Loading...
HomeMy WebLinkAbout1982-08-11; Planning Commission; Resolution 1997ii e e I % 1 2 3 4 5 6 7 PLANNING COMMISSION RESOLUTION NO. 1997 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING A SITE DEVELOPMENT PLAN NO. 82-2, TO ALLOW THE GRADING OF A 17 ACRE PARC ON PROPERTY GENERALLY LOCATED ON THE EAST SIDE OF EL CAMINO REAL IMMEDIATELY NORTH OF THE CABLEVISION BUII APPLICANT: KOLL - WELLS CASE NO. SDP 82-2 WHEREAS, a verified application has been filed with t City of Carlsbad, and referred to the Planning Commission; ane 8 9 10 11 12 WHEREAS, said verified application constitutes a reqL as provided by Title 21 of the Carlsbad Municipal Code; and WHEREAS, pursuant to the provisions of the Municipal the Planning Commission did, on the 11th day of August, 1982, considered said request on property described as: 13 14 Parcel 1 of Parcel Map No. 10060, being a portion of Lot B of Rancho Agua Hedionda according to Map 823 filed in San Diego County. 15 WHEREAS, at said hearing, upon hearing and considerir 16 testimony and arguments, if any, of all persons desiring to be 17 18 heard, said Commission considered all factors relating to Sit€ Development Plan No. 82-2. 19 NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planninc 20 ~ Commission of the City of Carlsbad as follows: That the foregoing recitations are true and correct. 22 B) That based on the evidence presented at the hearing, the 23 Commission APPROVES SDP 82-2, based on the following find and subject to the following conditions: 24 Findings: 25 1) The site is physically suitable for the type and density c development since the site is adequate in size and shape t 26 accommodate residential development at the density propose 21 lA) 27 //// 28 //// I ll e e '- ll l, ll 2) The project is consistent with all city public facility PC and ordinances since: 2 3 4 5 6 7 8 a) The project will not require sewer. b) The applicant has agreed and is required by the inclus an appropriate condition to pay a public facilities fe Performance of that contract and payment of the fee wi enable this body to find that public facilities will 1: available concurrent with need as required by the Gene Plan. c) All necessary public improvements have been provided c be required as conditions of approval if this project subsequent site development plans on the property. 9 10 11 3) The project will not cause any significant environmental impacts, and a Negative Declaration has been issued by the Planning Director on July 30, 1982, 4) Prior to any structural development of the site, a revised Development Plan will be submitted to the city. 12liconditions: I.3 l4 Planning Conditions: 17 2) Approval is granted for SDP 82-2, as shown on Exhibit(s) ' l6 Planning Commission. development plan shall be submitted to and approved by the 15 1) Prior to any further development of the site, a revised si as shown unless otherwise noted in these conditions. 18 the Planning Department. Development shall occur substar dated June 22, 1982, incorporated by reference and on file 19 20 21 22 23 3) This project is approved upon the express condition that t applicant shall pay a public facilities fee as required b) Council Policy No, 17, dated April 2, 1982, on file with t City Clerk and incorporated herein by reference, and accor to the agreement executed by the applicant for payment of fee a copy of that agreement dated June 8, 1982, is on fil the City Clerk and incorporated herein by reference. If E fee is not paid as promised, this application will not be consistent with the General Plan and approval for this prc shall be void, 24 IlEngineering Conditions: 25 26 4) Immediately after grading the entire site shall be hydrosc in accordance with the requirements of the City Standards 27 !///// 28 PC Reso No, 1997 -2- ll * .* ".. 1 2 3 to the satisfaction of the City Engineer. The developer s provide a means to water the hydroseeded areas until the F have become established. An appropriate sum of money, as determined by the City Engineer, shall be included in the grading and erosion control cash security for this project guarantee performance of this condition. * 5 5) The drainage swale shown running down the middle of the si 6 Engineer. Said erosion control measures shall be approved shall contain any erosion control measures required by the 7 prior to issuance of a grading permit. 6) The developer shall provide a desiltation basin at the lob of the project site in accordance with the requirements of City Standards and to the satisfaction of the City Engine€ This basin shall be in addition to any other erosion contr measures which may be required by the City Engineer as a condition of the issuance of a grading permit. a 9 10 11 12 13 14 15 16 PASSED, APPROVED AND ADOPTED at a regular meeting of Planning Commission of the City of Carlsbad, California, held the 11th day of August, 1982, by the following vote, to wit: AYES: Chairman Farrow; Commissioners Jose, Rombot Friestedt and Rawlins NOES : None ABSENT: Commissioners Schlehuber and Marcus 17 18 ABSTAIN : None 19 ,I 20 ATTEST : I1 ww &W(: VERNO J. FARROW, Cha L CARLS D PLANNING COMMI 1. 21 22 23 24 25 26 27 28 PC Reso No., 1997 -3-