HomeMy WebLinkAbout2018-06-12; City Council; Resolution 2018-096RESOLUTION NO. 2018-096
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
CALIFORNIA, ADOPTING CHANGES TO THE MASTER FEE SCHEDULE.
EXHIBIT 8
WHEREAS, the City Council of the City of Carlsbad has the authority to establish fees
for City services; and
WHEREAS, from time-to-time said fees are reviewed and evaluated to maintain an
adequate fee structure recovering costs for City services; and
WHEREAS, the City Council has determined the cost of providing general and
development-related services; and
WHEREAS, the City Council believes it is necessary for the City Manager to have the
authority to adjust the parks and recreation and library and arts program and classes fees from time
to time to remain competitive and within the market pricing for like programs and classes; and
WHEREAS, the City Council finds it necessary to recover the costs for City services; and
WHEREAS, the City Council has held the necessary public hearing and allowed for
public comment on the establishment of said fees.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad,
California, as follows:
1. That the above recitations are true and correct.
2. That the changes to the Master Fee Schedule are for the fees shown in Exhibit
8-A and attached hereto, and as amended by determinations of the City Council at its meeting of
Tuesday, June 12, 2018, as set forth in the minutes of that meeting, and as memorialized by
subsequent resolution of the City Council.
3. The City Council hereby authorizes the City Manager or his/her designee to set
parks and recreation and library and cultural arts program, rental, and class fees that are included in
June 12, 2018 Item #13 Page 89 of 147
the Community Services Guide. The fee shall not exceed the fully burdened (direct and indirect) costs
of providing the program, rental, and class but shall be no less (except in the case of introductory,
discount or promotional pricing) than the lowest fee charged for like kind programs or classes in
similarly benchmarked Southern California cities.
• 4. The City Council hereby authorizes the City Manager or his/her designee to
change parking violation fees at the time, and by the same amount, as the state changes their portion
of the fee. Any changes to these fees will be made to the current Master Fee Schedule.
5. This resolution shall become effective on September 1, 2018; not sooner than
60 days after adoption in accordance with Government Code 66017, for the Development-related
service fees and Development impact fees.
PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the Carlsbad City
Council, Carlsbad Municipal Water District Board of Directors, Carlsbad Public Financing Authority
Board of Directors, Community Development Commission, and City of Carlsbad as Successor Agency
to the Redevelopment Agency, held on the 12th day of June, 2018, by the following vote to wit:
AYES:
NOES:
ABSENT:
M. Hall, K. Blackburn, M. Schumacher, C. Schumacher.
None.
M. Packard.
(SEAL)
June 12, 2018 Item #13 Page 90 of 147
EXHIBITS-A
Section 1
General City Service Fees
Page 1
June 12, 2018 Item #13 Page 92 of 147
Category
City Clerk
City Clerk
City Clerk
City Clerk
City Clerk
City Clerk
City Clerk
City Clerk
City Clerk
City Clerk
Misc. Fees
Misc. Fees
Misc. Fees
Misc. Fees
Misc. Fees
Misc. Fees
Misc. Fees
Misc. Fees
Misc. Fees
Misc. Fees
Misc. Fees
Fire
Fire
Fire
Fire
Fire
Fire
Fire
Fire
Fire I Ambulance
Fire I Ambulance
Fire I Ambulance
Fire I Ambulance
Fire I Ambulance
Fire/ Ambulance
Fire I Ambulance
Fire I Ambulance
Fire I Ambulance
Fire I Ambulance
Fire/ Ambulance
Fire I Ambulance
Fire I Ambulance
Library
Library
Library
Library
Library
City of Carlsbad
Master Fee Schedule 2018-19
General City Service Fees
Fee Description
Blueprinting of Standard Size (24" x 36") Improvement Plan Sheet (cost for each)
Campaign Statements (per page), set by California Fair Political Practices Commission
(FPPC)
City Clerk -CD Copy
City Clerk -Certification Charge (per document)
Conflict of Interest Statement (per page), set by California Fair Political Practices
Commission (FPPC)
Copies -Black & White (each)
Copies -Color (each)
Deposition Subpoena
DVD Copy, including Council Meeting on DVD
Records Subpoena
Administrative Fee for 1915 Act Bond Call -1% of principal being repaid
(For all Assessment Districts using 1915 Act Bonds)
Business License -additional fee, per license, per State of California SB1186. The business
license tax per license is a separate charge and is per Municipal Code 5.08.
Business License -master list of active business licenses
Business License -monthly list of new licenses
Cable Channel Administration Fee
Electric Vehicle Charging Fee
GIS -digital data delivery, production of new documents, reproduction of existing
documents, and technical services (per hour+ overhead)
Hearing Disposition Services for Parking Citations -Personal Hearings
Hearing Disposition Services for Parking Citations -Written Review
Publications -As Determined by the City Manager
Returned Check Fee
Bicycle Licenses
Bicycle Licenses -Replacement or Transfer
Fire Nuisance Alarm -1st response in 12 month period
Fire Nuisance Alarm -2nd response in 12 month period
Fire Nuisance Alarm -3rd response in 12 month period
Fire Nuisance Alarm -each additional response thereafter
Fire Nuisance Alarm -each billing
Special Event -per fire personnel per hour (consistent with city payroll records)
Ambulance Fee -Advanced Life Support 1-Assessment/Non-Transport with medication
Given. No charge for assessment non-transport if no medication given.
Ambulance Fee -Advanced Life Support 1-Non-Resident-plus Level I or Level II supplies
and medications
Ambulance Fee -Advanced Life Support 1-Resident -plus Level I or Level II supplies and
medications
Ambulance Fee -Advanced Life Support 2 -Non-Resident -plus Level II supplies and
medications
Ambulance Fee -Advanced Life Support 2 -Resident -plus Level II supplies and
medications
Ambulance Fee -Mileage Charge -per mile
Ambulance Fee -Oxygen Charge
Ambulance Fee BLS -Base Rate -Non-Resident
Ambulance Fee BLS -Base Rate -Resident
Ambulance Transport-Community Paramedicine ALS -Resident -plus Level I or Level II
supplies and medications
Ambulance Transport-Community Paramedicine BLS -Resident
Ambulance Transport including Community Paramedicine -Level I supplies and
medications
Ambulance Transport including Community Paramedicine -Level II supplies and
medications
Carlsbad History Collection Photo Fee -vendor cost of printing historical photos
Library Account Collection Fee
Library Borrowing -Audio Visual Equipment (per item, per day)
Library Borrowing -Audio Visual Insurance fee (per DVD/Video Game)
Library Borrowing -Mobile Device Loan Late Fee (per item, per hour)
Page 2
EXHIBITS-A
2017-18 Fee 2018-19 Fee
$5 $5
$0.10 $0.10
$3 $3
$23 $24
$0.10 $0.10
$0.20 $0.20
$1 $1
$275 $275
$9 $9
$15 $15
$50 min/$500 max $50 min/$500 max
New Fee $4
$36 $37
$6 $6
$110/Hour $110/Hour
$0.35 / kWh $0.35 / kWh
Actual Cost Actual Cost
$0 $0
$0 $0
Determined by City Determined by City
Manager Manager
$37 $38
$3 $3
$1 $1
$0 $0
$86 $89
$172 $177
$338 $348
$11 $12
Actual Cost Actual Cost
$204 $206
$1,171 $1,184
$1,171 $1,184
$1,374 $1,389
$1,273 $1,287
$23 $24
$76 $77
$955 $966
$955 $966
$1,171 $1,184
$955 $966
$127 $129
$255 $257
Actual Cost Actual Cost
$10 $10
$5 $5
$1 $1
$5 $5
June 12, 2018 Item #13 Page 93 of 147
Category
Library
Library
Library
Library
Library
Library
Library
Library
Library
Library
Library
Library
Library
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Parking Violations
Police Fees
Police Fees
Police Fees
City of Carlsbad
Master Fee Schedule 2018-19
General City Service Fees
Fee Description
Library Card Replacement
Library Copies/Print-Black & White (each)
Library Copies/Print-Color (each)
Library Hold Request Non-Pickup Fee (per item)
Library Interlibrary Loan
Library Lost/Damaged -DVD/Video Game
Library Lost/Damaged -Library Materials
Library Lost/Damaged Item -beyond repair, book/audio item
Library Lost/Damaged Item -processing fee
Library Overdue Fines -DVD/ Video Game (per day, per item)
Library Overdue Fines -Juvenile Material (per day, per item)
Library Overdue Fines (per day, per item)
Refund Check Processing Fee (Customer Initiated)
22SOO(a) -In intersection
22SOO(b) -In cross walk
22SOO(c) -Red curb
22SOO(d) -Fire station driveway
22500(e) -Driveway
22SOO(f) -Sidewalk
22SOO(g) -Obstructing traffic
22SOO(h) -Double parking
22SOO(i) -Bus zone
225000) -Tube or tunnel
22SOO(k) -Bridge
22500(1) -Blocking Disabled
22500.1-Fire lane
22502 -18" from curb/wrong way
22507(a) -Oversize Vehicle
22507.8 -Disable space/block access
22514 -Fire hydrant
22515 -Unattended vehicle
22516 -Locked vehicle/passenger inside
22517 -Open/close door in traffic
22520 -Stopping on freeway
22520.5 -Vending from Hwy
22521 - > 7.5 ft. from RR tracks
22522 -3 ft. from handicap ramp
22526 -Blocking intersection
23226 -Store open container/pass comp
23333 -Stop/park in vehicle crossing
24003 -Vehicle with unlawful lighting device
24401 -Dimmed lights on parked vehicle
24604 -Lamp or flag on projections
24607 -Reflectors on rear
24608 -Reflectors on front and sides
25250 -Unlawful flashing lights
25251 -Flashing lights required
25300 -Warn device disabled, parked vehicle
26451 -Set parking brake
27155 -Fuel tank caps
4462(b) -Wrong vehicle registration
5200 -Plates front/back
5201-Position of plate
5204(a) -Tabs
72 hour parking
Alley parking
Commercial vehicle in residential area
Repair vehicle in street
Safety zone
Administrative Fee -DUI
Audio/Visual Copy
Burglary Alarm Response -Each Additional Occurrence. Per code section 8.50.080(e), Ord
NS-230 phl,2,1993; Ord -53 ph 3, 1989: Ord. 1278 ph 1 (part) 1985}
Page 3
EXHIBITS-A
2017-18 Fee 2018-19 Fee
$2 $2
$0.20 $0.20
$1 $1
$1 $1
$5 $5
20% of list price 20% of list price
Variable up to list Variable up to list
price price
List price+ $40 if out List price + $40 if out
of print of print
$5 $5
$1 $1
$0.10 $0.10
$0.25 $0.25
$20 $20
$38 $38
$38 $38
$38 $38
$38 $38
$38 $38
$38 $38
$38 $38
$38 $38
$260 $260
$38 $38
$38 $38
$320 $320
$50 $50
$38 $38
$SO $SO
$340 $340
$38 $38
$38 $38
$50 $50
$SO $50
$38 $38
$50 $50
$38 $38
$320 $320
$68 $68
$50 $50
$38 $38
$38 $38
$44 $44
$38 $38
$38 $38
$38 $38
$44 $44
$44 $44
$44 $44
$38 $38
$38 $38
$100 $100
$38 $38
$38 $38
$38 $38
$68 $68
$50 $50
$SO $50
$50 $SO
$50 $50
$20 $20
$46 $48
$60 $60
June 12, 2018 Item #13 Page 94 of 147
Category
Police Fees
Police Fees
Police Fees
Police Fees
Police Fees
Police Fees
Police Fees
Police Fees
Police Fees
Police Fees
Police Fees
Police Fees
Police Fees
Police Fees
Police Fees
Police Fees
Police Fees
Police Fees
Police Fees
Police Fees
Police Fees
Police Fees
Police Fees
Police Fees
Police Fees
Safety Training Center Facility
Rental
Safety Training Center Facility
Rental
Safety Training Center Facility
Rental
Safety Training Center Facility
Rental
Safety Training Center Facility
Rental
Safety Training Center Facility
Rental
Safety Training Center Facility
Rental
Safety Training Center Facility
Rental
Safety Training Center Facility
Rental
Safety Training Center Facility
Rental
Safety Training Center Facility
Rental
Safety Training Center Facility
Rental
Fee Description
City of Carlsbad
Master Fee Schedule 2018-19
General City Service Fees
Burglary Alarm Response -Second Occurrence (no charge for 1st response if permitted).
