Loading...
HomeMy WebLinkAbout2016-06-28; City Council; Resolution 2016-1321 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 2016-132 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ADOPTING CHANGES TO THE MASTER FEE SCHEDULE. EXHIBIT7 WHEREAS, the City Council of the City of Carlsbad has the authority to establish fees for City services; and WHEREAS, from time-to-time said fees are reviewed and evaluated to maintain an adequate fee structure recovering costs for City services; and WHEREAS, the City Council has determined the cost of providing general and development-related services; and WHEREAS, the City Council believes it is necessary for the City Manager to have the authority to adjust the parks and recreation and library and arts program and classes fees from time to time to remain competitive and within the market pricing for like programs and classes; and WHEREAS, the City Council finds it necessary to recover the costs for City services; and WHEREAS, the City Council has held the necessary public hearing and allowed for public comment on the establishment of said fees. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the changes to the Master Fee Schedule are for the fees shown in Exhibits 7-A and 7-B attached hereto, and as amended by determinations of the City Council at its meeting of Tuesday, June 28, 2016, as set forth in the minutes of that meeting, and as memorialized by subsequent resolution of the City Council. Item No. 15 - AB #22,337 June 28, 2016 Page 83 of 179 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 3. The City Council hereby authorizes the City Manager or his/her designee to set parks and recreation and library and cultural arts program, rental, and class fees that are included in the Community Services Guide. The fee shall not exceed the fully burdened (direct and indirect) costs of providing the program, rentat and class but shall be no less (except in the case of introductory, discount or promotional pricing) than the lowest fee charged for like kind programs or classes in similarly benchmarked Southern California cities. 4. The City Council hereby authorizes the City Manager or his/her designee to change parking violation fees at the time, and by the same amount, as the state changes their portion of the fee. Any changes to these fees will be made to the current Master Fee Schedule. 5. This resolution shall become effective on the first day the city services the public using the Energov software system, but not sooner than 60 days (September 1, 2016) after adoption in accordance with Government Code 66017, for the Development-related service fees and Development impact fees. Ill Ill Ill Ill Ill Ill Ill Ill 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the Carlsbad City Council, Carlsbad Municipal Water District Board of Directors, Carlsbad Public Financing Authority Board of Directors, Community Development Commission, and City of Carlsbad as Successor Agency to the Redevelopment Agency, held on the 28th day of June, 2016, by the following vote to wit: AVES: Hall, Wood, Schumacher, Blackburn, Packard. NOES: None. ABSENT: None. MATT HALL, Mayor ATTEST: Item No. 15 - AB #22,337 June 28, 2016 Page 85 of 179 CITY OF CARLSBAD MASTER FEE SCHEDULE June 2016 All fee changes approved by City Council on June 28, 2016 will go into effect on the first day the city serves the public using the new Energov software system, (currently estimated for November 1, 2016), and no sooner than 60 days after City Council adoption of the revised fees. EXHIBIT 7-A Item No. 15 - AB #22,337 June 28, 2016 Page 86 of 179 CITY OF CARLSBAD MASTER FEE SCHEDULE SECTION 1 GENERAL CITY SERVICE FEES June 2016 Item No. 15 - AB #22,337 June 28, 2016 Page 87 of 179 FEE CATEGORY City Clerk City Clerk City Clerk City Clerk City Clerk City Clerk City Clerk City Clerk City Clerk City Clerk Fire Administrative Fire Administrative Fire Ambulance Fire Ambulance Fire Ambulance Fire Ambulance Fire Ambulance Fire Ambulance Fire Ambulance Fire Ambulance Fire Ambulance Fire Ambulance Fire Ambulance Fire Ambulance Fire Ambulance Fire Nuisance Fire Nuisance Fire Nuisance Fire Nuisance Fire Nuisance Fire Prevention Library Library Library Library Library Library Library Library Library Library Library Library Library Library Library Library Library Miscellaneous Miscellaneous Miscellaneous Miscellaneous Miscellaneous Miscellaneous Miscellaneous Miscellaneous City of Carlsbad Master Fee Schedule 2016-17 General City Service Fees FEE DESCRIPTION Blueprinting of Standard Size (24" x 36") Improvement Plan Sheet (Cost for each) Campaign Statements (per page), set by FPPC City Clerk -CD Copy City Clerk -Certification Charge (per document) Conflict of Interest Statement (per page), set by FPPC Copies -Black & White (each) Copies -Color (each) Deposition Subpoena DVD Copy, including Council Meeting on DVD Records Subpoena Bicycle Licenses (Code Section 10.56.070 and 10.56.100) Bicycle Licenses -Replacement or Transfer (Code Section 10.56.070 and 10.56.100) Ambulance Fee -Advanced Life Support 1--Non Resident-plus Level I or Level II Supplies & Medications Ambulance Fee-Advanced Life Support 1--Resident-plus Level I or Level II Supplies & Medications Ambulance Fee-Advanced Life Support 2--Non Resident-plus Level II Supplies & Medications Ambulance Fee -Advanced Life Support 2--Resident-plus Level II Supplies & Medications Ambulance Fee -Mileage Charge -per mile Ambulance Fee -Oxygen Charge Ambulance Fee BLS-Base Rate -Resident Ambulance Fee BLS-Base Rate Non-Resident Ambulance Fee-Advanced Life Support I-Assessment/Non Transport with Medication Given. No charge for assessment non-transport if no medication given. Ambulance Transport including Community Para medicine -Level I Supplies & Medications Ambulance Transport including Community Para medicine-Level II Supplies & Medications Ambulance Transport-Community ParamedicineALS-Resident-Plus Level I or Level II Supplies and Medications Ambulance Transport-Community Para medicine BLS-Resident Fire Nuisance Alarm -1st response in 12 month period Fire Nuisance Alarm -2nd response in 12 month period Fire Nuisance Alarm -3rd response in 12 month period Fire Nuisance Alarm -each additional response thereafter Fire Nuisance Alarm -each billing Fire-Special Event -per fire personnel per hour (consistent with City payroll records) Copies -Black & White (each) Copies -Color (each) Library Account Collection Fee Library Book Non Pickup Fee (per item) Library Borrowing -Audio Visual Equipment (per item, per day) Library Borrowing -Audio Visual Insurance fee-Per DVD Library Borrowing -Mobile Device Loan Late Fee (Per Item, Per Hour) Library Card Replacement Library Fines -DVD (per day per item) Library Fines -Juvenile (per day per item) Library Fines (per day per item) Library History Room Photo Fee (vendor cost of duplicating historical photos) Library Interlibrary Loan Library Lost Item Processing Fee Lost/Damaged beyond repair book/audio item Lost/Damaged DVD Lost/Damaged Library Materials Administrative Fee for 1915 Act Bond Call -1% of principal being repaid (For all Assessment Districts using 1915 Act Bonds) Business License -master list of active business licenses Business License -monthly list of new licenses Cable Channel Administration Fee Check Processing Fee for Cancellation {Customer Initiated) Communications -DVD Copy Hearing Disposition Services for Parking Citations -Personal Hearings Hearing Disposition Services for Parking Citations -Written Review 1 FY 2015-16 FEE FY 2016-17 FEE $5 $5 $0.10 $0.10 $3 $3 $22 $22 $0.10 $0.10 $0.20 $0.20 $1.00 $1.00 $275 $275 $22 $22 $15 $15 $3 $3 $1 $1 $1,167 $1,163 $1,167 $1,163 $1,370 $1,365 $1,269 $1,264 $23 $23 $76 $76 $952 $949 $952 $949 $203 $202 $127 $126 $254 $253 $1,167 $1,163 $952 $949 $0 $0 $82 $84 $165 $168 $324 $330 $11 $11 Actual Cost Actual Cost $0.20 $0.20 $1 $1 $10 $10 $1 $1 $5 $5 $1 $1 $5 $5 $2 $2 $1 $1 $0.10 $0.10 $0.25 $0.25 Direct Cost Direct Cost $5 $5 $5 $5 List price+$40 if List price+$40 if out of print out of print 20% of list price 20% of list price Variable up to list Variable up to list price price $50 min/$500 $50 min/$500 max max $36 $36 $5 $6 $110/Hour $110/Hour $20 $20 $22 $22 $0 $0 $0 $0 Item No. 15 - AB #22,337 June 28, 2016 Page 88 of 179 FEE CATEGORY Miscellaneous Miscellaneous Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Parking Violation Police Police Police Police Police Police Police Police Police City of Carlsbad Master Fee Schedule 2016-17 General City Service Fees FEE DESCRIPTION Publications· As Determined by the City Manager Returned Check Fee 21113 (al· Vehicle/Animal public on grounds 21211 · Bike lane 22500 (al -In intersection 22500 (bl-In cross walk 22500 (dl -Fire station driveway 22500 (el -Driveway 22500 (fl -Sidewalk 22500 (g) -Obstructing traffic 22500 (h) -Double parking 22500 (i) -Bus zone 22500 U) -Tube or tunnel 22500 (k) -Bridge 22500 (I)· Blocking Disabled 22500 c · Red curb 22500.1-Fire lane 22502 -18" from curb/wrong way 22507 (a) -Oversize Vehicle 22507.8 • Disable space/block access 22514-Fire hydrant 22515 -Unattended vehicle 22516 -Locked vehicle/passenger inside 22517 • Open/close door in traffic 22520 • Stopping on freeway 22520.5 • Vending from Hwy 22521-> 7.5ft from RR tracks 22522-3ftfrom handicap ramp 22523 -Abandoned vehicle 22526 • Blocking intersection 23226 • Store open container I pass comp 23333 • Stop I park in vehicle crossing 24003 -Vehicle with unlawful lighting device 24401 • Dimmed lights on parked vehicle 24604-Lamp or flag on projections 24607 -Reflectors on rear 24608 • Reflectors on front and sides 25250 • Unlawful flashing lights 25251 • Flashing lights required 25300 Warn device disabled, oarked vehicle 26451-Set parking brake 27155 -Fuel tank caps 4462 (b) -Wrong vehicle registration 5200 -Plates front/back 5201 • Position of plate 5204 (a)· Tabs 72 hour parking Alley parking Commercial vehicle in residential area Repair vehicle in street Safety zone Storage I Impounded Vehicle Administrative Charge Administrative Fee -DUI Audio/Visual Copy Burglary Alarm Response-Second Occurrence (no charge for 1st response if permitted) (Note 1) Burglary Alarm Response -Each Additional Occurrence (Note 1) Copy Investigation Tapes(+ cost of duplicating the tape) Dispatch Historical Searches (per month searched) Entertainment License (Note 2) False Robbery-Panic Alarm Response· Second Occurrence (no charge for 1st response) (Note 1) False Robbery· Panic Alarm Response· Each Additional Occurrence (Note 1) 2 FY 2015-16 FEE FY 2016-17 FEE Determined by Determined by City Manager City Manager $36 $36 $38 $38 $50 $50 $38 $38 $38 $38 $38 $38 $38 $38 $38 $38 $38 $38 $38 $38 $260 $260 $38 $38 $38 $38 $320 $320 $38 $38 $50 $SO $38 $38 $50 $50 $340 $340 $38 $38 $38 $38 $SO $50 $50 $50 $38 $38 $50 $SO $38 $38 $320 $320 $128 $128 $68 $68 $50 $50 $38 $38 $38 $38 $44 $44 $38 $38 $38 $38 $38 $38 $44 $44 $44 $44 $44 $44 $38 $38 $38 $38 $100 $100 $38 $38 $38 $38 $38 $38 $68 $68 $50 $50 $50 $50 $50 $50 $50 $50 $60 $120 $19 $19 $45 $45 $30 $30 $60 $60 $54 $55 $20 $20 $219 $223 $100 $100 $100 $100 Item No. 15 - AB #22,337 June 28, 2016 Page 89 of 179 FEE CATEGORY Police Police Police Police Police Police Police Police Police Police Police Police Police Police Police Police Safety Center Facility Rental Safety Center Facility Rental Safety Center Facility Rental Safety Center Facility Rental Safety Center Facility Rental Safety Center Facility Rental Safety Center Facility Rental Safety Center Facility Rental Safety Center Facility Rental