HOUSING AND REDEVELOPMENT COMMISSION RESOLUTION NO. 371
A RESOLUTION OF THE HOUSING AND REDEVELOPMENT
COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA
APPROVING THE VILLAGE PARKING ENHANCEMENT ASSESSMENT
AND ACTION PLAN AND AUTHORIZING STAFF TO PROCEED WITH
APPROPRIATE MEASURES TO CARRY OUT THE RECOMMENDED
WHEREAS, the availability of public parking in the Village has been a priority of the
downtown area since prior to the establishment of the Village Redevelopment Area in 1981; and
WHEREAS, the availability of public parking is a significant factor in the success of the
Village Redevelopment Area; and
WHEREAS, as one of the City Council goals for fiscal year 2002-2003, the Village
Parking Enhancement Assessment and Action Plan was prepared to assess the various methods by
which the Redevelopment Agency believes it can increase the amount of City ownedlcontrolled
public parking in the Village Redevelopment Area and provide an action plan outlining specific
staff recommendations.
NOW, THEREFORE, BE IT RESOLVED by the Housing and Redevelopment
Commission of the City of Carlsbad as follows:
1. The Village Parking Enhancement Assessment and Action Plan attached hereto, is
hereby accepted and approved, and the Executive Director of the Carlsbad Redevelopment
Agency or designee is authorized to proceed with carrying out the recommended actions.
/Ill
1111
/Ill
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
<
2. Staff is authorized to proceed with the allocation of staff resources and to proceed with
ippropriate actions to obtain outside consultant services, as deemed necessary, to carry out the
-ecommended actions contained within the Village Parking Enhancement Assessment and Action
Plan.
PASSED, APPROVED AND ADOPTED at a Regular meeting of the Housing
and Redevelopment Commission of the City of Carlsbad, California, on the 16 th day of m.
2003, by the following vote, to wit:
AYES: Commissioners Lewis, Finnila, Kulchin, Hall
NOES: None
ABSENT: Commissioner Packard
ABSTAIN: None
ATTEST:
RAY~ND R. PATCHETT, Secretary
HRC Resolution No.
Page 2
Village Parking Enhancement Assessment
and
Action Plan
Prepared by
City of Carlsbad
Housing & Redevelopment Department
June, 2003
INTRODUCTION
Success of the Village Redevelopment Area is contingent on many things; a
desirable mixture of uses, a pleasant pedestrian-oriented shopping environment,
and the availability of parking. The focus of this report is on the third factor, the
availability of parking in the Village, which has been a priority of the downtown
area since prior to the establishment of the Village Redevelopment Area in 1981.
The historical land use patterns in the Village Area predominately consist of small
lots with large buildings and very little, if any, on-site parking. Many businesses
rely on street parking for their customers. In an effort to provide more parking in
the downtown area the Redevelopment Agency has purchased property for
public parking purposes, imposed three-hour time limits to encourage higher
turnover of street parking, and leased private property for public parking
purposes. While these efforts have been beneficial in helping to increase the
supply of public parking in the area, demand for public parking continues to
increase.
The availability of public parking is also a factor in the success of the Parking In-
Lieu Fee Program. The Program was initiated in 1999 as a tool to assist in the
redevelopment of the downtown area by providing an option for developers to
satisfy on-site parking requirements associated with new construction and the
expansion or intensification of existing uses. The Program allows developers to
pay a fee, per parking space, in lieu of providing a portion, or in some cases all,
of the required on-site parking. The fees collected from the Parking In-Lieu Fee
Program are deposited into an earmarked, interest bearing fund to be used for
construction of new, or maintenance of existing, public parking facilities within the
Village Redevelopment Area. One of the stipulations of the Program is that
participation in the Program will be suspended once an 85% utilization rate is
established in the existing public parking lots. Currently, the utilization rate is
79%. Therefore, it is important to continue to add public parking to maintain the
effectiveness of the Program.