Per code section 8.50.080/e), Ord NS-230 phl,2,1993; Ord-53 ph 3, 1989: Ord.1278 ph 1
{part) 1985)
Copy Investigation Tapes (plus cost of duplicating the tape)
Dispatch Historical Searches (per month searched)
Entertainment License. Per code section 8.09.070.
False Robbery -Panic Alarm Response -Each Additional Occurrence. Per section
8.50.080/e), Ord NS-230 phl,2,1993; Ord-53 ph 3, 1989: Ord. 1278 ph 1 {part) 1985}
False Robbery -Panic Alarm Response -Second Occurrence (no charge for 1st response)
Per code section 8.50.080/e), Ord NS-230 phl,2,1993; Ord-53 ph 3, 1989: Ord.1278 ph 1
(part) 1985)
Fingerprinting Fees
Fix-It Ticket, moving violation, with proof of correction
Fix-It Ticket, parking I registration violation, with proof of correction
Handicap Placard Violation
Photograph Copy (fee+ reproduction costs) -Subpoena or Records requests that require
retrieval in QueTel evidence program. Photos/Video must be approved prior to release
for compliance with privacy laws.
Police/Fire-Emergency Response DUI Traffic Collision (max $12,000 per incident)
Production of body worn camera videos. Staff time per hour of production and redaction
of videos.
Proof of Correction Certification -all others
Proof of Correction Certification -Carlsbad Resident or person with CPD citation
Report Copy Fee (Free to Victim) plus cost of reproduction
Special Business Permit (plus fingerprint fee)
Special Event Application -Major (3 or more intersections)(fee + services rendered) *
Special Event Application -Minor (2 or less intersections)(fee + services rendered) •
Special Event Application -Third party Vendor Fee (2nd Day) *
Special Event Application -Third party Vendor Fee (each day thereafter) •
Special Event Application -Third party Vendor Fee (1st Day)*
Special Event City Services -Staff Time {See Carlsbad Municipal Code Section 8.17.070} •
EXHIBITS-A
2017-18 Fee 2018-19 Fee
$30 $30
$45 $46
$17 $18
$229 $236
$100 $100
$100 $100
$15 $20
$16 $16
$10 $10
Waived upon proof of Waived upon proof of
correction correction
$16 $16
Actual Cost Actual Cost
Actual Cost Actual Cost
$16 $20
$0 $0
$11 $10
$132 $136
$378 $390
$126 $130
$113 $117
$142 $146
$85 $88
Actual Cost Actual Cost
*Special Events: A valid, unexpired City of Carlsbad Business License is required for all special event Applicants. An amendment ta
8.17.070 CMC requires an Applicant to pay a non-refundable fee to allow third party vendors to participate under the Applicant's
business License.
Storage/Impounded Vehicle Administrative Charge $123 $125
Classroom -Full Day $528 $528
Classroom -Half Day $296 $296
Confined Space Prop -Full Day $500 $500
Confined Space Prop -Half Day $250 $250
Grinder-Full Day $418 $418
Grinder -Half Day $236 $236
Grinder/Commercial Prop (No Fire Ops) -Full Day $600 $600
Grinder/Commercial Prop (No Fire Ops) -Half Day $300 $300
Grinder/Residential Prop (No Fire Ops) -Full Day $600 $600
Grinder/Residential Prop (No Fire Ops) -Half Day $300 $300
One Shooting Range -Full Day $1,100 $1,100
One Shooting Range -Half Day $550 $550
Page 4
June 12, 2018 Item #13 Page 95 of 147
Category
Safety Training Center Facility
Rental
Safety Training Center Facility
Rental
Safety Training Center Facility
Rental
Safety Training Center Facility
Rental
Safety Training Center Facility
Rental
Safety Training Center Facility
Rental
Safety Training Center Facility
Rental
Safety Training Center Facility
Rental
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
City of Carlsbad
Master Fee Schedule 2018-19
General City Service Fees
Fee Description
PriSim (Training Simulator) -Full Day
PriSim (Training Simulator) -Half Day
Pump Draft Pit -Full Day
Pump Draft Pit -Half Day
Streetscape -Full Day
Streetscape -Half Day
Two Shooting Ranges -Full Day
Two Shooting Ranges -Half Day
Commercial Cart (1-96 gal trash, 1-96 gal recycling) -Extra pick-up per week (1-96 gal cart
-trash)
Commercial Cart (1-96 gal trash, 1-96 gal recycling) -One pick-up per week (1-96 gal cart -
trash)
Commercial Cart (1-96 gal trash, 1-96 gal recycling) -One pick-up per week (1-96 gal cart -
trash, 1-96 gal cart -recycling)
Commercial Cart (1-96 gal trash, 1-96 gal recycling) -Three pick-ups per week (1-96 gal
cart -trash)
Commercial Cart (1-96 gal trash, 1-96 gal recycling) -Three pick-ups per week (1-96 gal
cart -trash, 1-96 gal cart -recycling)
Commercial Cart (1-96 gal trash, 1-96 gal recycling) -Two pick-ups per week (1-96 gal cart
-trash)
Commercial Cart (1-96 gal trash, 1-96 gal recycling) -Two pick-ups per week (1-96 gal cart
-trash, 1-96 gal cart -recycling)
Commercial Compactor -3-yard bin -extra pick-up
Commercial Compactor -3-yard bin -five pick-ups per week
Commercial Compactor -3-yard bin -four pick-ups per week
Commercial Compactor -3-yard bin -one pick-up per week
Commercial Compactor -3-yard bin -six picks-up per week
Commercial Compactor -3-yard bin -three pick-ups per week
Commercial Compactor -3-yard bin -two pick-ups per week
Commercial Haul Bin Rate -3-yard bin -extra pick-up
Commercial Haul Bin Rate -3-yard bin -five pick-ups per week
Commercial Haul Bin Rate -3-yard bin -four pick-ups per week
Commercial Haul Bin Rate -3-yard bin -one pick-up per week
Commercial Haul Bin Rate -3-yard bin -six pick-ups per week
Commercial Haul Bin Rate -3-yard bin -three pick-ups per week
Commercial Haul Bin Rate -3-yard bin -two pick-ups per week
Commercial Recycling -3-yard bin -extra pick-up
Commercial Recycling -3-yard bin -five pick-ups per week
Commercial Recycling -3-yard bin -four pick-ups per week
Commercial Recycling -3-yard bin -one pick-up per week
Commercial Recycling -3-yard bin -seven pick-ups per week
Commercial Recycling -3-yard bin -six pick-ups per week
Commercial Recycling -3-yard bin -three pick-ups per week
Commercial Recycling -3-yard bin -two pick-ups per week
Commercial Recycling -4-yard bin -extra pick-up
Commercial Recycling -4-yard bin -five pick-ups per week
Commercial Recycling -4-yard bin -four pick-ups per week
Commercial Recycling -4-yard bin -one pick-up per week
Commercial Recycling -4-yard bin -seven pick-ups per week
Commercial Recycling -4-yard bin -six pick-ups per week
Commercial Recycling -4-yard bin -three pick-ups per week
Commercial Recycling -4-yard bin -two pick-ups per week
Commercial Recycling -96 gal cart -extra pick-up
Commercial Recycling -96 gal cart-one pick-up per week
Commercial Recycling -96 gal cart -three pick-ups per week
Commercial Recycling -96 gal cart -two pick-ups per week
Commercial Split Bin 3 Yard -Five pick-ups per week
Commercial Split Bin 3 Yard -Four pick-ups per week
Commercial Split Bin 3 Yard -One pick-up per week
Page 5
EXHIBITS-A
2017-18 Fee 2018-19 Fee
$500 $500
$250 $250
$400 $400
$200 $200
$145 $145
$100 $100
$1,250 $1,250
$650 $650
$10.53 $10.78
$22.37 $22.89
$46.91 $48.01
$67.12 $68.68
$119.00 $121.73
$44.75 $45.79
$82.96 $84.90
$61.99 $63.52
$684.82 $703.13
$551.73 $566.46
$152.46 $156.48
$817.93 $839.81
$418.65 $429.82
$285.58 $293.16
$43.03 $44.23
$428.92 $441.19
$354.65 $364.77
$131.83 $135.54
$503.19 $517.61
$280.37 $288.36
$206.11 $211.96
$36.17 $36.99
$289.10 $295.69
$242.20 $247.73
$78.76 $80.56
$404.48 $413.72
$346.70 $354.61
$187.73 $192.01
$133.25 $136.29
$36.77 $37.61
$293.74 $300.46
$246.10 $251.72
$80.04 $81.87
$410.98 $420.39
$352.27 $360.33
$190.75 $195.11
$135.40 $138.49
$8.09 $8.31
$17.66 $18.14
$52.98 $54.42
$35.32 $36.28
$377.96 $386.79
$305.45 $312.58
$87.88 $89.92
June 12, 2018 Item #13 Page 96 of 147
Category
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management/ Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
City of Carlsbad
Master Fee Schedule 2018-19
General City Service Fees
Fee Description
Commercial Split Bin 3 Yard -Six pick-ups per week
Commercial Split Bin 3 Yard -Three pick-ups per week
Commercial Split Bin 3 Yard -Two pick-ups per week
Commercial Yard Bins -2-yard bin -extra pick-up
Commercial Yard Bins -2-yard bin -five pick-ups per week
Commercial Yard Bins -2-yard bin -four pick-ups per week
Commercial Yard Bins -2-yard bin -one pick-up per week
Commercial Yard Bins -2-yard bin -six pick-ups per week
Commercial Yard Bins -2-yard bin -three pick-ups per week
Commercial Yard Bins -2-yard bin -two pick-ups per week
Commercial Yard Bins -3-yard bin -extra pick-up
Commercial Yard Bins -3-yard bin -five pick-ups per week
Commercial Yard Bins -3-yard bin -four pick-ups per week
Commercial Yard Bins -3-yard bin -one pick-up per week
Commercial Yard Bins -3-yard bin -six pick-ups per week
Commercial Yard Bins -3-yard bin -three pick-ups per week
Commercial Yard Bins -3-yard bin -two pick-ups per week
Commercial Yard Bins -4-yard bin -extra pick-up
Commercial Yard Bins -4-yard bin -five pick-ups per week
Commercial Yard Bins -4-yard bin -four pick-ups per week
Commercial Yard Bins -4-yard bin -one pick-up per week
Commercial Yard Bins -4-yard bin -six pick-ups per week
Commercial Yard Bins -4-yard bin -three pick-ups per week
Commercial Yard Bins -4-yard bin -two pick-ups per week
Commercial Yard Bins -5-yard bin -extra pick-up
Commercial Yard Bins -5-yard bin -five pick-ups per week
Commercial Yard Bins -5-yard bin -four pick-ups per week
Commercial Yard Bins -5-yard bin -one pick-up per week
Commercial Yard Bins -5-yard bin -six pick-ups per week
Commercial Yard Bins -5-yard bin -three pick-ups per week
Commercial Yard Bins -5-yard bin -two pick-ups per week
Commercial Yard Waste -3-yard bin -one pick-up per week
Commercial Yard Waste -3-yard bin -two pick-ups per week
Commercial Yard Waste -96 gal cart -extra pick up
Commercial Yard Waste -96 gal cart -one pick-up per week
Construction and Demolition Recycling -3-yard temporary C&D Recycling Bin
Construction ~nd Demolition Recycling -4-yard temporary C&D Recycling Bin
Construction and Demolition Recycling -Special Haul Bin (no Storm Water Fees) 1 week
or less
Other Fees and Charges -Bin Exchange
Other Fees and Charges -Bin Lock Set Up Fee
Other Fees and Charges -Bin paint charge fee -allowed 1 per year. After first paint
within one year, there will be a charge per paint request.
