HomeMy WebLinkAbout2019-09-10; City Council; Resolution 2019-162RESOLUTION NO. 2019-162
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
CALIFORNIA, AUTHORIZING THE CITY MANAGER TO EXECUTE A
PROFESSIONAL SERVICE MASTER AGREEMENT FOR INFORMATION
TECHNOLOGY SELECTION OF PROJECT PORTFOLIO MANAGEMENT SYSTEM
SERVICES WITH PUBLIC CONSULTING GROUP, INC (PCG) FOR AN. AMOUNT
NOT TO EXCEED $200,000 FOR A ONE YEAR PERIOD.
Exhibit 3
WHEREAS, the City Council of the City of Carlsbad, California has determined that having
available consultants for professional services for the selection of a project portfolio management
system is needed; and
WHEREAS, the Information Technology Department solicited, received, and reviewed
Statements of Qualifications (SOQs) for professional services consistent with the Carlsbad Municipal
Code Section 3.28.060; and
WHEREAS, following a review and ranking of the SOQs based on a weighted scoring system staff
recommends that PCG, Inc is qualified and provides a best value to the City of Carlsbad in the discipline
of selection of a project portfolio management system; and
WHEREAS, the budget is available in the General Fund Innovation Fund for the selection of a
project portfolio management system.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as
follows:
1. That the above recitations are true and correct.
2. That the City Council hereby authorizes the City Manager to execute the Professional
Service Master Agreement with PCG, Inc in an amount not to exceed $200,000 over a
one year period (Attachment A).
Sept. 10, 2019 Item #2 Page 63 of 113
Exhibit 3
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of
Carlsbad on the 10th day of September 2019, by the following vote, to wit:
AYES: Hall, Blackburn, Bhat-Patel, Schumacher, Hamilton.
NAYS:
ABSENT:
None.
None.
A dill
~. Mayor
\:b f l L ,~YY]u Arh'. <tl~72 vfu/v
~RBARA ENGLESON, City Clerk
(,,/
(SEAL)
Sept. 10, 2019 Item #2 Page 64 of 113
MASTER AGREEMENT FOR INFORMATION TECHNOLOGY PROJECT PORTFOLIO
MANGEMENT SYSTEM IMPLEMENTATION SERVICES
PUBLIC CONSULTING GROUP, INC
THIS AGREEMENT Jr--.. made and entered into as of the /:} ·fh day of
" 0..L::J_, by and between the CITY OF CARLSBAD, a municipal
corpor ion, hereinafter referred to as "City", and Public Consulting Group, Inc a corporation,
hereinafter referred to as "Contractor."
RECITALS
A City requires the professional services of an information technology consulting firm
that is experienced in information technology project portfolio management system
implementation services.
B. The professional services are required on a non-exclusive, project-by-project
basis.
C. Contractor has the necessary experience in providing professional services and
advice related to information technology project portfolio management system implementation
services.
D. Contractor has submitted a proposal to City and has affirmed its willingness and
ability to perform such work.
NOW, THEREFORE, in consideration of these recitals and the mutual covenants
contained herein, City and Contractor agree as follows:
1. SCOPE OF WORK
City retains Contractor to perform, and Contractor agrees to render, those services (the
"Services") that are defined in attached Exhibit "A", which is incorporated by this reference in
accordance with this Agreement's terms and conditions. To the extent any of the terms in any
exhibit to this Agreement conflict, in whole or part, with the terms of this Agreement, the terms of
this Agreement shall prevail.
Contractor's obligations with respect to any project granted to Contractor under this Agreement
will be as specified in the Task Description for the project (see paragraph 5 below).
2. STANDARD OF PERFORMANCE
While performing the Services, Contractor will exercise the reasonable professional care and skill
customarily exercised by reputable members of Contractor's profession practicing in the
Metropolitan Southern California Area, and will use reasonable diligence and best judgment while
exercising its professional skill and expertise.
3. TERM
The term of this Agreement will be effective for a period of one (1) year from the date first above
written. The City Manager may amend the Agreement to extend it for two (2) additional one (1)
year periods or parts thereof. Extensions will be based upon a satisfactory review of Contractor's
performance, City needs, and appropriation of funds by the City Council. The parties will prepare
a written amendment indicating the effective date and length of the extended Agreement.
4. PROGRESS AND COMPLETION
The work for any project granted to Contractor pursuant to this Agreement will begin within ten
(10) days after receipt of notification to proceed by City and be completed within the time specified
City Attorney Approved Version 6/12/18 Sept. 10, 2019 Item #2 Page 65 of 113
in the Task Description for the project (see paragraph 5 below). Extensions of time for a specific
Task Description may be granted if requested by Contractor and agreed to in writing by the City
Manager or the Division Director as authorized by the City Manager ("Director"). The City
Manager or Director will give allowance for documented and substantiated unforeseeable and
unavoidable delays not caused by a lack of foresight on the part of Contractor, or delays caused
by City inaction or other agencies' lack of timely action. In no event shall a specific Task
Description exceed the term of this Agreement.
5. COMPENSATION
The cumulative total for all projects allowed pursuant to this Agreement will not exceed two
hundred thousand dollars ($200,000) per Agreement year. If the City elects to extend the
Agreement, the amount shall not exceed two hundred thousand dollars ($200,000) per Agreement
year. The total amount of the Agreement shall not exceed two hundred thousand dollars
($200,000) for the initial one year term. Fees will be paid on a project-by-project basis and will
be based on Contractor's Schedule of Rates specified in Exhibit "A". Prior to initiation of any
project work by Contractor, City shall prepare a Project Task Description and Fee Allotment (the
"Task Description") which, upon signature by Contractor and for City, the City Manager or
Director, will be considered a part of this Agreement. The Task Description will include a detailed
scope of services for the particular project being considered and a statement of Contractor's fee
to complete the project in accordance with the specified scope of services. The Task Description
will also include a description of the method of payment and will be based upon an hourly rate,
percentage of project complete, completion of specific project tasks or a combination thereof.
6. STATUS OF CONTRACTOR
Contractor will perform the Services in Contractor's own way as an independent contractor and
in pursuit of Contractor's independent calling, and not as an employee of City. Contractor will be
under control of City only as to the result to be accomplished, but will consult with City as
necessary. The persons used by Contractor to provide services under this Agreement will not be
considered employees of City for any purposes.
