HomeMy WebLinkAbout2016-06-28; City Council; Resolution 2016-1321
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO. 2016-132
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
CALIFORNIA, ADOPTING CHANGES TO THE MASTER FEE
SCHEDULE.
EXHIBIT7
WHEREAS, the City Council of the City of Carlsbad has the authority to establish
fees for City services; and
WHEREAS, from time-to-time said fees are reviewed and evaluated to maintain
an adequate fee structure recovering costs for City services; and
WHEREAS, the City Council has determined the cost of providing general and
development-related services; and
WHEREAS, the City Council believes it is necessary for the City Manager to have
the authority to adjust the parks and recreation and library and arts program and classes fees
from time to time to remain competitive and within the market pricing for like programs and
classes; and
WHEREAS, the City Council finds it necessary to recover the costs for City
services; and
WHEREAS, the City Council has held the necessary public hearing and allowed for
public comment on the establishment of said fees.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad,
California, as follows:
1. That the above recitations are true and correct.
2. That the changes to the Master Fee Schedule are for the fees shown in
Exhibits 7-A and 7-B attached hereto, and as amended by determinations of the City Council at
its meeting of Tuesday, June 28, 2016, as set forth in the minutes of that meeting, and as
memorialized by subsequent resolution of the City Council.
Item No. 15 - AB #22,337 June 28, 2016 Page 83 of 179
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
3. The City Council hereby authorizes the City Manager or his/her designee
to set parks and recreation and library and cultural arts program, rental, and class fees that are
included in the Community Services Guide. The fee shall not exceed the fully burdened (direct
and indirect) costs of providing the program, rentat and class but shall be no less (except in the
case of introductory, discount or promotional pricing) than the lowest fee charged for like kind
programs or classes in similarly benchmarked Southern California cities.
4. The City Council hereby authorizes the City Manager or his/her designee
to change parking violation fees at the time, and by the same amount, as the state changes
their portion of the fee. Any changes to these fees will be made to the current Master Fee
Schedule.
5. This resolution shall become effective on the first day the city services
the public using the Energov software system, but not sooner than 60 days (September 1, 2016)
after adoption in accordance with Government Code 66017, for the Development-related
service fees and Development impact fees.
Ill
Ill
Ill
Ill
Ill
Ill
Ill
Ill
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the Carlsbad
City Council, Carlsbad Municipal Water District Board of Directors, Carlsbad Public Financing
Authority Board of Directors, Community Development Commission, and City of Carlsbad as
Successor Agency to the Redevelopment Agency, held on the 28th day of June, 2016, by the
following vote to wit:
AVES: Hall, Wood, Schumacher, Blackburn, Packard.
NOES: None.
ABSENT: None.
MATT HALL, Mayor
ATTEST:
Item No. 15 - AB #22,337 June 28, 2016 Page 85 of 179
CITY OF CARLSBAD
MASTER FEE SCHEDULE
June 2016
All fee changes approved by City Council on June 28, 2016 will go into
effect on the first day the city serves the public using the new Energov
software system, (currently estimated for November 1, 2016), and no
sooner than 60 days after City Council adoption of the revised fees.
EXHIBIT 7-A
Item No. 15 - AB #22,337 June 28, 2016 Page 86 of 179
CITY OF CARLSBAD
MASTER FEE SCHEDULE
SECTION 1
GENERAL CITY SERVICE FEES
June 2016
Item No. 15 - AB #22,337 June 28, 2016 Page 87 of 179
FEE CATEGORY
City Clerk
City Clerk
City Clerk
City Clerk
City Clerk
City Clerk
City Clerk
City Clerk
City Clerk
City Clerk
Fire Administrative
Fire Administrative
Fire Ambulance
Fire Ambulance
Fire Ambulance
Fire Ambulance
Fire Ambulance
Fire Ambulance
Fire Ambulance
Fire Ambulance
Fire Ambulance
Fire Ambulance
Fire Ambulance
Fire Ambulance
Fire Ambulance
Fire Nuisance
Fire Nuisance
Fire Nuisance
Fire Nuisance
Fire Nuisance
Fire Prevention
Library
Library
Library
Library
Library
Library
Library
Library
Library
Library
Library
Library
Library
Library
Library
Library
Library
Miscellaneous
Miscellaneous
Miscellaneous
Miscellaneous
Miscellaneous
Miscellaneous
Miscellaneous
Miscellaneous
City of Carlsbad
Master Fee Schedule 2016-17
General City Service Fees
FEE DESCRIPTION
Blueprinting of Standard Size (24" x 36") Improvement Plan Sheet (Cost for each)
Campaign Statements (per page), set by FPPC
City Clerk -CD Copy
City Clerk -Certification Charge (per document)
Conflict of Interest Statement (per page), set by FPPC
Copies -Black & White (each)
Copies -Color (each)
Deposition Subpoena
DVD Copy, including Council Meeting on DVD
Records Subpoena
Bicycle Licenses (Code Section 10.56.070 and 10.56.100)
Bicycle Licenses -Replacement or Transfer (Code Section 10.56.070 and 10.56.100)
Ambulance Fee -Advanced Life Support 1--Non Resident-plus Level I or Level II Supplies &
Medications
Ambulance Fee-Advanced Life Support 1--Resident-plus Level I or Level II Supplies & Medications
Ambulance Fee-Advanced Life Support 2--Non Resident-plus Level II Supplies & Medications
Ambulance Fee -Advanced Life Support 2--Resident-plus Level II Supplies & Medications
Ambulance Fee -Mileage Charge -per mile
Ambulance Fee -Oxygen Charge
Ambulance Fee BLS-Base Rate -Resident
Ambulance Fee BLS-Base Rate Non-Resident
Ambulance Fee-Advanced Life Support I-Assessment/Non Transport with Medication Given. No
charge for assessment non-transport if no medication given.
Ambulance Transport including Community Para medicine -Level I Supplies & Medications
Ambulance Transport including Community Para medicine-Level II Supplies & Medications
Ambulance Transport-Community ParamedicineALS-Resident-Plus Level I or Level II Supplies and
Medications
Ambulance Transport-Community Para medicine BLS-Resident
Fire Nuisance Alarm -1st response in 12 month period
Fire Nuisance Alarm -2nd response in 12 month period
Fire Nuisance Alarm -3rd response in 12 month period
Fire Nuisance Alarm -each additional response thereafter
Fire Nuisance Alarm -each billing
Fire-Special Event -per fire personnel per hour (consistent with City payroll records)
Copies -Black & White (each)
Copies -Color (each)
Library Account Collection Fee
Library Book Non Pickup Fee (per item)
Library Borrowing -Audio Visual Equipment (per item, per day)
Library Borrowing -Audio Visual Insurance fee-Per DVD
Library Borrowing -Mobile Device Loan Late Fee (Per Item, Per Hour)
Library Card Replacement
Library Fines -DVD (per day per item)
Library Fines -Juvenile (per day per item)
Library Fines (per day per item)
Library History Room Photo Fee (vendor cost of duplicating historical photos)
Library Interlibrary Loan
Library Lost Item Processing Fee
Lost/Damaged beyond repair book/audio item
Lost/Damaged DVD
Lost/Damaged Library Materials
Administrative Fee for 1915 Act Bond Call -1% of principal being repaid (For all Assessment Districts
using 1915 Act Bonds)
Business License -master list of active business licenses
Business License -monthly list of new licenses
Cable Channel Administration Fee
Check Processing Fee for Cancellation {Customer Initiated)
Communications -DVD Copy
Hearing Disposition Services for Parking Citations -Personal Hearings
Hearing Disposition Services for Parking Citations -Written Review
1
FY 2015-16 FEE FY 2016-17 FEE
$5 $5
$0.10 $0.10
$3 $3
$22 $22
$0.10 $0.10
$0.20 $0.20
$1.00 $1.00
$275 $275
$22 $22
$15 $15
$3 $3
$1 $1
$1,167 $1,163
$1,167 $1,163
$1,370 $1,365
$1,269 $1,264
$23 $23
$76 $76
$952 $949
$952 $949
$203 $202
$127 $126
$254 $253
$1,167 $1,163
$952 $949
$0 $0
$82 $84
$165 $168
$324 $330
$11 $11
Actual Cost Actual Cost
$0.20 $0.20
$1 $1
$10 $10
$1 $1
$5 $5
$1 $1
$5 $5
$2 $2
$1 $1
$0.10 $0.10
$0.25 $0.25
Direct Cost Direct Cost
$5 $5
$5 $5
List price+$40 if List price+$40 if
out of print out of print
20% of list price 20% of list price
Variable up to list Variable up to list
price price
$50 min/$500 $50 min/$500
max max
$36 $36
$5 $6
$110/Hour $110/Hour
$20 $20
$22 $22
$0 $0
$0 $0
Item No. 15 - AB #22,337 June 28, 2016 Page 88 of 179
FEE CATEGORY
Miscellaneous
Miscellaneous
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Parking Violation
Police
Police
Police
Police
Police
Police
Police
Police
Police
City of Carlsbad
Master Fee Schedule 2016-17
General City Service Fees
FEE DESCRIPTION
Publications· As Determined by the City Manager
Returned Check Fee
21113 (al· Vehicle/Animal public on grounds
21211 · Bike lane
22500 (al -In intersection
22500 (bl-In cross walk
22500 (dl -Fire station driveway
22500 (el -Driveway
22500 (fl -Sidewalk
22500 (g) -Obstructing traffic
22500 (h) -Double parking
22500 (i) -Bus zone
22500 U) -Tube or tunnel
22500 (k) -Bridge
22500 (I)· Blocking Disabled
22500 c · Red curb
22500.1-Fire lane
22502 -18" from curb/wrong way
22507 (a) -Oversize Vehicle
22507.8 • Disable space/block access
22514-Fire hydrant
22515 -Unattended vehicle
22516 -Locked vehicle/passenger inside
22517 • Open/close door in traffic
22520 • Stopping on freeway
22520.5 • Vending from Hwy
22521-> 7.5ft from RR tracks
22522-3ftfrom handicap ramp
22523 -Abandoned vehicle
22526 • Blocking intersection
23226 • Store open container I pass comp
23333 • Stop I park in vehicle crossing
24003 -Vehicle with unlawful lighting device
24401 • Dimmed lights on parked vehicle
24604-Lamp or flag on projections
24607 -Reflectors on rear
24608 • Reflectors on front and sides
25250 • Unlawful flashing lights
25251 • Flashing lights required
25300 Warn device disabled, oarked vehicle
26451-Set parking brake
27155 -Fuel tank caps
4462 (b) -Wrong vehicle registration
5200 -Plates front/back
5201 • Position of plate
5204 (a)· Tabs
72 hour parking
Alley parking
Commercial vehicle in residential area
Repair vehicle in street
Safety zone
Storage I Impounded Vehicle Administrative Charge
Administrative Fee -DUI
Audio/Visual Copy
Burglary Alarm Response-Second Occurrence (no charge for 1st response if permitted) (Note 1)
Burglary Alarm Response -Each Additional Occurrence (Note 1)
Copy Investigation Tapes(+ cost of duplicating the tape)
Dispatch Historical Searches (per month searched)
Entertainment License (Note 2)
False Robbery-Panic Alarm Response· Second Occurrence (no charge for 1st response) (Note 1)
False Robbery· Panic Alarm Response· Each Additional Occurrence (Note 1)
2
FY 2015-16 FEE FY 2016-17 FEE
Determined by Determined by
City Manager City Manager
$36 $36
$38 $38
$50 $50
$38 $38
$38 $38
$38 $38
$38 $38
$38 $38
$38 $38
$38 $38
$260 $260
$38 $38
$38 $38
$320 $320
$38 $38
$50 $SO
$38 $38
$50 $50
$340 $340
$38 $38
$38 $38
$SO $50
$50 $50
$38 $38
$50 $SO
$38 $38
$320 $320
$128 $128
$68 $68
$50 $50
$38 $38
$38 $38
$44 $44
$38 $38
$38 $38
$38 $38
$44 $44
$44 $44
$44 $44
$38 $38
$38 $38
$100 $100
$38 $38
$38 $38
$38 $38
$68 $68
$50 $50
$50 $50
$50 $50
$50 $50
$60 $120
$19 $19
$45 $45
$30 $30
$60 $60
$54 $55
$20 $20
$219 $223
$100 $100
$100 $100
Item No. 15 - AB #22,337 June 28, 2016 Page 89 of 179
FEE CATEGORY
Police
Police
Police
Police
Police
Police
Police
Police
Police
Police
Police
Police
Police
Police
Police
Police
Safety Center Facility
Rental
Safety Center Facility
Rental
Safety Center Facility
Rental
Safety Center Facility
Rental
Safety Center Facility
Rental
Safety Center Facility
Rental
Safety Center Facility
Rental
Safety Center Facility
Rental
Safety Center Facility
Rental
Safety Center Facility
Rental
Safety Center Facility
Rental
Safety Center Facility
Rental
Safety Center Facility
Rental
Safety Center Facility
Rental
Safety Center Facility
Rental
Safety Center Facility
Rental
Safety Center Facility
Rental
Safety Center Facility
Rental
Safety Center Facility
Rental
Safety Center Facility
Rental
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
City of Carlsbad
Master Fee Schedule 2016-17
General City Service Fees
FEE DESCRIPTION
Fingerprinting Fees
Photograph Copy (fee plus reproduction costs)-Subpoena or Records requests that require retrieval
in Que Tel evidence program. Photos/ Video must be approved prior to release for compliance with
privacy laws.
