEFIT AREA FEES Sewer Benefit Area Fee - Area H $ 919 $ 959 IMPACT
SCHEDULE C CED SEWER BENEFIT AREA FEES Sewer Benefit Area Fee - Area J $ 1,734 S 1,809 IMPACT
SCHEDULE C CED SEWER BENEFIT AREA FEES Sewer Benefit Area Fee - Area K $ 1,371 $ 1,430 IMPACT
SCHEDULE C CED SEWER BENEFIT AREA FEES Sewer Benefit Area Fee - Area L $ 1,371 $ 1,430
IMPACT
SCHEDULE C CED SEWER BENEFIT AREA FEES Sewer Benefit Area Fee - Area M $ 67 $ 70
CITY OF CARLSBAD
MASTER FEE SCHEDULE
FY 2014-15
SCHEDULE PRIMARY
DEPT. FEE CATEGORY FEE DESCRIPTION NOTES FY 2013-14 FEE FY 2014-15
PROPOSED FEE
IMPACT
SCHEDULE D CED HABITAT MITIGATION FEES D. Coastal Sage Scrub $ 30,231 S 30,626 IMPACT
SCHEDULE D CED HABITAT MITIGATION FEES E. Grassland $ 15,116 S 15,313
IMPACT
SCHEDULE D CED HABITAT MITIGATION FEES F. Ag. Disturbed Eucalyp. Wood $ 3,024 $ 3,063
/P7
in - ^ o
O m UJ
" S " 4 S o 5 > S o
>- f 5
U- ^ Ul
o
13^