Other Fees and Charges -Bin that needs to be moved: 31 to 50 feet
Other Fees and Charges -Bin that needs to be moved: 5 to 30 feet
Other Fees and Charges -Bin that needs to be moved: Special haul bin delivery
Other Fees and Charges -Bin that needs to be moved: Additional 25 feet increments
Other Fees and Charges -Certified burial at Miramar plus special handling fee charged by
Miramar
Other Fees and Charges -Commercial Bin Customers Bulky Item requiring 2 people to
handle
Other Fees and Charges -Commercial Bin Customers Contamination Fee -to recover
costs for separating solid waste placed in a recycling or green waste container or for
arranging a special, unscheduled collection due to contamination.
Other Fees and Charges -Commercial Bin Customers Per Bulky Item -each additional
item
Other Fees and Charges -Commercial Bin Customers Per Bulky Item -first item
Other Fees and Charges -Commercial Bin Customers Scout service per bin per service
Other Fees and Charges -Commercial Return to Service Fee -The return to service fee for
two or more calls in a one-month period by a bin
Other Fees and Charges -Copy Fee -The charge for copies requested by customers
Page 6
EXHIBITS-A
2017-18 Fee 2018-19 Fee
$450.49 $461.02
$232.93 $238.37
$160.41 $164.15
$38.52 $39.41
$323.88 $331.59
$262.89 $269.15
$80.14 $82.03
$384.83 $393.99
$202.04 $206.83
$141.08 $144.42
$51.70 $52.89
$467.61 $478.76
$377.94 $386.94
$108.89 $111.47
$557.31 $570.60
$288.26 $295.12
$198.59 $203.31
$61.85 $63.28
$649.28 $664.73
$523.27 $535.71
$145.22 $148.66
$775.30 $793.75
$397.26 $406.71
$271.22 $277.66
$73.66 $73.66
$830.98 $850.73
$668.61 $684.50
$181.56 $185.85
$993.34 $1,016.95
$506.27 $518.29
$343.92 $352.08
$111.13 $113.76
$196.57 $201.27
$9.68 $9.91
$20.78 $21.27
$110.36 $113.49
$119.99 $123.43
$93.02 $95.58
$60.72 $62.10
$37.95 $38.81
$103.57 $106.38
$7.21 $7.38
$5.31 $5.44
$41.48 $42.60
$7.21 $7.38
$324.68 $333.48
$60.67 $62.31
$53.87 $55.33
$10.83 $11.13
$42.25 $43.40
$49.22 $50.32
$66.73 $68.54
$1.42 $1.46
June 12, 2018 Item #13 Page 97 of 147
Category
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Waste Management I Trash
Misc. Water Fees
Misc. Water Fees
Misc. Water Fees
Misc. Water Fees
Misc. Water Fees
Misc. Water Fees
Misc. Water Fees
Misc. Water Fees
Misc. Water Fees
Misc. Water Fees
Misc. Water Fees
Misc. Water Fees
Misc. Water Fees
Water Service Fees
Water Service Fees
Water Service Fees
Water Service Fees
Water Service Fees
Water Service Fees
Water Service Fees
Water Service Fees
Fee Description
City of Carlsbad
Master Fee Schedule 2018-19
General City Service Fees
Other Fees and Charges -Delivery of extra cart
Other Fees and Charges -Late Fee -There will be a minimum fee on any delinquent
account
Other Fees and Charges -Locking Fee
Other Fees and Charges -Overloaded Bins
Other Fees and Charges -Residential Return to Service Fee -The return to service fee for
two or more calls in a one-month period by a residential customer
Other Fees and Charges -Restart Fee -The fee for restarting commercial service when a
permanent account has been terminated for non-payment.
Other Fees and Charges -Roll off Service --Dead Run charge
Other Fees and Charges -Roll off Service --Delivery
Other Fees and Charges -Roll off Service --Delivery Demo (includes signage) *New*
Other Fees and Charges -Roll off Service --Disposal Fee per Ton (pass through)
Other Fees and Charges -Roll off Service --Relocation Charge offsite
Other Fees and Charges -Roll off Service --Relocation Charge onsite
Other Fees and Charges -Roll off Service --Roll off -Demurrage Per Day Charge
Other Fees and Charges -Roll off Service --Service Fee -Roll off service
Other Fees and Charges -Roll off Service --Service Fee /Contaminated Load *New*
Other Fees and Charges -Roll off Service --Standby charge per minute after 5 minutes
Other Fees and Charges -Roll off Service --Wash Out Receiver Boxes
Other Fees and Charges -Single and Multi-Family Residents Bulky Item -Exceeding 5 per
pick up -First item
Other Fees and Charges -Single and Multi-Family Residents Bulky Item -Exceeding 5 per
pick up -each additional item
Residential Services -Extra trash cart beyond first cart
Residential Services -Residential -per month (64 or 96 gallon cart)
Residential Services -Residential -per month (35 gallon trash)
Residential Services -Trash Collection -Residential -per month (backyard service)
Residential Services -Two additional Green Waste and/or Recycling carts will be free of
charge, after each additional cart will be charged
Backflow 2nd Notice
Backflow 3rd Notice
Backflow Inspection -California Department of Environmental Health (CDEH)
(invoice total from CDEH)
Backflow Preventer Charge (per month, each account)
Backflow Reinspection (Consistent with city payroll records)
Blueprinting of Standard Size (24" x 36") Improvement Plan Sheet (Cost for each)
Potable Water Meter -Construction Meter Deposit
Potable Water Meter -Construction Meter Installation
Potable Water Meter -Construction Meter Relocation
Recycled Water Meter -Construction Meter Deposit
Recycled Water Meter -Construction Meter Installation
Recycled Water Meter -Construction Meter Relocation
Utility Standards and Specifications (actual cost of reproduction)
Accounts scheduled for termination for non-payment
After Hours Turn-on
Continuity of Service
Door Hanger Electronic (not Physical)
Door Hanger Paper (drive to physical address and hang)
Next Scheduled Day Service Turn on
Per New Account -Service Turn on
Same Day Turn-on (Not Scheduled for That Day)
Page 7
EXHIBITS-A
2017-18 Fee 2018-19 Fee
$11.90 $12.23
$3.57 $3.67
$14.43 $14.75
$51.81 $53.22
$33.93 $34.85
$20.36 $20.91
$76.20 $78.27
$56.89 $58.43
$63.43 $63.43
$45.24 $46.74
$63.40 $65.12
$44.44 $45.65
$4.70 $4.83
$221.04 $227.03
$221.04 $227.03
$2.01 $2.07
$50.84 $52.22
$42.25 $43.40
$10.83 $11.13
$2.42 $2.48
$21.04 $21.55
$19.07 $19.51
$26.91 $27.57
$2.42 $2.48
$11 $11
$32 $33
Actual Cost Actual Cost
Actual Cost Actual Cost
Actual Cost Actual Cost
$5 $5
$946 $900
$186 $192
$82 $85
$946 $900
$186 $192
$82 $85
Actual Cost Actual Cost
$39 $40
$173 $178
$11 $12
$1 $1
$16 $16
$63 $65
$39 $40
$146 $150
June 12, 2018 Item #13 Page 98 of 147
Category
Building Permit Fees
Building Permit Fees
Building Permit Fees
Building Permit Fees
Building Permit Fees
Building Permit Fees
Building Permit Fees
Building Permit Fees
Building Permit Fees
Building Permit Fees I Other Fees
Building Permit Fees I Other Fees
Building Permit Fees I Other Fees
Building Permit Fees I Other Fees
Building Permit Fees I Other Fees
Building Permit Fees I Other Inspections
Building Permit Fees I Other Inspections
Building Permit Fees I Other Inspections
Building Permit Fees I Other Inspections
Building Permit Fees I Other Inspections
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
City of Carlsbad
Master Fee Schedule 2018-19
Development Related Service Fees
Fee Description
Total Valuation -$1 to $500*
Total Valuation -$1,000,001 and up -for the first $1,000,000
plus $1.99 for each additional $1,000 or fraction thereof*
Total Valuation -$100,001 to $500,000 -for the first
$100,000 plus $3.55 for each additional $1,000, or fraction
thereof, to and including $500,000. *
Total Valuation -$2,001 to $25,000 -for the first $2,000 plus
$8.87 for each additional $1,000, or fraction thereof, to and
including $25,000*
Total Valuation -$25,001 to $50,000 -for the first $25,000
plus $6.40 for each additional $1,000, or fraction thereof, to
and including $50,000 *
Total Valuation -$50,001 to $100,000 -for the first $50,000
plus $4.43 for each additional $1,000, or fraction thereof, to
and including $100,000 *
Total Valuation -$500,001 to $1,000,000 -for the first
$500,000 plus $3.00 for each additional $1,000, or fraction
thereof, to and including $1,000,000 *
Total Valuation -$501 to $2,000 -for the first $500 plus
$1.93 for each additional $100 or fraction thereof, to and
including $2,000 *
EXHIBITS-A
2017-18 Fee 2018-19 Fee
$15 $15
$3,534 $3,534
$626 $626
$44 $44
$246 $246
$406 $406
$2,037 $2,037
$44 $44
*Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include supervision, overhead, equipment,
hourly wages and fringe benefits of the employees involved. Notwithstanding other provisions of this section, the building
permit fee for factory built housing shall be twenty-five percent of the fee shown in table above, and the plan check fee shall
be sixty-five percent of the building permit fee.
Building Permit Revision, Fee+ Third Party Hourly Charge New Fee $35
Building Plan Check Fee 70% of Current Building
(8% discount on repetitive plan checks) 70% of Building Permit Fee Permit Fee
$1.00 per every $25,000 in $1.00 per every $25,000 in
building valuation or fraction building valuation or fraction
thereof, with a minimum fee of thereof, with a minimum fee
SB1473 Green Building State Standards Fee $1.00 of $1.00
(minimum $0.50 fee, pass
(minimum $0.50 fee, pass through from State):
Strong Motion Instrumentation Fee (SMIP) and Seismic through from State): $13.00 per $100,000
Hazard Mapping Fee -Residential $13.00 per $100,000 valuation valuation
(minimum $0.50 fee, pass
(minimum $0.50 fee, pass through from State):
Strong Motion Instrumentation Fee (SMIP) and Seismic through from State): $28.00 per $100,000
Hazard Mapping Fee -Commercial $28.00 per $100,000 valuation valuation
Additional plan review required by changes, additions or
revisions to approved plans, per hour**
(minimum charge -one-half-hour) $65 $117
Green Building Standards Plan Check and Inspection** $170 $175
Inspections for which no fee is specifically indicated, per
hour (minimum charge -one-half hour)** $65 $117
Inspections outside of normal business hours, per
hour(minimum charge-2 hours)** $65 $117
Re-inspection fees, per hour** $65 $117
**Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include supervision, overhead,
equipment, hourly wages and fringe benefits of the employees involved. Notwithstanding other provisions of this section,
the building permit fee for factory built housing shall be twenty-five percent of the fee shown in table above, and the plan
check fee shall be sixty-five percent of the building permit fee.