Safety Center Facility Rental Safety Center Facility Rental Safety Center Facility Rental Safety Center Facility Rental Safety Center Facility Rental Safety Center Facility Rental Safety Center Facility Rental Safety Center Facility Rental Safety Center Facility Rental Safety Center Facility Rental Safety Center Facility Rental Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection City of Carlsbad Master Fee Schedule 2016-17 General City Service Fees FEE DESCRIPTION Fingerprinting Fees Photograph Copy (fee plus reproduction costs)-Subpoena or Records requests that require retrieval in Que Tel evidence program. Photos/ Video must be approved prior to release for compliance with privacy laws. Police/Fire -Emergency Response DUI Traffic Collision (max $12,000 per incident) Proof of Correction Certification -all others Proof of Correction Certification -Carlsbad Resident or person with CPD citation Public Dump Permit-Fee per acre Report Copy Fee (Free to Victim) plus cost of reproduction Second Call per Police Employee per hour (consistent with City payroll records) Special Business Permit (plus fingerprint fee) Special Event Application -Major (3 or more intersections)(fee + services rendered) (Note 3) Special Event Application -Minor (2 or less intersections)(fee + services rendered) (Note 3) Special Event Application -Third party Vendor Fee (2nd Day) (Note 3) Special Event Application -Third party Vendor Fee (each day thereafter) (Note 3) Special Event Application -Third party Vendor Fee (1st Day) (Note 3) Special Event City Services -Staff Time (Note 4) Verification Letter Safety Training Center-Class Room -Full Day Safety Training Center -Classroom -Half Day Safety Training Center-Confined Space Prop -Full Day Safety Training Center -Confined Space Prop -Half Day Safety Training Center -Grinder-Full Day Safety Training Center-Grinder-Half Day Safety Training Center-Grinder/Commercial Prop (No Fire Ops) -Full Day Safety Training Center-Grinder/Commercial Prop (No Fire Ops)-Half Day Safety Training Center -Grinder/Residential Prop (No Fire Ops) -Full Day Safety Training Center-Grinder/Residential Prop (No Fire Ops) -Half Day Safety Training Center-One Shooting Range -Full Day Safety Training Center-One Shooting Range -Half Day Safety Training Center-PriSim (Training Simulator) -Full Day Safety Training Center-PriSim (Training Simulator) -Half Day Safety Training Center-Pump Draft Pit-Full Day Safety Training Center-Pump Draft Pit -Half Day Safety Training Center-Streetscape -Full Day Safety Training Center-Streetscape -Half Day Safety Training Center -Two Shooting Ranges -Full Day Safety Training Center-Two Shooting Ranges -Half Day A Bin that needs to be moved: 31 to 50feet A Bin that needs to be moved: 5 to 30 feet A Bin that needs to be moved: Additional 25 feet increments Bin Exchange Bin Lock Set Up Fee 3 FY 2015-16 FEE FY 2016-17 FEE $15 $15 $45 $15 Direct Cost Direct Cost $15 $16 $0 $0 $202 $202 $10 $10 Actual Cost Actual Cost $126 $128 $362 $369 $121 $123 $109 $111 $81 $83 $136 $138 Actual Cost Actual Cost $10 $10 $528 $528 $296 $296 New Fee $500 New Fee $250 $418 $418 $236 $236 $599 $600 $327 $300 $599 $600 $327 $300 $678-$1,102 $1,100 $312-$524 $550 New Fee $500 New Fee $250 New Fee $400 New Fee $200 $145 $145 $100 $100 $763-$1,239 $1,250 $401-$645 $650 $7.02 $7.11 $5.17 $5.24 $7.02 $7.11 $59.12 $59.83 $36.95 $37.40 Item No. 15 - AB #22,337 June 28, 2016 Page 90 of 179 FEE CATEGORY Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection City of Carlsbad Master Fee Schedule 2016-17 General City Service Fees FEE DESCRIPTION Bin paint charge fee -allowed 1 per year. After first paint within one year, there will be a charge per paint request. Certified burial at Miramar plus special handling fee charged by Miramar Commercial Return to Service Fee-The return to service fee for two or more calls in a one-month period by a bin Multi-Family Complex and Commerical Bin Customers -Contamination Fee -to recover costs for separating solid waste placed in a recycling or green waste container or for arranging a special, unscheduled collection due to contamination. Copy Fee-The charge for copies requested by customers. Dead Run ·charge Delivery of extra cart Disposal Fee per Ton (pass through) Interest Charge-Contractor may charge 1.5% interest per month on any delinquent account for such time as the bill remains unpaid after its due date. Late Fee -There will be a minimum fee on any delinquent account -$3 minimum charge. Locking Fee Multi Family Complex and Commercial Bin Customers shall be charged for bulky item pickups. Bulky Item requiring 2 people to handle Multi Family Complex and Commercial Bin Customers shall be charged for bulky item pickups. Per Bulky Item -each additional item Multi Family Complex and Commercial Bin Customers shall be charged for bulky item pickups. Per Bulky Item-first item Overloaded Bins Relocation Charge offsite Relocation Charge onsite Residential Return to Service Fee-The return to service fee for two or more calls in a one-month period by a residential Restart Fee-The fee for Restarting commercial service when a permanent account has been terminated for non payment. Roll off-Demurrage Per Day Charge Single and Multi-Family cart customers -3 bulky item pick ups per calendar year with 5 items maximum per pick up -Bulky Item -Exceeding 5 per pick up -First item Single and Multi-Family cart customers -3 bulky item pick ups per calendar year with 5 items maximum per pick up -Bulky Item -Exceeding 5 per pick up-each additional item Special Haul Bin (no Storm Water Fees) 1 week or less Special Haul Bin Delivery Special Pick-ups of Solid Waste-Delivery charge for roll-off boxes (per box) Special Pick-ups of Solid Waste -Door-to-door household hazardous waste collection (HHW) Service Fee -Roll off service Standby charge per min after 5 min Trash Collection -3 yard bin Commercial Recycling-Extra pick-up Trash Collection - 3 yard bin Commercial Yard Waste-Extra pick-up Trash Collection -3 yard bin Construction Bin Rate -Extra pick-up Trash Collection -3 yard compactor Commercial -Extra pick-up Trash Collection -3 yard compactor Commercial -Five picks-up per week Trash Collection - 3 yard compactor Commercial-One pick-up per week Trash Collection -3 yard compactor Commercial -Six picks-up per week Trash Collection -3 yard compactor Commercial -Three picks-up per week Trash Collection -96 gal cart Commercial Recycling Extra pick-up Trash Collection -Commercial 2-yard bin -Extra pick-up Trash Collection -Commercial 3-yard bin -Extra pick-up Trash Collection -Commercial 3-yard bin -six pick-ups per week Trash Collection -Commercial 3-yard bin -three pick-ups per week Trash Collection -Commercial 4-yard bin -Extra pick-up Trash Collection -Commercial 5-yard bin -Extra pick-up Trash Collection -Commercial Can Backyard Service -One pick-up per week Trash Collection -Commercial Can Backyard Service-Two pick-ups per week Trash Collection -Commercial Cart Extra pick up Trash Collection -Commercial Cart-One pick-up per week (up to two (2) 96 gal) Trash Collection -Commercial Cart-Three pick-up per week (up to two (2) 96 gal) Trash Collection -Commercial Cart-Two pick-up per week (upto two (2) 96 gal) Trash Collection -Commercial per bin -five pick-ups per week (2-yard bin) Trash Collection -Commercial per bin -five pick-ups per week (3-yard bin) 4 FY 2015-16 FEE FY 2016-17 FEE $100.31 $101.77 $314.45 $319.03 $64.63 $65.57 $52.17 $52.93 $1.37 $1.39 $73.80 $74.88 $11.53 $11.70 $45.02 $45.15 $3.46 $3.51 $14.05 $14.22 $58.76 $59.61 $10.49 $10.65 $40.92 $41.52 $50.18 $50.91 $61.41 $62.30 $43.04 $43.67 $32.86 $33.34 $19.72 $20.00 $4.56 $4.62 $40.92 $41.52 $10.49 $10.65 $90.23 $91.48 $40.17 $40.76 $54.19 $55.90 $10.00 $10.00 $210.56 $217.20 $1.95 $1.98 $35.22 $35.64 $9.45 $9.55 $60.27 $61.09 $60.70 $61.29 $674.29 $679.23 $149.95 $151.12 $805.40 $811.27 $412.13 $415.19 $8.00 $8.09 $37.59 $38.01 $50.47 $51.02 $546.18 $551.25 $282.44 $285.09 $60.40 $61.06 $70.32 $71.08 $52.08 $52.67 $104.15 $105.53 $17.12 $17.32 $36.40 $36.80 $109.22 $110.42 $72.82 $73.62 $317.32 $320.31 $458.25 $462.52 Item No. 15 - AB #22,337 June 28, 2016 Page 91 of 179 FEE CATEGORY Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Trash Collection Water Service Fees Water Service Fees Water Service Fees Water Service Fees Water Service Fees Water Service Fees Water Service Fees Water Service Fees Water Service Fees City of Carlsbad Master Fee Schedule 2016-17 General City Service Fees FEE DESCRIPTION Trash Collection -Commercial per bin -five pick-ups per week (4-yard bin) Trash Collection -Commercial per bin -five pick-ups per week (5-yard bin) Trash Collection -Commercial per bin -five pick-ups per week (split bin) Trash Collection -Commercial per bin -four pick-ups per week (2-yard bin) Trash Collection -Commercial per bin -four pick-ups per week (3-yard bin) Trash Collection -Commercial per bin -four pick-ups per week (4-yard bin) Trash Collection -Commercial per bin -four pick-ups per week (5-yard bin) Trash Collection -Commercial per bin -four pick-ups per week (split bin) Trash Collection -Commercial per bin -one pick-up per week (2-yard bin) Trash Collection -Commercial per bin -one pick-up per week (3-yard bin) Trash Collection -Commercial per bin -one pick-up per week (4-yard bin) Trash Collection -Commercial per bin -one pick-up per week (5-yard bin) Trash Collection -Commercial per bin -one pick-up per week (split bin) Trash Collection-Commercial per bin -six pick-ups per week (2-yard bin) Trash Collection -Commercial per bin -six pick-ups per week (3-yard bin) Trash Collection -Commercial per bin -six pick-ups per week (4-yard bin) Trash Collection -Commercial per bin -six pick-ups per week (5-yard bin) Trash Collection -Commercial per bin -six pick-ups per week (split bin) Trash Collection -Commercial per bin -three pick-ups per week (2-yard bin) Trash Collection -Commercial per bin -three pick-ups per week (3-yard bin) Trash Collection -Commercial per bin -three pick-ups per week (4-yard bin) Trash Collection -Commercial per bin -three pick-ups per week (5-yard bin) Trash Collection-Commercial per bin -three pick-ups per week (split bin) Trash Collection -Commercial per bin -two pick-ups per week (2-yard bin) Trash Collection -Commercial per bin -two pick-ups per week (3-yard bin) Trash Collection -Commercial per bin -two pick-ups per week (4-yard bin) Trash Collection -Commercial per bin -two pick-ups per week (5-yard bin) Trash Collection -Commercial per bin -two pick-ups per week (split bin) Trash Collection-Commercial Recycling-five pick-ups per week (3 yard bin) Trash Collection -Commercial Recycling-four pick-ups per week (3 yard bin) Trash Collection -Commercial Recycling-one pick-up per week (3 yard bin) Trash Collection -Commercial Recycling -one pick-up per week (96 gal cart) Trash Collection -Commercial Recycling-seven pick-ups per week (3 yard bin) Trash Collection -Commercial Recycling -six pick-ups per week (3 yard bin) Trash Collection -Commercial Recycling -three pick-ups per week (3 yard bin) Trash Collection -Commercial Recycling -two pick-ups per week (3 yard bin) Trash Collection -Commercial Recycling-three pick-ups per week (96 gal cart) Trash Collection -Commercial Recycling-two pick-ups per week (96 gal cart) Trash Collection -Commercial Yard Waste -one pick-up per week (3 yard bin) Trash Collection -Commercial Yard Waste -two pick-ups per week (3 yard bin) Trash Collection -Commercial Yard Waste-one pick-up per week (96 gal cart) Trash Collection -Construction Bin