HomeMy WebLinkAbout1982-09-22; Planning Commission; Resolution 2022’ I/ e 0 ll
I. 11 PLANNING COMMISSION RESOLUTION NO. 2022
2
3
4
5
A RESOLUTION OF THE PLANNING COMMISSION OF THE CIT
OF CARLSBAD, CALIFORNIA, RECOMMENDING APPROVAL OF
REQUEST TO DEVELOP AN AUTOMOBILE DEALERSHIP ON PRC
GENERALLY LOCATED ON THE EAST SIDE OF PASEO DEL MC
BETWEEN CANNON ROAD AND PALOMAR AIRPORT ROAD.
APPLICANT: RICHARDSON BROS.
CASE NO: PCD-37
~
6
Parcel 1, of Parcel Map No. 8651, filed in the ofl 8
wit: 7
WHEREAS, a verified application for certain proper
of the County Recorder, April 20, 1979.
9
10
has been filed with the city of Carlsbad and referred to tl
Planning Commission; and
I.3. ll WHEREAS, said verified application constitutes a 1 12
13
as provided by Title 21 of the Carlsbad Municipal Code: an(
WHEREAS, the Planning Commission did, on the 221x3
14/1 September 1982, consider said request; and
15 11 WHEREAS, at said hearing, upon hearing and consid(
16/( testimony and arguments, if any, of all persons desiring tc
17// heard, said Commission considered all factors relating to
l8 I! Planning Commission Determination; and 19
20
21
22
23
24
25
26
27
NOW, THEREFORE, BE IT HEREBY RESOLVED by the Plan
Commission as follows:
A) That the foregoing recitations are true and correct.
R) That based on the evidence presented at the public hea Commission APPROVES PCD-37, based on the following fin
subject to the following conditions:
Findings:
1) The project is consistent with the General Plan since
proposed use, an automobile dealership, is consistent
RRE, (Extensive Regional Retail), designation establi
this property in the Land Use Element of the General
28 ////
e 0
1
2
3
4
2) The project is consistent with the approved Specific P:
Car Country, as discussed in the staff report.
3) The site is physically suitable for the type of develo: since the site is adequate in size and shape to accomm the project and still meet all city regulations withou significant environmental impacts.
5
6
4) The project is consistent with all'city public facilit icies and ordinances since:
a) The Planning Commission hasl by inclusion of an ap
will not be issued for the project unless the City
and building cannot occur within the project unles
satisfied that the requirements of the public faci
apply to sewer service for this project.
7
service remains available, thus the Planning Commi 9
finds that sewer service is available to serve the a
condition to this project, insured that building p
10 element of the General Plan have been met insofar
17
LA I1 12
b) All necessary public improvements have been provid will be required as conditions of approval.
13
14
15
16
17
18
19
6)
20
5)
c) The applicant has agreed and is required by the ir of an appropriate condition to pay a public facili
Performance of that contract and payment of the fe
enable this body to find that public facilities wj
available concurrent with need as required by the
Plan,
The proposed project is compatible with existing and 1
developments in Car Country, as discussed in the stafj
The Land Use Planning Manager has determined that thir
is exempt from Environmental Review, per Section 19.01
of the Carlsbad Environmental Protection Ordinance, ar therefore, issued a Notice of Exemption on August 5,
21
22
23
24
25
26
27
General Conditions:
1) Approval is granted for PCD-37, as shown on Exhibit(s
C, D and E, dated September 22, 1982, incorporated by
and on file in the Land Use Planning off ice. Develop
occur substantially as shown unless otherwise noted i
conditions.
2) This project is approved upon the express condition t building permits will not be issued for development o
subject property unless the City Engineer determines
facilities are available at the time of application f
sewer permits and will continue to be available until
occupancy.
28 PC RES0 NO. 2022 ;I .2 II
I/ e e
1
2
3)
4
3
6
5
7
8
9
4)
5)
This project is approved upon the express condition th
applikant shall pay a public facilities fee as require
Council Policy No. 17, dated April 2, 1982, on file wi
City Clerk and incorporated herein by reference, and a to the agreement executed by the applicant for payment fee, a copy of that agreement, dated September 16, 198 file with the City Clerk and incorporated herein by re If said fee is not paid as promised, this application be consistent with the General Plan and approval for t project shall be void.
Approval of this request shall not excuse compliance w
sections of the Zoning Ordinance and all other applica
ordinances in effect at time of building permit issuan
Water shall be provided by the city of Carlsbad unless other arrangement is approved by the City Council.