Police/Fire -Emergency Response DUI Traffic Collision (max $12,000 per incident)
Proof of Correction Certification -all others
Proof of Correction Certification -Carlsbad Resident or person with CPD citation
Public Dump Permit-Fee per acre
Report Copy Fee (Free to Victim) plus cost of reproduction
Second Call per Police Employee per hour (consistent with City payroll records)
Special Business Permit (plus fingerprint fee)
Special Event Application -Major (3 or more intersections)(fee + services rendered) (Note 3)
Special Event Application -Minor (2 or less intersections)(fee + services rendered) (Note 3)
Special Event Application -Third party Vendor Fee (2nd Day) (Note 3)
Special Event Application -Third party Vendor Fee (each day thereafter) (Note 3)
Special Event Application -Third party Vendor Fee (1st Day) (Note 3)
Special Event City Services -Staff Time (Note 4)
Verification Letter
Safety Training Center-Class Room -Full Day
Safety Training Center -Classroom -Half Day
Safety Training Center-Confined Space Prop -Full Day
Safety Training Center -Confined Space Prop -Half Day
Safety Training Center -Grinder-Full Day
Safety Training Center-Grinder-Half Day
Safety Training Center-Grinder/Commercial Prop (No Fire Ops) -Full Day
Safety Training Center-Grinder/Commercial Prop (No Fire Ops)-Half Day
Safety Training Center -Grinder/Residential Prop (No Fire Ops) -Full Day
Safety Training Center-Grinder/Residential Prop (No Fire Ops) -Half Day
Safety Training Center-One Shooting Range -Full Day
Safety Training Center-One Shooting Range -Half Day
Safety Training Center-PriSim (Training Simulator) -Full Day
Safety Training Center-PriSim (Training Simulator) -Half Day
Safety Training Center-Pump Draft Pit-Full Day
Safety Training Center-Pump Draft Pit -Half Day
Safety Training Center-Streetscape -Full Day
Safety Training Center-Streetscape -Half Day
Safety Training Center -Two Shooting Ranges -Full Day
Safety Training Center-Two Shooting Ranges -Half Day
A Bin that needs to be moved: 31 to 50feet
A Bin that needs to be moved: 5 to 30 feet
A Bin that needs to be moved: Additional 25 feet increments
Bin Exchange
Bin Lock Set Up Fee
3
FY 2015-16 FEE FY 2016-17 FEE
$15 $15
$45 $15
Direct Cost Direct Cost
$15 $16
$0 $0
$202 $202
$10 $10
Actual Cost Actual Cost
$126 $128
$362 $369
$121 $123
$109 $111
$81 $83
$136 $138
Actual Cost Actual Cost
$10 $10
$528 $528
$296 $296
New Fee $500
New Fee $250
$418 $418
$236 $236
$599 $600
$327 $300
$599 $600
$327 $300
$678-$1,102 $1,100
$312-$524 $550
New Fee $500
New Fee $250
New Fee $400
New Fee $200
$145 $145
$100 $100
$763-$1,239 $1,250
$401-$645 $650
$7.02 $7.11
$5.17 $5.24
$7.02 $7.11
$59.12 $59.83
$36.95 $37.40
Item No. 15 - AB #22,337 June 28, 2016 Page 90 of 179
FEE CATEGORY
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
City of Carlsbad
Master Fee Schedule 2016-17
General City Service Fees
FEE DESCRIPTION
Bin paint charge fee -allowed 1 per year. After first paint within one year, there will be a charge per
paint request.
Certified burial at Miramar plus special handling fee charged by Miramar
Commercial Return to Service Fee-The return to service fee for two or more calls in a one-month
period by a bin
Multi-Family Complex and Commerical Bin Customers -Contamination Fee -to recover costs for
separating solid waste placed in a recycling or green waste container or for arranging a special,
unscheduled collection due to contamination.
Copy Fee-The charge for copies requested by customers.
Dead Run ·charge
Delivery of extra cart
Disposal Fee per Ton (pass through)
Interest Charge-Contractor may charge 1.5% interest per month on any delinquent account for such
time as the bill remains unpaid after its due date. Late Fee -There will be a minimum fee on any
delinquent account -$3 minimum charge.
Locking Fee
Multi Family Complex and Commercial Bin Customers shall be charged for bulky item pickups. Bulky
Item requiring 2 people to handle
Multi Family Complex and Commercial Bin Customers shall be charged for bulky item pickups. Per
Bulky Item -each additional item
Multi Family Complex and Commercial Bin Customers shall be charged for bulky item pickups. Per
Bulky Item-first item
Overloaded Bins
Relocation Charge offsite
Relocation Charge onsite
Residential Return to Service Fee-The return to service fee for two or more calls in a one-month
period by a residential
Restart Fee-The fee for Restarting commercial service when a permanent account has been
terminated for non payment.
Roll off-Demurrage Per Day Charge
Single and Multi-Family cart customers -3 bulky item pick ups per calendar year with 5 items
maximum per pick up -Bulky Item -Exceeding 5 per pick up -First item
Single and Multi-Family cart customers -3 bulky item pick ups per calendar year with 5 items
maximum per pick up -Bulky Item -Exceeding 5 per pick up-each additional item
Special Haul Bin (no Storm Water Fees) 1 week or less
Special Haul Bin Delivery
Special Pick-ups of Solid Waste-Delivery charge for roll-off boxes (per box)
Special Pick-ups of Solid Waste -Door-to-door household hazardous waste collection (HHW)
Service Fee -Roll off service
Standby charge per min after 5 min
Trash Collection -3 yard bin Commercial Recycling-Extra pick-up
Trash Collection - 3 yard bin Commercial Yard Waste-Extra pick-up
Trash Collection -3 yard bin Construction Bin Rate -Extra pick-up
Trash Collection -3 yard compactor Commercial -Extra pick-up
Trash Collection -3 yard compactor Commercial -Five picks-up per week
Trash Collection - 3 yard compactor Commercial-One pick-up per week
Trash Collection -3 yard compactor Commercial -Six picks-up per week
Trash Collection -3 yard compactor Commercial -Three picks-up per week
Trash Collection -96 gal cart Commercial Recycling Extra pick-up
Trash Collection -Commercial 2-yard bin -Extra pick-up
Trash Collection -Commercial 3-yard bin -Extra pick-up
Trash Collection -Commercial 3-yard bin -six pick-ups per week
Trash Collection -Commercial 3-yard bin -three pick-ups per week
Trash Collection -Commercial 4-yard bin -Extra pick-up
Trash Collection -Commercial 5-yard bin -Extra pick-up
Trash Collection -Commercial Can Backyard Service -One pick-up per week
Trash Collection -Commercial Can Backyard Service-Two pick-ups per week
Trash Collection -Commercial Cart Extra pick up
Trash Collection -Commercial Cart-One pick-up per week (up to two (2) 96 gal)
Trash Collection -Commercial Cart-Three pick-up per week (up to two (2) 96 gal)
Trash Collection -Commercial Cart-Two pick-up per week (upto two (2) 96 gal)
Trash Collection -Commercial per bin -five pick-ups per week (2-yard bin)
Trash Collection -Commercial per bin -five pick-ups per week (3-yard bin)
4
FY 2015-16 FEE FY 2016-17 FEE
$100.31 $101.77
$314.45 $319.03
$64.63 $65.57
$52.17 $52.93
$1.37 $1.39
$73.80 $74.88
$11.53 $11.70
$45.02 $45.15
$3.46 $3.51
$14.05 $14.22
$58.76 $59.61
$10.49 $10.65
$40.92 $41.52
$50.18 $50.91
$61.41 $62.30
$43.04 $43.67
$32.86 $33.34
$19.72 $20.00
$4.56 $4.62
$40.92 $41.52
$10.49 $10.65
$90.23 $91.48
$40.17 $40.76
$54.19 $55.90
$10.00 $10.00
$210.56 $217.20
$1.95 $1.98
$35.22 $35.64
$9.45 $9.55
$60.27 $61.09
$60.70 $61.29
$674.29 $679.23
$149.95 $151.12
$805.40 $811.27
$412.13 $415.19
$8.00 $8.09
$37.59 $38.01
$50.47 $51.02
$546.18 $551.25
$282.44 $285.09
$60.40 $61.06
$70.32 $71.08
$52.08 $52.67
$104.15 $105.53
$17.12 $17.32
$36.40 $36.80
$109.22 $110.42
$72.82 $73.62
$317.32 $320.31
$458.25 $462.52
Item No. 15 - AB #22,337 June 28, 2016 Page 91 of 179
FEE CATEGORY
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Trash Collection
Water Service Fees
Water Service Fees
Water Service Fees
Water Service Fees
Water Service Fees
Water Service Fees
Water Service Fees
Water Service Fees
Water Service Fees
City of Carlsbad
Master Fee Schedule 2016-17
General City Service Fees
FEE DESCRIPTION
Trash Collection -Commercial per bin -five pick-ups per week (4-yard bin)
Trash Collection -Commercial per bin -five pick-ups per week (5-yard bin)
Trash Collection -Commercial per bin -five pick-ups per week (split bin)
Trash Collection -Commercial per bin -four pick-ups per week (2-yard bin)
Trash Collection -Commercial per bin -four pick-ups per week (3-yard bin)
Trash Collection -Commercial per bin -four pick-ups per week (4-yard bin)
Trash Collection -Commercial per bin -four pick-ups per week (5-yard bin)
Trash Collection -Commercial per bin -four pick-ups per week (split bin)
Trash Collection -Commercial per bin -one pick-up per week (2-yard bin)
Trash Collection -Commercial per bin -one pick-up per week (3-yard bin)
Trash Collection -Commercial per bin -one pick-up per week (4-yard bin)
Trash Collection -Commercial per bin -one pick-up per week (5-yard bin)
Trash Collection -Commercial per bin -one pick-up per week (split bin)
Trash Collection-Commercial per bin -six pick-ups per week (2-yard bin)
Trash Collection -Commercial per bin -six pick-ups per week (3-yard bin)
Trash Collection -Commercial per bin -six pick-ups per week (4-yard bin)
Trash Collection -Commercial per bin -six pick-ups per week (5-yard bin)
Trash Collection -Commercial per bin -six pick-ups per week (split bin)
Trash Collection -Commercial per bin -three pick-ups per week (2-yard bin)
Trash Collection -Commercial per bin -three pick-ups per week (3-yard bin)
Trash Collection -Commercial per bin -three pick-ups per week (4-yard bin)
Trash Collection -Commercial per bin -three pick-ups per week (5-yard bin)
Trash Collection-Commercial per bin -three pick-ups per week (split bin)
Trash Collection -Commercial per bin -two pick-ups per week (2-yard bin)
Trash Collection -Commercial per bin -two pick-ups per week (3-yard bin)
Trash Collection -Commercial per bin -two pick-ups per week (4-yard bin)
Trash Collection -Commercial per bin -two pick-ups per week (5-yard bin)
Trash Collection -Commercial per bin -two pick-ups per week (split bin)
Trash Collection-Commercial Recycling-five pick-ups per week (3 yard bin)
Trash Collection -Commercial Recycling-four pick-ups per week (3 yard bin)
Trash Collection -Commercial Recycling-one pick-up per week (3 yard bin)
Trash Collection -Commercial Recycling -one pick-up per week (96 gal cart)
Trash Collection -Commercial Recycling-seven pick-ups per week (3 yard bin)
Trash Collection -Commercial Recycling -six pick-ups per week (3 yard bin)
Trash Collection -Commercial Recycling -three pick-ups per week (3 yard bin)
Trash Collection -Commercial Recycling -two pick-ups per week (3 yard bin)
Trash Collection -Commercial Recycling-three pick-ups per week (96 gal cart)
Trash Collection -Commercial Recycling-two pick-ups per week (96 gal cart)
Trash Collection -Commercial Yard Waste -one pick-up per week (3 yard bin)
Trash Collection -Commercial Yard Waste -two pick-ups per week (3 yard bin)
Trash Collection -Commercial Yard Waste-one pick-up per week (96 gal cart)
Trash Collection -Construction Bin Rate -Five pick-ups per week (3 yard bin)
Trash Collection-Construction Bin Rate -Four pick-ups per week (3 yard bin)
Trash Collection -Construction Bin Rate -One pick-up per week (3 yard bin)
Trash Collection -Construction Bin Rate-Three pick-ups per week (3 yard bin)
Trash Collection -Construction Bin Rate -Two pick-ups per week (3 yard bin)
Trash Collection -Residential -Additional trash cart beyond first one.