Rate -Five pick-ups per week (3 yard bin) Trash Collection-Construction Bin Rate -Four pick-ups per week (3 yard bin) Trash Collection -Construction Bin Rate -One pick-up per week (3 yard bin) Trash Collection -Construction Bin Rate-Three pick-ups per week (3 yard bin) Trash Collection -Construction Bin Rate -Two pick-ups per week (3 yard bin) Trash Collection -Residential -Additional trash cart beyond first one. Trash Collection -Residential -per month -64 or 96 Gallon Cart Trash Collection -Residential-per month (35 gallon trash) Trash Collection -Residential-per month (backyard service) Trash Collection -Residential-Two additional Green Waste and/or Recycling carts will be free of charge, after that each additional cart is charged Trash Collection -Commercial/Multi Family Scout Service Fee Wash Out Receiver Boxes Backflow 2nd Notice Backflow 3rd Notice Backflow Inspection -California Department of Environmental Health (CDEH) (invoice total from CDEH) Backflow Preventer Charge (per month, each account) Backflow Re-inspection (Consistent with City payroll records) Blueprinting of Standard Size (24" x 36") Improvement Plan Sheet (Cost for each) Hydraulic Analysis Only -Included in Improvement Plan Review Fees Potable, Reclaimed and Sewer Improvement Plan Review -Use Improvement Plan Review Fees Potable, Reclaimed and Sewer Standards and Specifications (available on Internet) 5 FY 201S-16 FEE FY 2016-17 FEE $636.12 $642.11 $814.01 $821.73 $369.50 $373.33 $257.55 $259.98 $370.34 $373.80 $512.63 $517.47 $654.94 $661.16 $298.60 $301.70 $78.42 $79.20 $106.61 $107.65 $142.18 $143.56 $177.76 $179.48 $85.86 $86.77 $377.06 $380.60 $546.18 $547.20 $759.60 $766.75 $973.09 $982.31 $440.42 $444.98 $197.90 $199.78 $282.44 $284.87 $389.16 $392.85 $495.89 $500.61 $227.69 $230.06 $138.15 $139.48 $194.54 $196.38 $265.65 $268.19 $336.83 $340.06 $156.78 $158.42 $281.44 $283.17 $235.79 $238.66 $76.68 $77.61 $17.45 $17.66 $393.77 $398.57 $337.52 $341.63 $182.76 $184.98 $129.72 $131.30 $52.34 $52.98 $34.90 $35.32 $108.73 $109.81 $192.45 $194:32 $20.32 $20.53 $958.84 $971.56 $779.62 $789.98 $241.97 $245.25 $600.41 $608.41 $421.19 $426.83 $2.34 $2.37 $20.62 $20.82 $18.66 $18.85 $26.29 $26.57 $2.34 $2.37 $47.94 $48.51 $49.24 $49.96 $8 $8 $24 $24 Actual Cost Actual Cost $3 $3 Actual Cost Actual Cost $5 $5 $0 $0 N/C N/C Item No. 15 - AB #22,337 June 28, 2016 Page 92 of 179 FEE CATEGORY Water Service Fees City of Carlsbad Master Fee Schedule 2016-17 General City Service Fees FEE DESCRIPTION Potable, Reclaimed and Sewer Standards and Specifications (Cost for each) FY 2015-16 FEE Actual Cost Water Service Fees Preliminary Potable Water, Reclaimed Water, Sewer Analysis Review -(Use Improvement Plan Review Fees) Water Service Fees Reclaimed Water Landscape Review-Use Improvement Plan Review fees Water Service Fees Utility Standards and Specifications (actual cost of reproduction) Water Service Fees Water Meter-Construction Meter Installation/Removal Water Service Fees Water Meter -Construction Meter Relocation Water Service Fees Water Meter Deposit -Construction Meters Water Service Fees Water Service Fee -Accounts scheduled for termination for non-payment Water Service Fees Water Service Fee -After Hour Turn-on Water Service Fees Water Service Fee -Continuity of Service Water Service Fees Water Service Fee-Door Hanger Electronic Water Service Fees Water Service Fee -Door Hanger Paper Water Service Fees Water Service Fee -Next Scheduled Day Service Turn on Water Service Fees Water Service Fee -Per New Account -Service Turn on Water Service Fees Water Service Fee -Same Day Turn-on {Not Scheduled for That Day) (Note 1) -Per section 8.50,0BO(e), Ord NS-230 phl,2,1993; Ord-53 ph 3, 1989: Ord. 1278 ph 1 (part) 1985) (Note 2) -Cade Section 8.09.070 Actual Cost $105 $46 $907 $14 $117 $11 $1 $10 $30 $35 $87 FY 2016-17 FEE Actual Cost Actual Cost $107 $47 $923 $15 $119 $11 $1 $11 $30 $36 $89 (Note 3) -A valid, unexpired City of Carlsbad Business License is required for all special event Applicants. An amendment to 8.17.070 CMC now also requires an Applicant to (Note 4) -See Carlsbad Municlpol Code Section 8.17.070 6 Item No. 15 - AB #22,337 June 28, 2016 Page 93 of 179 CITY OF CARLSBAD MASTER FEE SCHEDULE SECTION 2 DEVELOPMENT RELATED SERVICE FEES June 2016 Item No. 15 - AB #22,337 June 28, 2016 Page 94 of 179 FEE CATEGORY Bu ilding Permit Fees Building Permit Fees Building Permit Fees Building Permit Fees Building Permit Fees Building Permit Fees Building Permit Fees Building Permit Fees Building Permit Fees Building Permit Fees Building Permit Fees Building Permit Fees Building Permit Fees Building Permit Fees Building Permit Fees Building Permit Fees Building Permit Fees Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing City of Carlsbad Master Fee Schedule 2016-17 Development Related Service Fees FEE DESCRIPTION Additional plan review required by changes, additions or revisions to approved plans- per hour-(minimum charge -one half hour) (Note 5) Building Plan Check -70% of Building Permit Fee(8% discount on repetitive plan checks) Green Building Standards Plan Check and Inspection Inspections for which no fee is specifically indicated -per hour-(minimum charge-one half hour) (Note 5) inspections outside of normal business hours -per hour-(minimum charge -2 hours) (Note 5) Re-inspection fees -per hour (Note 5) 581473 Green Building State Standards Fee Strong Motion Instrumentation Fee (SMIP) and Seismic Hazard Mapping Fee - Commercial (minimum $0.50 fee, pass through from State) Strong Motion Instrumentation Fee (SMIP) and Seismic Hazard Mapping Fee - Residential (minimum $0.50 fee, pass through from State) Total Valuation -$1 to $500 (Note 5) Total Valuation -$1,000,001 and up -for the first $1,000,000 plus $1.99 for each additional $1,000 or fraction thereof (Note 5) Total Valuation -$100,001 to $500,000 -forthe first $100,000 plus $3.55 for each additional $1,000, or fraction thereof, to and including $500,000. (Note SJ Total Valuation -$2,001 to $25,000 -for the first $2,000 plus $8.87 for each additional $1,000, or fraction thereof, to and including $25,000 (Note 5) Total Valuation -$25,001 to $50,000 -for the first $25,000 plus $6.40 for each additional $1,000, or fraction thereof, to and including $50,000 (Note 5) Total Valuation -$50,001 to $100,000-forthe first $50,000 plus $4.43 for each additional $1,000, or fraction thereof, to and including $100,000 (Note 5) Total Valuation -$500,001 to $1,000,000-forthefirst $500,000 plus $3.00 for each additional $1,000, or fraction thereof, to and including $1,000,000 (Note 5) Total Valuation -$501 to $2,000-forthe first$500 plus $1.93 for each additional $100 or fraction thereof, to and including $2,000 (Note 5) Adjustment Plat Affordable Housing Credit Per Unit (Northwest Quadrants) Affordable Housing Credit Per Unit-Cassia Heights (Southeast and Southwest quadrants) Affordable Housing Credit Per Unit-Villa Loma (Southeast and Southwest quadrants) Affordable Housing Impact Fee (per unit) Affordable Housing In-Lieu Fee (per market rate unit) Agricultural Mitigation Fee All development related appeals Amendments and Revisions to Approved Projects Building Code Enforcement Certificate of Compliance Certificate of Compliance In Lieu of Parcel Map Certificate of Correction Coasta l Development Permit (CDP)-2 -4 unit or lot subdivision (per unit or lot whichever is greater) Coastal Development Permit (CDP)-5 or more units or lot subdivision (per permit) Coastal Development Permit (CDP) -Emergency Coastal Development Permit (CDP) -Exemption Coastal Development Permit (CDP) -Minor Permit Coastal Development Permit (CDP) -Non-Residential+ 10 cents per square foot Coastal Development Permit (CDP)-Single Family Lot Community Facilities District Annexation 7 FY 2015-16 FEE FY 2016-17 FEE $65 $65 70% of Building 70% of Building. Permit Fee Permit Fee $163 $166 $65 $65 $65 $65 $65 $65 $1.00 per every $1.00 per every $25,000 in building $25,000 in building valuation or fraction valuation or fraction thereof, with a thereof, with a minimum fee of minimum fee of $1.00 $1.00 $28.00 per $100,000 $28.00 per $100,000 valuation valuation $13.00 per $100,000 $13.00 per $100,000 valuation valuation $15 $15 $3,534 $3,534 $626 $626 $44 $44 $246 $246 $406 $406 $2,037 $2,037 $15 $15 $1,310 $1,334 $142,000 $142,000 $57,512 $58,547 $48,000 $48,000 $2,915 $2,915 $4,515 $4,515 $10,000 $10,000 $645 $850 50% of original Varies application fee Court costs Court costs $1,063 $1,082 $2,846 $2,846 $827 $842 $2,222 $2,262 $3,616 $3,682 $450 $458 $247 $252 $872 $887 $984 $1,002 $1,097 $1,117 $1,752 $1,752 Item No. 15 - AB #22,337 June 28, 2016 Page 95 of 179 FEE CATEGORY Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing City of Carlsbad Master Fee Schedule 2016-17 Development Related Service Fees FEE DESCRIPTION Conditional Use Permit-Regular Conditional Use Permit (CUP)-Biological Habitat Preserve Conditional Use Permit (CUP)-Minor Construction Change Review-Major (fee plus $245 per sheet) Construction Change Review -Minor (fee plus $155 per sheet) Daycare Permit (7 -14 Children) Developer Agreements -Deposit $10,000 increments (Consistent with City payroll records+ overhead) Easement Document Processing and Recording-Major (all others) Easement Document Processing and Recording-Minor (Single Family Lot) Encroachment Agreement Processing Environmental Impact Assessment (EIA)-AII Others Environmental Impact Assessment (EIA)-Single Family Environmental Impact Report (EIR) -Addendum (+fully burdened hourly rate after 1st 10 hours of project planner) Environmental Impact Report (EIR)-Focused/Supplemental (Requiring a Public Hearing)-(+ fully burdened hourly rate after the 1st 100 hours of project planner or 20 hours of project engineer) Environmental Impact Report (EIR}-Review(+ fully burdened hourly rate after the first 160 hours of project planner or 40 hours of Project Engineer) Extensions to projects in process Fish & Game Fee -Environmental Impact Report (EIR) -Set by Dept. of Fish and Wildlife Fish & Game Fee -Negative Declaration/ Mitigated Negative-Set by Dept. of Fish and Wildlife General Plan Amendment-0 - 5 Acres General Plan Amendment-Over 5 Acres Grading Permit Investigation Fee (Consistent with City payroll records plus overhead) Habitat Management Plan (HMP)-Amendment to Plan Document-Major (Plus fully burdened hourly rate after the first 20 hours of project planner.) Habitat Management Plan (HMP)-Amendmentto Plan Document-Minor Habitat Management Plan Permit-Major-habitat to be preserved Habitat Management Plan Permit-Single Family Hillside Development Permit-Major Hillside Development Permit -Minor Inspection -Additional Planning Inspection Overtime-per Hour (On Request) -each additional hour at $70 License Tax on New Construction -Mobile Homes, Per Lot Lighting and Landscape District #2 Annexation Local Coastal Plan -Amendment Local Facilities Management Fees -As established by Council Local Facilities Management Plan /Amendment-Fee+ deposit in minimum increments of $5,000 Mapping Fees -Final Tract Map(+ $5 per Acre)-Major Subdivision Mapping Fees -Parcel Map-Minor Subdivision Master Plan {Base fee+ fully burdened hourly rates after the first 200 hours of project planner or 100 hours project engineer) Master Plan Amendment-Major (Base fee+ fully burdened hourly rates after the first 100 hours of project planner or 40 hours project engineer) Master Plan Amendment -Minor {Base fee+ fully burdened hourly rates after the first 20 hours of project planner or 7 hours project engineer) Master Plan Pre-Filing Submittal Neighborhood Improvement Agreements Non Conforming Construction Permit Notice Fee (plus postage) Oversize Load Permit -1 trip (fee set by State) Oversize· Load Permit -Annual I Per Year (fee set by State) Park In Lieu Fee -Village Area Plan Consistency Determination Planned Development -5 or more/ Major Subdivision, based on number of units or lots, whichever is greater. 