1 RESOLUTION NO. 1420
2 A RESOLUTION OF THE BOARD OF DIRECTORS OF
CARLSBAD MUNICIPAL WATER DISTRICT (CMWD),
3 ADOPTING THE WATER DISTRICT FINAL OPERATING
. BUDGET AND CAPITAL IMPROVEMENT PROGRAM FOR
2011-12.
5
6
7 WHEREAS, the Board of Directors of the Carlsbad Municipal Water District,
g California, has held such public hearings as are necessary prior to the adoption of the
9 2011-12 Operating and Capital Improvement Budgets.
10 NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the
11 Carlsbad Municipal Water District as follows:
12 1. That the above recitations are true and correct.
13 2. That certain documents now on file in the office of the Secretary entitled "City
14 of Carlsbad, 2011-12 Operating Budget and 2011-12 to Buildout Capital Improvement
15 Program - Preliminary," as amended in accordance with Exhibit 4-A attached hereto
16 and incorporated by reference herein, is hereby adopted as the Operating and Capital
17 Improvement Budgets for the Carlsbad Municipal Water District for the Fiscal Year
18 2011-12 along with the Program Options determined by the City Council as set forth in
19 the minutes of the Council's meeting of Tuesday , June 21, 2011.
20 3. That the amounts reflected as estimated revenues for Fiscal Year 2011-12
21 are hereby adopted as the budgeted revenues for 2011-12.
22 4. That the amount designated as 2011-12 Budget in Exhibit 4-B is hereby
23 appropriated to the fund for which it is designated and such appropriation shall not be
24 increased except as provided herein.
25 5. That total appropriations may only be increased or decreased by the Board
26 of Directors by passage of a resolution amending the budget except as provided herein.
27 6. That the following controls are hereby placed on the use and transfers of
Exhibit 4
1
budget funds:
2
A. No expenditure of funds shall be authorized unless sufficient funds have
3
been appropriated by the Water Board or Executive Manager as described below.
4
i. The Executive Manager may authorize all transfers of funds from
5
account to account within the same fund in an amount up to $100,000 per transfer.
6
ii. The Executive Manager may delegate the authority to make budget
7
transfers.
8
iii. The Executive Manager may authorize budget adjustments
9
involving offsetting revenues and expenditures; the Executive Manager may authorize
10
increases in an appropriation for a specific purpose where the appropriation is offset by
11
unbudgeted revenue which is designated for said specific purpose.
12
iv. The Executive Manager may authorize increases in purchased
13
water appropriations in an amount equal to the same percent that water sales exceed
14
the amount of the original revenue estimate.
15
B. The Board of Directors must authorize any increase in the number of
16
authorized permanent personnel positions above the level identified in the final Budget.
17
The Executive Manager may authorize the hiring of temporary or part time staff as
18
necessary, within the limits imposed by the controls listed above.
19
7. That all appropriations and outstanding encumbrances as of June 30, 2011
20
are hereby continued into 2011-12 for such contracts and obligations.
21
8. All appropriations for Capital Improvement Projects remaining unexpended
22
at June 30, 2011, are hereby appropriated for such capital projects for the 2011-12
23
fiscal year.
24
25 ///
26 ///
27
28 V
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the
Carlsbad Municipal Water District Board of Directors, Carlsbad City Council, Carlsbad
Housing and Redevelopment Commission held on the 21st day of June 2011, by the
following vote to wit:
AYES: Board Members Hall, Kulchin, Blackburn, Douglas, Packard.
NOES: None.
ABSENT: None.
MATT HALL, President
ATTEST:
rORRAlKME M. WOOD, Secretary
(SEAL)
CARLSBAD MUNICIPAL WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM - FY 2011-12 TO 2026
PROJECT TITLE
RECYCLED WATER LINE - INNOVATION WAYAND GATEWAY
CALAVERA HILLS WATER BOOSTER STATION STANDBY GENERATOR
COLLEGE BOULEVARD - CANNON TO BADGER LANE
COLLEGE BOULEVARD (ECR TO CANNON ROAD) - Reimb
D RESERVOIR -PHASE I
EL FUERTE - NORTH OF LOKER - (Reimb)
MAERKLE PUMP STATION IMPROVEMENTS
