Exhibit 1
RESOLUTION NO. 1251
A RESOLUTION OF THE CARLSBAD MUNICIPAL WATER
DISTRICT BOARD OF DIRECTORS AUTHORIZING THE
ABANDONMENT OF THE REMAINING WELLS IN THE
MISSION BASIN WELL FIELD
WHEREAS, the FY2003-04 budget for the Water Enterprise Fund included fbnds to begin
abandonment of the remaining wells located in the Mission Basin in the City of Oceanside; and,
WHEREAS, it was decided that prior to abandoning these old wells that date back to the
1940’s, a studies should be performed to ascertain the feasibility of utilizing these wells to produce
supplemental water for Carlsbad, and,
WHEREAS, the studies have been completed and reviewed the condition of the existing
wells to determine if they could be rehabilitated or if new wells should be installed; and,
WHEREAS, these studies also included a determination of the feasibility of utilizing this
water as a supplemental water supply for Carlsbad; and,
WHEREAS, the results of these studies show that the total capital costs to produce, treat
and deliver the water to Carlsbad would be $18,540,000 and annual Operational Costs would be
E 1,000,000; and,
WHEREAS, these costs amount to an average costs of $1,023.30per acre-foot.; and,
WHEREAS, this compares to our present cost of $550 per acre-foot for imported water and
a cost of about $800 per acre-foot for the proposed seawater desalination project; and,
WHEREAS, these costs do not include possible additional treatment for 1,2,3-
Trichloropropane (1,2,3-TCP) and sharing in Oceanside’s outfall for the brine discharge; and,
WHEREAS, assuming that a treatment process to treat the 1,2,3 Trichloropropane would
include an activated carbon process and an agreement could be reached to lease capacity in
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Oceanside’s outfall line, the cost of this supplemental supply would range from $1300 to $1500 per
acre foot,
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, as
follows:
1. That the above recitations are true and correct.
2. That utilizing this Mission Basin water, as supplement to the present Carlsbad supply, is
not cost effective, at this time, and that the Public Works Director proceed with the
abandonment of the remaining wells in the Mission basin Well Field.
3. That any future capital funds for local water development would be better designated for
present seawater desalination or recycled water efforts rather than development of the
Mission Basin Well Field.
PASSED, APPROVED AND ADOPTED at a special meeting of the Board of Directors of
the Carlsbad Municipal Water District held on the 5th day of JULY , 2005 by
the following vote, to wit:
AYES: Board Members Lewis, Kulchin, Packard, Sigafoose
P,
ATTEST:
MAi
LORRAINE M. W&~OD, Secretary