The payment made to Contractor pursuant to the Agreement will be the full and complete
compensation to which Contractor is entitled. City will not make any federal or state tax
withholdings on behalf of Contractor or its agents, employees or subcontractors. City will not be
required to pay any workers' compensation insurance or unemployment contributions on behalf
of Contractor or its employees or subcontractors. Contractor agrees to indemnify City within thirty
(30) days for any tax, retirement contribution, social security, overtime payment, unemployment
payment or workers' compensation payment which City may be required to make on behalf of
Contractor or any agent, employee, or subcontractor of Contractor for work done under this
Agreement. At the City's election, City may deduct the indemnification amount from any balance
owing to Contractor.
7. SUBCONTRACTING
Contractor will not subcontract any portion of the Services without prior written approval of City.
If Contractor subcontracts any of the Services, Contractor will be fully responsible to City for the
acts and omissions of Contractor's subcontractor and of the persons either directly or indirectly
employed by the subcontractor, as Contractor is for the acts and omissions of persons directly
employed by Contractor. Nothing contained in this Agreement will create any contractual
relationship between any subcontractor of Contractor and City. Contractor will be responsible for
payment of subcontractors. Contractor will bind every subcontractor and every subcontractor of
a subcontractor by the terms of this Agreement applicable to Contractor's work unless specifically
noted to the contrary in the subcontract and approved in writing by City.
2 City Attorney Approved Version 6/12/18
Sept. 10, 2019 Item #2 Page 66 of 113
8. OTHER CONTRACTORS
The City reserves the right to employ other Contractors in connection with the Services.
9. INDEMNIFICATION
Contractor agrees to indemnify and hold harmless the City and its officers, officials, employees
and volunteers from and against all claims, damages, losses and expenses including attorneys
fees arising out of the performance of the work described herein caused by any willful misconduct
or negligent act or omission of the Contractor, any subcontractor, anyone directly or indirectly
employed by any of them or anyone for whose acts any of them may be liable.
The parties expressly agree that any payment, attorney's fee, costs or expense City incurs or
makes to or on behalf of an injured employee under the City's self-administered workers'
compensation is included as a loss, expense or cost for the purposes of this section, and that this
section will survive the expiration or early termination of this Agreement.
10. INSURANCE
Contractor will obtain and maintain for the duration of the Agreement and any and all
amendments, insurance against claims for injuries to persons or damage to property which may
arise out of or in connection with performance of the services by Contractor or Contractor's
agents, representatives, employees or subcontractors. The insurance will be obtained from an
insurance carrier admitted and authorized to do business in the State of California. The insurance
carrier is required to have a current Best's Key Rating of not less than "A-:VII"; OR with a surplus
line insurer on the State of California's List of Approved Surplus Line Insurers (LASLI) with a rating
in the latest Best's Key Rating Guide of at least "A:X"; OR an alien non-admitted insurer listed by
the National Association of Insurance Commissioners (NAIC) latest quarterly listings report.
10.1 Coverages and Limits. Contractor will maintain the types of coverages and minimum limits
indicated below, unless Risk Manager or City Manager approves a lower amount. These minimum
amounts of coverage will not constitute any limitations or cap on Contractor's indemnification
obligations under this Agreement. City, its officers, agents and employees make no representation
that the limits of the insurance specified to be carried by Contractor pursuant to this Agreement
are adequate to protect Contractor. If Contractor believes that any required insurance coverage
is inadequate, Contractor will obtain such additional insurance coverage, as Contractor deems
adequate, at Contractor's sole expense. The full limits available to the named insured shall also
be available and applicable to the City as an additional insured.
10.1.1 Commercial General Liability (CGL) Insurance. Insurance written on an
"occurrence" basis, including personal & advertising injury, with limits no less than $2,000,000 per
occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply
separately to this project/location or the general aggregate limit shall be twice the required
occurrence limit.
10.1.2 Automobile Liability. (if the use of an automobile is involved for Contractor's
work for City). $2,000,000 combined single-limit per accident for bodily injury and property
damage.
10.1.3 Workers' Compensation and Employer's Liability. Workers' Compensation
limits as required by the California Labor Code. Workers' Compensation will not be required if
Contractor has no employees and provides, to City's satisfaction, a declaration stating this.
3 City Attorney Approved Version 6/12/18
Sept. 10, 2019 Item #2 Page 67 of 113
10.1.4 Professional Liability. Errors and omIssIons liability appropriate to
Contractor's profession with limits of not less than $1,000,000 per claim. Coverage must be
maintained for a period of five years following the date of completion of the work.
10.2. Additional Provisions. Contractor will ensure that the policies of insurance required under
this Agreement contain, or are endorsed to contain, the following provisions:
10.2.1 The City will be named as an additional insured on Commercial General
Liability which shall provide primary coverage to the City.
10.2.2 Contractor will obtain occurrence coverage, excluding Professional
Liability, which will be written as claims-made coverage.
10.2.3 This insurance will be in force during the life of the Agreement and any
extensions of it and will not be canceled without thirty (30) days prior written notice to City sent
by certified mail pursuant to the Notice provisions of this Agreement.
10.3 Providing Certificates of Insurance and Endorsements. Prior to City's execution of this
Agreement, Contractor will furnish certificates of insurance and endorsements to City.
10.4 Failure to Maintain Coverage. If Contractor fails to maintain any of these insurance
coverages, then City will have the option to declare Contractor in breach, or may purchase
replacement insurance or pay the premiums that are due on existing policies in order to maintain
the required coverages. Contractor is responsible for any payments made by City to obtain or
maintain insurance and City may collect these payments from Contractor or deduct the amount
paid from any sums due Contractor under this Agreement.
10.5 Submission of Insurance Policies. City reserves the right to require, at anytime, complete
and certified copies of any or all required insurance policies and endorsements.
11. BUSINESS LICENSE
Contractor will obtain and maintain a City of Carlsbad Business License for the term of the
Agreement, as may be amended from time-to-time.
12. ACCOUNTING RECORDS
Contractor will maintain complete and accurate records with respect to costs incurred under this
Agreement. All records will be clearly identifiable. Contractor will allow a representative of City
during normal business hours to examine, audit, and make transcripts or copies of records and
any other documents created pursuant to this Agreement. Contractor will allow inspection of all
work, data, documents, proceedings, and activities related to the Agreement for a period of three
(3) years from the date of final payment under this Agreement.
