HomeMy WebLinkAbout1978-04-12; Planning Commission; Resolution 1442-\
.t m w
1 PLANNING COR?J!IISSION RESOLUTION NO. 1442
2
3
4
5
6
7
a
9
10
11
12
13
14
15
16
IV
RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF CARLSBAD, CALIFORNIA, APPROVING A
SITE DEVELOPMENT PLAN FOR A COMMERCIAL CENTER ON PROPERTY GENERALLY LOCATED ON THE NORTH
EAST INTERSECTION OF EL CAMINO REAL AND ALGA
ROAD.
CASE NO: SDP 77-1
APPLICANT : ROLL" PULASKI '.U ASSOCIATES
WHEREAS, a verified application for certain property to
wit:
Situated in the State of California, County of San Diego
Parcels 1, 2 and 3: All that portion of the west half of the northeast quarter of Section 26, Township 12 sout Range 4 west, San Bernardino Meridian, in the County of San Diego, State of California, according to official plat thereof, and also listed in the County Assessor's
Book No. 215, Page 25, Parcel 49-55-511
has been filed with the City of Carlsbad and referred to the
Planning Commission; and
WHEREAS, said verified application constitutes a request
as provided by Title 21 of the Carlsbad Municipal Code; and
WHEREAS, the Planning Commission did on the 12th day of
At
18
19
20
21
22
23
24
April, 1978, hold a duly noticed public hearing as prescribed
law to consider said request; and
WHEREAS, at said public hearing, upon hearing and consid
the testimony and arguments, if any, of all persons who desir
to be heard, said Commission considered all factors relating
the Site Development Plan (SDP 77-l), and found the followinq
facts and reasons to exist:
1- The project design demonstrates sensitivity to the view c 25 the project from adjoining residential properties and adj
26
27
28 adequate mitigation provided.
ing streets.
2. Adequate public improvements are assured.
3. A thorough environmental investigation has been conductec
11
. .'
7.
i
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
m m
4. The development complies with the General Plan because t
General Plan permits neighborhood commercial to be place
in areas convenient to residential uses.
5. The subject parcel is adequate in size and shape to
accommodate the proposed use.
NOW, THEREFORE, BE IT resolved by the Planning Commissi
of the City of Carlsbad as follows:
A) That the above recitations are true and correct.
B) That in view of the findings heretofore made and considc
the applicable law, the decision of the Planning Commis:
is to APPROVE the Site Development Plan (SDP 77-11, SUI
to the following conditions:
1. Approval is granted for a portion of SDP 77-1 Exhibit "I
dated 3/23/78. Areas designated as "future" on said ex1
are specifically not approved, and new application amen(
SDP 77-2 will be required to approve development of tho!
sites.
2. A landscape and irrigation plan shall be approved by thc Planning Department prior to the issuance of building pl
Said plans to include a landscape design for the center median of El Camino Real.
3. Parking areas shall be adequately screened from public and adjoining residential.
4. Roof mounted mechanical equipment shall be obscured fro
view of adjoining streets and adjoining residential.
5. If a retaining wall is to be constructed along the east
property line, it shall be constructed of decorative
materials and the view shall be buffered with landscapi
6. Location of fire hydrants and sizes of line serving sai
hydrants shall be approved by the Fire Marshall.
7. The driveway on Dove Lane shall not be located any furt
to the west than is presently shown on Exhibit "B".
8. As part of Phase I the parking lot shall be developed s
iciently to accommodate all parking required for Phase
uses. All access drives shall be fully improved to a w
of 28 feet. Developed portions of the parking lot shal
delineated from undeveloped portions to the satisfactic
Of the City Engineer. A suggested Phase I parking lot development is shown on Exhibit a~".
9- Alga Road shall be dedicated on the basis of a 102 foot street section.
.2
c. . ' li 0 m .
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
10. El Camino Real shall be dedicated on the basis of a 126
foot street section.
11. Complete half-street public improvements shall be provide
along the entire Alga Road and El Camino Real frontage. Those shall include dedication and construction of a curl return at the intersection to provide a free right lane t be approved by the City Engineer.
12. The applicant shall execute a secured agreement to provic
one fourth of the cost of a traffic signal, including
channelization, at the intersection of Alga Road and El ( Real, or participate in the cost of traffic signals in
accordance with the City Ordinance at the time building 1 are issued.
13. Dedication of Alga Road and El Camino Real shall include
waiver of direct access rights except at the driveways o
approved site development plan.
14. The median shall be constructed along the entire El Cami Real frontage. The median may be constructed in three p to ensure that all access points along El Camino Real sh
right turn in-turn, turn out, excepting at Street A (bet
the commercial area and the four-plex area). A fully
activated traffic signal shall be constructed at the int section of Street "A" and ,El Camino Real in conjunction
the construction of the commercial area.
15. Street lighting along El Camino Real shall be the Missic
Bell type.
16. No building permits shall be issued until the Planning
Director has approved the final site development plan.
17. This approval shall expire in one year from the date of approval if building permits are not issued within said
year period.
18. On site lighting shall be designed and shielded so that light and glare will not be a nuisance to adjoining res- idential uses or vehicular circulation on adjoining strt
PASSED, APPROVED AND ADOPTED at a regular meeting of tht
City of Carlsbad Planning Commission held on April 12, 1978,
the following vote, to wit:
xxx
xxx
xxx
xxx .3
.I .. Q. 0 w
I , I1
1
2
3
4
5
6
7
a
9
AYES: Commissioner Larson, Woodward, Yerkes, FiE Rombotis, Jose.
NOES: Commissioner L’Heureux
ABSTAIN : None.
ABSENT : None.
ATTEST :
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 .4
ll