8 FY 2015-16 FEE FY 2016-17 FEE $4,567 $4,649 $861 $876 $765 $779 $697 $710 $495 $504 $214 $218 Actual cost Actual cost $664 $676 $117 $119 $343 $349 $1,760 $1,792 $969 $986 $2,559 $2,605 $13,746 $13,993 $20,433 $20,801 Varies 25% of original fee $3,120 $3,120 $2,260 $2,260 $4,348 $4,426 $6,271 $6,384 Actual cost Actual cost $5,444 $5,542 $3,498 $3,561 $3,981 $4,053 50% Minor Fee 50% Minor Fee $2,559 $2,605 $1,265 $1,288 $94 $96 $118 $120 $2,311 $2,348 $5,400 $7,400 $6,356 $6,470 Full Cost Full Cost $10,000 $10,000 $7,615 $7,753 $3,419 $3,480 $42,566 $43,332 $26,632 $27,111 $1,699 $1,729 $7,239 $7,369 $160 $163 $710 $723 $320 $326 $16 $16 $90 $90 $12,201 $12,421 $720 $733 $8,515 $8,669 Item No. 15 - AB #22,337 June 28, 2016 Page 96 of 179 FEE CATEGORY Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing City of Carlsbad Master Fee Schedule 2016-17 Development Related Service Fees FEE DESCRIPTION Planned Development-4 or fewer, based on number of units or lots, whichever is greater. Planning Commission Agenda and Minutes (+postage) Planning Commission Determination -Other Planning Commission Determination -Single Family Plumbing, Electrical and Mechanical Permit (not combined with Building Permits) Postage (All) Precise Development Plan Preliminary Plan Review -Major (Other) Preliminary Plan Review -Minor (SFO) Public Facilities Fees-1.82% of Bldg. Permit Value (Inside CFO) Public Facilities Fees -3.5% of Bldg. Permit Value (Outside CFO) Quitclaim of Easement Reapportionment Fees for 1911 Act Assessment Districts Reversion to Acreage -(Consistent with City payroll records charged against a $3,100 deposit) Right of Way Permit-Minor-Construction (Single Family, Pool, Driveway, Spa) Right of Way Permit -Minor -Non Construction Right of Way Permit -Utility(+ actual costs for Inspector and Senior Inspector's time) Right of Way Permit -Utility (By Contract) Satellite Antenna Permit School Fees -Set by School Districts, State Mandates Limits. See School District Maps for applicable school district. Secured Agreement Processing Extension Secured Agreement Processing Replacement+ improvement plan revision fees if required Segregation of Assessments -1-4 lots (Consistent with City payroll records plus overhead, consultant cost and recording fee. Also see Streets and Highways Code Section 8760-8769 ) Segregation of Assessments -5 lots or more -fee plus $20 per lot (Consistent with City payroll records plus overhead, consultant cost and recording fee. Also see Streets and Highways Code Section 8760-8769) Service Installation Fee -Fire Hydrant Lateral and Assembly (staff time consistent with City payroll records) Service Installation Fee-Fire Sprinkler Lateral (staff time consistent with City payroll records) Sidewalk Tables and Chairs -Village Area -See Minor Right-of-Way Permit Sign Permit Sign Program Site Development Plan -Major-5 or more units I lots Site Development Plan -Minor-Residential, less than or equal to 4 units I lots Special Use Permit -All Specific Plan -base plus fully burdened hourly rate after first 200 hours project planner, or 60 hours project engineer Specific Plan Amendment-Major-base plus fully burdened hourly rate after 180 hours project planner, or 30hours project engineer Specific Plan Amendment-Minor-base plus fully burdened hourly rate after20 hours project planner, or 7 hours project engineer Street Vacation -Street/ Public Service Easement Vacation -Summary Street Name Change Street Vacation -Street I Public Service Easement Vacation -Regular Tentative Parcel Map -Minor Subdivision -0-4 Lots Tentative Tract Map -5 -49 units/lots-base fee+ $110 each, whichever is greater Tentative Tract Map -50 + units/lots -base fee + $15 each, whichever is greater Tentative Tract Map Litigation Stay 9 FY 2015-16 FEE FY 2016-17 FEE $3,071 $3,126 copy charge copy charge $1,665 $1,695 $1,029 $1,048 $160 $166 Current Postage Current Postage Rate Rate x Number of x Number of labels labels $7,750 $7,890 $720 $733 $202 $206 1.82% of Bldg. 1.82% of Bldg. Permit Value Permit Value 3.5% of Building 3.5% of Building Permit,Value Permit Value $697 $710 Actual Cost Actual Cost Actual Cost Charged Actual Cost Charged against $3,100 against $3,100 Deposit. Deposit. $354 $361 $174 $177 $754 $767 $754 $767 $427 $435 Set by School Set by School Districts Districts $416 $424 $765 $779 Actual Cost Actual Cost Actual Cost Actual Cost Actual Cost Actual Cost Actual Cost Actual Cost $62 $63 $1,074 $1,094 $11,541 $11,749 $4,550 $4,632 Varies $3,555 $35,552 $36,192 $22,880 $23,292 $1,479 $1,506 $1,350 $1,374 $1,665 $1,695 $3,402 $3,463 $3,875 $3,945 $8,392 $8,543 $16,772 $17,074 25% of original fee 25% of original fee Item No. 15 - AB #22,337 June 28, 2016 Page 97 of 179 FEE CATEGORY Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Development Processing Fire Inspection Fire Inspection Fire Inspection Fire Inspection Fire Inspection Fire Inspection Fire Inspection Fire Inspection Fire Inspection Fire Inspection Fire Inspection Fire Inspection Fire Inspection Fire Inspection Fire Inspection Fire Inspection Fire Inspection Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fi re Pe rm its Fire Permits City of Carlsbad Master Fee Schedule 2016-17 Development Related Service Fees FEE DESCRIPTION Third Party Review -plus consultant cost Trails-Major Trail Plan Check, greater than 1 mile Trails -Minor Trail Plan Check, less than 1 mile Trails Inspection Variance-Administrative (Planning) Variance -Planning Village Area Sidewalk Outdoor Dining and Curb Cafe [max of 2 parking spaces) Annual - See Right of Way Permit. Per Space I Per Year. Village Review Area Sidewalk Sign/Outdoor Display Permit -See Right of Way Permit Wireless Communication Third Party Review Zone Change -5 or fewer acres Zone Change -5.1 or more acres Zone Code Compliance Letter Fire Clearance Annual Inspection -State License. 26-50 Beds Individuals/Per Establishment Fire Clearance Annual Inspection -State License. 50 + Beds Individuals/Per Establishment Fire Clearance Annual Inspection -State License. 7-24 Individuals/Per Establishment Fire Clearance Initial Inspection-State License. 25 + Individuals/Per Establishment Fire Clearance Initial Inspection-State License. 7-24 Individuals/Per Establishment Fire Clearance Inspection-State License. 1-6 Individuals/Per Establishment Fire Inspection -R-1 Occupancy 15-50 dwelling units [DU's, plus $194.90 for each additional 50 dwelling units Fire Inspection -R-1 Occupancy 6-14 dwelling units (DU's) Inspection Inspection -Initial Occupancy Inspection-New Business Inspection -Interim Inspection -Knox System Inspection -New Above Ground storage tank Inspection -Re-inspection for a previously failed inspection Inspection -Underground Fire Protection Service Main Repair-Inspection Only Inspection -Underground Storage Tanks -New Inspection Only Inspection-Repeated Inspection on New Construction Permit-Aerosol Use/Storage Permit -Liquefied Petroleum Gas Permit -Medical Gas Dispensing System Permit -Motor Vehicle Repair Garages Permit -Above Ground Storage Tanks Permit -Assembly Occupancy A-1 Permit-Assembly Occupancy A-2 Permit-Assembly Occupancy A-3 Permit-Battery Systems Permit-Brazing, Soldering and Welding Permit-Candles or Open Flame-Public Assembly Permit-Child Day Care, E or 1-4 Permit -Combustible Fiber Use and Storage Permit -Compressed Gases/Cryogen Storage Use Permit -Covered Mall Permit-Dry Cleaning Permit -Dust Producing Operations Permit -Emergency and Standby Power Systems Permit-Exhibits and Trade Shows-Public Assembly Permit -Fire Watch Permit-Flammable and Combustible Liquids Dispensing, Use, Storage, Tanks Permit-Flammable Finishes Permit-Fumigation or Thermal Insecticidal Fogging Permit-Hazardous Materials Use and Storage Permit-High-Piled Combustible Storage Permit-Industrial Ovens-Kilns Permit-Misc. Combustible Storage/Tires Facility 10 FY 2015-16 FEE FY 2016-17 FEE $759 $773 $1,426 $1,452 $713 $726 $306 $311 $765 $779 $2,880 $2,932 $1,122 $1,142 Actual Cost Actual Cost $4,994 $5,084 $6,766 $6,888 $120 $645 $645 $1,035 $1,035 $400 $401 $449 $450 $323 $323 $253 $255 $507 $510 $205 $207 $125 $127 $250 $254 $198 $201 $172 $175 $450 $458 $71 $73 $547 $450 $289 $294 $82 $84 $124 $126 $135 $137 $264 $269 $177 $181 $539 $548 $539 $548 $346 $353 $250 $254 $636 $645 $124 $126 $124 $126 $250 $254 $191 $195 $124 $126 $124 $126 $191 $195 $191 $195 $442 $450 $443 $450 $250 $254 $135 $137 $124 $126 $250 $254 $270 $275 $337 $344 $186 $189 $180 $183 Item No. 15 - AB #22,337 June 28, 2016 Page 98 of 179 FEE CATEGORY Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Permits Fire Prevention Fire Prevention Fire Prevention Fire Prevention Fire Prevention Fire Prevention Fire Protection System Installation Fire Protection System Installation Fire Protection System Installation Fire Protection System Installation Fire Protection System Installation Fire Protection System Installation Fire Protection System Installation Fire Protection System Installation Fire Protection System Installation Fire Protection System Installation Fire Protection System Installation Fire Protection System Installation GIS GIS GIS GIS GIS Grading Fees Grading Fees Grading Fees Grading Fees Grading Fees Grading Fees Grading Fees Grading Fees City of Carlsbad Master Fee Schedule 2016-17 Development Related Service Fees FEE DESCRIPTION Permit-Miscellaneous Combustible Storage Permit-Pyrotechnics or Special Effects, Aerial Fireworks (per event or day) Permit -Refrigeration Equipment Install or Operate Permit -Spray Booth Permit-Temporary Use-Carnivals and Fairs Permit-Temporary Use-Tents (Major) Permit -Temporary Use -Tents (Minor) Permit-Underground Fire Protection Service Main Repair Permit-Underground Storage Tanks-(Single Site Multi Tanks) Permit -Vapor Expansion Tank RetrofitcLJST/AST Permit -Wood Products Alternative Materials and Methods Fire -Hydrant Water Flow Test Fire 0 Weed Abatement (charge per parcel) Fire Safety Standby Inspection-Weed Abatement Compliance Certificate Permit/Inspection -Hazardous Materials and Processes -Assembly Fire Protection System Installation Permit -Automatic Sprinkler System -Commercial System -each additional riser-Plan Check Permit-Automatic Sprinkler System -Commercial System 13-R -Plan Check Permit -Automatic Sprinkler System -Residential System 13-D -Plan Review Permit-Automatic Sprinkler System -Tenant Improvement -Plan Review Permit-Fire Alarm Systems-1 to 25 devices -Plan Review Minimum Permit -Fire Alarm Systems -26 or more -Plan Review Permit -Other Fixed Fire Systems -Hood and Duct Permit -Other Fixed Fire Systems -Paint Spray Booth Plan Review Permit-Other Fixed Fire Systems -Special Chemical Agent Permit-Other Fixed Fire Systems -Standpipe Permit -Underground Fire Protection Service Main: Single Hydrant or Single Riser Connection. GIS Digital Data Delivery (per hour Technician plus overhead) GIS Production of new docume~ts (per hour Technician plus materials and overhead) GIS Reproduction of Existing Documents (per hour Technician plus material and overhead) GIS Technical Services (per hour Manager plus overhead) GIS Technical Services (per hour Technician plus overhead) Minor