ASSESSMENT
This report will look at the various methods by which the Redevelopment Agency
can increase the amount of impediment-free, City-ownedkontrolled public
parking in the Village Redevelopment Area. Various opportunities that will be
discussed include: 1) revisions to existing street standards, 2) incorporation of
maximum public parking opportunities in conjunction with private development
projects, 3) restriping of existing public parking lots, 4) acquiring long term lease
agreements for public parking lots, and 5) acquiring private property for public
parking purposes.
Revisions to Street Standards
One method for increasing the amount of public parking is to consider revisions
to the City’s existing street standards. For instance, angled parking provides
2
almost twice the amount of spaces as parallel parking. Furthermore, providing
angled parking in conjunction with reducing the amount of curb cuts along a
street can substantially increase the amount of street parking available.
c - Parallel Parking Angled Parking
South Side 45 70
North Side 46 75
A majority of the existing street widths in the Village are established. Right-of-
ways have been dedicated and street improvements including curb, gutter,
sidewalks, and landscape areas have been installed. The type of street parking
provided (angled or parallel) depends on the overall street width and number of
travel lanes provided. Many streets in the downtown area do not have adequate
width to allow for an alternative parking arrangement. However, in a few cases,
the street widths and circulation patterns warrant an investigation of a different
parking layout in order to achieve more street parking.
The Public Works Traffic Division completed a preliminary study of the Village
Area and found two streets wide enough to incorporate angled parking where
parallel parking is currently provided. The streets are Grand Avenue between
Hope Avenue and Carlsbad Boulevard and Madison Street between Grand
Avenue and Arbuckle Place. The City’s Traffic Engineering staff conducted an
initial assessment of the streets in order to provide an estimate of the maximum
number of potential angled parking spaces. The information generated from this
assessment is provided below and should be used for planning purposes only.
Detailed engineering drawings will be needed to generate a final number of
potential parking spaces.
Grand Avenue - The following table shows the amount of parking spaces
that can be achieved on both sides of Grand Avenue by installing angled parking
versus parallel parking:
I Total 1 91 I 145 I
The assessment took into consideration the location of existing curb cuts, streets,
alleys, and “No Parking” zones.
Madison Street - An assessment of additional parking potential was also
conducted on Madison Street between Grand Avenue and Arbuckle Place.
Given the width of the street and the extensive curb cuts on the east side of the
street, angled parking was found to be only possible on the west side of the
street. There is about 41 feet of parallel parking between Grand Avenue and the
parking lot entrance to Old World Center. It is the opinion of the City Traffic
Engineer that this should remain and not be converted to angled parking
because of its proximity to Grand Avenue. On the remainder of the west side of
the street there is space for 12 parallel spaces or 20 angled parking spaces,
3
9
yielding a net increase of 8 spaces if the parking were modified to 45 degree
angled.
Overall, it is the opinion of the City Traffic Engineer that the portion of Madison
Street described above could be considered along with the Grand Avenue in a
comprehensive evaluation of angled parking in the downtown area. The
conversion from parallel to angled parking can be a somewhat controversial
issue, especially in light of the fact that angled parking previously existed on
Grand Avenue and was removed and replaced with parallel parking as part of the
streetscape improvements that took place in the late 1980’s. However, since that
time staff has a heightened awareness of traffic calming needs and a commonly
held goal for a pedestrian-oriented downtown. Prior to moving forward with any
changes to the existing parking layout on either Grand Avenue or Madison
Street, the pros and cons of angled and parallel parking will need to be evaluated
and detailed engineering drawings will need to be prepared to assess the total
number of spaces and impacts on through traffic lanes.
Public Parking in Conjunction with Private Development
Chapter 8 of the City of Carlsbad Village Redevelopment Master Plan and
Design Manual addresses the circulation plan for the Village Redevelopment
Area. It identifies the location of primary streets in the Village, bicycle routes,
and the transit center. It also discusses the goals for creating the pedestrian
framework for the area. The circulation plan for the Village Area was established
on land use patterns and buildings that were developed as long ago as the early
1900’s. A majority of the public right-of-way has been dedicated and public
improvements have been installed. However, along the periphery of the Village
Area there remains “pockets” of unimproved property which lack public
improvements. These areas present an opportunity to incorporate alternative
street ‘designs, such as angled parking, into redevelopment projects as they are
proposed.