Adjustment Plat $1,367 $1,410
Affordable Housing Credit Per Unit: Cassia Heights
(Southeast and Southwest quadrants) $60,011 $60,011
Affordable Housing Credit Per Unit: Northwest Quadrants $142,000 $142,000
Affordable Housing Credit Per Unit: Tavarua Senior
Affordable Apartments (Northwest quadrant) $84,000 $84,000
Page 9
June 12, 2018 Item #13 Page 100 of 147
Category
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Process ing Fees
Development Process ing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Dev~lopment Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
City of Carlsbad
Master Fee Schedule 2018-19
Development Related Service Fees
Fee Description
Affordable Housing Credit Per Unit: Villa Loma (Southeast
and Southwest quadrants)
Affordable Housing Impact Fee (per unit)
Affordable Housing In-Lieu Fee (per market rate unit)
Agricultural Mitigation Fee (per net converted acre)
Amendments and Revisions to Approved Projects
Appeals -all development related
Building Code Enforcement
Certificate of Compliance
Certificate of Compliance In Lieu of Parcel Map
Certificate of Correction
Climate Action Plan (CAP) Compliance Review
Coastal Development Permit (CDP): Single Family Lot
Coastal Development Permit (CDP): 2 -4 unit or lot
subdivision (per unit or lot whichever is greater).
Coastal Development Permit (CDP): 5 or more units or lot
subdivision (per permit)
Coastal Development Permit (CDP): Emergency
Coastal Development Permit (CDP): Exemption
Coastal Development Permit (CDP): Minor Permit
Coastal Development Permit (CDP): Non-Residential + 10
cents per square foot
Community Facilities District Annexation
Compact Disc prepared by Staff (CED)
Conditional Use Permit (CUP): Biological Habitat Preserve
Conditional Use Permit (CUP): Regular
Conditional Use Permit(CUP): Minor
Construction Change Review -Major (fee+ $245 per sheet)
Construction Change Review - Minor (fee+ $155 per sheet)
Copies - black and white (CED)
Copies -color (CED)
Copies -Large eg: 24" x 36" (CED)
Daycare Permit (7 -14 Children)
Developer Agreements -Deposit $10,000 increments
(Consistent with city payroll records+ overhead)
Easement Document Processing and Recording -Major (all
others)
Easement Document Processing and Recording - Minor
(Single Family Lot)
Encroachment Agreement Processing
Environmental Impact Assessment (EIA): All Others*
Environmental Impact Assessment (EIA):* Single Family
Environmental Impact Report (EIR):* Addendum,(+ fully
burdened hourly rate after 1st 10 hours of project planner)
Environmental Impact Report (EIR):* Focused/Supplemental
(requiring a public hearing)(+ fully burdened hourly rate
after 1st 100 hours of project planner or 20 hours of project
engineer)
Environmental Impact Report (EIR):* Review(+ fully
burdened hourly rate after 1st 160 hours of project planner
or 40 hours of project engineer)
*Fish & Game fees are additional to the EIA/ E/Rfees.
Extensions to projects in process
Fish & Game Fee (set by Department of Fish and Wildlife)**
Environmental Impact Report (EIR)
Page 10
EXHIBITS-A
2017-18 Fee 2018-19 Fee
$48,000 $48,000
$2,915 $2,915
$4,515 $4,515
$10,000 $10,000
50% of current application
50% of original application fee fee
$850 $876
Court costs Court costs
$1,109 $1,144
$2,918 $3,008
$863 $889
New Fee $740
$1,144 $1,180
$2,318 $2,390
$3,774 $3,891
$470 $484
$258 $266
$910 $938
$1,027 $1,059
$1,796 $1,851
$3 $3
$898 $926
$4,765 $4,913
$798 $823
$728 $750
$516 $532
$0.20 $0.20
$1/page $1/page
$5.00/sheet $5.00/sheet
$223 $230
Actual cost Actual cost
$693 $714
$122 $126
$358 $369
$1,837 $1,894
$1,011 $1,042
$2,670 $2,753
$14,343 $14,788
$21,321 $21,982
25% of original fee 25% of current fee
$3,218.00 $3,218.00
June 12, 2018 Item #13 Page 101 of 147
Category
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
' Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
City of Carlsbad
Master Fee Schedule 2018-19
Development Related Service Fees
Fee Description
Fish & Game Fee (set by Department of Fish and Wildlife),
Environmental Document pursuant to a Certified Regulatory
Program (CRP)**
Fish & Game Fee (set by Department of Fish and
Wildlife),Negative Declaration (ND) /Mitigated Negative
Declaration (MND)**
**Includes $50.00 County Clerk processing fee.
General Plan Amendment -0 - 5 Acres
General Plan Amendment -Over 5 Acres
Grading Permit Investigation Fee (Consistent with city
payroll records+ overhead)
Habitat Management Plan (HMP): Amendment to Plan
Document -Major(+ fully burdened hourly rate after the 1st
20 hours of project planner)
Habitat Management Plan (HMP): Amendment to Plan
Document -Minor
Habitat Management Plan (HMP): Permit -Major -Habitat
to be preserved
Habitat Management Plan (HMP): Permit -Minor-no
habitat to be preserved
Habitat Management Plan (HMP): Permit -Single Family
Hillside Development Permit-Major
Hillside Development Permit -Minor
Inspection -Additional Planning
Inspection Overtime-per Hour (On Request) -each additional
hour at $70
License Tax on New Construction -Mobile Homes, per lot
Lighting and Landscape District (LLD) #2 Annexation
Local Coastal Plan -Amendment
Local Facilities Management Fees -as established by Council
Local Facilities Management Plan/ Amendment -Fee+
deposit in minimum increments of $5,000
Mapping Fees: Final Tract Map -Major Subdivision (Fee+ $5
per acre)
Mapping Fees: Parcel Map -Minor Subdivision
Master Plan: Major Amendment (Base fee+ fully burdened
hourly rates after the 1st 100 hours of project planner or 40
hours project engineer)
Master Plan: Master Plan (Base fee+ fully burdened hourly
rates after the 1st 200 hours of project planner or 100 hours
project engineer)
Master Plan: Minor Amendment (Base fee+ fully burdened
hourly rates after the 1st 20 hours of project planner or 7
hours project engineer)
Master Plan: Pre-Filing Submittal
Neighborhood Improvement Agreements
Non Conforming Construction Permit
Notice Fee(+ postage)
Oversize Load Permit - 1 trip (fee set by State)
Oversize Load Permit -Annual/Per Year (fee set by State)
Plan Consistency Determination
Planned Development (residential/non-residential) - 5 or
more/Major Subdivision, based on number of units or lots,
whichever is greater
Planned Development (residential/non-residential) - 4 or
fewer, based on number of units or lots, whichever is
greater
Planning Commission Agenda and Minutes(+ postage)
Planning Commission Determination -Other
Planning Commission Determination -Single Family
Page 11
EXHIBITS-A
2017-18 Fee 2018-19 Fee
$1,127.00 $1,127.00
$2,330.25 $2,330.25
'
$4,537 $4,677
$6,544 $6,747
Actual Cost Actual Cost
$5,681 $5,857
$3,650 $3,764
$4,154 $4,283
$576 $594
50% Mi nor Fee 50% Minor Fee
$2,670 $2,753
$1,320 $1,361
$99 $102
$123 $127
$2,441 $2,522
$7,524 $7,524
$6,632 $6,837
Actual Cost Actual Cost
$10,000 $10,000
$7,946 $8,193
$3,567 $3,678
$27,789 $28,650
$44,415 $45,792
$1,772 $1,827
$7,553 $7,787
$167 $172
$741 $764
$334 $345
$16 $16
$90 $90
$751 $774
$8,885 I $9,161
$3,204 $3,304
Copy Charge Copy Charge
$1,737 $1,791
$1,074 $1,107
June 12, 2018 Item #13 Page 102 of 147
Category
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
City of Carlsbad
Master Fee Schedule 2018-19
Development Related Service Fees
Fee Description
Plumbing, Electrical and Mechanical Permit (not combined
with Building Permits)
Postage (All)
Precise Development Plan
Preliminary Plan Review -Major (Other)
Preliminary Plan Review -Minor (SFD)
Public Facilities Fees -1.82% of Building Permit Value (inside
CFD)
Public Facilities Fees -3.5% of Building Permit Value (outside
CFD)
Quitclaim of Easement
Reapportionment Fees for 1911 Act Assessment Districts
Reversion to Acreage ( Consistent with city payroll records
charged against a $3,100 deposit)
Right-of-Way Permit: Minor -Construction (Single Family,
Pool, Driveway, Spa) and Fencing and Curb Cafe
Construction (Sidewalk Cafe, Outdoor Display)
Right-of-Way Permit: Minor -Non-Construction
Right-of-Way Permit: Utility(+ actual costs for Inspector and
Senior Inspector's time)
Right-of-Way Permit: Utility (by contract)
Right-of-Way Permit: Village Area -Curb Cafe (max of two
parking spaces) -per space/per year
Satellite Antenna Permit
Secured Agreement Processing Extension
Secured Agreement Processing Replacement+ improvement
plan revision fees if required
Segregation of Assessments -1-4 lots (Consistent with city
payroll records + overhead, consultant cost and recording
fee. Also see Streets and Highways Code Section 8760-8769)
Segregation of Assessments - 5 lots or more -fee+ $20 per
lot (Consistent with city payroll records+ overhead,
consultant cost and recording fee. Also see Streets and
Highways Code Section 8760-8769)
Sign Program: Modified Minor Sign Program
Sign Program: Modified Regular Sign Program
Sign Program: Sign Permit (including non-commercial)
Sign Program: Sign Program
Site Development Plan -Major -5 or more units/lots
Site Development Plan -Minor -Residential, less than or
equal to 4 units/lots
Special Use Permit-All
Specific Plan: Amendment -Major -base+ fully burdened
hourly rate after 180 hours project planner, or 30 hours
project engineer
Specific Plan: Amendment -Minor -base+ fully burdened
hourly rate after 20 hours project planner or 7 hours project
engineer
Specific Plan: Base+ fully burdened hourly rate after 1st 200
hours project planner or 60 hours project engineer
Street Name Change
Street Vacation -Street/Public Service Easement Vacation -
Summary
Street Vacation -Street/Public Service Easement Vacation -
Regular
Tentative Tract Maps: Tentative Parcel Map -Minor
Subdivision -0-4 Lots
Tentative Tract Maps: Tentative Tract Map -5 -49 units/lots
base fee+ $110/unit or lot over 5, whichever is greater
Page 12
EXHIBITS-A
2017-18 Fee 2018-19 Fee
$170 $175
Current Postage Rate x Number Current Postage Rate x
of labels Number of labels
$8,087 $8,338
$751 $774
$211 $218
1.82% of Building Permit
1.82% of Building Permit Value Valuation
3.5% of Building Permit
3.5% of Building Permit Value Valuation
$728 $750
Actual Cost Actual Cost
Actual Cost Charged against Actual Cost Charged against
$3,100 Deposit $3,100 Deposit
$370 $381
$182 $188
$786 $811
$786 $811
$1,200 $1,200
$446 $460
$434 $448
$798 $823
Actual Cost Actual Cost
Actual Cost Actual Cost
$742 $765
$2,795 $2,882
$65 $67
$1,121 $1,156
$12,043 $12,416
$4,748 $4,895
$3,644 $3,757
$23,874 $24,614
$1,543 $1,591
$37,097 $38,247
$1,737 $1,791
$1,409 $1,452
$3,550 $3,660
$4,044 $4,169
$8,756 $9,028
June 12, 2018 Item #13 Page 103 of 147
Category
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Development Processing Fees
Fire/ Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & lnspec.
Fire/ Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & lnspec.
Fire/ Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & lnspec.
Fire/ Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & lnspec.
Fire/ Dev. Apps, Plan Review, & lnspec.
Fire/ Dev. Apps, Plan Review, & lnspec.
Fire/ Dev. Apps, Plan Review, & lnspec.
Fire/ Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & lnspec.
Fire/ Dev. Apps, Plan Review, & lnspec.
Fire/ Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & lnspec.