Trash Collection -Residential -per month -64 or 96 Gallon Cart
Trash Collection -Residential-per month (35 gallon trash)
Trash Collection -Residential-per month (backyard service)
Trash Collection -Residential-Two additional Green Waste and/or Recycling carts will be free of
charge, after that each additional cart is charged
Trash Collection -Commercial/Multi Family Scout Service Fee
Wash Out Receiver Boxes
Backflow 2nd Notice
Backflow 3rd Notice
Backflow Inspection -California Department of Environmental Health (CDEH) (invoice total from
CDEH)
Backflow Preventer Charge (per month, each account)
Backflow Re-inspection (Consistent with City payroll records)
Blueprinting of Standard Size (24" x 36") Improvement Plan Sheet (Cost for each)
Hydraulic Analysis Only -Included in Improvement Plan Review Fees
Potable, Reclaimed and Sewer Improvement Plan Review -Use Improvement Plan Review Fees
Potable, Reclaimed and Sewer Standards and Specifications (available on Internet)
5
FY 201S-16 FEE FY 2016-17 FEE
$636.12 $642.11
$814.01 $821.73
$369.50 $373.33
$257.55 $259.98
$370.34 $373.80
$512.63 $517.47
$654.94 $661.16
$298.60 $301.70
$78.42 $79.20
$106.61 $107.65
$142.18 $143.56
$177.76 $179.48
$85.86 $86.77
$377.06 $380.60
$546.18 $547.20
$759.60 $766.75
$973.09 $982.31
$440.42 $444.98
$197.90 $199.78
$282.44 $284.87
$389.16 $392.85
$495.89 $500.61
$227.69 $230.06
$138.15 $139.48
$194.54 $196.38
$265.65 $268.19
$336.83 $340.06
$156.78 $158.42
$281.44 $283.17
$235.79 $238.66
$76.68 $77.61
$17.45 $17.66
$393.77 $398.57
$337.52 $341.63
$182.76 $184.98
$129.72 $131.30
$52.34 $52.98
$34.90 $35.32
$108.73 $109.81
$192.45 $194:32
$20.32 $20.53
$958.84 $971.56
$779.62 $789.98
$241.97 $245.25
$600.41 $608.41
$421.19 $426.83
$2.34 $2.37
$20.62 $20.82
$18.66 $18.85
$26.29 $26.57
$2.34 $2.37
$47.94 $48.51
$49.24 $49.96
$8 $8
$24 $24
Actual Cost Actual Cost
$3 $3
Actual Cost Actual Cost
$5 $5
$0 $0
N/C N/C
Item No. 15 - AB #22,337 June 28, 2016 Page 92 of 179
FEE CATEGORY
Water Service Fees
City of Carlsbad
Master Fee Schedule 2016-17
General City Service Fees
FEE DESCRIPTION
Potable, Reclaimed and Sewer Standards and Specifications (Cost for each)
FY 2015-16 FEE
Actual Cost
Water Service Fees Preliminary Potable Water, Reclaimed Water, Sewer Analysis Review -(Use Improvement Plan Review Fees)
Water Service Fees Reclaimed Water Landscape Review-Use Improvement Plan Review fees
Water Service Fees Utility Standards and Specifications (actual cost of reproduction)
Water Service Fees Water Meter-Construction Meter Installation/Removal
Water Service Fees Water Meter -Construction Meter Relocation
Water Service Fees Water Meter Deposit -Construction Meters
Water Service Fees Water Service Fee -Accounts scheduled for termination for non-payment
Water Service Fees Water Service Fee -After Hour Turn-on
Water Service Fees Water Service Fee -Continuity of Service
Water Service Fees Water Service Fee-Door Hanger Electronic
Water Service Fees Water Service Fee -Door Hanger Paper
Water Service Fees Water Service Fee -Next Scheduled Day Service Turn on
Water Service Fees Water Service Fee -Per New Account -Service Turn on
Water Service Fees Water Service Fee -Same Day Turn-on {Not Scheduled for That Day)
(Note 1) -Per section 8.50,0BO(e), Ord NS-230 phl,2,1993; Ord-53 ph 3, 1989: Ord. 1278 ph 1 (part) 1985)
(Note 2) -Cade Section 8.09.070
Actual Cost
$105
$46
$907
$14
$117
$11
$1
$10
$30
$35
$87
FY 2016-17 FEE
Actual Cost
Actual Cost
$107
$47
$923
$15
$119
$11
$1
$11
$30
$36
$89
(Note 3) -A valid, unexpired City of Carlsbad Business License is required for all special event Applicants. An amendment to 8.17.070 CMC now also requires an Applicant to
(Note 4) -See Carlsbad Municlpol Code Section 8.17.070
6
Item No. 15 - AB #22,337 June 28, 2016 Page 93 of 179
CITY OF CARLSBAD
MASTER FEE SCHEDULE
SECTION 2
DEVELOPMENT RELATED
SERVICE FEES
June 2016
Item No. 15 - AB #22,337 June 28, 2016 Page 94 of 179
FEE CATEGORY
Bu ilding Permit Fees
Building Permit Fees
Building Permit Fees
Building Permit Fees
Building Permit Fees
Building Permit Fees
Building Permit Fees
Building Permit Fees
Building Permit Fees
Building Permit Fees
Building Permit Fees
Building Permit Fees
Building Permit Fees
Building Permit Fees
Building Permit Fees
Building Permit Fees
Building Permit Fees
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
City of Carlsbad
Master Fee Schedule 2016-17
Development Related Service Fees
FEE DESCRIPTION
Additional plan review required by changes, additions or revisions to approved plans-
per hour-(minimum charge -one half hour) (Note 5)
Building Plan Check -70% of Building Permit Fee(8% discount on repetitive plan
checks)
Green Building Standards Plan Check and Inspection
Inspections for which no fee is specifically indicated -per hour-(minimum charge-one
half hour) (Note 5)
inspections outside of normal business hours -per hour-(minimum charge -2 hours)
(Note 5)
Re-inspection fees -per hour (Note 5)
581473 Green Building State Standards Fee
Strong Motion Instrumentation Fee (SMIP) and Seismic Hazard Mapping Fee -
Commercial (minimum $0.50 fee, pass through from State)
Strong Motion Instrumentation Fee (SMIP) and Seismic Hazard Mapping Fee -
Residential (minimum $0.50 fee, pass through from State)
Total Valuation -$1 to $500 (Note 5)
Total Valuation -$1,000,001 and up -for the first $1,000,000 plus $1.99 for each
additional $1,000 or fraction thereof (Note 5)
Total Valuation -$100,001 to $500,000 -forthe first $100,000 plus $3.55 for each
additional $1,000, or fraction thereof, to and including $500,000. (Note SJ
Total Valuation -$2,001 to $25,000 -for the first $2,000 plus $8.87 for each additional
$1,000, or fraction thereof, to and including $25,000 (Note 5)
Total Valuation -$25,001 to $50,000 -for the first $25,000 plus $6.40 for each
additional $1,000, or fraction thereof, to and including $50,000 (Note 5)
Total Valuation -$50,001 to $100,000-forthe first $50,000 plus $4.43 for each
additional $1,000, or fraction thereof, to and including $100,000 (Note 5)
Total Valuation -$500,001 to $1,000,000-forthefirst $500,000 plus $3.00 for each
additional $1,000, or fraction thereof, to and including $1,000,000 (Note 5)
Total Valuation -$501 to $2,000-forthe first$500 plus $1.93 for each additional $100
or fraction thereof, to and including $2,000 (Note 5)
Adjustment Plat
Affordable Housing Credit Per Unit (Northwest Quadrants)
Affordable Housing Credit Per Unit-Cassia Heights (Southeast and Southwest
quadrants)
Affordable Housing Credit Per Unit-Villa Loma (Southeast and Southwest quadrants)
Affordable Housing Impact Fee (per unit)
Affordable Housing In-Lieu Fee (per market rate unit)
Agricultural Mitigation Fee
All development related appeals
Amendments and Revisions to Approved Projects
Building Code Enforcement
Certificate of Compliance
Certificate of Compliance In Lieu of Parcel Map
Certificate of Correction
Coasta l Development Permit (CDP)-2 -4 unit or lot subdivision (per unit or lot
whichever is greater)
Coastal Development Permit (CDP)-5 or more units or lot subdivision (per permit)
Coastal Development Permit (CDP) -Emergency
Coastal Development Permit (CDP) -Exemption
Coastal Development Permit (CDP) -Minor Permit
Coastal Development Permit (CDP) -Non-Residential+ 10 cents per square foot
Coastal Development Permit (CDP)-Single Family Lot
Community Facilities District Annexation
7
FY 2015-16 FEE FY 2016-17 FEE
$65 $65
70% of Building 70% of Building.
Permit Fee Permit Fee
$163 $166
$65 $65
$65 $65
$65 $65
$1.00 per every $1.00 per every
$25,000 in building $25,000 in building
valuation or fraction valuation or fraction
thereof, with a thereof, with a
minimum fee of minimum fee of
$1.00 $1.00
$28.00 per $100,000 $28.00 per $100,000
valuation valuation
$13.00 per $100,000 $13.00 per $100,000
valuation valuation
$15 $15
$3,534 $3,534
$626 $626
$44 $44
$246 $246
$406 $406
$2,037 $2,037
$15 $15
$1,310 $1,334
$142,000 $142,000
$57,512 $58,547
$48,000 $48,000
$2,915 $2,915
$4,515 $4,515
$10,000 $10,000
$645 $850
50% of original
Varies application fee
Court costs Court costs
$1,063 $1,082
$2,846 $2,846
$827 $842
$2,222 $2,262
$3,616 $3,682
$450 $458
$247 $252
$872 $887
$984 $1,002
$1,097 $1,117
$1,752 $1,752
Item No. 15 - AB #22,337 June 28, 2016 Page 95 of 179
FEE CATEGORY
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
City of Carlsbad
Master Fee Schedule 2016-17
Development Related Service Fees
FEE DESCRIPTION
Conditional Use Permit-Regular
Conditional Use Permit (CUP)-Biological Habitat Preserve
Conditional Use Permit (CUP)-Minor
Construction Change Review-Major (fee plus $245 per sheet)
Construction Change Review -Minor (fee plus $155 per sheet)
Daycare Permit (7 -14 Children)
Developer Agreements -Deposit $10,000 increments (Consistent with City payroll
records+ overhead)
Easement Document Processing and Recording-Major (all others)
Easement Document Processing and Recording-Minor (Single Family Lot)
Encroachment Agreement Processing
Environmental Impact Assessment (EIA)-AII Others
Environmental Impact Assessment (EIA)-Single Family
Environmental Impact Report (EIR) -Addendum (+fully burdened hourly rate after 1st
10 hours of project planner)
Environmental Impact Report (EIR)-Focused/Supplemental (Requiring a Public
Hearing)-(+ fully burdened hourly rate after the 1st 100 hours of project planner or
20 hours of project engineer)
Environmental Impact Report (EIR}-Review(+ fully burdened hourly rate after the first
160 hours of project planner or 40 hours of Project Engineer)
Extensions to projects in process
Fish & Game Fee -Environmental Impact Report (EIR) -Set by Dept. of Fish and
Wildlife
Fish & Game Fee -Negative Declaration/ Mitigated Negative-Set by Dept. of Fish and
Wildlife
General Plan Amendment-0 - 5 Acres
General Plan Amendment-Over 5 Acres
Grading Permit Investigation Fee (Consistent with City payroll records plus overhead)
Habitat Management Plan (HMP)-Amendment to Plan Document-Major (Plus fully
burdened hourly rate after the first 20 hours of project planner.)