Grading Plan Review Permit-1,000,001 Cubic Yards or More -for the first 1,000,000 CY plus $710 for each additional 100,000 CY orfractlon thereof Permit-1,001 to 10,000 Cubic Yards -for the first 1,000 CY plus $65 for each additional 1,000 CY or fraction thereof Permit -10,001 to 100,000 Cubic Yards -for the first 10,000 CY plus $130 for each additional 10,000 CY or fraction thereof Permit -100 Cubic Yards or Less -Permit Permit-100,001 to 200,000 Cubic Yards-for the first 100,000 CY plus $130 for each additional 10,000 CY or fraction thereof Permit-101 to 1,000 Cubic Yards -for the first 100 CY plus $65 for each additional 100 CY or fraction thereof Permit-200,001 TO 400,000 Cubic Yards -for the first 200,000 CY plus $195 for each additional 10,000 CY or fraction thereof 11 FY 2015-16 FEE FY 2016-17 FEE $539 $548 $352 $359 $191 $195 $157 $160 $270 $275 $298 $303 $135 $137 $450 $458 $1,118 $1,132 $539 $548 $250 $254 $1,699 $1,715 $56 $57 $163 $166 $250 $254 $121 $123 $124 $126 Actual Cost Actual Cost $414 $414 $741 $741 $71 $73 $71 $73 $66 $67 $110 $112 $71 $73 $143 $146 $71 $73 $88 $89 $636 $645 Actual Cost Actual Cost Actual Cost Actual Cost Direct cost Direct cost Actual Cost Actual Cost Actual Cost Actual Cost $952 $969 $18,156 $18,483 $1,226 $1,248 $2,026 $2,062 $431 $439 $3,551 $3,615 $437 $445 $5,242 $5,337 Item No. 15 - AB #22,337 June 28, 2016 Page 99 of 179 FEE CATEGORY Grading Fees Grading Fees Grading Fees Grading Fees Grading Fees Grading Fees Grading Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees lmprov~ment Plan Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees City of Carlsbad Master Fee Schedule 2016-17 Development Related Service Fees FEE DESCRIPTION Permit-400,000 to 1,000,000 Cubic Yards -for the first 400,000 CY plus $980 for each additional 100,000 CY or fraction thereof Plan Review -1,001 to 10,000 Cubic Yards-forthe first 1,000 CY plus $120 for each additional 1,000 CY or fraction thereof Plan Review-10,001 to 100,000 Cubic Yards -for the first 10,000 CY plus $180 for each additional 10,000 CY orfraction thereof Plan Review-100 Cubic Yards or Less Plan Review-100,001 to 200,000 Cubic Yards -for the first 100,000 CY plus $285 for each additional 10,000 CY or fraction thereof Plan Review-200,001 Cubic Yards or more-for the first 200,000 CY plus $130 for each additional 100,000 CY or fraction thereof Plan Review -101 to 1,000 Cubic Yards -for the first 100 CY plus $120 for each additional 100 CY or fraction thereof Cost of Landscape Improvements -$0 to $20,000 Cost of Landscape Improvements -$100,001 to $250,000 -Plus 2% over $100,000 Cost of Landscape Improvements -$20,001 to $50,000 -Plus 3.0% over $20,000 Cost of Landscape Improvements -$250,001 to $500,000 -Plus 0.15% over $250,000 Cost of Landscape Improvements -$50,001 to $100,000-Plus 1.5% over $50,000 Cost of Landscape Improvements -$500,001 to $1,000,000-Plus 0.1 over $500,000 Cost of Landscape Improvements -Over $1,000,000 -plus 0.07% over $1,000,000 Improvement Inspections -Cost of Improvements -$1,000,001 or more -for the first $1,000,000 plus $105 for each additional $10,000 or fraction thereof. Improvement Inspections -Cost of Improvements -$100,001 to $250,000 -for the first $100,000 plus $100 for each additional $10,000 or fraction thereof Improvement Inspections -Cost of Improvements -$20,001 to $50,000 -for the first $20,000 plus $250 for each additional $10,000 or fraction thereof. Improvement Inspections -Cost of Improvements -$250,001 to $500,000 -for the first $250,000 plus $105 for each additional $10,000 or fraction thereof Improvement Inspections-Cost of Improvements -$50,001 to $100,000 -for the first $50,000 plus $125 for each additional $10,000 or fraction thereof Improvement Inspections -Cost of Improvements -$500,001 to $1,000,000 -for the first $500,000 plus $105 for each additional $10,000 or fraction thereof Improvement Inspections -Cost of Improvements $0 to $20,000 Improvement Plan Check-Cost of Improvements -$0 to $20,000 -plus 5% of value of improvements Improvement Plan Check-Cost of Improvements -$100,001 to $250,000-plus 2.5% of value of improvements -$5,840 minimum Improvement Plan Check-Cost of Improvements -$20,001 to $50,000 -plus 4% of value of improvements -$2,470 minimum Improvement Plan Check-Cost of Improvements -$250,001 to $500,000-plus 2% of value of improvements-$13,910 minimum Improvement Plan Check-Cost of Improvements -$50,001 to $100,000 -plus 3% of value of improvements -$4,090 minimum Improvement Plan Check-Cost of Improvements -$500,001 to $1,000,000 -plus 1.5% of value of improvements-$23,840 minimum Improvement Plan Check-Cost of Improvements -Over $1,000,0000 -plus 0.75% of value of improvements -$31,630 minimum Landscape Inspection -Cost of Improvements -$0 to $20,000 Landscape Inspection -Cost of Improvements -$20,001 to $50,000 -for the first $20,000 of improvements plus $20 for each additional $10,000 or fraction thereof Landscape Inspection -Cost of Improvements -$50,001 to $100,000-forthe first $50,000 of improvements plus $20 for each additional $10,000 or fraction thereof Landscape Inspection -Cost of Improvements -$100,001 to $250,000-forthe first $100,000 of improvements plus $150 for each additional $100,000 or fraction thereof Landscape Inspection -Cost of Improvements -$250,001 to $750,000 -for the first $250,000 of improvements plus $150 for each additional $100,000 or fraction thereof 12 FY 2015-16 FEE FY 2016-17 FEE $10,406 $10,593 $2,581 $2,628 $4,063 $4,136 $431 $439 $6,196 $6,308 $9,941 $10,120 $863 $878 $601 $612 $3,535 $3,535 $855 $870 $4,435 $4,435 $2,469 $2,514 $5,619 $5,720 $8,515 $8,516 $16,454 $16,750 $4,290 $4,367 $1,713 $1,744 $6,354 $6,469 $3,433 $3,495 $10,315 $10,501 5.5%-$375 5.5%-$375 Minimum Minimum $1,378 $1,403 $2,547 $2,593 $1,759 $1,791 - $7,705 $7,844 $2,270 $2,310 $13,617 $13,862 $13,918 $14,168 $601 $605 $849 $787 $1,193 $1,210 $1,699 $1,729 $2,041 $2,078 Item No. 15 - AB #22,337 June 28, 2016 Page 100 of 179 FEE CATEGORY Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees Improvement Plan Fees Meter Installation Fees Meter Installation Fees Meter Installation Fees Meter Installation Fees Meter Installation Fees Meter Installation Fees Meter Installation Fees Meter Installation Fees Meter Installation Fees Meter Installation Fees Meter Installation Fees Meter Installation Fees Storm Water Storm Water Storm Water Storm Water Storm Water Storm Water Storm Water Storm Water Storm Water Storm Water Storm Water Storm Water Storm Water Storm Water Storm Water Storm Water Storm Water Storm Water Storm Water Storm Water Storm Water Storm Water Storm Water Waste Water Fees Waste Water Fees City of Carlsbad Master Fee Schedule 2016-17 Development Related Service Fees FEE DESCRIPTION Landscape Inspection -Cost of Improvements -$750,001 and Over -for the first $750,000 of improvements plus $150 for each additional $100,000 or fraction thereof Street Light Energizing Fee -100 Watts Street Light Energizing Fee -150 Watts Street Light Energizing Fee -200 Watts Street Light Energizing Fee -250 Watts Street Light Energizing Fee -40 Watts Street Light Energizing Fee -55 Watts Street Light Energizing Fee -70 Watts Street Light Energizing Fee -85 Watts Water Meter Installation -2" -Turbo Water Meter Installation -1-1/2" Water Meter Installation -1-1/2" -Turbo Water Meter Installation -2" Water Meter Installation -3" (Consistent with City payroll records plus overhead) Water Meter Installation -3/4" Water Meter Installation -5/8" Water Meter Installation -6" (Consistent with City payroll records plus overhead) Water Meter Installation - 8" (Consistent with City payroll records plus overhead) Water Meter Installation-1" Water Meter Installation-4" (Consistent with City payroll records plus overhead) Water Meter Installation Fee -Fire Protection Inspection Base Fee -Tier Level 1-Per Site-Low Inspection Priority Inspection Base Fee -Tier Level 1-Per Site-Medium Inspection Priority Inspection Fee -Tier Level 3 -Each Subsequent Acre Or Portion Over One Acre - Medium Inspection Priority Inspection Fee -Tier Level 2 -Per Site -High Inspection Priority Inspection Fee -Tier Level 2 -Per Site -Medium Inspection Priority Inspection Fee -Tier Level 3 -Each Subsequent Acre Or Portion Over One Acre -High Inspection Priority Inspection Fee -Tier Level 3 -Up to 1 Acre -High Inspection Priority Inspection Fee -Tier Level 3 -Up to 1 Acre -Medium Inspection Priority Plan Review Base fee -Tier Level 3 -Up to 1 Acre -Medium Inspection Priority Plan Review Base Fee -Tier Level 1-Per Site -Low Inspection Priority Plan Review Base Fee-Tier Level 3-Each Subsequent Acre Or Portion Over One Acre- High Inspection Priority Plan Review Base Fee -Tier Level 3 -Each Subsequent Acre Or Portion Over One Acre - Medium Inspection Priority Plan Review Base Fee -Tier Level 3 -Up to 1 Acre -High Inspection Priority Plan Review Base Fee -Tier Level 1 -Per Site -Medium Inspection Priority Plan Review fee -Tier Level 2-Per Site -High Inspection Priority Plan review fee-Tier Level 2 -Per Site -Medium Inspection Priority Retaining Wall Plan check (Valuation $250,000+) Retaining Wall Plan check (Valuation $50,001-$250,000) Retaining Wall Plan check (Valuation= 0-$50,000) SWMP inspection Fee -Up to One Half Acre SWMP Plan Review Fee-Up To One Half Acre SWMPP Fees -Plan Review Fee -For Each Subsequent Acre Or Portion Over One Half Acre SWMPP Fees -inspection Fee -For Each Subsequent Acre Or Portion Over One Half Acre Waste Water Discharge Permit Waste Water Pretreatment-Class I -One time fee for new users 13 FY 2015-16 FEE FY 2016-17 FEE $3,229 $3,287 $120 $117 $165 $161 not listed $205 $256 $249 $66 $65 not listed $78 $91 $91 $107 $105 $1,044 $1,054 $595 $605 $913 $923 $823 $834 Actual Cost Actual Cost $305 $310 $272 $277 Actual Cost Actual Cost Actual Cost Actual Cost $356 $362 Actual Cost Actual Cost Meter Fee-Use Rate Meter Fee-Use Rate Sheet Sheet $59 $60 $228 $232 $216 $220 $1,262 $1,285 $867 $883 $348 $354 $2,136 $2,174 $1,258 $1,280 $551 $561 $49 $SO $82 $84 $66 $67 $714 $727 $54 $55 $356 $362 $356 $362 0.5% of Engineer's 0.5% of Engineer's Estimate ($2,000 Estimate ($2,000 min.) min.) $500 + 0.5% of $500 + 0.5% of Engineer's Estimate Engineer's Estimate $369 $369 $284 $289 $338 $344 $122 $124 $113 $115 $42 $42 $293 $298 Item No. 15 - AB #22,337 June 28, 2016 Page 101 of 179 FEE CATEGORY Waste Water Fees Waste Water Fees Waste Water Fees Waste Water Fees City of Carlsbad Master Fee Schedule 2016-17 Development Related Service Fees FEE DESCRIPTION Waste Water Pretreatment-Class I (per month) -Existing user Waste Water Pretreatment -Class II -One time fee for new users Waste Water Pretreatment-Class II (per month)-Existing user Waste Water Pretreatment-Class Ill -One time fee for new users FY 2015-16 FEE FY 2016-17 FEE $217 $221 $293 $298 $206 $210 $87 $88 {Note 5) Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shallinc/ude supervision, overhead, equipment, hourly wages and fringe benefits of the employees Involved. Notwithstanding other provisions of this section, the building permit fee far factory built housing shall be twenty-jive percent of the fee shown in table above, and the plan check fee shall be sixty-five percent of the building permit fee. 14 Item No. 15 - AB #22,337 June 28, 2016 Page 102 of 179 CITY OF CARLSBAD MASTER FEE SCHEDULE SECTION 3 DEVELOPMENT IMPACT FEES June 2016 Item No. 15 - AB #22,337 June 28, 2016 Page 103 of 179 FEE CATEGORY Bridge and Thoroughfare Fees Bridge and Thoroughfare Fees Bridge and Thoroughfare Fees Bridge and Thoroughfare Fees Bridge and Thoroughfare Fees Bridge and Thoroughfare Fees Bridge and Thoroughfare Fees Bridge and Thoroughfare Fees Habitat Mitigation Fees Habitat Mitigation Fees Habitat Mitigation Fees Park in Lieu Park in Lieu Park in Lieu Park in Lieu Park in Lieu Park in Lieu Park in Lieu Park in Lieu Park in Lieu Park in Lieu Park in Lieu Park in Lieu Park in Lieu Park in Lieu Park in Lieu Park in Lieu Planned Local Drainage Area Fees Planned Local Drainage Area Fees Planned Local Drainage Area Fees City of Carlsbad Master Fee Schedule 2016-17 Development Impact Fees FEE DESCRIPTION Bridge & Thoroughfare -all other -per Avg. Daily Trip (Outside CFD) Bridge & Thoroughfare -per Apartment Unit (Outside CFD) Bridge & Thoroughfare -per Condominium Unit (Outside CFD) Bridge & Thoroughfare -per Single Family Unit (Outside CFD) Bridge & Thoroughfare District #2 -Zone 20 Bridge & Thoroughfare District #2 -Zone 21 Bridge & Thoroughfare District #2 -Zone 5 Bridge & Thoroughfare District #3 -Fee per ADT Type D -Coastal Sage Scrub Type F -Agricultural Land, Disturbed Land, Eucalyptus Woodland Type E -Non-Native Grassland District 1 NW -Value per Acre 977,000-Attached (5 units or more) District 1 NW -Value per Acre 977,000-Mobile Home District 1 NW -Value per Acre 977,000 -Attached (4 units or less) District 1 NW -Value per Acre 977,000 -Single Family Detached & Duplex District 2 NE-Value per Acre 732,000 -Attached (4 units or less) District 2 NE -Value per Acre 732,000 -Attached (5 units or more) District 2 NE -Value per Acre 732,000 -Mobile Home District 2 NE -Value per Acre 732,000 -Sing!