RESOLUTION NO. 8 6 2
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE
CARLSBAD, MUNICIPAL WATER DISTRICT OF THE CITY
OF CARLSBAD, CALIFORNIA, FOR APPROVAL OF
SUPPLEMENTAL AGREEMENT FOR THE PREPARATION OF
COVERING AND LINING MAERKLE RESERVOIR, CMWD
PROJECT NO. 90-109
WHEREAS, on December 8, 1992, the Board of Directors adopted Resolutio
8
9
10
11
12
13
14
15
16
17
18
19
20
21
approving an agreement in the amount of one hundred nineteen thousand, three hundl
($119,300) for engineering services for the design report, plans and specificatiol
covering and lining of Maerkle Reservoir, CMWD Project No. 90-109, between John
Associates, Inc., and the Carlsbad Municipal Water District; and
WHEREAS, the Water Commission requested additional studies which requir
meetings and two letter reports to the District; and
WHEREAS, after a preliminary evaluation of the project it was detern
additional services are required; and
WHEREAS, John Powell & Associates, Inc., has submitted a request for a lurr
of twenty-five thousand, two hundred two dollars ($25,202) for the additional service:
and
WHEREAS, there are sufficient funds available in the Capital Improvement P
to cover the contract amount of $25,202; and
WHEREAS, District staff recommends approval of the supplemental agreeme]
22 John Powell & Associates, Inc., and the Carlsbad Municipal Water District for
23 engineering services for the design report, plans and specifications for the covering an
24
25
26
Maerkle Reservoir.
NOW, THEREFORE, BE IT RESOLVED, by the Board of Directors of thr
Municipal Water District as follows:
27
28
1. That the above recitations are true and correct.
0 0
1 II
2 2. The Engineering Services Supplemental Agreement, attached to this r
between John Powell & Associates, Inc., and the Carlsbad Municipal Water District 3
4 /I with the District and incorporated hereby reference, is accepted.
5
6
3. The Executive Manager is authorized to execute the Supplemental Agra
PASSED, APPROVED AND ACCEPTED at a special meeting of the
7
8
9
Directors of the Carlsbad Municipal Water District held on the 15th
MARCH , 1994, by the following vote to wit:
AYES: Board Members Lewis, Stanton, Kulchin, Nygaard
10 NOES: None
ABSENT: Board Member Finnila 11
12
13
14
15
16
17
CMWD 90- 109 20
19
(SEAL) 18
ALETHA L. RAUTENKRANZ, Secretary
ATTEST:
21
22
23
24
25
26
27
28
0 0
1
2
3
I
SUPPLEMENTAL AGREEMENT FOR CONSULTANT SERVICES
FOR THE
PREPARATION OF COVERING AND LINING OF MAERKLE
RESERVOIR - CMWD PROJECT NO. 90-109
4 THIS SUPPLEMENTAL AGREEMENT IS MADE THIS 17th
!3 of MARCH , 19 94 , between the CARLSBAD MUNICIPAL '
hereinafter referred to as liDISTRICT1l and John Powel.1. & 7
DISTRICT, a municipal corporation of the State of Calif
8 -g,q Inc hereinafter refer
9 as TONSULTANTII .
10
11
12
13
14
15
16
17
RECITALS
WHEREAS, DISTRICT has entered into an agreement
December 11 , 19 92 , with CONSULTANT to p
design and engineering services and deliver to DISTRICT co
plans, specifications and cost estimates for $119,300-00 ' One hundred nineteen thousand three hundred dollars
, hereinafterreferre
Itthe Agreement. It
18
scope of work contained in the Agreement. 20
circumstance cause it to be prudent and necessary to alt 19
WHEREAS, DISTRICT has determined that chang
21 NOW, THEREFORE, in consideration of their
22
23
24
25
26
27
28
covenants and conditions, the parties hereto agree to sup€
the Agreement by the addition of the following:
SECTION 1. . CONSULTANT'S OBLIGATIONS
is amended as foll
Additional items added to Scope of Work, as described in Exhi]
attached hereto and made a part hereof.