Habitat Management Plan (HMP)-Amendmentto Plan Document-Minor
Habitat Management Plan Permit-Major-habitat to be preserved
Habitat Management Plan Permit-Single Family
Hillside Development Permit-Major
Hillside Development Permit -Minor
Inspection -Additional Planning
Inspection Overtime-per Hour (On Request) -each additional hour at $70
License Tax on New Construction -Mobile Homes, Per Lot
Lighting and Landscape District #2 Annexation
Local Coastal Plan -Amendment
Local Facilities Management Fees -As established by Council
Local Facilities Management Plan /Amendment-Fee+ deposit in minimum increments
of $5,000
Mapping Fees -Final Tract Map(+ $5 per Acre)-Major Subdivision
Mapping Fees -Parcel Map-Minor Subdivision
Master Plan {Base fee+ fully burdened hourly rates after the first 200 hours of project
planner or 100 hours project engineer)
Master Plan Amendment-Major (Base fee+ fully burdened hourly rates after the first
100 hours of project planner or 40 hours project engineer)
Master Plan Amendment -Minor {Base fee+ fully burdened hourly rates after the first
20 hours of project planner or 7 hours project engineer)
Master Plan Pre-Filing Submittal
Neighborhood Improvement Agreements
Non Conforming Construction Permit
Notice Fee (plus postage)
Oversize Load Permit -1 trip (fee set by State)
Oversize· Load Permit -Annual I Per Year (fee set by State)
Park In Lieu Fee -Village Area
Plan Consistency Determination
Planned Development -5 or more/ Major Subdivision, based on number of units or
lots, whichever is greater.
8
FY 2015-16 FEE FY 2016-17 FEE
$4,567 $4,649
$861 $876
$765 $779
$697 $710
$495 $504
$214 $218
Actual cost Actual cost
$664 $676
$117 $119
$343 $349
$1,760 $1,792
$969 $986
$2,559 $2,605
$13,746 $13,993
$20,433 $20,801
Varies 25% of original fee
$3,120 $3,120
$2,260 $2,260
$4,348 $4,426
$6,271 $6,384
Actual cost Actual cost
$5,444 $5,542
$3,498 $3,561
$3,981 $4,053
50% Minor Fee 50% Minor Fee
$2,559 $2,605
$1,265 $1,288
$94 $96
$118 $120
$2,311 $2,348
$5,400 $7,400
$6,356 $6,470
Full Cost Full Cost
$10,000 $10,000
$7,615 $7,753
$3,419 $3,480
$42,566 $43,332
$26,632 $27,111
$1,699 $1,729
$7,239 $7,369
$160 $163
$710 $723
$320 $326
$16 $16
$90 $90
$12,201 $12,421
$720 $733
$8,515 $8,669
Item No. 15 - AB #22,337 June 28, 2016 Page 96 of 179
FEE CATEGORY
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
City of Carlsbad
Master Fee Schedule 2016-17
Development Related Service Fees
FEE DESCRIPTION
Planned Development-4 or fewer, based on number of units or lots, whichever is
greater.
Planning Commission Agenda and Minutes (+postage)
Planning Commission Determination -Other
Planning Commission Determination -Single Family
Plumbing, Electrical and Mechanical Permit (not combined with Building Permits)
Postage (All)
Precise Development Plan
Preliminary Plan Review -Major (Other)
Preliminary Plan Review -Minor (SFO)
Public Facilities Fees-1.82% of Bldg. Permit Value (Inside CFO)
Public Facilities Fees -3.5% of Bldg. Permit Value (Outside CFO)
Quitclaim of Easement
Reapportionment Fees for 1911 Act Assessment Districts
Reversion to Acreage -(Consistent with City payroll records charged against a $3,100
deposit)
Right of Way Permit-Minor-Construction (Single Family, Pool, Driveway, Spa)
Right of Way Permit -Minor -Non Construction
Right of Way Permit -Utility(+ actual costs for Inspector and Senior Inspector's time)
Right of Way Permit -Utility (By Contract)
Satellite Antenna Permit
School Fees -Set by School Districts, State Mandates Limits. See School District Maps
for applicable school district.
Secured Agreement Processing Extension
Secured Agreement Processing Replacement+ improvement plan revision fees if
required
Segregation of Assessments -1-4 lots (Consistent with City payroll records plus
overhead, consultant cost and recording fee. Also see Streets and Highways Code
Section 8760-8769 )
Segregation of Assessments -5 lots or more -fee plus $20 per lot (Consistent with City
payroll records plus overhead, consultant cost and recording fee. Also see Streets and
Highways Code Section 8760-8769)
Service Installation Fee -Fire Hydrant Lateral and Assembly (staff time consistent with
City payroll records)
Service Installation Fee-Fire Sprinkler Lateral (staff time consistent with City payroll
records)
Sidewalk Tables and Chairs -Village Area -See Minor Right-of-Way Permit
Sign Permit
Sign Program
Site Development Plan -Major-5 or more units I lots
Site Development Plan -Minor-Residential, less than or equal to 4 units I lots
Special Use Permit -All
Specific Plan -base plus fully burdened hourly rate after first 200 hours project
planner, or 60 hours project engineer
Specific Plan Amendment-Major-base plus fully burdened hourly rate after 180 hours
project planner, or 30hours project engineer
Specific Plan Amendment-Minor-base plus fully burdened hourly rate after20 hours
project planner, or 7 hours project engineer
Street Vacation -Street/ Public Service Easement Vacation -Summary
Street Name Change
Street Vacation -Street I Public Service Easement Vacation -Regular
Tentative Parcel Map -Minor Subdivision -0-4 Lots
Tentative Tract Map -5 -49 units/lots-base fee+ $110 each, whichever is greater
Tentative Tract Map -50 + units/lots -base fee + $15 each, whichever is greater
Tentative Tract Map Litigation Stay
9
FY 2015-16 FEE FY 2016-17 FEE
$3,071 $3,126
copy charge copy charge
$1,665 $1,695
$1,029 $1,048
$160 $166
Current Postage
Current Postage Rate Rate x Number of
x Number of labels labels
$7,750 $7,890
$720 $733
$202 $206
1.82% of Bldg. 1.82% of Bldg.
Permit Value Permit Value
3.5% of Building 3.5% of Building
Permit,Value Permit Value
$697 $710
Actual Cost Actual Cost
Actual Cost Charged Actual Cost Charged
against $3,100 against $3,100
Deposit. Deposit.
$354 $361
$174 $177
$754 $767
$754 $767
$427 $435
Set by School Set by School
Districts Districts
$416 $424
$765 $779
Actual Cost Actual Cost
Actual Cost Actual Cost
Actual Cost Actual Cost
Actual Cost Actual Cost
$62 $63
$1,074 $1,094
$11,541 $11,749
$4,550 $4,632
Varies $3,555
$35,552 $36,192
$22,880 $23,292
$1,479 $1,506
$1,350 $1,374
$1,665 $1,695
$3,402 $3,463
$3,875 $3,945
$8,392 $8,543
$16,772 $17,074
25% of original fee 25% of original fee
Item No. 15 - AB #22,337 June 28, 2016 Page 97 of 179
FEE CATEGORY
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Development Processing
Fire Inspection
Fire Inspection
Fire Inspection
Fire Inspection
Fire Inspection
Fire Inspection
Fire Inspection
Fire Inspection
Fire Inspection
Fire Inspection
Fire Inspection
Fire Inspection
Fire Inspection
Fire Inspection
Fire Inspection
Fire Inspection
Fire Inspection
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fi re Pe rm its
Fire Permits
City of Carlsbad
Master Fee Schedule 2016-17
Development Related Service Fees
FEE DESCRIPTION
Third Party Review -plus consultant cost
Trails-Major Trail Plan Check, greater than 1 mile
Trails -Minor Trail Plan Check, less than 1 mile
Trails Inspection
Variance-Administrative (Planning)
Variance -Planning
Village Area Sidewalk Outdoor Dining and Curb Cafe [max of 2 parking spaces) Annual -
See Right of Way Permit. Per Space I Per Year.
Village Review Area Sidewalk Sign/Outdoor Display Permit -See Right of Way Permit
Wireless Communication Third Party Review
Zone Change -5 or fewer acres
Zone Change -5.1 or more acres
Zone Code Compliance Letter
Fire Clearance Annual Inspection -State License. 26-50 Beds Individuals/Per
Establishment
Fire Clearance Annual Inspection -State License. 50 + Beds Individuals/Per
Establishment
Fire Clearance Annual Inspection -State License. 7-24 Individuals/Per Establishment
Fire Clearance Initial Inspection-State License. 25 + Individuals/Per Establishment
Fire Clearance Initial Inspection-State License. 7-24 Individuals/Per Establishment
Fire Clearance Inspection-State License. 1-6 Individuals/Per Establishment
Fire Inspection -R-1 Occupancy 15-50 dwelling units [DU's, plus $194.90 for each
additional 50 dwelling units
Fire Inspection -R-1 Occupancy 6-14 dwelling units (DU's)
Inspection
Inspection -Initial Occupancy Inspection-New Business
Inspection -Interim
Inspection -Knox System
Inspection -New Above Ground storage tank
Inspection -Re-inspection for a previously failed inspection
Inspection -Underground Fire Protection Service Main Repair-Inspection Only
Inspection -Underground Storage Tanks -New Inspection Only
Inspection-Repeated Inspection on New Construction
Permit-Aerosol Use/Storage
Permit -Liquefied Petroleum Gas
Permit -Medical Gas Dispensing System
Permit -Motor Vehicle Repair Garages
Permit -Above Ground Storage Tanks
Permit -Assembly Occupancy A-1
Permit-Assembly Occupancy A-2
Permit-Assembly Occupancy A-3
Permit-Battery Systems
Permit-Brazing, Soldering and Welding
Permit-Candles or Open Flame-Public Assembly
Permit-Child Day Care, E or 1-4
Permit -Combustible Fiber Use and Storage
Permit -Compressed Gases/Cryogen Storage Use
Permit -Covered Mall
Permit-Dry Cleaning
Permit -Dust Producing Operations
Permit -Emergency and Standby Power Systems
Permit-Exhibits and Trade Shows-Public Assembly
Permit -Fire Watch
Permit-Flammable and Combustible Liquids Dispensing, Use, Storage, Tanks
Permit-Flammable Finishes
Permit-Fumigation or Thermal Insecticidal Fogging
Permit-Hazardous Materials Use and Storage
Permit-High-Piled Combustible Storage
Permit-Industrial Ovens-Kilns
Permit-Misc. Combustible Storage/Tires Facility
10
FY 2015-16 FEE FY 2016-17 FEE
$759 $773
$1,426 $1,452
$713 $726
$306 $311
$765 $779
$2,880 $2,932
$1,122 $1,142
Actual Cost Actual Cost
$4,994 $5,084
$6,766 $6,888
$120
$645 $645
$1,035 $1,035
$400 $401
$449 $450
$323 $323
$253 $255
$507 $510
$205 $207
$125 $127
$250 $254
$198 $201
$172 $175
$450 $458
$71 $73
$547 $450
$289 $294
$82 $84
$124 $126
$135 $137
$264 $269
$177 $181
$539 $548
$539 $548
$346 $353
$250 $254
$636 $645
$124 $126
$124 $126
$250 $254
$191 $195
$124 $126
$124 $126
$191 $195
$191 $195
$442 $450
$443 $450
$250 $254
$135 $137
$124 $126
$250 $254
$270 $275
$337 $344
$186 $189
$180 $183
Item No. 15 - AB #22,337 June 28, 2016 Page 98 of 179
FEE CATEGORY
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Permits
Fire Prevention
Fire Prevention
Fire Prevention
Fire Prevention
Fire Prevention
Fire Prevention
Fire Protection System
Installation
Fire Protection System
Installation
Fire Protection System
Installation
Fire Protection System
Installation
Fire Protection System
Installation
Fire Protection System
Installation
Fire Protection System
Installation
Fire Protection System
Installation
Fire Protection System
Installation
Fire Protection System
Installation
Fire Protection System
Installation
Fire Protection System
Installation
GIS
GIS
GIS
GIS
GIS
Grading Fees
Grading Fees
Grading Fees
Grading Fees
Grading Fees
Grading Fees
Grading Fees
Grading Fees
City of Carlsbad
Master Fee Schedule 2016-17
Development Related Service Fees
FEE DESCRIPTION
Permit-Miscellaneous Combustible Storage
Permit-Pyrotechnics or Special Effects, Aerial Fireworks (per event or day)
Permit -Refrigeration Equipment Install or Operate
Permit -Spray Booth
Permit-Temporary Use-Carnivals and Fairs
Permit-Temporary Use-Tents (Major)
Permit -Temporary Use -Tents (Minor)
Permit-Underground Fire Protection Service Main Repair
Permit-Underground Storage Tanks-(Single Site Multi Tanks)
Permit -Vapor Expansion Tank RetrofitcLJST/AST
Permit -Wood Products
Alternative Materials and Methods
Fire -Hydrant Water Flow Test
Fire 0 Weed Abatement (charge per parcel)
Fire Safety Standby
Inspection-Weed Abatement Compliance Certificate
Permit/Inspection -Hazardous Materials and Processes -Assembly
Fire Protection System Installation
Permit -Automatic Sprinkler System -Commercial System -each additional riser-Plan
Check
Permit-Automatic Sprinkler System -Commercial System 13-R -Plan Check
Permit -Automatic Sprinkler System -Residential System 13-D -Plan Review
Permit-Automatic Sprinkler System -Tenant Improvement -Plan Review
Permit-Fire Alarm Systems-1 to 25 devices -Plan Review Minimum
Permit -Fire Alarm Systems -26 or more -Plan Review
Permit -Other Fixed Fire Systems -Hood and Duct
Permit -Other Fixed Fire Systems -Paint Spray Booth Plan Review
Permit-Other Fixed Fire Systems -Special Chemical Agent
Permit-Other Fixed Fire Systems -Standpipe
Permit -Underground Fire Protection Service Main: Single Hydrant or Single Riser
Connection.