~ Family Detached & Duplex District 3 SW -Value per Acre 732,000 -Attached (5 units or more) District 3 SW -Value per Acre 732,000 -Mobile Home District 3 SW -Value per Acre 732,000 -Attached (4 units or less) District 3 SW -Value per Acre 732,000 -Single Family Detached & Duplex District 4 SE -Value per Acre 732,000 -Attached (5 units or more) District 4 SE -Value per Acre 732,000 -Mobile Home District 4 SE -Value per Acre 732,000 -Attached (4 units or less) District 4 SE -Value per Acre 732,000 -Single Family Detached & Duplex Area A -Buena Vista Lagoon -High Runoff Area A -Buena Vista Lagoon -Low Runoff Area A -Buena Vista Lagoon -Medium Runoff 15 FY 2015-16 FEE FY 2016-17 FEE $22 $22 $318 $318 $424 $424 $530 $530 $1,807 $1,855 $1,459 $1,498 $348 $358 $200 $204 $31,194 $31,943 $3,120 $3,195 $15,598 $15,972 $6,190 $6,190 $4,934 $4,934 $6,414 $6,414 $7,649 $7,649 $4,804 $4,804 $4,636 $4,636 $3,696 $3,696 $5,728 $5,728 $4,636 $4,636 $3,696 $3,696 $4,804 $4,804 $5,728 $5,728 $4,636 $4,636 $3,696 $3,696 $4,804 $4,804 $5,728 $5,728 $26,906 $27,336 $6,209 $6,308 $12,347 $12,545 Item No. 15 - AB #22,337 June 28, 2016 Page 104 of 179 FEE CATEGORY Planned Local Drainage Area Fees Planned Local Drainage Area Fees Planned Local Drainage Area Fees Planned Local Drainage Area Fees Planned Local Drainage Area Fees Planned Local Drainage Area Fees Planned Local Drainage Area Fees Planned Local Drainage Area Fees Planned Local Drainage Area Fees Potable & Reclaimed Connection Fees Potable & Reclaimed Connection Fees Potable & Reclaimed Connection Fees Potable & Reclaimed Connection Fees Potable & Reclaimed Connection Fees Potable & Reclaimed Connection Fees Potable & Reclaimed Connection Fees Potable & Reclaimed Connection Fees Potable & Reclaimed Connection Fees Potable & Reclaimed Connection Fees Potable & Reclaimed Connection Fees Potable & Reclaimed Connection Fees Potable & Reclaimed Connection Fees Potable & Reclaimed Connection Fees Potable & Reclaimed Connection Fees Sewer Benefit Area Fees Sewer Benefit Area Fees Sewer Benefit Area Fees Sewer Benefit Area Fees Sewer Benefit Area Fees Sewer Benefit Area Fees City of Carlsbad Master Fee Schedule 2016-17 Development Impact Fees FEE DESCRIPTION Area B -Aqua Hedionda Lagoon -High Runoff Area B -Aqua Hedionda Lagoon -Low Runoff Area B -Aqua Hedionda Lagoon -Medium Runoff Area C-Encinas Creek -High Runoff Area C-Encinas Creek -Low Runoff Area C-Encinas Creek -Medium Runoff Area D -Batiquitos Lagoon -High Runoff Area D -Batiquitos Lagoon -Low Runoff Area D -Batiquitos Lagoon -Medium Runoff Major Facility Fee -Potable and Reclaimed Water Connection Fees: Meter Size 1" -Displacement Major Facility Fee -Potable and Reclaimed Water Connection Fees: Meter Size 1-1/2" -Displacement Major Facility Fee -Potable and Reclaimed Water Connection Fees: Meter Size 1-1/2" -Turbo Major Facility Fee -Potable and Reclaimed Water Connection Fees: Meter Size 2" -Displacement Major Facility Fee -Potable and Reclaimed Water Connection Fees: Meter Size 2" -Turbo Major Facility Fee -Potable and Reclaimed Water Connection Fees: Meter Size 3" -Displacement Major Facility Fee -Potable and Reclaimed Water Connection Fees: Meter Size 3" -Turbo Major Facility Fee -Potable and Reclaimed Water Connection Fees: Meter Size 3/4" -Displacement Major Facility Fee -Potable and Reclaimed Water Connection Fees: Meter Size 4" -Displacement Major Facility Fee -Potable and Reclaimed Water Connection Fees: Meter Size 4" -Turbo Major Facility Fee -Potable and Reclaimed Water Connection Fees: Meter Size 5/8" -Displacement Major Facility Fee -Potable and Reclaimed Water Connection Fees: Meter Size 6" -Displacement Major Facility Fee -Potable and Reclaimed Water Connection Fees: Meter Size 6" -Turbo Major Facility Fee -Potable and Reclaimed Water Connection Fees: Meter Size 8" -Displacement Major Facility Fee -Potable and Reclaimed Water Connection Fees: Meter Size 8" -Turbo Sewer Benefit Area Fee -Area A Sewer Benefit Area Fee -Area B Sewer Benefit Area Fee -Area C Sewer Benefit Area Fee -Area D Sewer Benefit Area Fee -Area E Sewer Benefit Area Fee -Area F 16 FY 2015-16 FEE FY 2016-17 FEE $10,056 $10,217 $2,321 $2,358 $4,473 $4,545 $9,763 $9,920 $2,253 $2,289 $3,187 $3,238 $9,257 $9,405 $2,136 $2,170 $3,494 $3,550 $8,852 $9,029 $16,721 $17,055 $19,630 $20,022 $25,182 $25,686 $31,475 $32,105 $44,264 $45,149 $68,855 $70,232 $5,609 $5,721 $68,855 $70,232 $196,729 $200,664 $3,934 $4,013 $127,873 $130,430 $393,451 $401,320 $151,137 $154,160 $551,020 $562,040 $1,074 $1,103 $1,222 $1,255 $2,252 $2,313 $2,257 $2,318 $3,329 $3,418 $3,347 $3,437 Item No. 15 - AB #22,337 June 28, 2016 Page 105 of 179 FEE CATEGORY Sewer Benefit Area Fees Sewer Benefit Area Fees Sewer Benefit Area Fees Sewer Benefit Area Fees Sewer Benefit Area Fees Sewer Benefit Area Fees Sewer Benefit Area Fees Traffic Impact Fees Traffic Impact Fees Traffic Impact Fees Traffic Impact Fees Traffic Impact Fees Traffic Impact Fees Traffic Impact Fees Traffic Impact Fees City of Carlsbad Master Fee Schedule 2016-17 Development Impact Fees FEE DESCRIPTION Sewer Benefit Area Fee -Area G Sewer Benefit Area Fee -Area H Sewer Benefit Area Fee -Area J Sewer Benefit Area Fee -Area K Sewer Benefit Area Fee -Area L Sewer Benefit Area Fee -Area M Sewer Connection (General Capacity all areas plus Sewer Benefit Area Fees} Traffic Impact Fee -Apartment (Inside of CFD 1} per ADT Traffic Impact Fee -Apartment (Outside of CFD 1} per ADT Traffic Impact Fee -Commercial/Industrial Cost Per Trip (Inside CFD} Traffic Impact Fee -Commercial/Industrial Cost Per Trip (Out of CFD} Traffic Impact Fee -Condominium (Inside of CFD 1} per ADT Traffic Impact Fee -Condominium (Outside of CFD 1} per ADT Traffic Impact Fee -Single Family (Inside of CFD 1} per ADT Traffic Impact Fee -Single Family (Outside of CFD 1} per ADT 17 FY 2015-16 FEE FY 2016-17 FEE $675 $693 $982 $1,008 $1,852 $1,902 $1,464 $1,504 $1,464 $1,504 $72 $74 $881 $899 $269 $274 $316 $323 $107 $109 $126 $129 $269 $274 $316 $323 $269 $274 $316 $323 Item No. 15 - AB #22,337 June 28, 2016 Page 106 of 179 CITY OF CARLSBAD MASTER FEE SCHEDULE SECTION 4 DEPOSITS AND SECURITIES June 2016 Item No. 15 - AB #22,337 June 28, 2016 Page 107 of 179 FEE CATEGORY Development Deposits Development Deposits Development Deposits Development Deposits Development Deposits Development Deposits City of Carlsbad Master Fee Schedule 2016-17 Deposits and Securities FEE DESCRIPTION Grading & Erosion Control -Minor Grading Cash Deposit (with grading plans} Grading & Erosion Control -Grading Security (with approved plans} Grading & Erosion Control -Grading Cash Deposit Development/Subdivision Improvements -Faithful Performance Security Development/Subdivision Improvements -Labor and Materials Security Development/Subdivision Improvements -Monumentation Security 18 FY 2015-16 FEE FY 2016-17 FEE $1,250 $1,250 Based on Grading Cost Based on Grading Cost Estimate Estimate 10% of total grading 10% oftotal grading security security Based on Improvement Based on Improvement cost estimate cost estimate 50% of Faithful 50% of Faithful Performance Study Performance Study Based on total cost of Based on total cost of Monumentation Monumentation Item No. 15 - AB #22,337 June 28, 2016 Page 108 of 179 Count FEE CATEGORY 1 Appeals 2 Appeals 3 Appeals 4 Development 5 Development 6 Development 7 Development 8 Development 9 Development 10 Development 11 Development 12 Develooment 13 Development 14 Development 15 Development 16 Development 17 Development 18 Development 19 Development 20 Development 21 Development 22 Development 23 Development 24 Development 25 Development 26 Development FEE DESCRIPTION Appeal -City Council(+ noticing costs) -fee is refundable if appeal is won City of Carlsbad CED Removed Fees FY 2016-17 Appeal -Planning Commission(+ noticing costs) fee is refundable if appeal is won Appeal City Council -Miscellaneous Coastal Development Permit -SCCRA Coastal Development Permit (CDP) -Village Review Area -Major & Minor RP's SCCRA Permit (Minor) SCCRA Permit Amendment (Admin.) SCCRA Permit Amendment (Minor) SCCRA Permit Appeal -City Council SCCRA Permit Aooeal -Planning SCCRA Permit Extension (Major) SCCRA Permit Extension (Minor) SCCRA Permit Variance (Minor or Major) SCCRA Permit Variance Administrative SCCRA Sidewalk Sign/Outdoor Display SCCRA Sign Program SCCRA Sign Program Amendment Village Area Noticing Fee (Minor)-plus postage Village Area Permit Amendment (Minor) -plus noticing costs Village Area Review (Major) -plus noticing costs Village Area Review (Minor) -plus noticing costs Village Area Sign Program Village Area Sign Program Amendment Village Review Permit (Admin.) Village Review Permit Extension (Major) -plus noticing costs Village Review Permit Extension (Minor)-plus noticing costs FY 2015-16 FEE $1,097 $673 $165 $427 $663 $1,606 $145 $622 $623 $564 $276 $237 $415 $142 $60 $126 $82 $217 $591 $3,015 $1,645 $297 $72 $442 $701 $603 Removal reason Appeals, amendments, and extensions are being consolidated and simplified based on a fee study by NBS. Appeals, amendments, and extensions are being consolidated and simplified based on a fee study by NBS. Appeals, amendments, and extensions are being consolidated and simplified based on a fee study by NBS. Fees by area in SSCRA and Village consolidated to have uniform fee amounts across city. Fees by area in SSCRA and Village consolidated to have uniform fee amounts across city. Fees by area in SSCRA and Village consolidated to have uniform fee amounts across city. Fees by area in SSCRA and Village consolidated to have uniform fee amounts across city. Fees by area in SSCRA and Village consolidated to have uniform fee amounts across citv. Fees by area In SSCRA and Village consolidated to have uniform fee amounts across city. Fees by area in SSCRA and Village consolidated to have uniform fee amounts across city. Fees by area in SSCRA and Village consolidated to have uniform fee amounts across city. Fees