City of Carlsbad
Master Fee Schedule 2018-19
Development Related Service Fees
Fee Description
Tentative Tract Maps: Tentative Tract Map -50 + units/lots -
base fee+ $15/unit or lot over 49, whichever is greater
Tentative Tract Maps: Tentative Tract Map Litigation Stay
Third Party Review -+ consultant cost
Third Party Review -ENG
Trails -Inspection
Trails -Trail Plan Check
Variance
Variance -Administrative
Village Area -Parking In Lieu Fee -Village Area
Village Area Review -Major -Plus Noticing Costs
Village Area Review -Minor -Plus Noticing Costs
Village Area Review -Administrative
Water Heater Permit
Wireless Communication Third Party Review
Zone Change - 5 or fewer acres
Zone Change -5.1 or more acres
Zone Code Compliance Letter
Zoning Map 1000 Scale
Zoning Map 1000 Scale -Color
Zoning Map 500 Scale
Building Construction Plan (Architectural Review) -A-1
Occupancies-New
Building Coni;truction Plan (Architectural Review) -A-1
Occupancies-Tenant Improvement
Building Construction Plan (Architectural Review) -A-2 & A-3
Occupancies-New
Building Construction Plan (Architectural Review) -A-2 & A-3
Occupancies-Tenant Improvement
Building Construction Plan (Architectural Review) -A-4 & A-5
Occupancies-New
Building Construction Plan (Architectural Review) -A-4 & A-5
Occupancies-Tenant Improvement
Building Construction Plan (Architectural Review) -E
Occupancies (Daycare only)
Building Construction Plan (Architectural Review) -E
Occupancies New
Building Construction Plan (Architectural Review) -E
Occupancies -Tenant Improvement
Building Construction Plan (Architectural Review) -F
Occupancies New
Building Construction Plan (Architectural Review) -F
Occupancies Tenant Improvement
Building Construction Plan (Architectural Review) -H
Occupancies (Not including Chem Class) New
Building Construction Plan (Architectural Review) -H
Occupancies (Not including Chem Class) Tenant
Improvement
Building Construction Plan (Architectural Review) -I
Occupancies New
Building Construction Plan (Architectural Review) -I
Occupancies Tenant Improvement
Building Construction Plan (Architectural Review) -L
Occupancies new
Building Construction Plan (Architectural Review) - L
Occupancies Tenant Improvement
Building Construction Plan (Architectural Review) - R
Occupancies-all Tenant Improvements
Building Construction Plan (Architectural Review) -R-1 & R-2
Occupancies SO units and above New
Building Construction Plan (Architectural Review) -R-1 & R-2
Occupancies under 50 units New
Building Construction Plan (Architectural Review) -R-3
Townhomes New
Page 13
EXHIBITS-A
2017-18 Fee 2018-19 Fee
$17,501 $18,043
25% of original fee 25% of current fee
$792 $817
New Fee Actual Cost
$319 $329
$1,488 $1,534
$3,005 $3,098
$798 $823
$11,240 $11,240
$3,090 $3,186
$1,686 $1,738
$450 $450
New Fee $98
Actual Cost Actual Cost
$5,211 $5,373
$7,060 $7,279
$123 $127
$5 $5
$10 $10
$3 $3
$1,152 $1,188
$881 $908
$790 $814
$609 $628
$1,152 $1,188
$881 $908
$461 $475
$1,152 $1,188
$881 $908
$790 $814
$609 $628
$790 $814
$609 $628
$790 $814
$609 $628
$461 $475
$362 $373
$609 $628
$1,424 $1,468
$1,152 $1,188
$790 $814
June 12, 2018 Item #13 Page 104 of 147
Category
Fire I Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & Ins pee.
Fire I Dev. Apps, Plan Review, & Ins pee.
Fire I Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & Ins pee.
Fire I Dev. Apps, Plan Review, & Ins pee.
Fire I Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & Ins pee.
Fire I Dev. Apps, Plan Review, & Ins pee.
Fire I Dev. Apps, Plan Review, & lnspec.
Fire/ Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & Ins pee.
Fire I Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & Ins pee.
Fire I Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & Ins pee.
Fire I Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & lnspec.
Fire/ Dev. Apps, Plan Review, & Ins pee.
Fire I Dev. Apps, Plan Review, & Ins pee.
Fire I Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & Ins pee.
City of Carlsbad
Master Fee Schedule 2018-19
Development Related Service Fees
Fee Description
Building Construction Plan (Architectural Review) -S
Occupancies 50,000 sq. ft. and above-New
Building Construction Plan (Architectural Review) - S
Occupancies 50,000 sq. ft. and above-Tenant Improvement
Building Construction Plan (Architectural Review) -S
Occupancies under 50,000 sq. ft.-Tenant Improvement
Building Construction Plan (Architectural Review) - S
Occupancies under 50,000 sq. ft.-New
Building Construction Plan (Plan Review & Inspection -
Vegetation Fuel Modification-Tract 75 and above Homes
Building Construction Plan (Plan Review & Inspection) -
Hazardous Materials Storage-Chem Class under 10
Chemicals
Building Construction Plan (Plan Review & Inspection) -
Storage Tanks -Each Additional tank
Building Construction Plan (Plan Review & Inspection) -
Aboveground Storage Tanks (First tank)
Building Construction Plan (Plan Review & Inspection) -
Hazardous Materials Storage-Chem Class 10-25 Chemicals
Building Construction Plan (Plan Review & Inspection) -High
Piled Storage
Building Construction Plan (Plan Review & Inspection) -High
Rise Structure -Per Additional Floor
Building Construction Plan (Plan Review & Inspection) -High
Rise Structure greater than 55 feet
Building Construction Plan (Plan Review & Inspection) -
Smoke Control-Rational Analysis & Plan Review
Building Construction Plan (Plan Review & Inspection) -
Underground Storage Tanks (First tank)
Building Construction Plan (Plan Review & Inspection) -
Vegetation Fuel Modification-Custom Home
Building Construction Plan (Plan Review & Inspection) -
Vegetation Fuel Modification-Tract under 75 Homes
Building Construction Plan (Plan Review & Inspection)-
Hazardous Materials Storage -Chem Class over 100
Chemicals
Building Construction Plan(Plan Review & Inspection) -
Hazardous Materials Storage-Chem Class 26-100 Chemicals
New Alarm System -Per Additional Inspection
New Alarm System -Per Additional Plan Type
New Sprinkler System -ESFP Fire Sprinkler System -Per
Additional Inspection
New Sprinkler System -ESFR Fire Sprinkler System with In-
Rack Sprinklers -Per Additional Inspection
New Sprinkler System -NFPA 13 System (Over 100 heads) -
Per Additional Inspection
New Sprinkler System -NFPA 13 System (Over 100 heads) -
Per Additional Plan Type
New Sprinkler System -NFPA 13 System (Under 100 heads) -
Per Additional Inspection
New Sprinkler System -NFPA 13 System (Under 100 heads) -
Per Additional Plan Type
New Sprinkler System -NFPA 13R System 3-16 units (per
building) -Per Additional Inspection (per building)
Page 14
EXHIBITS-A
2017-18 Fee 2018-19 Fee
$856 $883
$658 $678
$362 $373
$461 $475
$1,260 $1,299
$470 $485
$99 $102
$700 $722
$733 $756
$733 $756
$263 $271
$329 $339
$1,326 $1,367
$634 $654
$470 $485
$865 $892
$1,392 $1,435
$1,062 $1,095
$691 $712
$428 $441
$99 $102
$99 $102
$99 $102
$362 $373
$99 $102
$198 $204
$362 $373
June 12, 2018 Item #13 Page 105 of 147
Category
Fire I Dev. Apps, Plan Review, & lnspec.
Fire/ Dev. Apps, Plan Review, & lnspec.
Fire/ Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & Ins pee.
Fire I Dev. Apps, Plan Review, & lnspec.
Fire/ Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & Ins pee.
Fire/ Dev. Apps, Plan Review, & lnspec.
Fire I Dev. Apps, Plan Review, & lnspec.
Fire I Fire Exiting.& Alarm Systems
Fire I Fire Exiting.& Alarm Systems
Fire I Fire Exiting.& Alarm Systems
Fire I Fire Exiting.& Alarm Systems
Fire I Fire Exiting.& Alarm Systems
Fire I Fire Exiting.& Alarm Systems
Fire I Fire Exiting.& Alarm Systems
Fire/ Fire Exiting.& Alarm Systems
Fire I Fire Exiting.& Alarm Systems
Fire I Fire Exiting.& Alarm Systems
Fire I Fire Exiting.& Alarm Systems
Fire/ Fire Exiting.& Alarm Systems
Fire I Fire Exiting.& Alarm Systems
Fire/ Fire Exiting.& Alarm Systems
Fire/ Fire Exiting.& Alarm Systems
Fire I Fire Exiting.& Alarm Systems
Fire I Fire Exiting.& Alarm Systems
Fire I Fire Exiting.& Alarm Systems
Fire/ Fire Exiting.& Alarm Systems
Fire I Fire Exiting.& Alarm Systems
Fire/ Fire Exiting.& Alarm Systems
-
Fire I Fire Exiting.& Alarm Systems
Fee Description
City of Carlsbad
Master Fee Schedule 2018-19
Development Related Service Fees
New Sprinkler System -NFPA 13R System 3-16 units (per
building) -Per Additional Plan Type
Sprinkler Monitoring -Per Additional Inspection
Sprinkler Monitoring -Per Additional Plan Type
Tenant Improvement Fire Alarm System -Per Additional
Inspection
Tenant Improvement Fire Alarm System -Per Additional Plan
Type
Tenant Improvement Sprinkler System -NFPA 13 or 13R
System -7 to 100 heads -Per Additional Inspection
Tenant Improvement Sprinkler System -NFPA 13 or 13R
System -7 to 100 heads -Per Additional Plan Type
Tenant Improvement Sprinkler System -NFPA 13 or 13R
System -Over 100 heads -Per Additional Inspection
Tenant Improvement Sprinkler System -NFPA 13 or 13R
System -Over 100 heads -Per Additional Plan Type
EXHIBITS-A
2017-18 Fee 2018-19 Fee
$362 $373
$132 $136
$132 $136
$263 $271
$165 $170
$263 $271
$165 $170
$329 $339
$198 $204
For services requested of City staff which have no fee listed in this fee schedule, the City Manager or the City Manager's
designee shall determine the appropriate fee based on the established hourly rates for this division. Additionally, the City
will pass-through to the applicant any discrete costs incurred from the use of external service providers if required to
process the specific application.
Alarm Systems -New Alarm System $1,227 $1,265
Alarm Systems -Sprinkler Monitoring $371 $383
Alarm Systems -Tenant Improvement Fire Alarm System $601 $620
New Sprinkler System -ESFP Fire Sprinkler System (Initial
system) $832 $858
New Sprinkler System -ESFR Fire Sprinkler System with In-
Rack Sprinklers $964 $994
New Sprinkler System -ESFR with in rack sprinklers -Each
additional System $230 $237
New Sprinkler System -Fire Pump (First pump) $766 $790
New Sprinkler System -NFPA 13 System (Over 100 heads-
includes one riser) $832 $858
New Sprinkler System -NFPA 13 System (Over 100 heads-
includes one riser) -Each Additional Riser $230 $237
New Sprinkler System -NFPA 13 System (Under 100 heads) $601 $620
New Sprinkler System -NFPA 13D Single Family System
(Inspection per building) $121 $125
New Sprinkler System -NFPA 13D Single Family System (Plan
Review Per Initial or Single Plan Type) $239 $246
New Sprinkler System -NFPA 13R System 3-16 units (per
building) $832 $858
New Sprinkler System -Underground Piping with 5 or more
Hydrants/Risers $966 $996
New Sprinkler System -Underground Piping with up to 4
Hydrants/Risers $733 $756
New Sprinkler System Fire Pump (First Pump) -Each
Additional pump $263 $271
NFPA 13D New Sprinkler System -Per Additional Plan Type $132 $136
Other Extinguishing Systems -Gas Systems (Med Gas,
Industrial Gas, LPG) $404 $417
Other Extinguishing Systems -Hood & Duct -Initial system $404 $417
Other Extinguishing Systems -Hood & Duct Each additional
system $198 $204
Other Extinguishing Systems -Pre-Action System with Alarm $536 $553
Other Extinguishing Systems -Refrigeration Systems over
500 lbs. $1,194 $1,231
Page 15
June 12, 2018 Item #13 Page 106 of 147
Category
Fire I Fire Exiting.& Alarm Systems
Fire I Fire Exiting.& Alarm Systems
Fire I Fire Exiting.& Alarm Systems
Fire I Fire Exiting.& Alarm Systems
Fire I Fire Exiting.& Alarm Systems
Fire/ Fire Exiting.& Alarm Systems
Fire/ Fire Exiting.& Alarm Systems
Fire I Fire Exiting.& Alarm Systems
Fire I Other Fire Fees
Fire I Other Fire Fees
Fire I Other Fire Fees
Fire I Other Fire Fees
Fire I Other Fire Fees
Fire I Other Fire Fees
Fire I Other Fire Fees
Fire I Other Fire Fees
Fire I Other Fire Fees
Fire I Other Fire Fees
Fire I Other Fire Fees
Fire I Other Fire Fees
Fire I Other Fire Fees
Fire I Other Fire Fees
Fire I Other Fire Fees
Fire I Other Fire Fees
Fire I Other Fire Fees
Fire I Other Fire Fees
Fire I Other Fire Fees
Grading Fees I Grading Permit Fees*
Grading Fees I Grading Permit Fees*
Grading Fees I Grading Permit Fees*
Grading Fees I Grading Permit Fees*
City of Carlsbad
Master Fee Schedule 2018-19
Development Related Service Fees
Fee Description
Other Extinguishing Systems -Refrigeration Systems under
500 lbs.