GIS Digital Data Delivery (per hour Technician plus overhead)
GIS Production of new docume~ts (per hour Technician plus materials and overhead)
GIS Reproduction of Existing Documents (per hour Technician plus material and
overhead)
GIS Technical Services (per hour Manager plus overhead)
GIS Technical Services (per hour Technician plus overhead)
Minor Grading Plan Review
Permit-1,000,001 Cubic Yards or More -for the first 1,000,000 CY plus $710 for each
additional 100,000 CY orfractlon thereof
Permit-1,001 to 10,000 Cubic Yards -for the first 1,000 CY plus $65 for each additional
1,000 CY or fraction thereof
Permit -10,001 to 100,000 Cubic Yards -for the first 10,000 CY plus $130 for each
additional 10,000 CY or fraction thereof
Permit -100 Cubic Yards or Less -Permit
Permit-100,001 to 200,000 Cubic Yards-for the first 100,000 CY plus $130 for each
additional 10,000 CY or fraction thereof
Permit-101 to 1,000 Cubic Yards -for the first 100 CY plus $65 for each additional 100
CY or fraction thereof
Permit-200,001 TO 400,000 Cubic Yards -for the first 200,000 CY plus $195 for each
additional 10,000 CY or fraction thereof
11
FY 2015-16 FEE FY 2016-17 FEE
$539 $548
$352 $359
$191 $195
$157 $160
$270 $275
$298 $303
$135 $137
$450 $458
$1,118 $1,132
$539 $548
$250 $254
$1,699 $1,715
$56 $57
$163 $166
$250 $254
$121 $123
$124 $126
Actual Cost Actual Cost
$414 $414
$741 $741
$71 $73
$71 $73
$66 $67
$110 $112
$71 $73
$143 $146
$71 $73
$88 $89
$636 $645
Actual Cost Actual Cost
Actual Cost Actual Cost
Direct cost Direct cost
Actual Cost Actual Cost
Actual Cost Actual Cost
$952 $969
$18,156 $18,483
$1,226 $1,248
$2,026 $2,062
$431 $439
$3,551 $3,615
$437 $445
$5,242 $5,337
Item No. 15 - AB #22,337 June 28, 2016 Page 99 of 179
FEE CATEGORY
Grading Fees
Grading Fees
Grading Fees
Grading Fees
Grading Fees
Grading Fees
Grading Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
lmprov~ment Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
City of Carlsbad
Master Fee Schedule 2016-17
Development Related Service Fees
FEE DESCRIPTION
Permit-400,000 to 1,000,000 Cubic Yards -for the first 400,000 CY plus $980 for each
additional 100,000 CY or fraction thereof
Plan Review -1,001 to 10,000 Cubic Yards-forthe first 1,000 CY plus $120 for each
additional 1,000 CY or fraction thereof
Plan Review-10,001 to 100,000 Cubic Yards -for the first 10,000 CY plus $180 for each
additional 10,000 CY orfraction thereof
Plan Review-100 Cubic Yards or Less
Plan Review-100,001 to 200,000 Cubic Yards -for the first 100,000 CY plus $285 for
each additional 10,000 CY or fraction thereof
Plan Review-200,001 Cubic Yards or more-for the first 200,000 CY plus $130 for each
additional 100,000 CY or fraction thereof
Plan Review -101 to 1,000 Cubic Yards -for the first 100 CY plus $120 for each
additional 100 CY or fraction thereof
Cost of Landscape Improvements -$0 to $20,000
Cost of Landscape Improvements -$100,001 to $250,000 -Plus 2% over $100,000
Cost of Landscape Improvements -$20,001 to $50,000 -Plus 3.0% over $20,000
Cost of Landscape Improvements -$250,001 to $500,000 -Plus 0.15% over $250,000
Cost of Landscape Improvements -$50,001 to $100,000-Plus 1.5% over $50,000
Cost of Landscape Improvements -$500,001 to $1,000,000-Plus 0.1 over $500,000
Cost of Landscape Improvements -Over $1,000,000 -plus 0.07% over $1,000,000
Improvement Inspections -Cost of Improvements -$1,000,001 or more -for the first
$1,000,000 plus $105 for each additional $10,000 or fraction thereof.
Improvement Inspections -Cost of Improvements -$100,001 to $250,000 -for the first
$100,000 plus $100 for each additional $10,000 or fraction thereof
Improvement Inspections -Cost of Improvements -$20,001 to $50,000 -for the first
$20,000 plus $250 for each additional $10,000 or fraction thereof.
Improvement Inspections -Cost of Improvements -$250,001 to $500,000 -for the first
$250,000 plus $105 for each additional $10,000 or fraction thereof
Improvement Inspections-Cost of Improvements -$50,001 to $100,000 -for the first
$50,000 plus $125 for each additional $10,000 or fraction thereof
Improvement Inspections -Cost of Improvements -$500,001 to $1,000,000 -for the
first $500,000 plus $105 for each additional $10,000 or fraction thereof
Improvement Inspections -Cost of Improvements $0 to $20,000
Improvement Plan Check-Cost of Improvements -$0 to $20,000 -plus 5% of value of
improvements
Improvement Plan Check-Cost of Improvements -$100,001 to $250,000-plus 2.5% of
value of improvements -$5,840 minimum
Improvement Plan Check-Cost of Improvements -$20,001 to $50,000 -plus 4% of
value of improvements -$2,470 minimum
Improvement Plan Check-Cost of Improvements -$250,001 to $500,000-plus 2% of
value of improvements-$13,910 minimum
Improvement Plan Check-Cost of Improvements -$50,001 to $100,000 -plus 3% of
value of improvements -$4,090 minimum
Improvement Plan Check-Cost of Improvements -$500,001 to $1,000,000 -plus 1.5%
of value of improvements-$23,840 minimum
Improvement Plan Check-Cost of Improvements -Over $1,000,0000 -plus 0.75% of
value of improvements -$31,630 minimum
Landscape Inspection -Cost of Improvements -$0 to $20,000
Landscape Inspection -Cost of Improvements -$20,001 to $50,000 -for the first
$20,000 of improvements plus $20 for each additional $10,000 or fraction thereof
Landscape Inspection -Cost of Improvements -$50,001 to $100,000-forthe first
$50,000 of improvements plus $20 for each additional $10,000 or fraction thereof
Landscape Inspection -Cost of Improvements -$100,001 to $250,000-forthe first
$100,000 of improvements plus $150 for each additional $100,000 or fraction thereof
Landscape Inspection -Cost of Improvements -$250,001 to $750,000 -for the first
$250,000 of improvements plus $150 for each additional $100,000 or fraction thereof
12
FY 2015-16 FEE FY 2016-17 FEE
$10,406 $10,593
$2,581 $2,628
$4,063 $4,136
$431 $439
$6,196 $6,308
$9,941 $10,120
$863 $878
$601 $612
$3,535 $3,535
$855 $870
$4,435 $4,435
$2,469 $2,514
$5,619 $5,720
$8,515 $8,516
$16,454 $16,750
$4,290 $4,367
$1,713 $1,744
$6,354 $6,469
$3,433 $3,495
$10,315 $10,501
5.5%-$375 5.5%-$375
Minimum Minimum
$1,378 $1,403
$2,547 $2,593
$1,759 $1,791 -
$7,705 $7,844
$2,270 $2,310
$13,617 $13,862
$13,918 $14,168
$601 $605
$849 $787
$1,193 $1,210
$1,699 $1,729
$2,041 $2,078
Item No. 15 - AB #22,337 June 28, 2016 Page 100 of 179
FEE CATEGORY
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Improvement Plan Fees
Meter Installation Fees
Meter Installation Fees
Meter Installation Fees
Meter Installation Fees
Meter Installation Fees
Meter Installation Fees
Meter Installation Fees
Meter Installation Fees
Meter Installation Fees
Meter Installation Fees
Meter Installation Fees
Meter Installation Fees
Storm Water
Storm Water
Storm Water
Storm Water
Storm Water
Storm Water
Storm Water
Storm Water
Storm Water
Storm Water
Storm Water
Storm Water
Storm Water
Storm Water
Storm Water
Storm Water
Storm Water
Storm Water
Storm Water
Storm Water
Storm Water
Storm Water
Storm Water
Waste Water Fees
Waste Water Fees
City of Carlsbad
Master Fee Schedule 2016-17
Development Related Service Fees
FEE DESCRIPTION
Landscape Inspection -Cost of Improvements -$750,001 and Over -for the first
$750,000 of improvements plus $150 for each additional $100,000 or fraction thereof
Street Light Energizing Fee -100 Watts
Street Light Energizing Fee -150 Watts
Street Light Energizing Fee -200 Watts
Street Light Energizing Fee -250 Watts
Street Light Energizing Fee -40 Watts
Street Light Energizing Fee -55 Watts
Street Light Energizing Fee -70 Watts
Street Light Energizing Fee -85 Watts
Water Meter Installation -2" -Turbo
Water Meter Installation -1-1/2"
Water Meter Installation -1-1/2" -Turbo
Water Meter Installation -2"
Water Meter Installation -3" (Consistent with City payroll records plus overhead)
Water Meter Installation -3/4"
Water Meter Installation -5/8"
Water Meter Installation -6" (Consistent with City payroll records plus overhead)
Water Meter Installation - 8" (Consistent with City payroll records plus overhead)
Water Meter Installation-1"
Water Meter Installation-4" (Consistent with City payroll records plus overhead)
Water Meter Installation Fee -Fire Protection
Inspection Base Fee -Tier Level 1-Per Site-Low Inspection Priority
Inspection Base Fee -Tier Level 1-Per Site-Medium Inspection Priority
Inspection Fee -Tier Level 3 -Each Subsequent Acre Or Portion Over One Acre -
Medium Inspection Priority
Inspection Fee -Tier Level 2 -Per Site -High Inspection Priority
Inspection Fee -Tier Level 2 -Per Site -Medium Inspection Priority
Inspection Fee -Tier Level 3 -Each Subsequent Acre Or Portion Over One Acre -High
Inspection Priority
Inspection Fee -Tier Level 3 -Up to 1 Acre -High Inspection Priority
Inspection Fee -Tier Level 3 -Up to 1 Acre -Medium Inspection Priority
Plan Review Base fee -Tier Level 3 -Up to 1 Acre -Medium Inspection Priority
Plan Review Base Fee -Tier Level 1-Per Site -Low Inspection Priority
Plan Review Base Fee-Tier Level 3-Each Subsequent Acre Or Portion Over One Acre-
High Inspection Priority
Plan Review Base Fee -Tier Level 3 -Each Subsequent Acre Or Portion Over One Acre -
Medium Inspection Priority
Plan Review Base Fee -Tier Level 3 -Up to 1 Acre -High Inspection Priority
Plan Review Base Fee -Tier Level 1 -Per Site -Medium Inspection Priority
Plan Review fee -Tier Level 2-Per Site -High Inspection Priority
Plan review fee-Tier Level 2 -Per Site -Medium Inspection Priority
Retaining Wall Plan check (Valuation $250,000+)
Retaining Wall Plan check (Valuation $50,001-$250,000)
Retaining Wall Plan check (Valuation= 0-$50,000)
SWMP inspection Fee -Up to One Half Acre
SWMP Plan Review Fee-Up To One Half Acre
SWMPP Fees -Plan Review Fee -For Each Subsequent Acre Or Portion Over One Half
Acre
SWMPP Fees -inspection Fee -For Each Subsequent Acre Or Portion Over One Half
Acre
Waste Water Discharge Permit
Waste Water Pretreatment-Class I -One time fee for new users
13
FY 2015-16 FEE FY 2016-17 FEE
$3,229 $3,287
$120 $117
$165 $161
not listed $205
$256 $249
$66 $65
not listed $78
$91 $91
$107 $105
$1,044 $1,054
$595 $605
$913 $923
$823 $834
Actual Cost Actual Cost
$305 $310
$272 $277
Actual Cost Actual Cost
Actual Cost Actual Cost
$356 $362
Actual Cost Actual Cost
Meter Fee-Use Rate Meter Fee-Use Rate
Sheet Sheet
$59 $60
$228 $232
$216 $220
$1,262 $1,285
$867 $883
$348 $354
$2,136 $2,174
$1,258 $1,280
$551 $561
$49 $SO
$82 $84
$66 $67
$714 $727
$54 $55
$356 $362
$356 $362
0.5% of Engineer's 0.5% of Engineer's
Estimate ($2,000 Estimate ($2,000
min.) min.)
