HomeMy WebLinkAbout1974-11-12; Planning Commission; Resolution 11100' 0.
1
2
3
4
5
6
PLANNING COMMISSION RESOLUTION NO. 1110
RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA, CONCERNING THE MASTER PLAN TO ALLOW PLANNED INDUSTRIAL DEVELOPMENT ON APPROXIMATELY 187 ACRES AND PLANNED RESIDENTIAL DEVELOPMENT ON 410 ACRES, LOCATED 1/2 MILE EAST OF EL CAMINO REAL ON THE NORTH SIDE OF PALOMAR AIRPORT ROAD. APPLICANT: LOMAS SANTA FE DEVELOPMENT CORP. ASt NO. MP-153
7
wit: 8
WHEREAS, a verifed application for a certain property, to
9
10
11
12
13
14
15
16
17
18
19
20
21
22
That portion of Lot B or Rho Agua Hedionda in the City of Carlsbad according to Map thereof No. 823 filed in the County of San Diego, State of California, described as follows:
Commencing at. "Point 15" of said Lot B as designated on said Map No. 823; thence along the Easterly boundary of said Lot "B", South 3 05'08'' east a distance of 4108.96 feet to point "A", thence continuing along said easterly boundary, south 3 05'08" east a distance of 1511.59 to a point in the arc of a nontangent 1230.00 feet radius curve, concave southerly, a radial to said point bears north 2 00'16" west; thence leaving said easterly boundar of lot By continuing westerly along the arc of said curve through a central angle of 12 51'07" a distance of 275.90 thence south 79 09'09" west a distance of 803.98 feet to the beginning of a tangent 2970.00 feet radius curve conc northerly; thence westerly along the arc of said curve through a central angle of 26 56'49" a distance of 1377.C feet; thence north 73.54'02" west a distance of 453.00 feet to the beginning of a tangent 3030.00 feeot radius curve concave southerly; thence westerly along the arc of said curve through a central angle of 21 31'20" a distanc
of 1138.17 feet; thence south 84 34'38" west a distance of 578.90 feet; thence north 3 05'08" west a distance of 5563.11 feet; thence south 89 54'00" east a distance of 4590.59 feet to the point of commencement,
23
Planning Commission; and 24
has been filed with the City of Carlsbad and referred to the
25 WHEREAS, said verified application constitutes a request
26
27
as provided by Title 21 of the "Carlsbad Municipal Code"; and
place specified in said notice on October 22, 1974 and contint 28
WHEREAS, the public hearing was held at the time and in 1
29 to November 12 , 1974; and
30 WHEREAS, the applicant has complied with the Public Faci'
31 Policy of the City of Carlsbad and has provided the necessary
32 information which insures Public Facilities will be available
0- 0.
1 current with need; and
2 WHEREAS, the subject application has complied with the
3
Ordinance of 1972”; and 4
requirements of the Cfty of Carlsbad “Environmental Protectior
5 WHEREAS, at said public hearing, upon hearing and considt
6
desired to be heard, said Commission consi.dered all factors 7
ing the testimony and argumentsS if any, of all persons who
reasons to exist: 9
relating to the Master Plan and found the following facts and 8
10
11
12
13
14
15
16
1’7
1) The Master Plan meets the requirements of the adopt€ General P1 an.
2) The Master Plan meets the requi.rements and intent of the Planned Community and Planned Industrial Zone Ordinances.
3) The Master Plan meets a71 applicable City policies including the Public Faci,lities Poli-cy.
4) The Master Plan meets all requirements of CEQA and the Carlsbad Environmental Protection Ordinance. The mitigations proposed in the Certified EIR and as a part of this Master Plan are adequate i.n minimizing adverse impacts.
18
21
i:s appraved for use of said property to allow a planned indust 2o
the City of Carlsbad, California, as follows: That a Master P l9
NOW, THEREFORE, BE IT RESOLVED by the Planning Commission
development on approximately 187 acres and a planned residenti
22 development on 410 acres at an average density of 3.66 dwell ir
23 uni:ts net acre. The property is zoned P-C and P-M and is loca
24 approximately 1/2 mile east of El Camino Real on the north sic
25 Palomar Airport Road; and is subject to the following conditic
26
27
28
29
30
31
32
1) Master Plan approval is granted for land described i the application and any attachments thereto, and as shown on the Plot Plan (Exhibit D, dated 10-22-74), descriptive text (labeled Exhibit F) and slope analy (labeled Exhibit E, and dated 10-22-74). The locati of all proposed developmental units, roadways, open space and other features shall be substantially the same as the Plot Plan and Text labelled Exhibits D a
2) In order to reduce fire hazard, the applicant shall agree to selectively clear underbrush and debris fro open space areas prior to issuance of any building o grading permits. Th.is brush and debris clearance sh
-2-
..