13. OWNERSHIP OF DOCUMENTS
All work product produced by Contractor or its agents, employees, and subcontractors pursuant
to this Agreement is the property of City. In the event this Agreement is terminated, all work
product produced by Contractor or its agents, employees and subcontractors pursuant to this
Agreement will be delivered at once to City. Contractor will have the right to make one (1) copy
of the work product for Contractor's records.
4 City Attorney Approved Version 6/12/18
Sept. 10, 2019 Item #2 Page 68 of 113
14. COPYRIGHTS
Contractor agrees that all copyrights that arise from the services will be vested in City and
Contractor relinquishes all claims to the copyrights in favor of City.
15. NOTICES
The name of the persons who are authorized to give written notice or to receive written notice on
behalf of City and on behalf of Contractor under this Agreement are:
For Cit~{ For Contractor:
Name Maria Callander Name
Title IT Director Title
Dept Information Technology Address
CITY OF CARLSBAD
Address 1635 Faraday Ave Phone
Carlsbad, CA 92008 Email
Phone 760.602.2454
Each party will notify the other immediately of any changes of address that would require any
notice or delivery to be directed to another address.
16. CONFLICT OF INTEREST
Contractor shall file a Conflict of Interest Statement with the City Clerk in accordance with the
requirements of the City of Carlsbad Conflict of Interest Code. The Contractor shall report
investments or interests in all categories.
YesD No~
17. GENERAL COMPLIANCE WITH LAWS
Contractor will keep fully informed of federal, state and local laws and ordinances and regulations
which in any manner affect those employed by Contractor, or in any way affect the performance
of the Services by Contractor. Contractor will at all times observe and comply with these laws,
ordinances, and regulations and will be responsible for the compliance of Contractor's services
with all applicable laws, ordinances and regulations.
Contractor will be aware of the requirements of the Immigration Reform and Control Act of 1986
and will comply with those requirements, including, but not limited to, verifying the eligibility for
employment of all agents, employees, subcontractors and consultants whose services are
required by this Agreement.
18. DISCRIMINATION AND HARASSMENT PROHIBITED
Contractor will comply with all applicable local, state and federal laws and regulations prohibiting
discrimination and harassment.
19. DISPUTE RESOLUTION
If a dispute should arise regarding the performance of the Services the following procedure will
be used to resolve any questions of fact or interpretation not otherwise settled by agreement
between the parties. Representatives of Contractor or City will reduce such questions, and their
respective views, to writing. A copy of such documented dispute will be forwarded to both parties
involved along with recommended methods of resolution, which would be of benefit to both
parties. The representative receiving the letter will reply to the letter along with a recommended
method of resolution within ten (10) business days. If the resolution thus obtained is unsatisfactory
5 City Attorney Approved Version 6/12/18
Sept. 10, 2019 Item #2 Page 69 of 113
to the aggrieved party, a letter outlining the disputes will be forwarded to the City Manager. The
City Manager will consider the facts and solutions recommended by each party and may then opt
to direct a solution to the problem. In such cases, the action of the City Manager will be binding
upon the parties involved, although nothing in this procedure will prohibit the parties from seeking
remedies available to them at law.
20. TERMINATION
In the event of the Contractor's failure to prosecute, deliver, or perform the Services, City may
terminate this Agreement for nonperformance by notifying Contractor by certified mail of the
termination. If City decides to abandon or indefinitely postpone the work or services contemplated
by this Agreement, City may terminate this Agreement upon written notice to Contractor. Upon
notification of termination, Contractor has five (5) business days to deliver any documents owned
by City and all work in progress to City at the address contained in this Agreement. City will make
a determination of fact based upon the work product delivered to City and of the percentage of
work that Contractor has performed which is usable and of worth to City in having the Agreement
completed. Based upon that finding City will determine the final payment of the Agreement.
Either party upon tendering thirty (30) days written notice to the other party may terminate this
Agreement. In this event and upon request of City, Contractor will assemble the work product and
put it in order for proper filing and closing and deliver it to City. Contractor will be paid for work
performed to the termination date; however, the total will not exceed the lump sum fee payable
under this Agreement. City will make the final determination as to the portions of tasks completed
and the compensation to be made.
21. COVENANTS AGAINST CONTINGENT FEES
Contractor warrants that Contractor has not employed or retained any company or person, other
than a bona fide employee working for Contractor, to solicit or secure this Agreement, and that
Contractor has not paid or agreed to pay any company or person, other than a bona fide
employee, any fee, commission, percentage, brokerage fee, gift, or any other consideration
contingent upon, or resulting from, the award or making of this Agreement. For breach or violation
of this warranty, City will have the right to annul this Agreement without liability, or, in its discretion,
to deduct from the Agreement price or consideration, or otherwise recover, the full amount of the
fee, commission, percentage, brokerage fees, gift, or contingent fee.
22. CLAIMS AND LAWSUITS
By signing this Agreement, Contractor agrees that any Agreement claim submitted to City must
be asserted as part of the Agreement process as set forth in this Agreement and not in anticipation
of litigation or in conjunction with litigation. Contractor acknowledges that if a false claim is
submitted to City, it may be considered fraud and Contractor may be subject to criminal
prosecution. Contractor acknowledges that California Government Code sections 12650 et seq.,
the False Claims Act applies to this Agreement and, provides for civil penalties where a person
knowingly submits a false claim to a public entity. These provisions include false claims made
with deliberate ignorance of the false information or in reckless disregard of the truth or falsity of
information. If City seeks to recover penalties pursuant to the False Claims Act, it is entitled to
recover its litigation costs, including attorney's fees. Contractor acknowledges that the filing of a
false claim may subject Contractor to an administrative debarment proceeding as the result of
which Contractor may be prevented to act as a Contractor on any public work or improvement for
a period of up to five (5) years. Contractor acknowledges debarment by another jurisdiction is
grounds for City to terminate this Agreement.
23. JURISDICTIONS AND VENUE
Any action at law or in equity brought by either of the parties for the purpose of enforcing a right
or rights provided for by this Agreement will be tried in a court of competent jurisdiction in the
County of San Diego, State of California, and the parties waive all provisions of law providing for
6 City Attorney Approved Version 6/12/18
Sept. 10, 2019 Item #2 Page 70 of 113
a change of venue in these proceedings to any other county.