$500 + 0.5% of $500 + 0.5% of
Engineer's Estimate Engineer's Estimate
$369 $369
$284 $289
$338 $344
$122 $124
$113 $115
$42 $42
$293 $298
Item No. 15 - AB #22,337 June 28, 2016 Page 101 of 179
FEE CATEGORY
Waste Water Fees
Waste Water Fees
Waste Water Fees
Waste Water Fees
City of Carlsbad
Master Fee Schedule 2016-17
Development Related Service Fees
FEE DESCRIPTION
Waste Water Pretreatment-Class I (per month) -Existing user
Waste Water Pretreatment -Class II -One time fee for new users
Waste Water Pretreatment-Class II (per month)-Existing user
Waste Water Pretreatment-Class Ill -One time fee for new users
FY 2015-16 FEE FY 2016-17 FEE
$217 $221
$293 $298
$206 $210
$87 $88
{Note 5) Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shallinc/ude supervision, overhead, equipment, hourly wages and fringe benefits of the
employees Involved. Notwithstanding other provisions of this section, the building permit fee far factory built housing shall be twenty-jive percent of the fee shown in table
above, and the plan check fee shall be sixty-five percent of the building permit fee.
14
Item No. 15 - AB #22,337 June 28, 2016 Page 102 of 179
CITY OF CARLSBAD
MASTER FEE SCHEDULE
SECTION 3
DEVELOPMENT IMPACT FEES
June 2016
Item No. 15 - AB #22,337 June 28, 2016 Page 103 of 179
FEE CATEGORY
Bridge and Thoroughfare
Fees
Bridge and Thoroughfare
Fees
Bridge and Thoroughfare
Fees
Bridge and Thoroughfare
Fees
Bridge and Thoroughfare
Fees
Bridge and Thoroughfare
Fees
Bridge and Thoroughfare
Fees
Bridge and Thoroughfare
Fees
Habitat Mitigation Fees
Habitat Mitigation Fees
Habitat Mitigation Fees
Park in Lieu
Park in Lieu
Park in Lieu
Park in Lieu
Park in Lieu
Park in Lieu
Park in Lieu
Park in Lieu
Park in Lieu
Park in Lieu
Park in Lieu
Park in Lieu
Park in Lieu
Park in Lieu
Park in Lieu
Park in Lieu
Planned Local Drainage
Area Fees
Planned Local Drainage
Area Fees
Planned Local Drainage
Area Fees
City of Carlsbad
Master Fee Schedule 2016-17
Development Impact Fees
FEE DESCRIPTION
Bridge & Thoroughfare -all other -per Avg. Daily Trip (Outside
CFD)
Bridge & Thoroughfare -per Apartment Unit (Outside CFD)
Bridge & Thoroughfare -per Condominium Unit (Outside CFD)
Bridge & Thoroughfare -per Single Family Unit (Outside CFD)
Bridge & Thoroughfare District #2 -Zone 20
Bridge & Thoroughfare District #2 -Zone 21
Bridge & Thoroughfare District #2 -Zone 5
Bridge & Thoroughfare District #3 -Fee per ADT
Type D -Coastal Sage Scrub
Type F -Agricultural Land, Disturbed Land, Eucalyptus Woodland
Type E -Non-Native Grassland
District 1 NW -Value per Acre 977,000-Attached (5 units or
more)
District 1 NW -Value per Acre 977,000-Mobile Home
District 1 NW -Value per Acre 977,000 -Attached (4 units or less)
District 1 NW -Value per Acre 977,000 -Single Family Detached &
Duplex
District 2 NE-Value per Acre 732,000 -Attached (4 units or less)
District 2 NE -Value per Acre 732,000 -Attached (5 units or more)
District 2 NE -Value per Acre 732,000 -Mobile Home
District 2 NE -Value per Acre 732,000 -Sing!~ Family Detached &
Duplex
District 3 SW -Value per Acre 732,000 -Attached (5 units or
more)
District 3 SW -Value per Acre 732,000 -Mobile Home
District 3 SW -Value per Acre 732,000 -Attached (4 units or less)
District 3 SW -Value per Acre 732,000 -Single Family Detached &
Duplex
District 4 SE -Value per Acre 732,000 -Attached (5 units or more)
District 4 SE -Value per Acre 732,000 -Mobile Home
District 4 SE -Value per Acre 732,000 -Attached (4 units or less)
District 4 SE -Value per Acre 732,000 -Single Family Detached &
Duplex
Area A -Buena Vista Lagoon -High Runoff
Area A -Buena Vista Lagoon -Low Runoff
Area A -Buena Vista Lagoon -Medium Runoff
15
FY 2015-16 FEE FY 2016-17 FEE
$22 $22
$318 $318
$424 $424
$530 $530
$1,807 $1,855
$1,459 $1,498
$348 $358
$200 $204
$31,194 $31,943
$3,120 $3,195
$15,598 $15,972
$6,190 $6,190
$4,934 $4,934
$6,414 $6,414
$7,649 $7,649
$4,804 $4,804
$4,636 $4,636
$3,696 $3,696
$5,728 $5,728
$4,636 $4,636
$3,696 $3,696
$4,804 $4,804
$5,728 $5,728
$4,636 $4,636
$3,696 $3,696
$4,804 $4,804
$5,728 $5,728
$26,906 $27,336
$6,209 $6,308
$12,347 $12,545
Item No. 15 - AB #22,337 June 28, 2016 Page 104 of 179
FEE CATEGORY
Planned Local Drainage
Area Fees
Planned Local Drainage
Area Fees
Planned Local Drainage
Area Fees
Planned Local Drainage
Area Fees
Planned Local Drainage
Area Fees
Planned Local Drainage
Area Fees
Planned Local Drainage
Area Fees
Planned Local Drainage
Area Fees
Planned Local Drainage
Area Fees
Potable & Reclaimed
Connection Fees
Potable & Reclaimed
Connection Fees
Potable & Reclaimed
Connection Fees
Potable & Reclaimed
Connection Fees
Potable & Reclaimed
Connection Fees
Potable & Reclaimed
Connection Fees
Potable & Reclaimed
Connection Fees
Potable & Reclaimed
Connection Fees
Potable & Reclaimed
Connection Fees
Potable & Reclaimed
Connection Fees
Potable & Reclaimed
Connection Fees
Potable & Reclaimed
Connection Fees
Potable & Reclaimed
Connection Fees
Potable & Reclaimed
Connection Fees
Potable & Reclaimed
Connection Fees
Sewer Benefit Area Fees
Sewer Benefit Area Fees
Sewer Benefit Area Fees
Sewer Benefit Area Fees
Sewer Benefit Area Fees
Sewer Benefit Area Fees
City of Carlsbad
Master Fee Schedule 2016-17
Development Impact Fees
FEE DESCRIPTION
Area B -Aqua Hedionda Lagoon -High Runoff
Area B -Aqua Hedionda Lagoon -Low Runoff
Area B -Aqua Hedionda Lagoon -Medium Runoff
Area C-Encinas Creek -High Runoff
Area C-Encinas Creek -Low Runoff
Area C-Encinas Creek -Medium Runoff
Area D -Batiquitos Lagoon -High Runoff
Area D -Batiquitos Lagoon -Low Runoff
Area D -Batiquitos Lagoon -Medium Runoff
Major Facility Fee -Potable and Reclaimed Water Connection
Fees: Meter Size 1" -Displacement
Major Facility Fee -Potable and Reclaimed Water Connection
Fees: Meter Size 1-1/2" -Displacement
Major Facility Fee -Potable and Reclaimed Water Connection
Fees: Meter Size 1-1/2" -Turbo
Major Facility Fee -Potable and Reclaimed Water Connection
Fees: Meter Size 2" -Displacement
Major Facility Fee -Potable and Reclaimed Water Connection
Fees: Meter Size 2" -Turbo
Major Facility Fee -Potable and Reclaimed Water Connection
Fees: Meter Size 3" -Displacement
Major Facility Fee -Potable and Reclaimed Water Connection
Fees: Meter Size 3" -Turbo
Major Facility Fee -Potable and Reclaimed Water Connection
Fees: Meter Size 3/4" -Displacement
Major Facility Fee -Potable and Reclaimed Water Connection
Fees: Meter Size 4" -Displacement
Major Facility Fee -Potable and Reclaimed Water Connection
Fees: Meter Size 4" -Turbo
Major Facility Fee -Potable and Reclaimed Water Connection
Fees: Meter Size 5/8" -Displacement
Major Facility Fee -Potable and Reclaimed Water Connection
Fees: Meter Size 6" -Displacement
Major Facility Fee -Potable and Reclaimed Water Connection
Fees: Meter Size 6" -Turbo
Major Facility Fee -Potable and Reclaimed Water Connection
Fees: Meter Size 8" -Displacement
Major Facility Fee -Potable and Reclaimed Water Connection
Fees: Meter Size 8" -Turbo
Sewer Benefit Area Fee -Area A
Sewer Benefit Area Fee -Area B
Sewer Benefit Area Fee -Area C
Sewer Benefit Area Fee -Area D
Sewer Benefit Area Fee -Area E
Sewer Benefit Area Fee -Area F
16
FY 2015-16 FEE FY 2016-17 FEE
$10,056 $10,217
$2,321 $2,358
$4,473 $4,545
$9,763 $9,920
$2,253 $2,289
$3,187 $3,238
$9,257 $9,405
$2,136 $2,170
$3,494 $3,550
$8,852 $9,029
$16,721 $17,055
$19,630 $20,022
$25,182 $25,686
$31,475 $32,105
$44,264 $45,149
$68,855 $70,232
$5,609 $5,721
$68,855 $70,232
$196,729 $200,664
$3,934 $4,013
$127,873 $130,430
$393,451 $401,320
$151,137 $154,160
$551,020 $562,040
$1,074 $1,103
$1,222 $1,255
$2,252 $2,313
$2,257 $2,318
$3,329 $3,418
$3,347 $3,437
Item No. 15 - AB #22,337 June 28, 2016 Page 105 of 179
FEE CATEGORY
Sewer Benefit Area Fees
Sewer Benefit Area Fees
Sewer Benefit Area Fees
Sewer Benefit Area Fees
Sewer Benefit Area Fees
Sewer Benefit Area Fees
Sewer Benefit Area Fees
Traffic Impact Fees
Traffic Impact Fees
Traffic Impact Fees
Traffic Impact Fees
Traffic Impact Fees
Traffic Impact Fees
Traffic Impact Fees
Traffic Impact Fees
City of Carlsbad
Master Fee Schedule 2016-17
Development Impact Fees
FEE DESCRIPTION
Sewer Benefit Area Fee -Area G
Sewer Benefit Area Fee -Area H
Sewer Benefit Area Fee -Area J
Sewer Benefit Area Fee -Area K
Sewer Benefit Area Fee -Area L
Sewer Benefit Area Fee -Area M
Sewer Connection (General Capacity all areas plus Sewer Benefit
Area Fees}
Traffic Impact Fee -Apartment (Inside of CFD 1} per ADT
Traffic Impact Fee -Apartment (Outside of CFD 1} per ADT
Traffic Impact Fee -Commercial/Industrial Cost Per Trip (Inside
CFD}
Traffic Impact Fee -Commercial/Industrial Cost Per Trip (Out of
CFD}
Traffic Impact Fee -Condominium (Inside of CFD 1} per ADT
Traffic Impact Fee -Condominium (Outside of CFD 1} per ADT
Traffic Impact Fee -Single Family (Inside of CFD 1} per ADT
Traffic Impact Fee -Single Family (Outside of CFD 1} per ADT
17
FY 2015-16 FEE FY 2016-17 FEE
$675 $693
$982 $1,008
$1,852 $1,902
$1,464 $1,504
$1,464 $1,504
$72 $74
$881 $899
$269 $274
$316 $323
$107 $109
$126 $129
$269 $274
$316 $323
$269 $274
$316 $323
Item No. 15 - AB #22,337 June 28, 2016 Page 106 of 179
CITY OF CARLSBAD
MASTER FEE SCHEDULE
SECTION 4
DEPOSITS AND SECURITIES
June 2016
Item No. 15 - AB #22,337 June 28, 2016 Page 107 of 179
FEE CATEGORY
Development Deposits
Development Deposits
Development Deposits
Development Deposits
Development Deposits
Development Deposits
City of Carlsbad
Master Fee Schedule 2016-17
Deposits and Securities
FEE DESCRIPTION
Grading & Erosion Control -Minor Grading Cash Deposit
(with grading plans}
Grading & Erosion Control -Grading Security (with approved
plans}
Grading & Erosion Control -Grading Cash Deposit
Development/Subdivision Improvements -Faithful
Performance Security
Development/Subdivision Improvements -Labor and
Materials Security
Development/Subdivision Improvements -Monumentation
Security
18
FY 2015-16 FEE FY 2016-17 FEE
$1,250 $1,250
Based on Grading Cost Based on Grading Cost
Estimate Estimate
10% of total grading 10% oftotal grading
security security
Based on Improvement Based on Improvement
cost estimate cost estimate
50% of Faithful 50% of Faithful
Performance Study Performance Study
Based on total cost of Based on total cost of
Monumentation Monumentation
Item No. 15 - AB #22,337 June 28, 2016 Page 108 of 179
Count FEE CATEGORY
1 Appeals
2 Appeals
3 Appeals
4 Development
5 Development
6 Development
7 Development
8 Development
9 Development
10 Development
11 Development
12 Develooment
13 Development
14 Development
15 Development
16 Development
17 Development
18 Development
19 Development
20 Development
21 Development
22 Development
23 Development
24 Development
25 Development
26 Development
FEE DESCRIPTION
Appeal -City Council(+ noticing costs) -fee is refundable if appeal is won
City of Carlsbad
CED Removed Fees
FY 2016-17
Appeal -Planning Commission(+ noticing costs) fee is refundable if appeal is won
Appeal City Council -Miscellaneous
Coastal Development Permit -SCCRA
Coastal Development Permit (CDP) -Village Review Area -Major & Minor RP's
SCCRA Permit (Minor)
SCCRA Permit Amendment (Admin.)