Other Extinguishing Systems -Special Equipment (Ovens,
Dust, Battery)
Other Extinguishing Systems -Special Extinguishing System
Other Extinguishing Systems -Spray Booths
Tenant Improvement Sprinkler System -NFPA 13 or 13R
System 6 heads or less
Tenant Improvement Sprinkler System -NFPA 13 or 13R
System 7 to 100 heads
Tenant Improvement Sprinkler System -NFPA 13 or 13R
System over 100 heads
EXHIBITS-A
2017-18 Fee 2018-19 Fee
$700 $722
$404 $417
$568 $586
$404 $417
$121 $125
$536 $553
$634 $654
For services requested of City staff which have no fee listed in this fee schedule, the City Manager or the City Manager's
designee shall determine the appropriate fee based on the established hourly rates for this division. Additionally, the City
will pass-through to the applicant any discrete costs incurred from the use af external service providers if required to
process the specific application.
Aerial Fireworks Display-Major $1,251 $1,290
Aerial Fireworks Display-Minor $724 $746
Hourly Services for: Alternate Methods and Materials
Review, Time and Materials Review, Project Meetings, etc. -
First Hour $154 $159
Hourly Services for: Alternate Methods and Materials
Review, Time and Materials Review, Project Meetings, etc. -
Each Additional Hour $132 $136
Plan Resubmittal (3rd and Subsequent Submittal, per hour) $132 $136
Plan Review -Per Hour-Overtime $147 $152
Plan Revjew -Per Hour-Regular Office Hours $132 $136
Plan Review -Processing Fee $22 $23
Reinspection (Per inspection) $187 $193
Special Events Application Processing-Building and Safety
Referral $22 $23
Special Events Application Processing-Major: Events that
may impact emergency operations equipment or access and
have attendance or participation of 1,500 or more persons
(Building and Safety) $132 $136
Special Events Application Processing -Miscellaneous:
Events that may impact emergency operations equipment or
access and may only' require an over the counter submittal $22 $23
Special Events Application Processing -Parks and Recreation
Referral $132 $136
Special Events-Fire Prevention/Operations Support Prior
To/During Event Actual Cost Actual Cost
Tent Permit (Not associated with special events) -2-5 tents $395 $407
Tent Permit (Not associated with special events) -6 or more
tents $527 $543
Tent Permit (Not associated with special events) -Single tent $198 $204
Weed Abatement Administrative Fee $263 $271
Far services requested of City staff which have no fee listed in this fee schedule, the City Manager or the City Manager's
designee shall determine the appropriate fee based on the established hourly rates for this division. Additionally, the City
will pass-through to the applicant any discrete costs incurred from the use of external service providers if required to
process the specific application.
1,000,001 cubic yards or more -for the first 1,000,000 cubic
yards : Fee+ $710 for each additional 100,000 cubic yards or
fraction thereof $18,945 $19,532
1,001 to 10,000 cubic yards -for the first 1,000 cubic yards :
Fee+ $65 for each additional 1,000 cubic yards or fraction
thereof $1,279 $1,319
10,001 to 100,000 cubic yards -for the first 10,000 cubic
yards : Fee+ $130 for each additional 10,000 cubic yards or
fraction thereof $2,114 $2,179
100 cubic yards or less -Flat Fee $450 $464
Page 16
June 12, 2018 Item #13 Page 107 of 147
Category
Grading Fees I Grading Permit Fees*
Grading Fees I Grading Permit Fees*
Grading Fees I Grading Permit Fees*
Grading Fees I Grading Permit Fees*
Grading Fees I Grading Plan Check Fees*
Grading Fees/ Grading Plan Check Fees*
Grading Fees I Grading Plan Check Fees*
Grading Fees I Grading Plan Check Fees•
Grading Fees I Grading Plan Check Fees•
Grading Fees I Grading Plan Check Fees*
Grading Fees I Grading Plan Check Fees*
Grading Fees I Grading Plan Check and
Permit Fees
Improvement & Landscape I Improvement
Inspection
Improvement & Landscape I Improvement
Inspection
Improvement & Landscape I Improvement
Inspection
Improvement & Landscape I Improvement
Inspection
Improvement & Landscape I Improvement
Inspection
Improvement & Landscape I Improvement
Inspection
Improvement & Landscape I Improvement
Inspection
Improvement & Landscape I Improvement
Plan Review•
Improvement & Landscape I Improvement
Plan Review•
Improvement & Landscape I Improvement
Plan Review•
Improvement & Landscape I Improvement
Plan Review*
Improvement & Landscape I Improvement
Plan Review*
Improvement & Landscape I Improvement
Plan Review *
Improvement & Landscape I Improvement
Plan Review *
Improvement & Landscape I Improvement
Plan Review
City of Carlsbad
Master Fee Schedule 2018-19
Development Related Service Fees
Fee Description
100,001 to 200,000 cubic yards -for the first 100,000 cubic
yards : Fee+ $130 for each additional 10,000 cubic yards or
fraction thereof
101 to 1,000 cubic yards -for the first 100 cubic yards: Fee+
$65 for each additional 100 cubic yards or fraction thereof
200,001 to 400,000 cubic yards -for the first 200,000 cubic
yards : Fee+ $195 for each additional 10,000 cubic yards or
fraction thereof
400,001 to 1,000,000 cubic yards -for the first 400,000 cubic
yards : Fee+ $980 for each additional 100,000 cubic yards or
fraction thereof
1,001 to 10,000 cubic yards -for the first 1,000 cubic yards:
Fee+ $120 for each additional 1,000 cubic yards or fraction
thereof
10,001 to 100,000 cubic yards -for the first 10,000 cubic
yards : Fee+ $180 for each additional 10,000 cubic yards or
fraction thereof
100 cubic yards or Jess -Flat Fee
100,001 to 200,000 cubic yards -for the first additional
100,000 cubic yards : Fee+ $285 for each additional 10,000
cubic yards or fraction thereof
101 to 1,000 cubic yards -for the first 100 cubic yards : Fee+
$120 for each additional 100 cubic yards or fraction thereof
200,001 to cubic ya rds or more -for the first 200,000 cubic
yards : Fee+ $130 for each for additional 100,000 cubic
yards or fraction thereof
Plan Review -Minor Grading
EXHIBITS-A
2017-18 Fee 2018-19 Fee
$3,706 $3,821
$456 $470
$5,470 $5,640
$10,858 $11,195
$2,693 $2,777
$4,239 $4,371
$450 $464
$6,465 $6,666
'
$900 $928
$10,373 $10,694
50% of Current Grading Plan
$993 Review Fee
*Quantities are calculated by using the greater of cut/fill, plus remedial work. Plan checks extending more thon 24 months
moy be assessed on additional fee of 25% of the current plan check fee.
$1,000,001 and over fee for the first $1,000,000 + $105 for
each additional $10,000 or fraction thereof $17,169 $17,701
$100,001 to $250,000 fee for the first $100,000 + $100 for
each additional $10,000 or fraction thereof $4,476 $4,615
$20,0001 to $50,000 fee for the first $20,000 + $250 for
each additional $10,000 or fraction thereof $1,788 $1,843
$250,001 to $500,000 fee for the first $250,000 + $105 for
each additional $10,000 or fraction thereof $6,630 $6,836
$50,001 to $100,000 fee for the first $50,000 + $125 for
each additional $10,000 or fraction thereof $3,582 $3,693
$500,001 to $1,000,000 fee for the first $500,000 + $105 for
each additional $10,000 or fraction thereof $10,763 $11,097
Estimated Costs of Jmprovements:$0 to $20,000 fee 5.5% or $375 minimum 5.5% or $375 minimum
$1,000,001 and over fee+ 0. 75% of value of improvements
($31,630 minimum) $14,523 $14,973
$100,001 to $250,000 fee+ 2.5% of value of improvements
($5,840 minimum) $2,658 $2,740
$20,001 to $50,000 fee+ 4% of value of improvements
($2,850 minimum) $1,836 $1,893
$250,001 to $500,000 fee+ 2% of value of improvements
($13,910 minimum) $8,040 $8,289
$50,001 to $100,000 fee+ 3% of value of improvements
($4,090 minimum) $2,368 $2,442
$500,001 to $1,000,000 fee+ 1.5% of value of
improvements ($23,840 minimum) $14,209 $14,649
Estimated Costs of lmprovements:$0 to $20,000 fee+ 5% of
value of improvements $1,438 $1,483
*Plan check fees are based on the current City of San Diego Unit Prices. This includes the cost of curbs; gutter, sidewalks,
asphalt or concrete paving, storm drains, etc. Plan checks extending more than 24 months may be assessed an additional
fee of 15% of the current plan check fee. Water and sewer facilities owned by separate utility districts (i.e.: LCWD, OMWD,
etc.) are not reviewed by the city ond there/are do not need to be included in project cost estimate.