24. SUCCESSORS AND ASSIGNS
It is mutually understood and agreed that this Agreement will be binding upon City and Contractor
and their respective successors. Neither this Agreement nor any part of it nor any monies due or
to become due under it may be assigned by Contractor without the prior consent of City, which
shall not be unreasonably withheld.
25. ENTIRE AGREEMENT
This Agreement, together with any other written document referred to or contemplated by it, along
with the purchase order for this Agreement and its provisions, embody the entire Agreement and
understanding between the parties relating to the subject matter of it. In case of conflict, the terms
of the Agreement supersede the purchase order. Neither this Agreement nor any of its provisions
may be amended, modified, waived or discharged except in a writing signed by both parties.
/II
/II
/II
/II
/II
Ill
Ill
/II
/II
/II
/II
/II
/II
/II
Ill
/II
/II
7 City Attorney Approved Version 6/12/18
Sept. 10, 2019 Item #2 Page 71 of 113
26. AUTHORITY
The individuals executing this Agreement and the instruments referenced in it on behalf of
Contractor each represent and warrant that they have the legal power, right and actual authority
to bind Contractor to the terms and conditions of this Agreement.
CONTRACTOR
. ~sinhere)
\..J I .\ \ I -.. 5; . \'('\ I> ~ -.....\lc..l""'-.)11. 'l..;. G\--...r '
(print name/title)
~½=Q&
.S \~~ ¥ j \('-"'-~ ~r-t.\ C..... •
(print nameititle) \
By:
ATTEST:
ARLSBAD, a municipal
0
1
thf ?tate of California
'·-1,.
~ City Manager
~ARBARA ENGLESON
l' City Clerk
Proper notarial acknowledgment of execution by Contractor must be attached. If a corporation,
Agreement must be signed by one corporate officer from each of the following two groups:
Group A Group B
Chairman, Secretary,
President, or Assistant Secretary,
Vice-President CFO or Assistant Treasurer
Otherwise, the corporation must attach a resolution certified by the secretary or assistant
secretary under corporate seal empowering the officer(s) signing to bind the corporation.
CITY OF CARLSBAD, a municipal corporation of the State of California
APPROVED AS TO ~~~~
CELIA A. ff EWYf-, cttorney
BY: _....;:(/;__/M,):_ ________ _
Assistant City Attorney
8 City Attorney Approved Version 6/12/18
Sept. 10, 2019 Item #2 Page 72 of 113
Commonwealth of Massachusetts
County of Suffolk
On this a, day of ~Fw+-2019, before me Diane E. Casey, the undersigned
officer, personally appeare William S. Mosakowski, who acknowledged himself
to be the President and CEO of Public Consulting Group, Inc., and that such
William S. Mosakowski, being authorized to do so, executed the foregoing
instrument for the purposes therein contained.
Commonwealth of Massachusetts
County of Suffolk
~ DIANc E CASEY
W Notary Public
COMMONWEALTH OF MASSACHUSETTS
My Commission Expires On
January 22, 2021
On this dt3 day of au,,~ 2019, before me Diane E. Casey, the undersigned
officer, personally appearStephen S. Skinner, who acknowledged himself to be
the Secretary of Public Consulting Group, Inc., and that such Stephen P. Skinner,
being authorized to do so, executed the foregoing instrument for the purposes
therein contained.
DIANE E CASEY ~ Notary Public
COMMONWEALTH OF MASSACHUSETTS
My Commission Expires On
January 22. 2021
Sept. 10, 2019 Item #2 Page 73 of 113
Primary Address of Firm
Firm's Legal Name
Firm's Legal Address
Street Address
City/State/Zip
Telephone Number
Email
EXHIBIT "A"
SCOPE OF SERVICES
Public Consulting Group, Inc.
621 Capitol Mall, Ste. 1425
same as above
Sacramento, CA 95814
(916) 565-8090
services@pcgus.com
Primary address from which City contracted services will be provided
Firm's Legal Address 621 Capitol Mall, Ste. 1425
Street Address same as above
City/State/Zip Sacramento, CA 95814
Telephone Number (916) 565-8090
Email services@pcgus.com
Project Manager responsible for the Consultants Firm's service, delivery, execution and
performance
Name and Title Sally Nagy
Office Phone 621 Capitol Mall, Ste. 1425
Mobile Phone (916) 704-6701
Email swnagy@pcgus.com
CA Registration No. n/a
(If applicable)
Expiration Date n/a
(If applicable)
Alternate contact for contracted services
Name and Title Bret Mohninger
Office Phone (916) 565-8090
Mobile Phone n/a
Email bmohninger@pcgus.com
9 City Attorney Approved Version 6/12/18
Sept. 10, 2019 Item #2 Page 74 of 113
1. Project Team and Approach
Project Team
Experience has shown us that successful projects result from a well-balanced project team with a broad
spectrum of capabilities and experience; bringing the right expertise for the task at hand. We are therefore
presenting six resumes, including some without the preferred PMP. These additional individuals not only
bring local government experience but also specialized expertise in the areas of Change Management,
Procurement, IV&V, Testing, and Implementation. The best fit resources for a given project will be assigned
based on the project's requirements. The overall team structure is shown below by potential role. Most staff
are shown in more than one role which will be determined by the nature of the project. In addition, Subject
Matter Experts are available if needed depending on the nature of the project (such as financial
management, human resources, and security).
Project
Manager
Yvonne De la Rosa
Change
Managers
Shell Culp
Phyllis Smith
Implementation
SMEs
MarieBeth Adams
David Westphalen
Figure 1. Project Portfolio Management System Team Structure
Requirements and Certifications
Procurement
Specialists
Sally Nagy
Phyllis Smith
All PCG team members have a Bachelor's degree or higher and possess the required knowledge and
experience needed. Most have ten years' experience in a project management capacity.
The table below highlights key req uirements and certifications for the proposed team.