SCCRA Permit Amendment (Minor)
SCCRA Permit Appeal -City Council
SCCRA Permit Aooeal -Planning
SCCRA Permit Extension (Major)
SCCRA Permit Extension (Minor)
SCCRA Permit Variance (Minor or Major)
SCCRA Permit Variance Administrative
SCCRA Sidewalk Sign/Outdoor Display
SCCRA Sign Program
SCCRA Sign Program Amendment
Village Area Noticing Fee (Minor)-plus postage
Village Area Permit Amendment (Minor) -plus noticing costs
Village Area Review (Major) -plus noticing costs
Village Area Review (Minor) -plus noticing costs
Village Area Sign Program
Village Area Sign Program Amendment
Village Review Permit (Admin.)
Village Review Permit Extension (Major) -plus noticing costs
Village Review Permit Extension (Minor)-plus noticing costs
FY 2015-16 FEE
$1,097
$673
$165
$427
$663
$1,606
$145
$622
$623
$564
$276
$237
$415
$142
$60
$126
$82
$217
$591
$3,015
$1,645
$297
$72
$442
$701
$603
Removal reason
Appeals, amendments, and extensions are being consolidated and simplified based
on a fee study by NBS.
Appeals, amendments, and extensions are being consolidated and simplified based
on a fee study by NBS.
Appeals, amendments, and extensions are being consolidated and simplified based
on a fee study by NBS.
Fees by area in SSCRA and Village consolidated to have uniform fee amounts across
city.
Fees by area in SSCRA and Village consolidated to have uniform fee amounts across
city.
Fees by area in SSCRA and Village consolidated to have uniform fee amounts across
city.
Fees by area in SSCRA and Village consolidated to have uniform fee amounts across
city.
Fees by area in SSCRA and Village consolidated to have uniform fee amounts across
citv.
Fees by area In SSCRA and Village consolidated to have uniform fee amounts across
city.
Fees by area in SSCRA and Village consolidated to have uniform fee amounts across
city.
Fees by area in SSCRA and Village consolidated to have uniform fee amounts across
city.
Fees by area in SSCRA and Village consolidated to have uniform fee amounts across
citv.
Fees by area in SSCRA and Village consolidated to have uniform fee amounts across
city.
Fees by area in SSCRA and Village consolidated to have uniform fee amounts across
city.
Fees by area in SSCRA and Village consolidated to have uniform fee amounts across
city.
Fees by area in SSCRA and Village consolidated to have uniform fee amounts across
city.
Fees by area in SSCRA and Village consolidated to have uniform fee amounts across
city.
Fees by area in SSCRA and Village consolidated to have uniform fee amounts across
city.
Fees by area in SSCRA and Village consolidated to have uniform fee amounts across
city.
Fees by area in SSCRA and Village consolidated to have uniform fee amounts across
city.
Fees by area in SSCRA and Village consolidated to have uniform fee amounts across
city.
Fees by area in SSCRA and Village consolidated to have uniform fee amounts across
city.
Fees by area in SSCRA and Village consolidated to have uniform fee amounts across
city.
Fees by area in SSCRA and Village consolidated to have uniform fee amounts across
city.
Fees by area in SSCRA and Village consolidated to have uniform fee amounts across
city.
Fees by area in SSCRA and Village consolidated to have uniform fee amounts across
city.
m X ::t:
CJ
=i
-..J I
CJ
Item No. 15 - AB #22,337 June 28, 2016 Page 109 of 179
Count FEE CATEGORY
27 Development
Development
28 Processing
Development
29 Processing
Development
30 Processing
Development
31 Processing
Development
32 Processing
Development
33 Processing
Development
34 Processing
Development
35 Processing
Development
36 Processing
Development
37 Processing
Development
38 Processing
Development
39 Processing
Development
40 Processing
Development
41 Processing
Development
42 Processing
Development
43 Processing
Development
44 Processing
Development
45 Processing
Development
46 Processing
Development
47 Processing
Development
48 Processing
Development
49 Processing
Development
50 Processing
Development
51 Processing
Development
52 Processing
City of Carlsbad
CED Removed Fees
FY2016-17
FEE DESCRIPTION FY 2015-16 FEE
Village Review Permit Noticing Fee (Major) -plus postage $407
Alley parking $552
Any permit amendment not specifically identified 50% of original cost
Bond Search $32.92
Campaign Sign Permit $60.36
50% Current Permit
Coastal Development Permit (CDP) -Amendment Cost
25% Current Permit
Coastal Development Permit (CDP) -Extensions Cost
Conditional Use Permit -Extension 50% of original fee
Conditional Use Permit (CUP) -Amendment $2,458
Conditional Use Permit {CUP) -Extension -Regular $922
Duplicate Tracing Fees -Final Parcel Maps -per sheet(+ $32 per sheet) $23
Grading Permit Extension Fee 25% permit fee
Habitat Management Plan Permit Amendment -Major -amendment for properties with
no on-site habitat to be preserved 75% Original fee
Habitat Management Plan Permit Amendment -Minor -no on-site habitat to be
preserved 75% Original Fee
Habitat Management Plan Permit Amendment -Single Family 75% Original Fee
Hillside Development Permit Amendment -Minor $720
Hillside Development Permit Amendment -Other (Multiple Lots) $2,194
Hillside Development Permit Extension 25% of original fee
Hillside Development Permit Extension -Other (Multiple Lots) 25% of original fee
Major Site Development Plan -Non Residential -Extension 25% of original fee
Minor Conditional Use Permit-Amendment $582
Permit Amendment -plus noticing costs $1,476.41
Permit Amendment (Adm in) $177.17
Permit Appeal -City Council(+ noticing costs) fee is refundable if appeal is won $685.05
Permit Appeal -Planning Commission(+ noticing costs) fee is refundable if appeal is won $685.05
Permit Variance -Administrative $191.23
Removal reason
Fees by area in SSCRA and Village consolidated to have uniform fee amounts across
city.
This is a police fee, not CED. It is also listed in Police.
Appeals, amendments, and extensions are being consolidated and simplified based
on a fee study by NBS.
Per NBS study, eliminated as part of fee consolidation effort due to no longer being
used.
Being consolidated with other sign permits.
Appeals, amendments, and extensions are being consolidated and simplified based
on a fee study by NBS.
Appeals, amendments, and extensions are being consolidated and simplified based
on a fee studv bv NBS.
Appeals, amendments, and extensions are being consolidated and simplified based
on a fee study by NBS.
Appeals, amendments, and extensions are being consolidated and simplified based
on a fee study by NBS.
Appeals, amendments, and extensions are being consolidated and simplified based
on a fee study bv NBS.
Appeals, amendments, and extensions are being consolidated and simplified based
on a fee study by NBS.
Appeals, amendments, and extensions are being consolidated and simplified based
on a fee study by NBS.
Appeals, amendments, and extensions are being consolidated and simplified based
on a fee study by NBS.
Appeals, amendments, and extensions are being consolidated and simplified based
on a fee studv bv NBS.
Appeals, amendments, and extensions are being consolidated and simplified based
on a fee studv bv NBS.
Appeals, amendments, and extensions are being consolidated and simplified based
o.n a fee study by NBS.
Appeals, amendments, and extensions are being consolidated and simplified based
on a fee study by NBS.
Appeals, amendments, and extensions are being consolidated and simplified based
on a fee study by NBS.
Appeals, amendments, and extensions are being consolidated and simplified based
on a fee study by NBS.
Appeals, amendments, and extensions are being consolidated and simplified based
on a fee study by NBS.
Appeals, amendments, and extensions are being consolidated and simplified based
on a fee study by NBS.
All Permit fees are being consolidated and simplified based on fee study by NBS.
All Permit fees are being consolidated and simplified based on fee study by NBS.
All Permit fees are being consolidated and simplified based on fee studv by NBS.
All Permit fees are being consolidated and simplified based on fee study by NBS.
All Permit fees are being consolidated and simplified based on fee study by NBS.
Item No. 15 - AB #22,337 June 28, 2016 Page 110 of 179
Count FEE CA TE GORY
Development
53 Processing
Development
54 Processing
Development
55 Processing
Development
56 Processing
Development
57 Processing
Development
58 Processing
Development
59 Processing
Development
60 Processing
Development
61 Processing
Development
62 Processing
Development
63 Processing
Development
64 Processing
Development
65 Processing
Development
66 Processing
Development
67 Processing
Development
68 Processing
Development
69 Processing
Development
70 Processing
Development
71 Processing
Development
72 Processing
FEE DESCRIPTION
Permit Variance (Minor or Major)
Planned Development -51 or more I Major Subdivision (Note 9)
Planned Development -Non Residential Extension -All
Planned Development -Non-Residential -Major I 5 to SO (Note 9)
Planned Development -Non-Residential -Major I 51 or more (Note 9)
Planned Develooment -Residential -Amendment Extension -All
Planned Develooment -Residential -Extension -All
Planned Development Amendment -Non Residential -Extension -All
Oty of Carlsbad
CED Removed Fees
FY 2016-17
Planned Development Amendment -Non-Residential -Major I 5 to 50 (Note 9)
Planned Development Amendment-Non-Residential -Major I 51 or more (Note 9)
Planned Development Amendment-Non-Residential -Minor I 4 or less (Note 9)
Planned Development Residential -4 or less I Minor Subdivision (Note 9)
Planned Development Residential Amendment -4 or less I Minor Subdivision (Note 9)
Planned Develooment Residential Amendment -5 to 50 I Major Subdivision (Note 9)
Planned Develooment Residential. Amendment -51 or more/ Major Subdivision (Note 9)
Planning Commission Discussion Item
Precise Development Plan -Amendment
Preliminary Review -Redevelopment -Major -
Preliminary Review -Redevelopment -Minor
Sign Program Amendment
FY 2015-16 FEE Removal reason
$427.46 All Permit fees are being consolidated and simplified based on fee study by NBS.
