PLANNING COMMISSION RESOLUTIDN NO. 1727
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF CARLSBAD, CALIFORNIA, APPROVING SITE
DEVELOPMENT PLAN NO. 80-10 TO DEVELOP A COM-
MERCIAL OFFICE BUILDING AND DRIVE-THRU BANK ON
PROPERTY GENERALLY LOCATED ON THE SOUTHEAST
CORNER OF EL CAMINO REAL AND LA COSTA AVENUE
IN THE C-1-Q ZONE.
APPLICANT: SILVERS
CASE NO: SDP .80-10
WHEREAS, a verified application has been filed with the
City of Carlsbad, and referred to the Planning Commission; an
WHEREAS, said verified application constitutes a request
provided by Title 21 of the Carlsbad Municipal Code; and
WHEREAS, pursuant to the provisions of the Municipal Cod
the Planning Commission did, on the 26th day of November, 198
consider said request on property described as:
That portion lying within Survey No. 1800-1 in Parcel
No. 67084-A filed December 3, 1969.
WHEREAS, at said hearing, upon hearing and considering a
testimony and arguments, if any, of all persons desiring to
be heard, said Commission considered all factors relating to
Site Development Plan No. 80-10.
NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning
Commission of the City of Carlsbad as follows:
A) That the foregoing recitations are true and correct.
B) That based on the evidence presented at the hearing, the
Commission recommends APPROVAL of SDP 80-10, based on tk:
following findings and subject to the following conditic
Finrdings:
1) The site is physically suitable for the type, density ar
design of the development since the property is adequate
in size and topography to accommodate the project and st
meet all city regulations without any significant envirc mental impacts.
. ll e e
1
2
2) The project is consistent with all city public facility
3
policies and ordinances since:
a) The applicant has been allocated sufficient sewer
hookups for the project.
4
5
6
7
8
b) The applicant has agreed and is required by the inclusion of an appropriate condition to pay a publ. facilities fee. Performance of that contract and payment of the fee will enable this body to find th(
public facilities will be available concurrent with
need as required by the General Plan.
c) All necessary public improvements have either been
provided or will be required as conditions of appro.
9
10
11
12
13
14
15
16
3,
17
4, 18
19 I
d) The Planning Commission has, by inclusion of an
appropriate condition, insured that the project wil
not be approved unless the City Council finds that
sewer service is available to serve the project. S
the project cannot be approved unless sewer service
is available, and building cannot occur within the
project unless sewer service remains available, the Planning Commission is satisfied that the requireme: of the public facilities element of the General Pla have been met insofar as they apply to sewer servic,
for this project.
The design of the project and all required improvements not cause any significant environmental impacts, and a
Declaration of Negative Environmental Impact has been issued by the Planning Director on October 2, 1980, Log
No. 760.
The proposed development is consistent with the Land Use
Element and all other applicable elements of the General Plan.
2o /1 5) The proposed development as conditioned is consistent wi
surrounding development, both existing and future.
21
22
23
24
General Conditions:
1. Approval is granted for SDP 80-10, as shown on Exhibits
A, B, & C, dated July 25, 1980, incorporated by
reference and on file in the Planning Department. Devel ment shall occur substantially as shown unless otherwise noted in these conditions.
25 '
26
2. This project is approved upon the express condition that building permits will not be issued for development of t subject property unless the City Engineer determines tha
27 sewer facilities are available at the time of applicatio
such sewer permits and will continue to be available unt
28 time of occupancy.
PC RES0 # 1727
Page 2
I
,. 5 -
- -il e a
1 3-
2
3
4
5
This project is approved upon the express condition that applicant shall pay a public facilities fee as required 1 City Council Policy No. 17, dated August 29, 1979, on fil with the City Clerk and incorporated herein by reference,
according to the agreement executed by the applicant for
payment of said fee a copy of that agreement dated July
21, 1980, is on file with the City Clerk and incorporatec
herein by reference. If said fee is not paid as prornisec
this application will not be consistent with the General
Plan and approval for this project shall be void.
6 4. Approval of this request shall not excuse compliance wit1
city ordinances in effect at time of building permit issl 7 all sections of the Zoning Ordinance and all other applic
8
9
10
11
12
5. This approval shall become null and void if building perr are not issued for this project within one year from the date of project approval.
6. The applicant shall prepare a revised site plan incorpor; the conditions contained herein. Said site plan shall bc submitted to and approved by the Planning Director prior
to the issuance of building permits.
13 7. The applicant shall prepare a detailed landscape and irrigation plan which shall be submitted to and approved
14 by the Planning Director prior to final site plan approvz
15 8. Parking lot trees shall be a minimum 15 gallon size.
16
17
9. All landscaped areas shall be maintained in a healthy an(
10. Any signs proposed for this development shall be designec
18 in conformance with the city's Sign Ordinance and a unifc
sign program for the development shall be submitted to tl
Planning Department for their review and approval prior .
occupancy of any building and the installation of any sic
11. Trash receptable areas shall be enclosed by a 6 foot higl
thriving condition, free from weeds, trash, and debris.
19 I
20
21
Director. 22
masonry wall with gates pursuant to city standards. Loci
of said receptacles shall be approved by the Planning
23 12. All roof appurtenances, including air conditioners, shal:
be architecturally inteqrated and shielded from view and
25 I
24 I the sound buffered from-adjacent properties and streets to the satisfaction of the Planning Department and Build.
Director.
26
//// 28
//// 27
//// ////
////
PC RESO. # 1727
Page 3
- L. -
4 . a *
1
2
3
4
5
13. The project shall provide bus stop facilities at locatic
subject to the satisfaction of the North County Transit
District. Said facilities shall at a minimum include a
bench, free from advertising and a pole for the bus stoF
The bench and pole shall be designed in a manner so as t detract from the basic architectural theme of the projec and said design shall be subject to the approval of the
Planning Director and North County Transit District.
14. The two compact car spaces located on the east side of 6
15. The applicant shall install "do not enter" sign and pair 7
the building shall be eliminated.
drive-thru exits to mitigate potential traffic conflicts a to the satisfaction of the City Engineer.
9 16. The parking spaces which back into the entry driveway tc
the bank shall be signed and labeled as employee parkinc 10
PASSED, APPROVED AND ADOPTED at a regular meeting of thc 11
to the satisfaction of the Planning Director.
12
ABSTAIN: None. 17
ABSENT: Leeds. 16
NOES : L'Heureux. 15
AYES: Marcus, Rombotis, Larson, Jose and Friestedt. 14
on the 26th day of November, 1980, by the following vote, to 13
Planning Commission of the City of Carlsbad, California, held
18
19
20
F .?-) c., .> .. "?
11. ,q"&.q& $/(&A 4- /'
MARY Y-US, Chairman
CARLSVAIj PLANNING COMMISS
,I
21 IlATTEST: 4
28 //PC RES0 #1727
Page 4
I,