Loading...
HomeMy WebLinkAbout1980-09-10; Planning Commission; Resolution 1689*. - II 1 2 3 4 5 6 7 e .o PLANNING 'COMMI'SSION RESOLUTION NO. 1689 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING A SITE DEVELOP- MENT PLAN NO. SDP-80-9, FOR A SAVINGS AND LOAN OFFICE ON PROPERTY GENEFKLLY LOCATED ON THE NORTH- EAST CORNER OF EL CAMINO REAL AND ALGA ROAD. APPLICANT: BmRLY HILLS SAVINGS AND LOAN 'CA'SE NO: .SDP .8 o .9' . . . . . . " WHEREAS, a verified application has been filed with the a of Carls,bad, and referred to the Planning Commission; and WHEREAS, said verified application constitutes a request 9 10 11 12 13 14 15 16 provided by Title 21 of the Carlsbad Municipal Code; and WHEREAS, pursuant to the provisions of the Municipal Cod the Plann.ing Commission did, on the 10th day of September, 15 Considered said request on property described as: Parcel 1 of Parcel Map 9043, in the City of Carlsbad, fi in the office of the County Recorder of San Diego Count3 August 14!' 1979. WHEREAS, at said hearing, upon hearing and considering E ~ 17 I/ testimony and arguments, if any, of all persons desiring to 1 11 heard, said Commission considered all factors relating to Si1 18 I 19 I 20 21 22 23 24 Development Plan No. SDP-80-9. NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning Cc sion of the City of Carlsbad as follows: A) That the foregoing recitations are true and correct. B) That based on the evidence presented at the hearing, thc mlssion recommends: APPROVAL of SDP-80-9, based on the fc ihg fhdlngs and s-ubj.ect to the following conditions: , .. . I ' Fin.ddngs : 25 26 design of the development since the property is adequatc s2ze .and topography to accommodate the project and stil 27 all c2ty regulations. 1) The site is physically suitable for the type and 28 I! II -1- ., - "* ii e e < 1 2 2) The project is consistent with all city public facility cies and ordinances since: a) The applicant has been allocated sufficient sewer h 3 ups for the project. 4 5 6 7 a b) The applicant has agreed and is required by the inc of an appropriate condition to pay a public facilit fee, Performance of that contract and payment of t fee will enable this body to find that public facil will be available concurrent with need as required the General Plan. c) All necessary public improvements have either been vided or will be required as conditions of approval 9 10 11 12 13 14 I dl I The Planning Commission has, by inclusion of an app prlate condition to this project, insured that the pr'oject will not be approved unless the City Counci ginds that sewer service is available to serve the project. Slnce the project cannot be approved unle sewer service is available, and building cannot occ wlthin the project unless sewer service remains ava able, the Planning Commission is satisfied that the requirements of the public facilities element of th General Plan have been met insofar as they apply tc sewer service for this project. 15 3) The design of the project and all required improvements 1975, Lot. No. 283. a shopping center that had a Declaration of Negative EnTi project will be located on a previously graded parcel wi 16 not cause any significant environmental impacts. The pr 17 mental Impact issued by the Planning Department on May 6 18 4) The design of the project provides for efficient traffic 19 I pedestrjan circulation. 20 5) The proposed development is consistent with the Land Use Element and all other applicable elements of the General 21 Plan. 22 6) The proposed development as conditioned is consistent wi surrounding .. development, both existing and future. 23 11. Co'n'ditTo'ns II 1) Approval is granted for SDP 80-9, as shown on Exhibit(s) 25 on file in the Planning Department. Development shall c 26 tions. substantially as shown unless otherwise noted in these c 24 I B, and C, dated July 18, 1980, incorporated by reference 27 11 28/1 PC RES0 #1689 - 2- 7% - . - I( e 0 4 2) This project is approved upon the express condition thal 2 subject property unless the City Engineer determines thz sewer facilities are available at the time of applicatic such sewer pe-rmits and will continue to be available unl 1 time of occupancy. 3 building permits shall be issued for development of the I 4 5 6 7 8 9 3) This project is approved upon the express condition thai applicant shall pay a public facilities fee as required City Council Policy No. 17, dated August 29, 1979, on f: with the City Clerk and incorporated herein by referencc 'according to the agreement executed by the applicant fol payment'of said fee a copy of that agreement dated June 1980, is on file will the City Clerk and is incorporate( hereln by reference. If said fee is not paid as promist th2-s appllcation wlll not be consistent with the Genera: and approval for this project shall be void. 10 4) The applicant shall prepare a detailed landscape and ir: tion plan which shall be submitted to and approved by tl Planning Department prior to issuance of building permi- 12 the buiTd2ng and the southerly property line adjacent tc road. 13 5) Parking lot trees shall be a minimum 15 gallon size. I* 6) Signing for this development shall be in substantial COI mance to the existing uniform sign program for the West 15 Plaza Center and shall be submitted to the Planning Dep; 16 for their review and approval prior to installation. 17 architectura1.ly integrated and shielded from view and sound buffered frbm. adjacent properties and streets to 18 satisfaction of the Planning Department and Building De: 19 i 8) A,pproval of this request shall not excuse compliance wi. sections of the Zoning Ordinance and Policies and all 0' pemlt Issuance. 11 Said plan shall include a dense landscaping screen betwc 7) A11 roof appurtenances, including air conditioners, sha 20 applicable city ordinances in effect at time of buildinl 21 22 9) The applicant shall obtain a reciprocal access agreemen. between the subject parcel and the other parcels within We.st Bluff Shopping Center. Said agreement shall be SUI 23 to and approved by the City Engineer prior to occupancy the. proposed savings and loan office. 24 10) The walkway from the sidewalk along El Camino Real shal 25 reduced in width to 6 feet and relocated 36 feet north I 26 the location shown on Exhibit "A". 27 28 PC mS0 #1689 -3- li .I " ll a 0 I 1 2 3 4 5 If 6 7 8 9 PASSED, APPROVED AND ADOPTED at a regular meeting of the Planning Commission of the City of Carlsbad, California, held the 10th day of September, 1980, by the following vote, to wi AYES: Schick, Larson, Friestedt and Leeds NOES : None ABSENT: Rombotis, Jose and Ma s ABSTA1N:None 15 16 17 18 19 i 20 21 22 23 24 25 26 27 28 ~ PC RES0 81'689 -4-