I/ 1 9/1
,. 0
1 I1 II
2 II
~~ II
3 II I/
4 /I II
5 I/
6
7 II II ~~ ~
8 I1
9 /I lo
include : 1 1
SECTION 4 . FEES TO BE PAID TO THE CONSULTANT is amenc
12 Total Fees to be paid to the CONSULTANT for addi
13
Agreement remain the same and are not affected by this Supple 15
$ 25,202.00 . All other terms and conditions 14
work authorized as by supplemental agreement shall not
16 Agreement.
17
seals this 17th day of MARCH , 19 94 . 18
IN WITNESS THEREOF, we have hereunto set our han
l9 il CARLSBAD MUNICIPAL WATER
DISTRICT
CONSULTANT JOHN POWELL & ASSOCIATES, IN(
20 y yT$/ /tlL'(, I/ !$A
-RAYMOND R. PATCHETT , i. S gnature)
Executive Manager J HN M. POWELL
23
PRESIDENT 24
ATTEST : -x Name)
25 aeesend.0p.h (Title)
ALETHA L. RAUTENKRANZ APP OVED A5 TO FORM; 26 Secretary ' LR.& 27 (SEAL)
28 RONALD R. BALL, 3.1&,.$4
General Counsel
il CMWD 90-109 2 911
0 0
1
2
3
4
5
6
7
NOTARY ACKNOWLEDGEMENT FOR
.f 1 State of -( :( ,G~~<w,-~,:~ i'<L 1 i' /.; I
I, 0 1 ss County of f,,?,; -; .<., ,L/ :. .e,,<: 1
I ,/ -
On . /I [..;? , (' ,+fl,~[.,d ,,(/f)
)* i ~/f 1 6.7 L 7 .<
i before me, ,
,f ,, ! // j, /:: 1 A,/\ /( / (.I A /{{ .) -7 L-
/ I
(here insert name and title of the officer), personally a
8 , personally 1
9
the person (.sJ whose name(s) is/.are subscribed to the 10
me (or proved to me on the basis of satisfactory evidence
his/he-rm-dr signature($) on the instrument the person($) , 13
same in hisfherfifieir authorized capacity( ies) , and t 12
instrument and acknowledged to me that he/shefthey execu' 11
14 entity upon behalf of which the person(p$ acted, execul
15 instrument.
r .- ,.,,.
./ ,(/ L! $[ /fd -14, I! J& 1- i -..
16
17 WITNESS my hand and official seal.
18
19
20
21
22
23
24
25
26
27
28
(- '. .__.. j
,' I .I. /' 1
i. I ") .' '/ / I !- 2' !- ! . -! d 1 L:L/': e' - 1 i ,.L< 4' / 1. .Signature /
CMWD ?p- ,- c, 7
(SEAL)
j""?xv LOlflSE WYLl &&) ; (&>2br,2- Con:nlission #979<
Plotary Public - Calif0 San Em00 County
L"*..*:* My COG~I~;S~C:I E;cs!:c..; Dec~,nt.sr 6, 1
*.- .."o-.a.".-"
3 9
4 e * EXH 18 IT "A"
SCOPE OF WORK
Paqe one of one
WATER COMMISSION STUDIES
As discussed, we have prepared a preliminary evaluation of a water treatment facility
replace covering and lining of the reservoir. This study included developing prelimina
size, layouts and cost opinions for the construction of a water treatment facility that cou
replace the covering and lining of the reservoir. This facility included a direct filtratic
water treatment facility using conventional gravity or pressure filters as well as
comparative life cycle economic evaluation of the various options. In addition, v
prepared a cost opinion and short discussion for the construction of a reinforcc
concrete liner in lieu of a porus asphalt liner as recommended in the predesign repol
These additional studies have included, to date, the investigation and writing of two lett
reports to the District (dated July 27, 1993 and October 2, 1993), attendance to sevei
meetings with the District and preparation of flow schematics and a site layout for tl
proposed treatment facility. In addition, it is planned to revise our October 12 letter
accordance with your comments and prepare for and make a presentation to tl
Commission on November IO, 1993.
ADDITIONAL DESIGN SERVICES
' 1. Reservoir Access Perimeter Road. In our initial discussions with the Distr
Engineer, it was stated that the need for a reservoir perimeter access road was r
clear, so for purposes of the proposal, it should not be included in the SCOL
However, during the predesign phase, it was determined that a perimeter accE
road was required for access to the floating cover, and is an important element
the project.
2. Access Walkway and Stairs. In those areas where a perimeter access road
not feasible due to the topography, as access walkway and a series of stairws
will be designed to provide access to the reservoir. Once again, these faciliti
were not envisioned in the original scope.
3. Drainage Diversion Channel. The existing diversion channel in unlined and
some areas ponding of water occurs during rainstorms. As with the access roc
based on our discussions with the District staff, the need for improvements to t
channel was undetermined at the time of our original proposal, and we WE
directed to assume no work would be required. As a part of the predesign stuc
it was found that the existing channel did not function well and was in need
substantial improvement. As a result this channel will be regraded and lined w
concrete to promote drainage and prevent water from moving toward the reservc:
Additional survey and topographic mapping will be required to perform the desi
of the drainage channel. Since the District performed the initial surveys a
topographic mapping for the project, it is our understanding that the District WOI
have its survey consultant perform the additional survey work.