MAERKLE RESERVOIR STORAGE (TAP #2)
MARRON ROAD - PRESSURE REGULATING STATION TO OCEANSIDE
MELROSE DRIVE - PALOMAR AIRPORT ROAD TO FARADAY - (Reimb)
POINSETTIA LANE - EL CAMINO REAL TO SKIMMER CT (Reimb)
POINSETTIA LANE - SKIMMER CT TO CASSIA
POINSETTIA LANE EAST OF BLACK RAIL ROAD 12"
WATER MASTER PLAN UPDATE
MAINTENANCE AND OPERATIONS CENTER
AVIARA PARKWAY AT PLUM TREE
BUENA VISTA PUMP STATION IMPROVEMENTS (STUDY)
CARLSBAD BOULEVARD - SOUTH OF AVENIDA ENCINAS
CATHODIC PROTECTION PROGRAM
CRESTVIEW DRIVE TRANSMISSION MAIN
D RESERVOIR -PHASE II
DESALINATION GROUNDWATER/SEAWATER STUDY
EL CAMINO REAL TRANSMISSION MAIN FROM FARADY TO COUGAR DRIVE
EL FUERTE AND CORINTIA STREET
ELLERY WATER PUMP PROJECT
GROUNDWATER DEVELOPMENT - SAN LUIS REY RIVER (STUDY)
HYDROELECTRIC PRESSURE REDUCING STATION-MAERKLE RESERVOIR
KELLY RANCH PRESSURE REDUCING STATION
LAKE CALAVERA RESERVOIR IMPROVEMENTS
MAERKLE FACILITY IMPROVEMENTS
MAERKLE FLOATING COVER REPLACEMENT
MAERKLE PUMP STATION IMPROVEMENTS
MAERKLE TRANSMISSION MAIN
MISCELLANEOUS PIPELINE REPLACEMENT PROJECTS
MISCELLANEOUS WATER VALVE REPAIRS/REPLACEMENTS
NCTD RIGHT OF WAY UTILITY RELOCATION (WATER)
OCEANSIDE INTERTIE UPGRADE
PARK DRIVE WATER LINE AND SURFACE IMPROVEMENTS
POINSETTIA LANE - SKIMMER CTTO CASSIA
POINSETTIA LANE EAST OF BLACK RAIL ROAD 12"
PRESSURE REDUCING STATION REPLACEMENT
RESERVOIR REPAIR /MAINTENANCE PROGRAM
SANTA FE II RESERVOIR SITE DRAINAGE
TRI-AGENCIES WATER TRANSMISSION PIPELINE REPLACEMENT
WATER SYSTEM INTERTIE CONNECTION
CARLSBAD WATER RECYCLING FACILITY (ENCINA)
12" RECYCLED WATER TRANSMISSION MAIN-CWRF TO CHINQ
CARLSBAD WATER RECYCLING FACILITY SCADA MODIFICATIONS
CHESTNUT AVENUE RECYCLED WATER LINE
FUND
RECL WATER
WATER CONN
WATER CONN
WATER CONN
WATER CONN
WATER CONN
WATER CONN
WATER CONN
WATER CONN
WATER CONN
WATER CONN
WATER CONN
WATER CONN
WATER CONN
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
TOTAL
BUDGET
675,000
500,000
1,066,000
1,060,000
6,849,000
250,000
1,000,200
14,815,000
820,000
1,475,000
135,000
410,000
247,000
700,000
7,170,000
815,000
430,000
950,000
1,246,700
210,000
2,283,000
795,000
1,517,380
500,000
298,495
55,000
2,000,000
560,000
6,396,908
2,135,200
10,000,000
999,322
6,330,000
1,433,000
250,000
80,000
114,600
1,092,000
523,000
247,000
1,102,000
4,185,000
645,000
6,455,000
439,774
1,103,666
1,900,000
210,000
716,600
PRIOR
EXP/ENC
595,913
-
64,098
-
163,645
522,217
-
222
-
-
1,436,952
23,495
-
443,670
-
5,840,145
1,083,547
44,322
8,882
262,815
34,154
32,283
-
75,288
34,838
11,257
130,085
34,774
-
76,030
157,441
-
BALANCE
FORWARD
79,087
1,066,000
1,060,000
185,902
-
1,311,355
177,783
65,000
-
100,000
-
1,246,478
-
-
80,428
-
-
1,556,330
560,000
556,763
1,051,653
-
4,866,118
1,170,185
215,846
80,000
-
967,717
1,026,712
1,850,162
633,743
1,124,915
42,000
898,970
52,559
-
YEAR 1 YEAR 2
2011-12 2012-13
YEARS YEAR 4 YEARS YEAR 6-10 YEAR 11 -15
2013-14 2014-15 2015-16 2017-2021 2022-2026
500,000
6,849,000
85,000 915,200
14,815,000
820,000
135,000
410,000
247,000
-
7,105,000
815,000
330,000
280,000 670,000
210,000
2,283,000
795,000
100,000
55,000
400,000
220,000
55,000
130,000 540,000 9,330,000
85,000 870,000
1,455,000
114,600
92,000
523,000
247,000
1,150,000 1,150,000
5,200,000
405,000
79,500 321,490 209,169 287,530 53,580 54,652 55,745
925,000
716,600
CARLSBAD MUNICIPAL WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM - FY 2011-12 TO 2026
PROJECT TITLE
ECR/TAMARACK PUMP STATION REMOVAL
PALOMAR BUISNESS PARK RECYCLED WATER PIPELINES
PUMP STATION REMOVAL
RECYCLED WATER CONNECTION - ALGA ROAD
RECYCLED WATER LINE - INNOVATION WAYAND GATEWAY
RECYCLED WATER MASTER PLAN UPDATE
SIDEWALK/STREET CONSTRUCTION - VALLEY AND MAGNOLIA SIDEWALKS
TOTAL CARLSBAD MUNICIPAL WATER DISTRICT PROJECTS
FUND
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
TOTAL
BUDGET
80,000
1,245,000
442,700
75,000
410,000
672,468
291,000
98,407,013
PRIOR
EXP/ENC
-
175,805
11,977
463,489
-
11,727,344
BALANCE
FORWARD
1,110,000
266,895
398,023
208,979
-
24,009,603
YEAR1 YEAR 2 YEAR 3 YEAR 4
2011-12 2012-13 2013-14 2014-15
YEAR 5 YEAR 6-10 YEAR 11 -15
2015-16 2017-2021 2022 - 2026
80,000
135,000
75,000
291,000
10,562,500 10,223,090 17,928,769 11,402,730 133,580 11,543,652 875,745