Page 17
June 12, 2018 Item #13 Page 108 of 147
Category
Improvement & Landscape I Landscape
Improvement Fees
Improvement & Landscape I Landscape
Improvement Fees
Improvement & Landscape I Landscape
Improvement Fees
Improvement & Landscape I Landscape
Improvement Fees
Improvement & Landscape I Landscape
Improvement Fees
Improvement & Landscape I Landscape
Improvement Fees
Improvement & Landscape/ Landscape
Improvement Fees
Improvement & Landscape I Landscape
Inspection Fees*
Improvement & Landscape I Landscape
Inspection Fees*
Improvement & Landscape I Landscape
Inspection Fees*
Improvement & Landscape I Landscape
Inspection Fees*
Improvement & Landscape I Landscape
Inspection Fees*
Improvement & Landscape I Landscape
Inspection Fees*
Improvement & Landscape I Landscape
Inspection Fees*
Meter Installation Fees I Potable
Meter Installation Fees I Potable
Meter Installation Fees I Potable
Meter Installation Fees I Potable
Meter Installation Fees I Potable
Meter Installation Fees I Potable
Meter Installation Fees I Potable
Meter Installation Fees/ Potable
Meter Installation Fees I Potable
Meter Installation Fees I Potable
Meter Installation Fees I Potable
Meter Installation Fees I Potable
Meter Installation Fees I Potable
Meter Installation Fees I Potable
Meter Installation Fees I Potable
Meter Installation Fees I Potable
Meter Installation Fees I Potable
Meter Installation Fees I Potable
Meter Installation Fees I Recycled Water
Meter Installation Fees I Recycled Water
Meter Installation Fees I Recycled Water
Meter Installation Fees I Recycled Water
Meter Installation Fees I Recycled Water
Meter Installation Fees I Recycled Water
Meter Installation Fees I Recycled Water
Meter Installation Fees I Recycled Water
Meter Installation Fees I Recycled Water
Fee Description
City of Carlsbad
Master Fee Schedule 2018-19
Development Related Service Fees
$1,000,001 and over fee + 0.070% over $1,000,000
$100,001 to $250,000 fee+ 0.20% over $100,000
$20,001 to $50,000 fee+ 3.0% over $20,000
$250,001 to $500,000 fee+ 0.15% over $250,000
$50,001 to $100,000 fee+ 1.50% over $50,000
$500,001 to $1,000,000 fee+ 0.10% over $500,000
Estimated Costs of lmprovements:$0 to $20,000 fee Flat Fee
$100,001 to $250,000 fee for the first $100,000 + $150 for
each additional $100,000 or fraction thereof
$20,001 to $50,000 fee for the first $20,000 + $20 for each
additional $10,000 or fraction thereof
$250,001 to $750,000 fee for the first $250,000 + $150 for
each additional $100,000 or fraction thereof
$50,001 to $100,000 fee for the first $50,000 + $20 for each
additional $10,000 or fraction thereof
$750,001 and over fee for the first $750,000 + $150 for each
additional $100,000 or fraction thereof
Estimated Costs of lmprovements:$0 to $20,000 fee Flat Fee
2017-18 Fee
$8,729
$3,624
$892
$4,546
$2,577
$5,863
$628
$1,773
$806
$2,130
$1,241
$3,369
$620
*NOTE: No landscape inspection fees for four (4) residential units or less.
Potable Meter Size, Inches: Fire Protection -5/8"
Displacement Meter Meter Fee-Use Rate Sheet
Potable Water Meter Size, Inches: 1" Displacement $352
Potable Water Meter Size, Inches: 10" Actual Cost
Potable Water Meter Size, Inches: 1-1/2" Displacement $606
Potable Water Meter Size, Inches: 1-1/2" Turbo $743
Potable Water Meter Size, Inches: 12" Actual Cost
Potable Water Meter Size, Inches: 2" Displacement $829
Potable Water Meter Size, Inches: 2" Turbo $929
Potable Water Meter Size, Inches: 3/4" Displacement $315
Potable Water Meter Size, Inches: 3" Compound Actual Cost
Potable Water Meter Size, Inches: 3" Turbo Actual Cost
Potable Water Meter Size, Inches: 4" Compound Actual Cost
Potable Water Meter Size, Inches: 4" Turbo Actual Cost
Potable Water Meter Size, Inches: 5/8" Displacement $318
Potable Water Meter Size, Inches: 6" Compound Actual Cost
Potable Water Meter Size, Inches: 6" Turbo Actual Cost
Potable Water Meter Size, Inches: 8" Compound Actual Cost
Potable Water Meter Size, Inches: 8" Turbo Actual Cost
Recycled Meter Size, Inches: Fire Protection -5/8" Meter Fee-Use Rate Sheet Displacement Meter
Recycled Water Meter Size, Inches: 1" Displacement $348
Recycled Water Meter Size, Inches: 10" Tu rbo Actual Cost
Recycled Water Meter Size, Inches: 1-1/2" Turbo $743
Recycled Water Meter Size, Inches: 12" Turbo Actual Cost
Recycled Water Meter Size, Inches: 2" Turbo $929
Recycled Water Meter Size, Inches: 3/4" Displacement $311
Recycled Water Meter Size, Inches: 3" Turbo Actual Cost
Recycled Water Meter Size, Inches: 4" Turbo Actual Cost
Page 18
EXHIBITS-A
2018-19 Fee
$9,000
$3,736
$920
$4,687
$2,656
$6,045
$647
$1,828
$831
$2,196
$1,279
$3,473
$640
$228
$282
Actual Cost
$632
$877
Actual Cost
$834
$981
$246
$3,914
$2,820
$5,437
$3,981
$228
$7,547
$6,104
$11,085
$8,058
$228
$278
Actual Cost
$890
Actual Cost
$994
$242
$2,801
$3,962
June 12, 2018 Item #13 Page 109 of 147
Category
Meter Installation Fees I Recycled Water
Meter Installation Fees I Recycled Water
Meter Installation Fees I Recycled Water
Storm and Wastewater I Retaining Wall Plan
Check Fees**
Storm and Wastewater I Retaining Wall Plan
Check Fees**
Storm and Wastewater I Retaining Wall Plan
Check Fees**
Storm and Wastewater I Retaining Wall Plan
Check Fees**
Storm and Wastewater I Construction SWPPP
Fees***
Storm and Wastewater I Construction SWPPP
Fees***
Storm and Wastewater I Construction SWPPP
Fees***
Storm and Wastewater I Construction SWPPP
Fees***
Storm and Wastewater I Construction SW PPP
Fees***
Storm and Wastewater I Construction SWPPP
Fees***
Storm and Wastewater I Construction SWPPP
Fees***
Storm and Wastewater I Construction SWPPP
Fees***
Storm and Wastewater I Construction SWPPP
Fees***
Storm and Wastewater I Construction SWPPP
Fees***
Storm and Wastewater I Construction SWPPP
Fees***
Storm and Wastewater I Construction SWPPP
Fees***
Storm and Wastewater I Construction SWPPP
Fees***
Storm and Wastewater I Construction SWPPP
Fees***
Storm and Wastewater I Construction SWPPP
Fees***
Storm and Wastewater I Construction SWPPP
Fees***
Storm and Wastewater I Construction SWPPP
Fees
Storm and Wastewater I Storm Water Mgmt.
Plan (SWQMP)
Storm and Wastewater I Storm Water Mgmt.
Plan (SWQMP)
Storm and Wastewater / Storm Water Mgmt.
Plan (SWQMP)
Storm and Wastewater I Storm Water Mgmt.
Plan (SWQMP)
Street Light Energizing Fees*
Street Light Energizing Fees*
Street Light Energizing Fees*
Street Light Energizing Fees*
Street Light Energizing Fees*
Fee Description
City of Carlsbad
Master Fee Schedule 2018-19
Development Related Service Fees
Recycled Water Meter Size, Inches: 5/8" Displacement
Recycled Water Meter Size, Inches: 6" Turbo
Recycled Water Meter Size, Inches: 8" Turbo
Retaining Wall Plan check (Valuation $250,000+)
Retaining Wall Plan check (Valuation $50,001-$250,000)
Retaining Wall Plan check (Valuation = 0-$50,000)
2017-18 Fee
$318
Actual Cost
Actual Cost
0.5% of Engineer's Estimate
($2,000 min.)
$500 + 0.5% of Engineer's
Estimate
$369
EXHIBITS-A
2018-19 Fee
$228
$6,085
$8,039
0.5% of Engineer's Estimate
($2,062 min.)
$516 + 0.5% of Engineer's
Estimate
$380
**Plan Check fee required for retaining walls that are detailed an grading plans, unless they are a San Diego Regional
Standard Drawing.
Inspection Base Fee -Tier Level 1-Per Site -Low Inspection
Priority $62 $64
Inspection Base Fee -Tier Level 1-Per Site -Medium
Inspection Priority $238 $246
Inspection Fee -Tier Level 3 -Each Subsequent Acre Or
Portion Over One Acre -Medium Inspection Priority $226 $233
Inspection Fee -Tier Level 2 -Per Site -High Inspection
Priority $1,317 $1,358
Inspection Fee -Tier Level 2 -Per Site -Medium Inspection
Priority $905 $933
Inspection Fee -Tier Level 3 -Each Subsequent Acre Or
Portion Over One Acre -High Inspection Priority $363 $374
Inspection Fee -Tier Level 3 -Up to 1 Acre -High Inspection
Priority $2,228 $2,298
Inspection Fee -Tier Level 3 -Up to 1 Acre -Medium
Inspection Priority $1,312 $1,353
Plan Review Base fee -Tier Level 3 -Up to 1 Acre -Medium
Inspection Priority $575 $593
Plan Review Base Fee -Tier Level 1 -Per Site -Low
Inspection Priority $52 $53
Plan Review Base Fee -Tier Level 3 -Each Subsequent Acre
Or Portion Over One Acre -High Inspection Priority $86 $89
Plan Review Base Fee -Tier Level 3 -Each Subsequent Acre
Or Portion Over One Acre -Medium Inspection Priority $69 $71
Plan Review Base Fee -Tier Level 3 -Up to 1 Acre -High
Inspection Priority $724 $746
Plan Review Base Fee -Tier Level 1-Per Site -Medium
Inspection Priority $56 $58
Plan Review fee -Tier Level 2 -Per Site -High Inspection
Priority $371 $383
Plan review fee -Tier Level 2 -Per Site -Medium Inspection
Priority $371 $383
***Inspection priority os determined using city's Construction Threat Assessment Worksheet tar Determination ot Praiect's
Threat to Water Qualitl found in Appendix A to Chapter 3, Volume IV of City Standards
SWQMP Fees -Plan Review Fee -Fee for each subsequent
acre or portion thereof over one half acre, in addition to
base fee $127 $131
SWQMP Fees -Inspection Fee -Base Fee for up to one half
acre $297 $306
SWQMP Fees -Inspection Fee -Fee for each subsequent
acre or portion thereof over one half acre, in addition to
base fee $118 $122
SWQMP Fees -Plan Review Fee -Base Fee for up to one half
acre $353 $364
100WAITS $124 $125
150WAITS $171 $172
200WAITS $220 $220
250WAITS $267 $268
40WAITS $67 $67
Page 19
June 12, 2018 Item #13 Page 110 of 147
Category
Street Light Energizing Fees*
Street Light Energizing Fees*
Street Light Energizing Fees*
Street Light Energizing Fees*
Fee Description
4SWATIS
70WATIS
8SWATIS
City of Carlsbad
Master Fee Schedule 2018-19
Development Related Service Fees
EXHIBIT8-A
2017-18 Fee 2018-19 Fee
$72 $72
$95 $96
$110 $110
*Street Light Energizing Fees are the cost for energizing each street light for eighteen months and includes a $30.00 charge
per light/or connecting the light to an SDG&E service point.