by area in SSCRA and Village consolidated to have uniform fee amounts across citv. Fees by area in SSCRA and Village consolidated to have uniform fee amounts across city. Fees by area in SSCRA and Village consolidated to have uniform fee amounts across city. Fees by area in SSCRA and Village consolidated to have uniform fee amounts across city. Fees by area in SSCRA and Village consolidated to have uniform fee amounts across city. Fees by area in SSCRA and Village consolidated to have uniform fee amounts across city. Fees by area in SSCRA and Village consolidated to have uniform fee amounts across city. Fees by area in SSCRA and Village consolidated to have uniform fee amounts across city. Fees by area in SSCRA and Village consolidated to have uniform fee amounts across city. Fees by area in SSCRA and Village consolidated to have uniform fee amounts across city. Fees by area in SSCRA and Village consolidated to have uniform fee amounts across city. Fees by area in SSCRA and Village consolidated to have uniform fee amounts across city. Fees by area in SSCRA and Village consolidated to have uniform fee amounts across city. Fees by area in SSCRA and Village consolidated to have uniform fee amounts across city. Fees by area in SSCRA and Village consolidated to have uniform fee amounts across city. m X ::t: CJ =i -..J I CJ Item No. 15 - AB #22,337 June 28, 2016 Page 109 of 179 Count FEE CATEGORY 27 Development Development 28 Processing Development 29 Processing Development 30 Processing Development 31 Processing Development 32 Processing Development 33 Processing Development 34 Processing Development 35 Processing Development 36 Processing Development 37 Processing Development 38 Processing Development 39 Processing Development 40 Processing Development 41 Processing Development 42 Processing Development 43 Processing Development 44 Processing Development 45 Processing Development 46 Processing Development 47 Processing Development 48 Processing Development 49 Processing Development 50 Processing Development 51 Processing Development 52 Processing City of Carlsbad CED Removed Fees FY2016-17 FEE DESCRIPTION FY 2015-16 FEE Village Review Permit Noticing Fee (Major) -plus postage $407 Alley parking $552 Any permit amendment not specifically identified 50% of original cost Bond Search $32.92 Campaign Sign Permit $60.36 50% Current Permit Coastal Development Permit (CDP) -Amendment Cost 25% Current Permit Coastal Development Permit (CDP) -Extensions Cost Conditional Use Permit -Extension 50% of original fee Conditional Use Permit (CUP) -Amendment $2,458 Conditional Use Permit {CUP) -Extension -Regular $922 Duplicate Tracing Fees -Final Parcel Maps -per sheet(+ $32 per sheet) $23 Grading Permit Extension Fee 25% permit fee Habitat Management Plan Permit Amendment -Major -amendment for properties with no on-site habitat to be preserved 75% Original fee Habitat Management Plan Permit Amendment -Minor -no on-site habitat to be preserved 75% Original Fee Habitat Management Plan Permit Amendment -Single Family 75% Original Fee Hillside Development Permit Amendment -Minor $720 Hillside Development Permit Amendment -Other (Multiple Lots) $2,194 Hillside Development Permit Extension 25% of original fee Hillside Development Permit Extension -Other (Multiple Lots) 25% of original fee Major Site Development Plan -Non Residential -Extension 25% of original fee Minor Conditional Use Permit-Amendment $582 Permit Amendment -plus noticing costs $1,476.41 Permit Amendment (Adm in) $177.17 Permit Appeal -City Council(+ noticing costs) fee is refundable if appeal is won $685.05 Permit Appeal -Planning Commission(+ noticing costs) fee is refundable if appeal is won $685.05 Permit Variance -Administrative $191.23 Removal reason Fees by area in SSCRA and Village consolidated to have uniform fee amounts across city. This is a police fee, not CED. It is also listed in Police. Appeals, amendments, and extensions are being consolidated and simplified based on a fee study by NBS. Per NBS study, eliminated as part of fee consolidation effort due to no longer being used. Being consolidated with other sign permits. Appeals, amendments, and extensions are being consolidated and simplified based on a fee study by NBS. Appeals, amendments, and extensions are being consolidated and simplified based on a fee studv bv NBS. Appeals, amendments, and extensions are being consolidated and simplified based on a fee study by NBS. Appeals, amendments, and extensions are being consolidated and simplified based on a fee study by NBS. Appeals, amendments, and extensions are being consolidated and simplified based on a fee study bv NBS. Appeals, amendments, and extensions are being consolidated and simplified based on a fee study by NBS. Appeals, amendments, and extensions are being consolidated and simplified based on a fee study by NBS. Appeals, amendments, and extensions are being consolidated and simplified based on a fee study by NBS. Appeals, amendments, and extensions are being consolidated and simplified based on a fee studv bv NBS. Appeals, amendments, and extensions are being consolidated and simplified based on a fee studv bv NBS. Appeals, amendments, and extensions are being consolidated and simplified based o.n a fee study by NBS. Appeals, amendments, and extensions are being consolidated and simplified based on a fee study by NBS. Appeals, amendments, and extensions are being consolidated and simplified based on a fee study by NBS. Appeals, amendments, and extensions are being consolidated and simplified based on a fee study by NBS. Appeals, amendments, and extensions are being consolidated and simplified based on a fee study by NBS. Appeals, amendments, and extensions are being consolidated and simplified based on a fee study by NBS. All Permit fees are being consolidated and simplified based on fee study by NBS. All Permit fees are being consolidated and simplified based on fee study by NBS. All Permit fees are being consolidated and simplified based on fee studv by NBS. All Permit fees are being consolidated and simplified based on fee study by NBS. All Permit fees are being consolidated and simplified based on fee study by NBS. Item No. 15 - AB #22,337 June 28, 2016 Page 110 of 179 Count FEE CA TE GORY Development 53 Processing Development 54 Processing Development 55 Processing Development 56 Processing Development 57 Processing Development 58 Processing Development 59 Processing Development 60 Processing Development 61 Processing Development 62 Processing Development 63 Processing Development 64 Processing Development 65 Processing Development 66 Processing Development 67 Processing Development 68 Processing Development 69 Processing Development 70 Processing Development 71 Processing Development 72 Processing FEE DESCRIPTION Permit Variance (Minor or Major) Planned Development -51 or more I Major Subdivision (Note 9) Planned Development -Non Residential Extension -All Planned Development -Non-Residential -Major I 5 to SO (Note 9) Planned Development -Non-Residential -Major I 51 or more (Note 9) Planned Develooment -Residential -Amendment Extension -All Planned Develooment -Residential -Extension -All Planned Development Amendment -Non Residential -Extension -All Oty of Carlsbad CED Removed Fees FY 2016-17 Planned Development Amendment -Non-Residential -Major I 5 to 50 (Note 9) Planned Development Amendment-Non-Residential -Major I 51 or more (Note 9) Planned Development Amendment-Non-Residential -Minor I 4 or less (Note 9) Planned Development Residential -4 or less I Minor Subdivision (Note 9) Planned Development Residential Amendment -4 or less I Minor Subdivision (Note 9) Planned Develooment Residential Amendment -5 to 50 I Major Subdivision (Note 9) Planned Develooment Residential. Amendment -51 or more/ Major Subdivision (Note 9) Planning Commission Discussion Item Precise Development Plan -Amendment Preliminary Review -Redevelopment -Major - Preliminary Review -Redevelopment -Minor Sign Program Amendment FY 2015-16 FEE Removal reason $427.46 All Permit fees are being consolidated and simplified based on fee study by NBS. · $13,453.59 Removed as a result of NBS fee study. Remove residential vs. non-residential categories as a fee simplification effort. Appeals, amendments, and extensions are being consolidated and simplified based 25% of original fee on a fee study by NBS. Remove residential vs. non-residential categories as a fee simplification effort. Appeals, amendments, and extensions are being consolidated and simplified based $8,515 on a fee study by NBS. Remove residential vs. non-residential categories as a fee simplification effort. Appeals, amendments, and extensions are being consolidated and simplified based $13,454 on a fee study by NBS. Remove residential vs. non-residential categories as a fee simplification effort. Appeals, amendments, and extensions are being consolidated and simplified based 25% of original fee on a fee study by NBS. Remove residential vs. non-residential categories as a fee simplification effort. Appeals, amendments, and extensions are being consolidated and simplified based 25% of original fee on a fee study by NBS. Remove residential vs. non-residential categories as a fee simplification effort. Appeals, amendments, and extensions are being consolidated and simplified based 25% of original fee on a fee study by NBS. Remove residential vs. non-residential categories as a fee simplification effort. Appeals, amendments, and extensions are being consolidated and simplified based $6,766.16 on a fee study by NBS. Remove residential vs. non-residential categories as a fee simplification effort. Appeals, amendments, and extensions are being consolidated and slmpllfled based $9,162.16 on a fee study by NBS. Remove residential vs. non-residential categories as a fee simplification effort. Appeals, amendments, and extensions are being consolidated and simplified based $1,878.55 on a fee studv by NBS. Remove residential vs. non-residential categories as a fee simplification effort. Appeals, amendments, and extensions are being consolidated and simplified based $3,070.93 on a fee study by NBS. Remove residential vs. non-residential categories as a fee simplification effort. Appeals, amendments, and extensions are being consolidated and simplified based $1,653.58 on a fee study bv NBS. Remove residential vs. non-residential categories as a fee simplification effort. Appeals, amendme11ts, and extensions are being consolidated and simplified based $6,307.21 on a fee study by NBS. Remove residential vs. non-residential categories as a fee simplification effort. Appeals, amendments, and extensions are being consolidated and simplified based $8,504.11 on a fee study by NBS. Appeals, amendments, and extensions are being consolidated and simplified based $674.93 on a fee study by NBS. Appeals, amendments, and extensions are being consolidated and simplified based $4,218.31 on a fee studv by NBS. Fees by area ln SSCRA and Village consolidated to have uniform fee amounts across $359.73 city. Fees by area in SSCRA and Village consolidated to have uniform fee amounts across $202.61 city. Appeals, amendments, and extensions are being consolidated and simplified based $646.81 on a fee study by NBS. Item No. 15 - AB #22,337 June 28, 2016 Page 111 of 179 Count FEE CATEGORY Development 73 Processing Development 74 Processing Development 75 Processing Development 76 Processing Development 77 Processing Development 78 Processing Development 79 Processing Development 80 Processing Development 81 Processing