0' 0.
3
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
be an on-going activity and shall be done under the guidance of the Parks and Recreation Department and Fire Department. This activity should not be constr to be total brush removal normally associated with grading activities.
3) The applicant shall erect a six-foot chain link fen( topped with three strands of barbed wire which shall separate the subject residential development and thc University of California and Dawson properties (a) 2 the property line in Parcel A-2 and (b) below and nc of the rear of the development pad within Parcel A-1 The barbed wire shall be angled toward the Valle Ver property. A 15 foot wide fire break shall border tt. length of the fence. This shall be done prior to issuance of any residential building permits or pric to any residential area grading.
4) The applicant shall design all development along the northern property boundary to drain to the south.
5) The project shall be generally phased as follows:
AREA 1975 1976 1977 1978 1979 1980 1981 TOTI!
A1 50 100 66 - - - - 21 f A2 - - 34 50 - - - 84 B1 30 100 38 - - - - 168 B2 - - - - - - 71 71 B3 - - - - - 54 - 54 B4 - - 74 100 100 100 - 374 B5 - - - 39 150 - - 185 B6 - - - - - - 64 64 B7 30 100 100 50 - - - 28C
TOTAL 110 300 312 239 250 154 135 150C
6) All denuded-natural or constructed slope areas shall be planted with natural plant materials in order to reduce erosion. This shall be done in a manner satisfactory to the Parks Director and City Engineer prior to the issuance of any permits by the City anc also after any grading activities.
7) All areas indicated on the Master Plan as greenbelt, existing trees and pond shall be rezoned to Open Spa (0-S) zone prior to or concurrent with consideratiofi of any Specific Plan or Tentative Subdivision Map wi in the project boundaries.
8) The applicant shall offer to the City an 15 foot wid open space easement for pedestrian, equestrian and bicycle purposes. The easement shall transverse the east-west valley (shown on the Master as "green belt existing trees, and existing pond "between units B-7 and B-2 and also 8-4 and B-5) and shall be located a sized according to the specifications outlined by th Parks and Recreation Director at the time of Specifi Plan/Tentative Map application. The applicant will responsible for improving the easement to City Stand and the City will be responsible for normal maintena and liability. The easement shall be offered to the City concurrent with the first final map adjacent to any portion of the east-west valley described above.
-3-
1
2
3
4
5
6
7
8
9
10
I1
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
0- 0.
9) The applicant, prior to consideration of any Specif- Plan applications, shall prepare a water master plar which is acceptable to the Carlsbad Municipal Water District and also to the City Fire Department.
10) Approval of this Master Plan indicates an acceptanct of the City Council of a general scheme of developmt for the property. It is part of an on-going plannil process and is sub.ject to amendment In tke.future.
Approval of the plan does not constitute any guaran. that individual Specific Plans will be subsequently approved, nor that the availability of public facil and services will necessarily coincide with the developer's time table for construction- Availabil of public services will be evaluated in the context Specific Plan approvals.
Specific Plans will be evaluated in accordance with Municipal Ordinances in force at the time when said Specific Plans are before the City Council for apprc Approval and construction of a Specific Plan shall I vest any rights in the balance of the Master Plan nc create any vested rights to the appro,val of any subsequent Specific Plans.
11) The developer shall comply with the City of Carlsbac Master Drainage Plan and related drainage improvemel
12) The development is' presently within the sewer servic area of th.e City of Carlsbad. Sewer facilities (:i.e., City Master Plan sized gravity mains and/or sewage pump stations), will be required as approved by the City Engineer.
13) The applicant shall enter into a secured agreement the construction of full half street improvements or Palomar Airport Road between the westerly and the easterly limits of the development along the entire precise alignment as adopted prior to completion of first phase of development, (63' half-section right
way 10
14) Archaeological sites #2, #8 and #9 shall be mapped, excavated, and/or have surface collections made according to specifications contained in the Certifi E.I.R. prior to any Specific Plan consideration.
PASSED, APPROVED AND ADOPTED at a regular meeting of the
City of Carlsbad Planning Commission held on November 12, 1974
by the following vote, to wit:
AYES: Commissioners Watson, Fikes, Jose, Casler
NOES: Commissioner Wrench
ABSENT: Commissioner Dominquez
ABSTAIN: None
-4-
-
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
- fi -..
e..
,:? .- <..- I . ,. 8. . ,&
. . . P/J.. ; J“4L-j
1. CC4L”,
Mary Casl,!er, Chai.rman