Table 1. PCG's Team Member Requirements and Certifications
TEAM MEMBER
SALLY NAGY
SHELL CULP
YVONNE DE LA ROSA
DAVID WESTPHALEN
10+ YEARS
PM EXP
✓
✓
✓
✓
✓ ✓
✓
✓ ✓
✓ ✓
LOCAL
Gov
✓
✓
✓
✓
PROSCI
✓
ITIL v3
✓
✓
✓
AGILE SCRUM
MASTER
✓
✓
ECLIPSE
IV&V
✓
✓
10 City Attorney Approved Version 6/12/18
Sept. 10, 2019 Item #2 Page 75 of 113
10+ YEARS LOCAL PROSCI AGILE SCRUM ECLIPSE TEAM MEMBER BS+ PMP ITIL v3
PM EXP Gov OCM MASTER IV&V
PHYLLIS SMITH ·---MARIEBETH ADAMS --
Provided below are detailed qualification summaries for all the team members. Resumes can be found in
Appendix I
Sally Nagy, PMP, Engagement Manager
Program Management. Sally and a proven record of results applying business insight to the application of
information technology to achieve the organization's goals. She has an extensive background in both public
and private sector executive management, including as CIO for two cities, a county, and a court. Her 30
years of experience includes information technology governance, organizational change management,
business and technology strategic planning, information technology tactical planning, procurement and
contract negotiations, workforce development, organizational and program reviews, quality assurance, and
enterprise technical architecture. She has recently led several enterprise procurement efforts for local
government clients.
Operational Management. As Chief Information Officer/IT Director of both public and private sector
organizations, Sally has directed all aspects of information technology including application development,
project management, communications, operations, system architecture, GIS and technical support.
Office of Record: Sacramento I Work would be Performed: Primarily in Sacramento, though available
on-site as needed.
Yvonne De la Rosa, PMP, Project Manager
Project Management: A certified PMP, Yvonne has 22 years of experience in information technology (IT),
including 12 years of independent verification and validation (IV&V) project management. With an
emphasis in project management, systems integration, and IV&V, Yvonne has provided oversight on both
customized and commercial-off-the-shelf systems as well as legacy conversion projects and phased
implementations. Yvonne's focus is on the IV&V oversight of large State of California engagements that
span multiple projects and agencies. Yvonne's skills include technical leadership, project management,
quality assurance, application testing and training, system requirements analysis and strategic planning.
Yvonne also holds certifications in IT Infrastructure Library Foundation (ITIL-F) and Scrum Master.
Office of Record: Sacramento I Work would be Performed: Primarily in Sacramento, though available
on-site as needed.
Shell Culp, Prosci, Change Manager
Change Management. Shell is a Senior Advisor with PCG where she advises clients on Organizational
Change Management (OCM) readiness assessment, strategy, and implementation. Shell is a Prosci ®
Certified Change Management Professional and uses this and other techniques and tools to build and align
OCM strategies with an organization's objectives across the country.
Portfolio Management. Shell worked as Chief Deputy Director and Interim Director for the California Office
of Systems Integration (OSI) for over 3 years, providing extensive experience managing project portfolios
with values in excess of $58.
Office of Record: Sacramento I Work would be Performed : Primarily in Sacramento, though available
on-site as needed.
11 City Attorney Approved Version 6/12/18
Sept. 10, 2019 Item #2 Page 76 of 113
David Westphalen, PMP, Project Manager, Implementation SME
Project Management. A PMI-Certified Project Management Professional (PMP), David leads PCG's
internal training program for PMP certification. In this role, he created the training material for the following
knowledge areas: Project Integration Management, Cost Management, Time Management, and Risk
Management. He has also completed quality reviews of all remaining Project Management Body of
Knowledge (PMBOK) knowledge area training material for PCG. David has project management
experience in all aspects of initiating, planning, executing, controlling, and closing projects. His areas of
expertise include most major structured systems development lifecycle methodologies and project
management standards; development of detailed project plans and schedules; leading teams of IT technical
and business staff; project management assistance such as issue identification and facilitation of decisions
with various stakeholders; change management and communications planning; monitoring and controlling
project progress; program and project planning; resource planning and acquisition; guiding and mentoring
staff; risk and issue management; project initiation and document reviews; and status reporting to all levels.
Office of Record: Sacramento I Work would be Performed: Primarily in Sacramento, though available
on-site as needed.
MarieBeth Adams, Implementation SME
Implementation SME. MarieBeth is a decisive, action-oriented project manager and business system
analyst with an impressive track record of managing complex projects within time and budget expectations
in corporate and government settings. She is highly skilled in identifying and clarifying business
requirements, performing a gap analysis of existing procedures and processes, and designing
business/system improvements to meet organizational and end-user functionality needs. MarieBeth has
extensive experience serving as a business expert in the implementation of custom and commercial-off-
the-shelf solutions. She is a strong team leader with excellent communication and interpersonal skills and
is highly proficient at diplomatically facilitating discussions and negotiations with project stakeholders at all
levels. She is a Microsoft Certified Professional and is adept with SAP Enterprise Business Information and
Objects (Bl/BOE), Crystal Reports and SOL Developer.
Local Government. MarieBeth has worked in local government for over 30 years. She has worked with
numerous business groups during the adoption of large IT systems to successfully deliver complex system
deployments for local and state government agencies.
Office of Record: Sacramento I Work would be Performed: Primarily in Sacramento, though available
on-site as needed.
Phyllis Smith, Prosci, Change Manager, Procurement Specialist
Phyllis has worked in local government and as a consultant to local government entities for over 35 years.
Change Management. Phyllis is a certified Prosci Change Management Practitioner with significant
experience managing change for large and small projects for local government agencies. Examples of
projects include culture-transforming automation systems, moving a large public-facing operation, and
revamping a records management system.
Local Government. Phyllis has worked in local government for over 40 years and as a consultant to
California trial courts.
Implementation SME. Phyllis has strong business analyst skills. As a trial court department head and as
a consultant to courts in the U.S. and internationally, she analyzed business processes and made concrete
recommendations for improvement. She has recently performed business analysis for local government
entities in Los Angeles and Sacramento and assisted with the procurement and implementation of new
case management systems.
Procurement Activities. Phyllis has worked on procurements for large and small automation systems for
local government and judicial organizations, including the Hong Kong Judiciary, Hawaii Judiciary,
Sacramento Sheriff and Los Angeles County Public Defender. Activities have included developing
functional and non-functional requirements, doing market research, analyzing alternatives, writing
12 City Attorney Approved Version 6/12/18
Sept. 10, 2019 Item #2 Page 77 of 113
procurement documents, answering bidder questions, evaluating proposals, and conducting reference
checks.