If an alternative street design is planned out in advance of any redevelopment
project, additional right-of-way can be obtained as part of the land use permit
process. However, unless an extensive street frontage is redeveloped this can
result in a “patchwork” of various public improvements. It can take decades for
each parcel to redevelop in order to complete the public improvements along a
single block. Incorporating angled parking into this kind of scenario becomes
very difficult unless the City can acquire all the necessary right-of-way and is
willing to fund the installation of public improvements, including angled street
parking.
Therefore, staff believes that one of the only reasonable opportunities for
providing angled street parking is through large redevelopment projects. One
such project where this was highly successful is the Village by the Sea project.
This mixed-use project includes 65-condominium units and 8,700 square feet of
4
retail space. The project is bordered by Carlsbad Boulevard to the west,
Washington Street to the east, Christiansen Way to the south, and Beech
Avenue to the north. When the project was initially proposed, the developer
requested the City vacate excess right-of-way along Christiansen Way. Seeing
an opportunity to create more street parking near the Coaster Station, staff
supported maintaining the existing right-of-way and assisted the developer in
designing an angled parking lay-out along Christiansen Way that almost doubled
the number of public parking spaces provided on the street. The Village by the
Sea project is an excellent example of what can achieved by City staff and
developers working together to maximize street parking. For all future
redevelopment projects, staff will assess the ability to achieve maximum on-
street parking as a part of the standard project review.
Identifying potential areas for increased street parking in the future will require a
comprehensive right-of-way analysis for all streets within the Village
Redevelopment Area. Alternative street designs should be evaluated to
determine where additional public right-of-way could be obtained through the
development review’permit process.
Restriping of Existing Lots
Another opportunity to create additional public parking is to consider restriping
the existing public parking lots to create more spaces. Staff conducted an
assessment of the public parking lots and it appears the parking layouts that exist
today are the most optimal in terms of on-site circulation, points of ingress and
egress, and configuration of the lots. Therefore, staff has no recommendations
for increasing the number of parking spaces by restriping the existing public
parking lots.
Long Term Lease Agreements
The Carlsbad Redevelopment Agency owns parking Lots A, B, and I and
maintains lease agreements for the use of Lots C, D, and E (see attached map
for reference). There are no time limits for parking in any of these lots, with the
exception of Lot I, and parking is free to the public. Lot I has a three (3) hour
time limit to keep this centrally located parking lot available to customers and
visitors to the area while discouraging its use by Coaster Station commuters.
North County Transit District (NCTD) owns, operates and maintains parking Lots
F, G, H, and J.
The Redevelopment Agency currently leases Lots C, D, and E. Lots D and E are
owned by the NCTD and Lot C is privately owned by the Baumgartner Family
Trust. In the Business Plan developed by NCTD, it states that it is their intent to
increase all land leases to “fair market value”. To date, this increase has not
taken place, however, it is staff’s belief that these increases will occur in the near
future. In fiscal year 2002-03, the Redevelopment Agency paid $14,530 to lease
5 IC
128 parking spaces from NCTD. Once the Redevelopment Agency receives
notification of any increases in lease amounts to these two properties, staff will
evaluate the benefits of maintaining the lease agreements against the costs. For
instance, 44 of the parking spaces in Lot D are utilized by the Public Works
Department for the parking of City vehicles. If the Public Works Yard is
relocated, the benefit of maintaining this parking lot should be reevaluated.
Historically, Lot E has received minimal amount of use because it is situated in
an obscure location on the east side of Washington Street behind an existing
building that blocks its view from Carlsbad Village Drive. However, utilization is
increasing in this lot. Currently, the cost of this lease is a nominal amount that
warrants maintaining the lease agreement. However, future lease increases or
the provision of public parking in an alternative location may warrant the
termination of this agreement.
