Loading...
HomeMy WebLinkAbout2020-02-25; City Council; Resolution 2020-041RESOLUTION NO. 2020-041 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ACCEPTING BIDS AND AWARDING JOB ORDER CONTRACTS (JOCs) TO ACCO ENGINEERED SYSTEMS FOR HEATING, VENTILATION AND AIR CONDITIONING, AND HPS PLUMBING SERVICES FOR SEWER PIPELINE REHABILITATION AND ACCESS HOLE REPLACEMENT. WHEREAS, the City Council of the City of Carlsbad, California, has determined it necessary, desirable and in the public interest to perform repair and construction work for heating, ventilation and air conditioning, and sewer pipeline rehabilitation and access hole replacement using job order contracting; and WHEREAS, job order contracting allows for recurring repair or construction work to be completed under a single competitively bid contract using firm, fixed pricing; and WHEREAS, Carlsbad Municipal Code Section (CMC) Section 3.28.087 provides definitions and guidelines for the award, use and evaluation of JOCs; and WHEREAS, a formal bidding process for JOCs in the categories of heating, ventilation and air conditioning, and sewer pipeline rehabilitation and access hole replacement, was completed on Dec. 13, 2019;and WHEREAS, Acco Engineered Systems submitted the lowest responsive and responsible bid for heating, ventilation and air conditioning; and WHEREAS, HPS Plumbing Services submitted the lowest responsive and responsible bid for sewer pipeline rehabilitation and access hole replacement; and WHEREAS, the initial term for each JOC is three years, with the option to extend for two additional one-year periods, for a total term of five years; and WHEREAS, each JOC has a maximum contract value of $1 million over the five-year term, consistent with CMC Section 3.28.087; and WHEREAS, CMC Section 3.28.087(D)(2) authorizes the city manager to issue task orders less than the dollar amount specified in California Public Contract Code Section 22032(b); and WHEREAS, expenditures against these JOCs are subject to availability of project funding appropriated through regular annual budgeting processes. Feb. 25, 2020 Item #7 Page 4 of 5 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the low bid submitted by Acco Engineered Systems for heating, ventilation and air conditioning is accepted and the mayor is hereby authorized to execute a JOC for this work. 3. That the low bid submitted by HPS Plumbing Services for sewer pipeline rehabilitation and access hole replacement is accepted and the mayor is hereby authorized to execute a JOC for this work. 4. That the city manager or designee is hereby authorized to issue task orders against JOCs in accordance with the dollar amount specified in California Public Contract Code Section 22032(b). 5. That the award of this contract is contingent upon Acco Engineered Systems and HPS Plumbing Services executing the required JOCs and submitting the required bonds and insurance policies, as described in the contract, within 20 days of adoption of this Resolution. The city manager may grant reasonable extensions of time. PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 25th day of February 2020, by the following vote, to wit: AYES: Hall, Blackburn, Bhat-Patel, Schumacher. NAYS: None. ABSENT: None. ~~1-Jaft;rG<mtz, Depvi-j fer BARBARAENGLESON,City Clerk Cl'} (SEAL) ,11111\\\IIII////////// ,,,, G CA l:'I 1111 ~'o;,-rt(. ,,'1/,,;, '>~ ··•·· u'of (fJi(~~)~ ~ -~r; ct~--~' % ,..·· .... · .... ,,,n· .. • ... ··· ;f 'i,c'-~,·············~,~,$' 1"111,,, ... I FO~ .,,,,,,,,, ///////JIIIII\\\\I• Cltnf Feb. 25, 2020 Item #7 Page 5 of 5