Office of Record: Sacramento I Work would be Performed: Primarily in Sacramento, though available
on-site as needed.
Project Approach
PCG is proud to offer to its clients our PCG AcquirelT™ Methodology which is housed within our Strategy,
Architecture, Planning, and Procurement Center of Excellence (CoE). AcquirelT is a well-tested, repeatable
methodology that provides us with a roadmap to help us navigate through the IT procurement process. This
methodology both drives and guides the delivery of strategic procurement services through a project's life
cycle from start to finish, resulting in objective, evidence-based procurements. PCG's AcquirelT Framework
honors and supports the premise that an organization's IT investments should be driven by its business
strategies while being supported by and supportive of its enterprise architecture infrastructure.
We have used this methodology to support multiple engagements and continue to improve it with lessons
learned from each engagement. In addition to providing a procurement roadmap, AcquirelT has an
extensive toolkit and templates that have been designed specifically for procurement projects. PCG's ability
to rely on the AcquirelT framework means little to no time will be spent "reinventing the wheel" because the
necessary meeting facilitation tools and document templates will be immediately accessible. PCG will
ensure the project stays on-course, on schedule and within budget, by using the AcquirelT procurement
phases in conjunction with our Project Management Methodology (PMM).
The PCG Team will work diligently to develop a collaborative relationship that stresses objectivity, balance,
and support. We will provide focus, support, advice, leadership, and pro-active communication to ensure
success in providing the City the procurement assistance services that are required to furnish only high-
quality deliverables delivered on a timely basis. Our personal guiding principles include:
• Protect the stakeholder's interests
• Foster excellent relations by engaging early and often
• Plan activities and resource requirements and commitments carefully
• Take a practical approach
• Follow through to resolution
• Be consistent
• Foster project management maturity
• Be critical and objective
• Minimize disruption to project personnel
Working closely with our clients, PCG's goals have always focused on the success of the client's goals and
objectives. We have always worked hard to ensure a mutual beneficial relationship is established and
maintained throughout our engagement and beyond in order to achieve the desired outcomes despite
possible changes in funding, setbacks, and delays which one or the other is usually challenged. This is
evident in our procurement assistance projects.
Additionally, defining and regularly measuring our progress against a set of critical success factors will
guide us to successfully build a partnership, a highly functioning team that will complete what is needed to
deliver a competitive procurement for the City. PCG will not only provide staff who are qualified and
experienced resources; we will:
13 City Attorney Approved Version 6/12/18
Sept. 10, 2019 Item #2 Page 78 of 113
• Foster a functional relationship approach -PCG treats our clients as partners. We view our
partnership with the City as truly collaborative, where we are both mutually invested in not only the
successful completion of a competitive procurement but also in the successful implementation of a
procured solution that will support the City for years to come.
• Develop and maintain trust -Trust is key to any relationship, and PCG will work with the City to
build and maintain trust. PCG will demonstrate confidence through our team members by
continuously following through with the services we provide the City. It is important to PCG that we
not only build trust to the City team but also become a trusted advisor to the City. PCG has selected
staff that are not only experts in their industry but also trusted advisors to their clients.
• Demonstrate follow-through -PCG believes that follow-through is a critical success factor to
fostering a functional relationship. PCG encourages its staff to be in close contact with clients and
to demonstrate their ability to deliver on our commitments.
• Provide continuity of staff -PCG strives to maintain staff continuity. Consistent, long-term
staffing of PCG resources will help to ensure success of relationship management.
Acquire IT
The primary phases and subordinate steps in our AcquirelT Framework are depicted below.
e STRATEGY AND
SOLICITATION
DEVELOPMENT
• Validate proJect scope
· Document functional and
technical requirements
· Analyze the marketplace
• Develop the procurement
strategy
• Develop the evaluation
strategy
• Create solicitation document
· Create detailed evaluation plan
-
VENDOR
QUALIFICATION
AND EVALUATION
• Release solicitation
• Conduct vendor conference
· Receive and review draft
proposals
• Conduct vendor confidential
d1scuss1ons
· Receive and review final
proposals
• Conduct corporate and key
personnel reference checks
VENDOR
SELECTION
· Conduct vendor demonstrations
· Conduct finalist interview(s)
and recommend selected
vendor
· Obtain project steering
committee and executive
management approval
• Assist with contract
negotiations
Figure 2. PCG's AcquirelT7"' Phases and Primary Tasks
The AcquirelT phases -Strategy and Solicitation Development, Vendor Qualification and Evaluation, and
Vendor Selection -are each briefly described below. PCG believes it is this process complemented by the
activities and deliverables defined by the City that will support the successful completion of a competitive
procurement. These include:
Strategy and Solicitation Development -Planning is key to any successful procurement. The purpose
of this phase is to clarify the scope, goals, and objectives of the IT initiative (in this case, a new Project
Portfolio Management System}, determine the appropriate sourcing and procurement approaches (what's
the best way to buy it), and develop the solicitation documents and procedures needed to conduct a
successful procurement (how to buy it).
14 City Attorney Approved Version 6/12/18
Sept. 10, 2019 Item #2 Page 79 of 113
The eight (8) steps that PCG will perform in this phase include:
1. Validate Project Scope: Being clear on the problems to be solved and objectives to be met are
"must haves" in any major procurement. While this may seem obvious to the casual observer,
individual perceptions may vary widely, or even conflict, across multiple stakeholder groups.
Agreeing on the project scope and on the relative significance of problems that the organization
faces not only results in better solicitations but even more importantly, vendor proposals that are
more responsive to the client's critical needs.
2. Document Functional Requirements: Requirements definition is one of the most critical steps in
PCG's AcquirelT approach. The requirements development process involves many layers of
specification to support the eventual design and development of a technical solution. During the
procurement process, it starts with well-documented business needs that describe the top-level
needs that a solution must meet. These high-level statements (e.g., "The system must support
timely payment of invoices.") help to frame the project scope and lay the foundation for other project
activities such as our analysis of solutions in the marketplace and, of course, the eventual
development of the solicitation document.