Page 20
June 12, 2018 Item #13 Page 111 of 147
EXHIBITS-A
Section 3
Development Impact Fees
Page 21
June 12, 2018 Item #13 Page 112 of 147
Category
Bridge and Thoroughfare District 1
Bridge and Thoroughfare District 2
Bridge and Thoroughfare District 3
Bridge and Thoroughfare District 4
Bridge and Thoroughfare District 2
Bridge and Thoroughfare District 2
Bridge and Thoroughfare District 2
Bridge and Thoroughfare District 3
Habitat Mitigation Fees
Habitat Mitigation Fees
Habitat Mitigation Fees
Local Facility Management Zones
Local Facility Management Zones
Local Facility Management Zones
Local Facility Management Zones
Local Facility Management Zones
Local Facility Management Zones
Local Facility Management Zones
Local Facility Management Zones
Local Facility Management Zones
Local Facility Management Zones
Local Facility Management Zones
Local Facility Management Zones
Local Facility Management Zones
Local Facility Management Zones
Local Facility Management Zones
Local Facility Management Zones
Local Facility Management Zones
Local Facility Management Zones
Local Facility Management Zones
Local Facility Management Zones
Local Facility Management Zones
Local Facility Management Zones
Local Facility Management Zones
Local Facility Management Zones
Local Facility Management Zones
Park in Lieu
Park in Lieu
Park in Lieu
Park in Lieu
Park in Lieu
Park in Lieu
Park in Lieu
Park in Lieu
Park in Lieu
Park in Lieu
Park in Lieu
Park in Lieu
Park in Lieu
Park in Lieu
Park in Lieu
Park in Lieu
Planned Local Drainage Area Fees*
Planned Local Drainage Area Fees*
Planned Local Drainage Area Fees*
Planned Local Drainage Area Fees*
Planned Local Drainage Area Fees*
Planned Local Drainage Area Fees*
Planned Local Drainage Area Fees*
Planned Local Drainage Area Fees*
Planned Local Drainage Area Fees*
Planned Local Drainage Area Fees*
Planned Local Drainage Area Fees*
Fee Description
City of Carlsbad
Master Fee Schedule 2018-19
Development Impact Fees
Bridge & Thoroughfare -all other -per Avg. Daily Trip (Outside CFD)
Bridge & Thoroughfare -per Apartment Unit (Outside CFD)
Bridge & Thoroughfare -per Condominium Unit (Outside CFD)
Bridge & Thoroughfare -per Single Family Unit (Outside CFD)
Bridge & Thoroughfare District #2 -Zone 20
Bridge & Thoroughfare District #2 -Zone 21
Bridge & Thoroughfare District #2 -Zone 5
Bridge & Thoroughfare District#3 -Fee per ADT
Type D -Coastal Sage Scrub
Type E -Non-Native Grassland
Type F -Agricultural Land, Disturbed Land, Eucalyptus Woodland
Local Facilities Map -Zone 1
Local Facilities Map -Zone 10
Local Facilities Map -Zone 11
Local Facilities Map -Zone 12
Local Facilities Map -Zone 13 (per square foot)
Local Facilities Map -Zone 14
Local Facilities Map -Zone 15 (per square foot I New Construction)
Local Facilities Map -Zone 16 (per square foot I New Construction)
Local Facilities Map -Zone 17 (per square foot I New Construction)
Local Facilities Map -Zone 18
Local Facilities Map -Zone 19
Local Facilities Map -Zone 2
Local Facilities Map -Zone 20
Local Facilities Map -Zone 21
Local Facilities Map -Zone 22
Local Facilities Map -Zone 23
Local Facilities Map -Zone 24
Local Facilities Map -Zone 25
Local Facilities Map -Zone 3
Local Facilities Map -Zone 4
Local Facilities Map -Zone 5 (per square foot/ New Construction)
Local Facilities Map -Zone 6 (per unit) -Local Facilities Map -Zone 7
Local Facilities Map -Zone 8
Local Facilities Map -Zone 9
District 1 NW -Value per Acre 977,000 -Attached (5 units or more)
District 1 NW -Value per Acre 977,000 -Mobile Home
District 1 NW -Value per Acre 977,000 -Attached (4 units or less)
District 1 NW -Value per Acre 977,000 -Single Family Detached & Duplex
District 2 NE -Value per Acre 732,000 -Attached (4 units or less)
District 2 NE-Value per Acre 732,000-Attached (5 units or more)
District 2 NE -Value per Acre 732,000 -Mobile Home
District 2 NE-Value per Acre 732,000-Single Family Detached & Duplex
District 3 SW -Value per Acre 732,000 -Attached (5 units or more)
District 3 SW -Value per Acre 732,000 -Mobile Home
District 3 SW -Value per Acre 732,000 -Attached (4 units or less)
District 3 SW -Value per Acre 732,000 -Single Family Detached & Duplex
District 4 SE -Value per Acre 732,000 -Attached (5 units or more)
District 4 SE -Value per Acre 732,000 -Mobile Home
District 4 SE -Value per Acre 732,000 -Attached (4 units or less)
District 4 SE-Value per Acre 732,000-Single Family Detached & Duplex
PLDA -High Runoff -Drainage Area A
PLDA-High Runoff-Drainage Area B
PLDA-High Runoff-Drainage Area C
PLDA-High Runoff-Drainage Area D
PLDA -Low Runoff -Drainage Area A
PLDA -Low Runoff -Drainage Area B
PLDA -Low Runoff -Drainage Area C
PLDA-Low Runoff -Drainage Area D
PLDA -Medium Runoff-Drainage Area A
PLDA -Medium Runoff-Drainage Area B
PLDA-Medium Runoff -Drainage Area C
Page 22
EXHIBITS-A
2017-18 Fee 2018-19 Fee
$22 $22
$318 $318
$424 $424
$530 $530
$1,928 $1,982
$1,557 $1,600
$372 $382
$212 $219
$32,582 $33,494
$16,292 $16,748
$3,259 $3,350
$0 $0
$0 $0
$0 $0
$0 $0
$0.40 $0.40
$0 $0
$0 $0
$0 $0
$0.40 $0.40
$0.40 $0.40
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0.40 $0.40
$310 $310
$0 $0
$0 $0
$0 $0
$6,190 $6,190
$4,934 $4,934
$6,414 $6,414
$7,649 $7,649
$4,804 $4,804
$4,636 $4,636
$3,696 $3,696
$5,728 $5,728
$4,636 $4,636
$3,696 $3,696
$4,804 $4,804
$5,728 $5,728
$4,636 $4,636
$3,696 $3,696
$4,804 $4,804
$5,728 $5,728
$28,279 $29,212
$10,569 $10,917
$10,262 $10,600
$9,729 $10,050
$6,526 $6,741
$2,439 $2,520
$2,368 $2,446
$2,245 $2,319
$12,977 $13,405
$4,702 $4,857
$3,350 $3,460
June 12, 2018 Item #13 Page 113 of 147
Category
Planned Local Drainage Area Fees*
Planned Local Drainage Area Fees*
Potable and Reclaimed Connection Fees**
Potable and Reclaimed Connection Fees**
Potable and Reclaimed Connection Fees**
Potable and Reclaimed Connection Fees**
Potable and Reclaimed Connection Fees**
Potable and Reclaimed Connection Fees**
Potable and Reclaimed Connection Fees**
Potable and Reclaimed Connection Fees**
Potable and Reclaimed Connection Fees**
Potable and Reclaimed Connection Fees**
Potable and Reclaimed Connection Fees**
Potable and Reclaimed Connection Fees**
Potable and Reclaimed Connection Fees**
Potable and Reclaimed Connection Fees**
Potable and Reclaimed Connection Fees**
Potable and Reclaimed Connection Fees**
Sewer Benefit Areas
Sewer Benefit Areas
Sewer Benefit Areas
Sewer Benefit Areas
Sewer Benefit Areas
Sewer Benefit Areas
Sewer Benefit Areas
Sewer Benefit Areas
Sewer Benefit Areas
Sewer Benefit Areas
Sewer Benefit Areas
Sewer Benefit Areas
Sewer Connection Fee
Traffic Impact Fees***
Traffic Impact Fees***
Traffic Impact Fees***
Traffic Impact Fees***
Traffic Impact Fees***
Traffic Impact Fees***
Traffic Impact Fees***
Traffic Impact Fees***
Traffic Impact Fees***
Fee Description
City of Carlsbad
Master Fee Schedule 2018-19
Development Impact Fees
PLDA-Medium Runoff-Drainage Area D
*Fees are in Dollars Per Acre.
1" Meter Size, Inches -Displacement
1-1/2" Meter Size, Inches -Displacement
1-1/2" Meter Size, Inches -Turbo (All Irrigation Meters)
2" Meter Size, Inches -Displacement
2" Meter Size, Inches -Turbo (All Irrigation Meters)
3/4" Meter Size, Inches -Displacement
3" Meter Size, Inches -Displacement
3" Meter Size, Inches -Turbo (All Irrigation Meters)
4" Meter Size, Inches -Displacement
4" Meter Size, Inches -Turbo (All Irrigation Meters)
5/8" Meter Size, Inches -Displacement
6" Meter Size, Inches -Displacement
6" Meter Size, Inches -Turbo (All Irrigation Meters)
8" Meter Size, Inches -Displacement
8" Meter Size, Inches -Turbo (All Irrigation Meters)
**These fees are in addition to the Meter lnstollotion Fees and SDCWA Fees.
Sewer Benefit Area Fee -Area A
Sewer Benefit Area Fee -Area B
Sewer Benefit Area Fee -Area C
Sewer Benefit Area Fee -Area D
Sewer Benefit Area Fee -Area E
Sewer Benefit Area Fee -Area F
Sewer Benefit Area Fee -Area G
Sewer Benefit Area Fee -Area H
Sewer Benefit Area Fee -Area J
Sewer Benefit Area Fee -Area K
Sewer Benefit Area Fee -Area L
Sewer Benefit Area Fee -Area M
Sewer Connection (General Capacity all areas plus Sewer Benefit Area Fees)
Traffic Impact Fee -Apartment (Inside of CFD 1) per ADT
Traffic Impact Fee -Apartment (Outside of CFD 1) per ADT
Traffic Impact Fee -Commercial/Industrial Cost Per Trip (Inside CFD)
Traffic Impact Fee -Commercial/Industrial Cost Per Trip (Outside of CFD)
Traffic Impact Fee -Condominium (Inside of CFD 1) per ADT
Traffic Impact Fee -Condominium (Outside of CFD 1) per ADT
Traffic Impact Fee -Single Family (Inside of CFD 1) per ADT
Traffic Impact Fee -Single Family (Outside of CFD 1) per ADT
EXHIBITS-A
2017-18 Fee 2018-19 Fee
$3,673 $3,794
$9,381 $9,644
$17,721 $18,217
$20,803 $21,386
$26,687 $27,434
$33,357 $34,291
$5,944 $6,111
$45,149 $46,413
$70,232 $72,199
$70,232 $72,199
$200,664 $206,282
$4,169 $4,286
$130,430 $134,083
$401,320 $412,557
$154,160 $158,476
$562,040 $577,778
$1,146 $1,178
$1,304 $1,341
$2,403 $2,471
$2,408 $2,476
$3,552 $3,651
$3,571 $3,671
$720 $740
$1,048 $1,077
$1,976 $2,032
$1,562 $1,606
$1,562 $1,606
$77 $79
$934 $960
$280 $288
$329 $339
$111 $114
$132 $136
$280 $288
$329 $339
$280 $288
$329 $339
***CMC 18.42.020 determines definitions and Average Doily Trips (ADT}. Residential generation rotes are:
Single Family (calculated at 10 ADT}, Condominiums (calculated at 8 ADT}, Apartments (calculated at 6 ADT}.
Code 18.42.050 -Traffic Impact Fees will be adjusted annually as part of the Capital Improvement Program
budget process, by two percent or the annual percentage change in the Ca/trans Construction Cost Index (12
month index, whichever is higher). FEES SUBJECT TO SECTION 66000 OF THE CALIFORNIA GOVERNMENT CODE.
Page 23
June 12, 2018 Item #13 Page 114 of 147
Section 4
Deposits and Securities
Page 24
EXHIBITS-A
June 12, 2018 Item #13 Page 115 of 147
Category
Development/ Subdivision Improvements*
Development/ Subdivision Improvements*
Development/ Subdivision Improvements*
Grading and Erosion Control*
Grading and Erosion Control*
Description
City of Carlsbad
Master Fee Schedule 2018-19
Deposits and Securities
Faithful Performance
Security
Labor and Materials Security
Monumentation
Security
Grading Cash
2017-18 Deposit
Based on improvement cost
estimate
50% of Faithful Performance
Security
Based on total cost of
Monumentation
Deposit 10% of total grading security
Grading Security (with approved
plans) Based on grading cost estimate
EXHIBITS-A
2018-19 Deposit
Based on improvement cost
estimate
50% of Faithful Performance
Security
Based on total cost of
Monumentation
10% of total grading security
Based on grading cost
estimate
*Note: These are not fees. Rather, the city may require yau to provide security to ensure work related to your project is completed in accordance with
the Carlsbad Municipal Code and development agreements executed between you and the city. This information is to help you understand the standard
structure of how these deposits and securities are calculated. The security amounts are calculated using final city-approved cost estimates, not initial or
draft estimates during plan check.
Page 25
June 12, 2018 Item #13 Page 116 of 147