Development 82 Processing Development 83 Processing Development 84 Processing Development 85 Processing Development 86 Processing Development 87 Processing Electrical & 88 Mechanical Permits Electrical & 89 Mechanical Permits Electrical & 90 Mechanical Permits Electrical & 91 Mechanical Permits Electrical & 92 Mechanical Permits Electrical & 93 Mechanical Permits Electrical & 94 Mechanical Permits FEE DESCRIPTION Site Development Plan Amendment -Major Site Development Plan Amendment -Minor Site Development Plan Extension -Minor Special Use Permit -Scenic Corridor Special Use Permit -Extension Special Use Permit -Flood Plain Special Use Permit -Flood Plain, Coastal High Hazard Area City of Carlsbad CED Removed Fees FY 2016-17 Substantial Conformance Exhibit Review (For Planning -see consistencv determination) Tentative Map Revision -5 -49 Units/ Lots -base fee + $40 per Jot I unit over 5, whichever is greater Tentative Map Revision -50+ Units I Lots -base fee + $15 each per Jot /unit over 49, whichever is greater Tentative Parcel Map -1 year extension, per application Tentative Tract Map Extension -5 to 49 Variance -Administrative (Planning) Recreational Vehicle Ad min. Variance Variance -Engineering Zoning Compliance Letter Boiler/Compressor to 15 HP (each) Exhaust Fan (each) Fireplace (each) Furnace, Ducts, Heat Pumps (each) Hood (each) Install/relocate vent (each) New construction for each ampere of main service, switch, fuse or breaker -Per ampere, 480 three-phase FY 2015-16 FEE Removal reason Consolidate all special use permit types into one category as an effort to simplify $7,817.93 fees, as result of NBS fee study. Consolidate all special use permit types into one category as an effort to simplify $3,037.18 fees, as result of NBS fee study. Consolidate all special use permit types into one category as an effort to simplify 25% of original fee fees, as result of NBS fee study. Consolidate all special use permit types into one category as an effort to simplify $3,554.63 fees, as result of NBS fee study. Consolidate all special use permit types into one category as an effort to simplify 25% of original fee fees, as result of NBS fee study. Consolidate all special use permit types into one category as an effort to simplify $3,937.09 fees, as result of NBS fee study. Consolidate all special use permit types into one category as an effort to simplify $2,845.95 fees, as result of NBS fee study. Appeals, amendments, and extensions are being consolidated and simplified based $1,029.27 on a fee study by NBS. Appeals, amendments, and extensions are being consolidated and simplified based $4,190.18 on a fee study by NBS. Appeals, amendments, and extensions are being consolidated and simplified based $7,750.44 on a fee study by NBS. Appeals, amendments, and extensions are being consolidated and simplified based $1,501.72 on a fee study by NBS. Appeals, amendments, and extensions are being consolidated and simplified based $2,941.57 on a fee study by NBS. Appeals, amendments, and extensions are being consolidated and simplified based $767.17 on a fee study by NBS. Appeals, amendments, and extensions are being consolidated and simplified based $764.92 on a fee study by NBS. Appeals, amendments, and extensions are being consolidated and simplified based $84.37 on a fee study by NBS. Fee simplification consolidated plumbing, mechanical and electrical fees based on $17.91 valuation for the overall building permit, as a result of NBS fee studv. Fee simplification consolidated plumbing, mechanical and electrical fees based on $7.06 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrical fees based on $7.06 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrical fees based on $9.77 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrical fees based on $7.06 valuation for the overall building permit, as a result of NBS fee studv. Fee simplification consolidated plumbing, mechanical and electrical fees based on $4.88 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrical fees based on $1.09 valuation for the overall building permit, as a result of NBS fee study. Item No. 15 - AB #22,337 June 28, 2016 Page 112 of 179 Count FEE CATEGORY Electrical & 95 Mechanical Permits Electrical & 96 Mechanical Permits Electrical & 97 Mechanical Permits Electrical & 98 Mechanical Permits Electrical & 99 Mechanical Permits Electrical & 100 Mechanical Permits Electrical & 101 Mechanical Permits Electrica I & 102 Mechanical Permits Electrical & 103 Mechanical Permits Electrical & 104 Mechanical Permits Electrical & 105 Mechanical Permits Electrical & 106 Mechanical Permits Plumbing Permit and 107 Inspection Fees Plumbing Permit and 108 Inspection Fees Plumbing Permit and 109 Inspection Fees Plumbing Permit and 110 Inspection Fees Plumbing Permit and 111 Inspection Fees FEE DESCRIPTION City of Carlsbad CED Removed Fees FY 2016-17 New construction for each ampere of main service, switch, fuse or breaker -Per ampere, single phase New construction for each ampere of main service, switch, fuse or breaker -Per ampere, three phase Remodel, alteration, no change in service -Or minimum Remodel, alteration, no change in service -Per ampere Service upgrade on existing building -For each ampere or increase in main service, switch, fuse or breaker-Per ampere, 480 three-phase Service upgrade on existing building -For each ampere or increase in main service, switch, fuse or breaker -Per ampere, single phase Service upgrade on existing building-For each ampere or increase in main service, switch, fuse or breaker -Per ampere, three-phase Temporarv service over 200 amperes -plus $10.00 per each 100 amperes over 200 Temporarv service up to and including 200 amperes Test Meter Individual Electrical Permit Individual Mechanical Permit Additional plan review required by changes, additions or revisions to approved plans, (minimum charge -one half hour) For atmospheric-type vacuum breakers not included in above item: 1 to 5 For atmospheric-type vacuum breakers not included in above item: Over 5, each For each additional gas-piping system outlet, per outlet For each backflow protective device other than atmospheric type vacuum breakers: 2 inch diameter and smaller FY 2015-16 FEE Removal reason Fee simplification consolidated plumbing, mechanical and electrical fees based on $0.27 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plum bing, mechanical and electrical fees based on $0.54 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrical fees based on $5.43 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrical fees based on $0.27 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrical fees based on $1.09 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrical fees based on $0.27 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrlcal fees based on $0.54 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrical fees based on $10.86 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrical fees based on $10.86 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrical fees based on $27.14 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrical fees based on $162.83 valuation for the overall building permit, as a result of NBS fee studv. Fee simplification consolidated plumblng, mechanical and electrical fees based on $162.83 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrical fees based on $32.57 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrical fees based on $5.43 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrical fees based on $1.09 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrical fees based on $1.09 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrical fees based on $7.60 valuation for the overall building permit, as a result of NBS fee study. Item No. 15 - AB #22,337 June 28, 2016 Page 113 of 179 Count FEE CATEGORY Plumbing Permit and 112 Inspection Fees Plumbing Permit and 113 Inspection Fees Plumbing Permit.and 114 Inspection Fees Plumbing Permit and 115 Inspection Fees Plumbing Permit and 116 Inspection Fees Plumbing Permit and 117 Inspection Fees Plumbing Permit and 118 Inspection Fees Plumbing Permit and 119 Inspection Fees Plumbing Permit and 120 Inspection Fees Plumbing Permit and 121 Inspection Fees Plumbing Permit and 122 Inspection Fees Plumbing Permit and 123 Inspection Fees Plumbing Permit and 124 Inspection Fees Plumbing Permit and 125 Inspection Fees Plumbing Permit and 126 Inspection Fees Plumbing Permit and 127 Inspection Fees FEE DESCRIPTION City of Carlsbad CED Removed Fees FY 2016-17 For each backflow protective device other than atmospheric type vacuum breakers: Over 2 inch diameter For each building sewer antj each trailer park sewer For each cesspool (where permitted) For each gas-piping system one to five outlets For each industrial waste pretreatment interceptor including its trap and vent, excepting kitchen-type grease interceptors functioning as fixture traps For each installation, alteration or repair of water piping and/or water treating equipment, each For each lawn sprinkler system on any one meter including backflow protection devices therefore For each plumbing fixture on one trap or a set of fixtures on one trap {including water, drainage piping and backflow protection therefore) For each private sewage discosal svstem For each repair or alteration of drainage or vent piping, each fixture For each water heater and/or vent Individual Plumbing Permit Inspections for which no fee is scecifically indicated Inspections outside of normal business hours Rainwater systems -per drain (inside building) Re-inspection Fee FY 2015-16 FEE Removal reason Fee simplification consolidated plumbing, mechanical and electrical fees based on $16.28 valuation for the overall building permit, as a result of NBS fee studv. Fee simplification consolidated plumbing, mechanical and electrical fees based on $16.28 valuation for the overall building permit, as a result of NBS fee studv. .Fee simplification consolidated plumbing, mechanical and electrical fees based on $27.14 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrical fees based on $5.43 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrical fees based on $7.60 valuation for the overall building permit, as a result of NBS fee studv. Fee simplification consolidated plumbing, mechanical and electrical fees based on $7.60 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrical fees based on $7.60 valuation for the overall building permit, as a result of NBS fee studv. Fee simplification consolidated plumbing, mechanical and electrical fees based on $7.60 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrical fees based on $43.42 valuation for the overall building permit, as a result of NBS fee studv. Fee simplification consolidated plumbing, mechanical and electrical fees based on $7.60 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrical fees based on $7.60 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrical fees based on $162.83 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrical fees based on $32.57 valuation for the overall building permit, as a result of NBS fee studY. Fee simplification consolidated plumbing, mechanical and electrical fees based on $32.57 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrical fees based on $7.60 valuation for the overall building permit, as a result of NBS fee study. Fee simplification consolidated plumbing, mechanical and electrical fees based on $32.57 valuation for the overall building cermit, as a result of NBS fee study.