3. Document Technical Requirements: While the business needs inform the development of
functional requirements, it is the functional requirements that further refine those business needs
into technical requirements. During this stage of the procurement process, technical requirements
are built to define a specific technical approach (e.g., in compliance with federal and state
requirements) yet not dictate the technical design, and be sufficiently detailed for prospective
vendors to develop project budgets and define resources needed to implement the solution.
4. Analyze the Marketplace: Understanding the marketplace is critical to a successful procurement.
AcquirelT is a knowledge-based approach to procurement that will incorporate the research and
discovery of pre-built software or Commercial-Off-The-Shelf (COTS) software that can be
purchased, leased or licensed and helps inform clients about solutions that exist in the marketplace
as well as educates them about functionalities that are available.
5. Develop the Strategy: Procurement strategy is a key factor in determining the most appropriate
procurement method given the complexity and monetary value of the required solution/services,
market availability, and the organization's capacity to support the eventual solution in addition to
putting its procurement strategy in place.
6. Develop the Evaluation Strategy: The evaluation strategy considers which areas should be the
focus of evaluation (i.e., evaluation criteria) as well as weighting and scoring factors. Decisions
made during this step will directly impact the development of the solicitation and evaluation
documentation. The Evaluation Plan and supporting tools (e.g., score sheets, etc.) will provide a
road map for analyzing vendor bid responses and making a final determination consistent with the
processes and procedures outlined within the solicitation document and should be completed
before the procurement is released.
7. Create the Solicitation Document: In this step, PCG assembles the complete solicitation
document based on information gathered in the previous steps. A framework or outline for the
solicitation document (based on the client's specific requirements and regulations) is built.
8. Create the Detailed Evaluation Plan: With the evaluation strategy in place and the solicitation
done, the next step is to develop the mechanics for reviewing vendor responses. This is done
through the development of the Evaluation Plan. Decisions made during the procurement approach
and evaluation strategy step, such as determining the necessity of a pre-qualification proposal and
the selection of the Evaluation Committee, are now detailed out.
15 City Attorney Approved Version 6/12/18
Sept. 10, 2019 Item #2 Page 80 of 113
The Evaluation Toolkit (ET) will be drafted in this task and will provide a roadmap for analyzing
vendor bid responses and making a final determination consistent with the processes, procedures
and evaluation criteria outlined within the procurement documents. The ET will include the
procedures, processes, protocols, and tools necessary to guide the evaluation process and
establish the basis for contract award. The procedures will include worksheets to aid the evaluation
team in examining and scoring vendor offers. Meetings between the PCG Team and the City's
Project Team will be needed during this task to consider the details of the scoring methodology that
had been previously outlined during the Procurement and Evaluation Strategy sessions.
Vendor Qualification and Evaluation -The procurement document release initiates the selection
process. Decisions made during the procurement and evaluation strategy steps, such as the timing/duration
of key activities, will be implemented during the procurement/selection process. The PCG Team will assist
the City with a variety of procurement activities leading to the successful contract award.
The goal and purpose of the vendor qualification is to determine which vendors should progress through
the selection process. Once vendors have been qualified, the evaluation committee may select a short list
that are highly acceptable candidates and could successfully complete the project. These vendors will then
participate in the Vendor Selection Phase which should include at least one (1) site visit and at least one
(1) finalist interview. The five (5) steps that PCG will perform in this phase include:
1. Release Solicitation: The solicitation has been developed and is released for vendor
consideration. Let the Games begin!
2. Conduct Vendor Conference: Making sure that vendors are clear about the client's business
needs, technical environment, and requirements included in the solicitation document goes a long
way toward ensuring that proposals are on target and that they can be evaluated in a consistent
fashion.
3. Assist with Vendor Q & A: Sufficient time should be given potential bidders to ask questions to
clarify their understanding of the procurement document. PCG will assist the City Project Team to
write informative, unambiguous responses to allow vendors to submit proposals that most closely
meet the City's requirements.
4. Receive and Review Proposals: Interested vendors submit their proposals according to the
proposal schedule at a specific time I place, and the proposals are entered into review. For all
proposals passing the administrative review process, PCG will facilitate the formal evaluation
process, working with a City team of administrators and subject matter experts to evaluate the
proposals in an impartial and consistent manner. The review team will use the factors identified in
the Evaluation Strategy and the tools in the Evaluation Toolkit to systematically and thoroughly
review and score the proposals. PCG will participate in review discussions with the team, but will
not be scoring. They will also assist the evaluation team if there are technical questions.
5. Conduct Corporate, and Key Personnel Reference Checks: Validating the past performance of
a vendor is critical. In large IT projects, you will be working alongside your chosen vendor for many
months, and in some instances, years. PCG will assist the City in conducting reference checks on
the top scoring proposals, using a structured interview process.
16 City Attorney Approved Version 6/12/18
Sept. 10, 2019 Item #2 Page 81 of 113
Vendor Selection -The goal and purpose of this step is first to recommend, and then to select the
preferred vendor. This step is designed to distinguish between multiple acceptable vendors that have
shown, during the prior step, they meet requirements at a reasonable cost. Vendor selection usually
includes at least one (1) customer site visit and at least one (1) finalist interview. The four (4) steps that
PCG will perform in this phase include:
1. Conduct Vendor Demonstrations: Seeing a proposed solution in play can be key to the
evaluation process. Demonstrations and onsite visits provide insight into real-world applications of
a proposed solution and help the client to discern the differences between proposed solutions in
environments that may or may not be like their own.
2. Conduct Finalist lnterview(s) and Recommend Selected Vendor: This represents the final step
in the vendor selection process, and with the due diligence of everyone involved, the recommended
vendor is selected.
3. Obtain Project Steering Committee and Executive Management Approval: Once the
Evaluation Committee has made its recommended selection, approval is required from the Steering
Committee (or similar governing body) and executive-level management as necessary.
4. Assist with Contract Negotiations: As appropriate, PCG will assist the client with its contract
negotiation discussions to ensure that the City's best interests are protected and that the
appropriate contract controls are in place. The PCG Team will work with the City Team in the final
activities required to bring the selected vendor on board, through finalizing and confirming the
selected vendor's Statement of Work, Project Plans, Cost Agreements for software services,
Software License agreements, Warranty and Support agreements, Payment Schedule and
Interface Control documentation, along with any additional escrow agreements which are required
by the City contracting processes.