The last property the Redevelopment Agency leases is Lot C, owned by the
Baumgartner Family Trust. This property has 50 parking spaces for which the
Redevelopment Agency paid $74,500 in fiscal year 2002-03 and is subject to
annual increases (6% automatic) based on the current lease agreement. The
cost of leasing this property to date warrants the Redevelopment Agency’s
investigation of an alternative action associated with maintaining public parking
on the property such as a more cost effective long-term lease agreement or
purchase of the property.
Acquisition of Private Property
Staff consistently evaluates properties that come on the market for their potential
use as public parking lots. The primary factors associated with acquiring land for
public parking purposes are location, size, and cost. The property must be in an
area that is centrally located and in close proximity to high pedestrian traffic
areas. Yet the property should not be so centrally located that it upsets retail
continuity or displaces desirable land uses. Secondly, the property must be of a
sufficient size to achieve a significant number of parking spaces. Ideally, around
50-55 spaces are desirable for surface level parking. A lot of .4 acres (125 ft. x
140 ft.) is needed to provide 50-55 spaces and associated drive aisles. This
constitutes approximately one-third of a standard block in the Village Area.
Additional ingress and egress points associated with an adjacent alley are also
highly desirable when determining location. Finally, the cost of the property must
be evaluated to weigh the public benefit against the fair market value of the land.
Ideally, the consolidation of multiple surface parking lots for the construction of a
multi-level parking structure achieves the greatest outcome in terms of providing
maximum parking opportunities in the smallest area.
In January 1999, staff completed a report on parking utilization, programs and
recommendations for the Carlsbad Village Redevelopment Area entitled Parking
in the Carlsbad Village Redevelopment Area. The report identified two key sites
for parking structures in the Village Area. One site is the Carlsbad Coaster
6
Station owned by NCTD. Development of a parking structure on this site would
require a coordinated effort between NCTD and the City of Carlsbad, but would
not require the acquisition of additional private property. The second site is on
the east side of Roosevelt Street between Grand Avenue and Carlsbad Village
Drive where a majority of the property is owned by the Carlsbad Redevelopment
Agency and two surface parking lots (Lots A and B) currently exist. Along with
the property owned by the Redevelopment Agency on Roosevelt Street, the
remainder of the block includes two additional parcels owned by separate
entities. The first parcel abuts the corner of Roosevelt Street and Grand Avenue
and is 50 feet wide by 140 feet deep. The second parcel is 75 feet wide by 140
feet deep and is located between the two existing public parking lots. The
location of the second parcel makes it ideal for acquisition by the Redevelopment
Agency, but previous offers by the Agency to purchase the property have not
been accepted. Staff is continuing efforts to acquire the noted properties on
Roosevelt Street and to work with NCTD on construction of a parking structure.
As previously discussed, the Baumgartner property (Lot C) is also ideal for
acquisition by the Redevelopment Agency. The current lease will expire in June
2008. The owners have stated they are not currently interested in selling the
property. However, if the lease is not extended by the AgencyKity beyond 2008,
there might be another opportunity to purchase the property.
PARKING ENHANCEMENT ACTION PLAN
The purpose of the Village Parking Enhancement Assessment was to research
and identify methods for increasing City ownedkontrolled public parking. The
different mechanisms investigated include: 1) revisions to existing street
standards, 2) incorporation of maximum public parking opportunities in
conjunction with private development projects, 3) restriping of existing public
parking lots, 4) acquiring long term lease agreements for public parking lots, and
5) acquiring private property for public parking purposes. Based on the
assessment, the following actions are being recommended:
Revisions to Street Standards - Staff is recommending that a comprehensive
study be completed to determine the feasibility of converting the existing parallel
parking on Grand Avenue and Madison Street to angled parking. If this action is
acceptable, detailed engineering drawings and a traffic analysis need to be
prepared to assess the total number of spaces to be feasibly achieved and the
impacts to through traffic on the subject streets, as well as, adjacent streets.