10 6) The applicant shall prepare a detailed landscape and j plan which shall be submitted to and approved by the I
11 Planning Manager prior to the issuance of building pel
12
13
7) All parking lot trees shall be a minimum of 15 gallon:
thriving condition, free from weeds, trash, and debrir 14
8) All landscaped areas shall be maintained in a healthy
size.
15
16
9)
18
17
19 10)
2o I
The applicant shall prepare a detailed lighting plan F
shall be submitted to and approved by the Land Use Pli
Manager prior to the issuance of building permits. A: lighting fixtures shall be of metallic vapor and quari variety and shielded form direct glare onto adjoining
properties and roadways.
Any signs proposed for this development shall be desi! conformance with the city's Sign Ordinance and shall 1
review and approval of the Land Use Planning Manager installation of such signs.
21 11) A uniform sign program for this development shall be to the Land Use Planning Manager for his review and a 22 prior to occupany of any building.
23
24
25
26
27
28
I
12) Trash receptacle areas shall be enclosed by a 6-foot masonry wall with gates pursuant to city standards. L of said receptacles shall be approved by the Land Use Manager.
13) All roof appurtenances, including air conditioners, s architecturally integrated and shielded from view and sound buffered from adjacent properties and streets t satisfaction of the land Use Planning Manager and Bui
Planning Director.
1PC RES0 NO. 2022 .3
e e
1 14) Spaces shown as customer parking on Exhibit "A", shall
be revised to 90" parking and shall be appropriately rn
this area shall be incorporated in the overall sign pr 2
Land Use Planning Office review and approval. 3
and/or signed. Any signs or special striping or marki
4 15) A'striping plan for the parking lot shall be submitted
utilized by customers and employees shall observe a mi
approved by the Land Use Planning Manager prior to the
5 issuance of a building permit. All parking spaces to
6 24' of back-up space.
7 Eng ineer ing : I/ a 16)
9
10
11
12
13
17)
The developer shall obtain a grading permit prior to t commencement of any clearing or grading of the site.
The grading for this project is defined as "regular gr
Section 11.06.170(a) of the Carlsbad Municipal Code. developer shall submit a grading plan for approval whi include all required drainage structures and any requi erosion control measures. The developer shall also SL soils, geologic or compaction reports if reuuired and comply with all provisions of Chapter 11.06 of the Car
Municipal Code.
14 18) No grading shall occur outside the limits of the subdj
occupancy of any building within this project.
clean out and repair the A.B.M. lined ditch at the rei 19) As part of the overall grading operation the develope] 16
the affected properties. 15
unless a letter of permission is obtained from the owr
17 project site. This system shall be operative prior t(
18
19
20
21
22
20) As part of the overall grading operation the develope] hydroseed the slope adjacent to the rear of this projt
insure against sloughing and silt runoff.
21) The developer shall install street trees at the equivi
40-foot intervals along all public street frontages il
conformance with City of Carlsbad Standards. The trec
be of a variety selected from the approved Street Trec
23 22) The developer shall comply with all the rules, regula,
design requirements of the respective sewer and water 24 regarding services to the project.
25 Fire Department
26
PC RES0 NO. 2022 .4 28
Department. 27
23) Prior to the issuance of building permits, complete b
plans shall be submitted to and approved by the Fire
1" *
I1 e e
I/ '
2
24) Additional public and/or on site fire hydrants shall b quired if deemed necessary by the Fire Marshall.
3
4
5
6
25) All required fire hydrants, water mains and appurtenan
be operational prior to combustible building materials located on the project site.
26) All fire alarm systems, fire hydrants, extinguishing s automatic sprinklers, and other systems pertinent to t project shall be submitted to the Fire Department for prior to construction.
~ 7 27) Storage of flammable liquids shall comply with Fire Cc
a requirements.
9 PASSED, APPROVED AND ADOPTED at a regular meeting
lo I1 Planning Commission of the city of Carlsbad, California, he
11
12
13
14
15
the 22nd day of September, 1982, by the following vote, to
AYES: Chairman Farrow, Commissioners Marcus, Rc
NOES : None-
Schlehuber, Jose, Friestedt and Rawlins.
ABSENT: None-
ABSTAIN : None -
16
17
l8 ATTEST:
CARLSB D PLANNING cW\ss: ""\J
19 I
20 1
21
22
LAND USE PLANNING MANAGER
23
24
25
26
27
28 PC RES0 NO. 2022
II
.5