Within PCG's AcquirelT methodology, each of these steps are further defined to include the objective,
anticipated results, primary tasks, client participants, key assumptions, and deliverables. It is this further
knowledge and information that will guide us as we partner with the City and successfully complete a
competitive procurement.
Upon completion of contract negotiations with the selected vendor, the project is ready to move to the
implementation phase. At that point, the PCG team will continue to follow our Project Management
Methodology
Project Description / Scope of Services
PCG is a recognized national leader in the delivery of Project Management Services. We are proud of our
Business Solutions Center of Excellence (CoE) and Project Management Methodology (PMM) which both
bolster the knowledge and support of our consultants in the delivery of successful, time-tested Project
Management services.
Our consultants are formally trained to support their project management certification efforts as well as
mentored by experienced staff based on Project Management Institute (PMI) Project Management Body of
Knowledge (PMBOK) and other industry standards and best practices. We have more than 42 PM I-certified
Project Management Practitioners within our Technology Services Practice Area alone.
PCG's PMM has four (4) basic tenets that we believe are the foundation of any sound project management
methodology which we will use to support development of our deliverables to the City of Carlsbad. Without
these being in place, control methods, procedures, and other project management best practices will not
be effective. Our specific objectives include:
1. High-Quality Work -Deliver high quality services and work products that address the business
objectives and meet the requirements of the City of Carlsbad
17 City Attorney Approved Version 6/12/18
Sept. 10, 2019 Item #2 Page 82 of 113
2. On-Time Delivery -Complete deliverables on schedule and within budget
3. Effective Communication -Timely and accurate communication to the City of Carlsbad project
participants and stakeholders throughout the entire project
4. Proactive Management -Identify potential problems before they develop and initiate appropriate
corrective action
The PCG PMM ensures that various review activities are conducted, work teams and deliverables are
coordinated, and high-quality work products are delivered to the City of Carlsbad. This includes meeting
the agreed-to timeline for each deliverable.
All the consultants being bid on this opportunity are seasoned project management professionals with many
years of experience. Working on many projects and juggling different timelines means knowing how to
prioritize. Projects will have different priorities, and tasks within those projects will also have different
priorities. PCG staff know how to prioritize and understand what is really important and what may be just a
nice to have. As evidenced by staff resumes, our project managers have worked in program management
offices (California Employment Development Department, for example) and have served on multiple
projects at the same time.
Our approach is built on three principles that serve as its cornerstone and reinforce the notion that projects
require a commitment that starts from the very beginning:
1. Understand the Goal -Success begins with an understanding of the City's projects. PCG Project
Managers are active listeners, avid consumers of information, and facilitators of structured
discussion that results in a common understanding of the project goals by both PCG and city staff.
2. Be Proactive and Stay on Task -PCG maintains progress by planning ahead, communicating
actively, being collaborative, leading decisively as well as accepting responsibility for outcomes.
3. Deliver Results -PCG will work collaboratively with the City of Carlsbad to successfully deliver on
time, within scope, and on budget while exceeding expectations.
PCG Project Manage.ment Methodology
-
--
Understand the goal,
Be proactive and stay on task,
Deliver Results.
t
t -
18
....... . .
City Attorney Approved Version 6/12/18
Sept. 10, 2019 Item #2 Page 83 of 113
Figure 3. PCG Project Management Methodology
PCG will follow a process that includes Project Initiation, Planning, Execution, Control, and Closeout. PCG's
PMM employs a structured and repeatable process broken into five (5) industry standard process groups
that will not only complement the goals and objectives of this RFQ but interact and overlap iteratively over
the life of the project:
1. Initiation -Begins at project conceptualization and focuses on building the foundation with the City
of Carlsbad and the project. The project governance and Project Charter are reviewed and/or
established and alignment between the City of Carlsbad and the PCG Project Team is obtained. A
high-level schedule is created, resource requirements identified, and processes for monitoring
progress and resolving issues are established.
2. Planning -Centers on formalizing the project plan, budget and schedule. PCG will work in
coordination with the City of Carlsbad to finalize all contract requirements and workload estimates,
define risks and contingencies, establish communication protocols, verify deliverable expectations
and implement management tools.
3. Execution -Occurs throughout the life of the project, beginning with the allocation of human
resources and assignment of work tasks. PCG will again work in coordination with the City of
Carlsbad to direct project activities and administer project policy in accordance with the plan.
Execution is an iterative process that often requires re-planning to accommodate unforeseen
changes in priority or scope.
4. Control -Occurs throughout the life of the project. The focus here is on tracking progress against
the plan and controlling scope, schedule, budget, and human resource needs. PCG will work in
coordination with the City of Carlsbad to forecast project needs and execute corrective actions to
overcome project challenges.
5. Closeout -Formalizes acceptance of the project. Lessons learned are documented, transition
activities are completed, and all project artifacts are formally accepted and transitioned to the City
of Carlsbad ensuring each work producUdeliverable can be found in the project's documentation
repository.
19 City Attorney Approved Version 6/12/18
Sept. 10, 2019 Item #2 Page 84 of 113
Statement of Cost SeNices
The table below provides the maximum hourly rate for each proposed consultant. We do not anticipate
using any subcontractors.
Table 2. Staff Hourly Rates
MAXIMUM
NAME TITLE HOURLY
RATE
1 Sally Nagy Engagement Manager, Project Manager, Procurement $250 Specialist
2 Shell Culp Change Manager $250
3 Yvonne De LaRosa Project Manager, Implementation SME, Procurement $225 Specialist
4 David Westphalen Project Manager, Implementation SME $225
5 Selvi Dorairaj Project Manager, Implementation SME $225
6 Phyllis Smith Change Manager, Implementation SME, Procurement $200 Specialist
7 David Shickman Project Manager $225
8 Ted Marsh Project Manager, Implementation SME $200
9 MarieBeth Adams Implementation SME $200
10 Ryan White Change Manager $200
11 Michelle Fox Change Manager $200
12 Amber Nottingham Change Manager $200
Table 3. Sub-Consultants Hourly Rate
We not plan to use subcontractors
Table 4. Expenses
~•1#94111Ml___________...~i'!55'1·,
~ge O _
Assumptions
• To keep rates down, we make good use of tools such as WebEx and Skype to meet regularly and
when feasible with our clients without incurring travel costs.
20 City Attorney Approved Version 6/12/18