Estimated costs for completing the work will also be calculated. Once this
information is prepared, staff will present this information, via the Leadership
Team, to the Traffic Safety Commission and then to the Housing and
Redevelopment Commission to receive public input and provide staff with further
direction.
7
Public Parkinq in Coniunction with Private Development - In order to maximize
public parking opportunities in conjunction with private development, staff
recommends alternative street designs be evaluated for the Village
Redevelopment Area. This will require a comprehensive right-of-way
assessment for every street in the downtown area. On streets where right-of-
way has been previously established, remaining sites should be identified where
additional right-of-way is needed. Identification of these parcels will ensure
necessary right-of-way is acquired through the land use permit process. On
streets where excess right-of-way exists, an alternative street design should be
prepared before any requests to vacate right-of-way are granted, which will
ensure maximum public parking opportunities in the future. Finally, as part of
every large redevelopment project, especially those that encompass an entire
street frontage on a single block, creative alternatives to maximizing on-street
public parking will be evaluated as part of formal project review and
development.
Restripinq of Existing Lots - There is no action recommended in terms of
restriping of the existing public parking lots. The initial assessment indicates
parking has been maximized at all existing lots.
Lonq Term Lease Aqreements - All existing parking lot leases are paid out of the
Redevelopment Operations budget. With the Village Redevelopment Plan set to
expire in 2006, staff recommends against entering into any new lease
agreements for parking on private property until a future funding source has been
identified and approved. Staff is currently working on development of a Village
Redevelopment Operations Strategy. This strategy will outline the actions that
must take place prior to the expiration of the Redevelopment Plan. A major
component of the strategy is the future administration of actions currently
supported by redevelopment funds. Administration and funding for existing
parking lot leases will be evaluated as part of the overall strategy. Any proposed
rate increases on Lots D and E, owned by NCTD, will be carefully evaluated.
Currently, the cost of leasing these lots is such a nominal amount that it warrants
the Redevelopment Agency continuing administration. However, a substantial
rate increase by NCTD may justify termination of the lease agreements. The
high lease cost on the Baumgartner lot and its termination in 2008 warrants
consideration of a renegotiation of a more cost-effective long-term lease
agreement or purchase of the property.
Acquisition of Private Propertv - As part of the goal process for fiscal year 2003-
04, staff will be actively pursuing the purchase of property for public parking
purposes. Key sites that are being considered include, but are not limited to, the
two private properties on the east side of Roosevelt Street between Grand
Avenue and Carlsbad Village Drive and the Baumgartner property. Staff will also
be pursuing other properties as opportunities are identified or offered.
8 13
CONCLUSION
When the Village Redevelopment Plan was created in 1981, one of the primary
issues facing the Village was the availability of public parking. Many efforts have
been made since 1981 to improve parking in the downtown area including:
0 Private property has been purchased and leased for public parking
purposes;
0 The City/Redevelopment Agency worked with NCTD to expand parking at
the Commuter Rail Station by approximately 200 spaces. Further effort is
ongoing with NCTD to provide additional parking.
0 The Parking In-Lieu Fee has been implemented to assist in the funding of
additional public parking lots and ideally, a parking structure;
0 Three-hour time limits have been established on various streets within the
core Village Area and in one public parking lot to discourage Commuter
Rail customers, business owners and employees from parking in areas
intended for retail customers;
0 The “Three for Free” marketing campaign was initiated to encourage
people to utilize the public parking lots and walk around the Village in
order to experience all that the area has to offer in terms of products and
services: and
0 A comprehensive analysis was conducted on the impediments to higher
utilization rates of the public parking lots and recommend actions were
implemented to increase the public’s use of the lots.
Even with all the actions taken since 1981 to increase the amount and utilization
of City ownedkontrolled public parking, the availability of public parking
continues to be viewed as a key factor in the future success of the Village Area.
The assessment and action plan outlined in this report provides an overview of
remaining opportunities to increase public parking in the Village and the
necessary steps to achieve them. Staff will continue to seek creative and
innovative ways to achieve this challenging goal.