· $13,453.59 Removed as a result of NBS fee study.
Remove residential vs. non-residential categories as a fee simplification effort.
Appeals, amendments, and extensions are being consolidated and simplified based
25% of original fee on a fee study by NBS.
Remove residential vs. non-residential categories as a fee simplification effort.
Appeals, amendments, and extensions are being consolidated and simplified based
$8,515 on a fee study by NBS.
Remove residential vs. non-residential categories as a fee simplification effort.
Appeals, amendments, and extensions are being consolidated and simplified based
$13,454 on a fee study by NBS.
Remove residential vs. non-residential categories as a fee simplification effort.
Appeals, amendments, and extensions are being consolidated and simplified based
25% of original fee on a fee study by NBS.
Remove residential vs. non-residential categories as a fee simplification effort.
Appeals, amendments, and extensions are being consolidated and simplified based
25% of original fee on a fee study by NBS.
Remove residential vs. non-residential categories as a fee simplification effort.
Appeals, amendments, and extensions are being consolidated and simplified based
25% of original fee on a fee study by NBS.
Remove residential vs. non-residential categories as a fee simplification effort.
Appeals, amendments, and extensions are being consolidated and simplified based
$6,766.16 on a fee study by NBS.
Remove residential vs. non-residential categories as a fee simplification effort.
Appeals, amendments, and extensions are being consolidated and slmpllfled based
$9,162.16 on a fee study by NBS.
Remove residential vs. non-residential categories as a fee simplification effort.
Appeals, amendments, and extensions are being consolidated and simplified based
$1,878.55 on a fee studv by NBS.
Remove residential vs. non-residential categories as a fee simplification effort.
Appeals, amendments, and extensions are being consolidated and simplified based
$3,070.93 on a fee study by NBS.
Remove residential vs. non-residential categories as a fee simplification effort.
Appeals, amendments, and extensions are being consolidated and simplified based
$1,653.58 on a fee study bv NBS.
Remove residential vs. non-residential categories as a fee simplification effort.
Appeals, amendme11ts, and extensions are being consolidated and simplified based
$6,307.21 on a fee study by NBS.
Remove residential vs. non-residential categories as a fee simplification effort.
Appeals, amendments, and extensions are being consolidated and simplified based
$8,504.11 on a fee study by NBS.
Appeals, amendments, and extensions are being consolidated and simplified based
$674.93 on a fee study by NBS.
Appeals, amendments, and extensions are being consolidated and simplified based
$4,218.31 on a fee studv by NBS.
Fees by area ln SSCRA and Village consolidated to have uniform fee amounts across
$359.73 city.
Fees by area in SSCRA and Village consolidated to have uniform fee amounts across
$202.61 city.
Appeals, amendments, and extensions are being consolidated and simplified based
$646.81 on a fee study by NBS.
Item No. 15 - AB #22,337 June 28, 2016 Page 111 of 179
Count FEE CATEGORY
Development
73 Processing
Development
74 Processing
Development
75 Processing
Development
76 Processing
Development
77 Processing
Development
78 Processing
Development
79 Processing
Development
80 Processing
Development
81 Processing
Development
82 Processing
Development
83 Processing
Development
84 Processing
Development
85 Processing
Development
86 Processing
Development
87 Processing
Electrical &
88 Mechanical Permits
Electrical &
89 Mechanical Permits
Electrical &
90 Mechanical Permits
Electrical &
91 Mechanical Permits
Electrical &
92 Mechanical Permits
Electrical &
93 Mechanical Permits
Electrical &
94 Mechanical Permits
FEE DESCRIPTION
Site Development Plan Amendment -Major
Site Development Plan Amendment -Minor
Site Development Plan Extension -Minor
Special Use Permit -Scenic Corridor
Special Use Permit -Extension
Special Use Permit -Flood Plain
Special Use Permit -Flood Plain, Coastal High Hazard Area
City of Carlsbad
CED Removed Fees
FY 2016-17
Substantial Conformance Exhibit Review (For Planning -see consistencv determination)
Tentative Map Revision -5 -49 Units/ Lots -base fee + $40 per Jot I unit over 5,
whichever is greater
Tentative Map Revision -50+ Units I Lots -base fee + $15 each per Jot /unit over 49,
whichever is greater
Tentative Parcel Map -1 year extension, per application
Tentative Tract Map Extension -5 to 49
Variance -Administrative (Planning) Recreational Vehicle Ad min. Variance
Variance -Engineering
Zoning Compliance Letter
Boiler/Compressor to 15 HP (each)
Exhaust Fan (each)
Fireplace (each)
Furnace, Ducts, Heat Pumps (each)
Hood (each)
Install/relocate vent (each)
New construction for each ampere of main service, switch, fuse or breaker -Per ampere,
480 three-phase
FY 2015-16 FEE Removal reason
Consolidate all special use permit types into one category as an effort to simplify
$7,817.93 fees, as result of NBS fee study.
Consolidate all special use permit types into one category as an effort to simplify
$3,037.18 fees, as result of NBS fee study.
Consolidate all special use permit types into one category as an effort to simplify
25% of original fee fees, as result of NBS fee study.
Consolidate all special use permit types into one category as an effort to simplify
$3,554.63 fees, as result of NBS fee study.
Consolidate all special use permit types into one category as an effort to simplify
25% of original fee fees, as result of NBS fee study.
Consolidate all special use permit types into one category as an effort to simplify
$3,937.09 fees, as result of NBS fee study.
Consolidate all special use permit types into one category as an effort to simplify
$2,845.95 fees, as result of NBS fee study.
Appeals, amendments, and extensions are being consolidated and simplified based
$1,029.27 on a fee study by NBS.
Appeals, amendments, and extensions are being consolidated and simplified based
$4,190.18 on a fee study by NBS.
Appeals, amendments, and extensions are being consolidated and simplified based
$7,750.44 on a fee study by NBS.
Appeals, amendments, and extensions are being consolidated and simplified based
$1,501.72 on a fee study by NBS.
Appeals, amendments, and extensions are being consolidated and simplified based
$2,941.57 on a fee study by NBS.
Appeals, amendments, and extensions are being consolidated and simplified based
$767.17 on a fee study by NBS.
Appeals, amendments, and extensions are being consolidated and simplified based
$764.92 on a fee study by NBS.
Appeals, amendments, and extensions are being consolidated and simplified based
$84.37 on a fee study by NBS.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$17.91 valuation for the overall building permit, as a result of NBS fee studv.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$7.06 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$7.06 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$9.77 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$7.06 valuation for the overall building permit, as a result of NBS fee studv.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$4.88 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$1.09 valuation for the overall building permit, as a result of NBS fee study.
Item No. 15 - AB #22,337 June 28, 2016 Page 112 of 179
Count FEE CATEGORY
Electrical &
95 Mechanical Permits
Electrical &
96 Mechanical Permits
Electrical &
97 Mechanical Permits
Electrical &
98 Mechanical Permits
Electrical &
99 Mechanical Permits
Electrical &
100 Mechanical Permits
Electrical &
101 Mechanical Permits
Electrica I &
102 Mechanical Permits
Electrical &
103 Mechanical Permits
Electrical &
104 Mechanical Permits
Electrical &
105 Mechanical Permits
Electrical &
106 Mechanical Permits
Plumbing Permit and
107 Inspection Fees
Plumbing Permit and
108 Inspection Fees
Plumbing Permit and
109 Inspection Fees
Plumbing Permit and
110 Inspection Fees
Plumbing Permit and
111 Inspection Fees
FEE DESCRIPTION
City of Carlsbad
CED Removed Fees
FY 2016-17
New construction for each ampere of main service, switch, fuse or breaker -Per ampere,
single phase
New construction for each ampere of main service, switch, fuse or breaker -Per ampere,
three phase
Remodel, alteration, no change in service -Or minimum
Remodel, alteration, no change in service -Per ampere
Service upgrade on existing building -For each ampere or increase in main service, switch,
fuse or breaker-Per ampere, 480 three-phase
Service upgrade on existing building -For each ampere or increase in main service, switch,
fuse or breaker -Per ampere, single phase
Service upgrade on existing building-For each ampere or increase in main service, switch,
fuse or breaker -Per ampere, three-phase
Temporarv service over 200 amperes -plus $10.00 per each 100 amperes over 200
Temporarv service up to and including 200 amperes
Test Meter
Individual Electrical Permit
Individual Mechanical Permit
Additional plan review required by changes, additions or revisions to approved plans,
(minimum charge -one half hour)
For atmospheric-type vacuum breakers not included in above item: 1 to 5
For atmospheric-type vacuum breakers not included in above item: Over 5, each
For each additional gas-piping system outlet, per outlet
For each backflow protective device other than atmospheric type vacuum breakers: 2
inch diameter and smaller
FY 2015-16 FEE Removal reason
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$0.27 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plum bing, mechanical and electrical fees based on
$0.54 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$5.43 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$0.27 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$1.09 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$0.27 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrlcal fees based on
$0.54 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$10.86 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$10.86 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$27.14 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$162.83 valuation for the overall building permit, as a result of NBS fee studv.
Fee simplification consolidated plumblng, mechanical and electrical fees based on
$162.83 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$32.57 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$5.43 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$1.09 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$1.09 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$7.60 valuation for the overall building permit, as a result of NBS fee study.
Item No. 15 - AB #22,337 June 28, 2016 Page 113 of 179
Count FEE CATEGORY
Plumbing Permit and
112 Inspection Fees
Plumbing Permit and
113 Inspection Fees
Plumbing Permit.and
114 Inspection Fees
Plumbing Permit and
115 Inspection Fees
Plumbing Permit and
116 Inspection Fees
Plumbing Permit and
117 Inspection Fees
Plumbing Permit and
118 Inspection Fees
Plumbing Permit and
119 Inspection Fees
Plumbing Permit and
120 Inspection Fees
Plumbing Permit and
121 Inspection Fees
Plumbing Permit and
122 Inspection Fees
Plumbing Permit and
123 Inspection Fees
Plumbing Permit and
124 Inspection Fees
Plumbing Permit and
125 Inspection Fees
Plumbing Permit and
126 Inspection Fees
Plumbing Permit and
127 Inspection Fees
FEE DESCRIPTION
City of Carlsbad
CED Removed Fees
FY 2016-17
For each backflow protective device other than atmospheric type vacuum breakers: Over
2 inch diameter
For each building sewer antj each trailer park sewer
For each cesspool (where permitted)
For each gas-piping system one to five outlets
For each industrial waste pretreatment interceptor including its trap and vent, excepting
kitchen-type grease interceptors functioning as fixture traps
For each installation, alteration or repair of water piping and/or water treating
equipment, each
For each lawn sprinkler system on any one meter including backflow protection devices
therefore
For each plumbing fixture on one trap or a set of fixtures on one trap {including water,
drainage piping and backflow protection therefore)
For each private sewage discosal svstem
For each repair or alteration of drainage or vent piping, each fixture
For each water heater and/or vent
Individual Plumbing Permit
Inspections for which no fee is scecifically indicated
Inspections outside of normal business hours
Rainwater systems -per drain (inside building)
Re-inspection Fee
FY 2015-16 FEE Removal reason
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$16.28 valuation for the overall building permit, as a result of NBS fee studv.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$16.28 valuation for the overall building permit, as a result of NBS fee studv.
.Fee simplification consolidated plumbing, mechanical and electrical fees based on
$27.14 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$5.43 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$7.60 valuation for the overall building permit, as a result of NBS fee studv.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$7.60 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$7.60 valuation for the overall building permit, as a result of NBS fee studv.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$7.60 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$43.42 valuation for the overall building permit, as a result of NBS fee studv.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$7.60 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$7.60 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$162.83 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$32.57 valuation for the overall building permit, as a result of NBS fee studY.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$32.57 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$7.60 valuation for the overall building permit, as a result of NBS fee study.
Fee simplification consolidated plumbing, mechanical and electrical fees based on
$32.57 valuation for the overall building cermit, as a result of NBS fee study.