Loading...
HomeMy WebLinkAbout1982-09-22; Planning Commission; Resolution 2022’ I/ e 0 ll I. 11 PLANNING COMMISSION RESOLUTION NO. 2022 2 3 4 5 A RESOLUTION OF THE PLANNING COMMISSION OF THE CIT OF CARLSBAD, CALIFORNIA, RECOMMENDING APPROVAL OF REQUEST TO DEVELOP AN AUTOMOBILE DEALERSHIP ON PRC GENERALLY LOCATED ON THE EAST SIDE OF PASEO DEL MC BETWEEN CANNON ROAD AND PALOMAR AIRPORT ROAD. APPLICANT: RICHARDSON BROS. CASE NO: PCD-37 ~ 6 Parcel 1, of Parcel Map No. 8651, filed in the ofl 8 wit: 7 WHEREAS, a verified application for certain proper of the County Recorder, April 20, 1979. 9 10 has been filed with the city of Carlsbad and referred to tl Planning Commission; and I.3. ll WHEREAS, said verified application constitutes a 1 12 13 as provided by Title 21 of the Carlsbad Municipal Code: an( WHEREAS, the Planning Commission did, on the 221x3 14/1 September 1982, consider said request; and 15 11 WHEREAS, at said hearing, upon hearing and consid( 16/( testimony and arguments, if any, of all persons desiring tc 17// heard, said Commission considered all factors relating to l8 I! Planning Commission Determination; and 19 20 21 22 23 24 25 26 27 NOW, THEREFORE, BE IT HEREBY RESOLVED by the Plan Commission as follows: A) That the foregoing recitations are true and correct. R) That based on the evidence presented at the public hea Commission APPROVES PCD-37, based on the following fin subject to the following conditions: Findings: 1) The project is consistent with the General Plan since proposed use, an automobile dealership, is consistent RRE, (Extensive Regional Retail), designation establi this property in the Land Use Element of the General 28 //// e 0 1 2 3 4 2) The project is consistent with the approved Specific P: Car Country, as discussed in the staff report. 3) The site is physically suitable for the type of develo: since the site is adequate in size and shape to accomm the project and still meet all city regulations withou significant environmental impacts. 5 6 4) The project is consistent with all'city public facilit icies and ordinances since: a) The Planning Commission hasl by inclusion of an ap will not be issued for the project unless the City and building cannot occur within the project unles satisfied that the requirements of the public faci apply to sewer service for this project. 7 service remains available, thus the Planning Commi 9 finds that sewer service is available to serve the a condition to this project, insured that building p 10 element of the General Plan have been met insofar 17 LA I1 12 b) All necessary public improvements have been provid will be required as conditions of approval. 13 14 15 16 17 18 19 6) 20 5) c) The applicant has agreed and is required by the ir of an appropriate condition to pay a public facili Performance of that contract and payment of the fe enable this body to find that public facilities wj available concurrent with need as required by the Plan, The proposed project is compatible with existing and 1 developments in Car Country, as discussed in the stafj The Land Use Planning Manager has determined that thir is exempt from Environmental Review, per Section 19.01 of the Carlsbad Environmental Protection Ordinance, ar therefore, issued a Notice of Exemption on August 5, 21 22 23 24 25 26 27 General Conditions: 1) Approval is granted for PCD-37, as shown on Exhibit(s C, D and E, dated September 22, 1982, incorporated by and on file in the Land Use Planning off ice. Develop occur substantially as shown unless otherwise noted i conditions. 2) This project is approved upon the express condition t building permits will not be issued for development o subject property unless the City Engineer determines facilities are available at the time of application f sewer permits and will continue to be available until occupancy. 28 PC RES0 NO. 2022 ;I .2 II I/ e e 1 2 3) 4 3 6 5 7 8 9 4) 5) This project is approved upon the express condition th applikant shall pay a public facilities fee as require Council Policy No. 17, dated April 2, 1982, on file wi City Clerk and incorporated herein by reference, and a to the agreement executed by the applicant for payment fee, a copy of that agreement, dated September 16, 198 file with the City Clerk and incorporated herein by re If said fee is not paid as promised, this application be consistent with the General Plan and approval for t project shall be void. Approval of this request shall not excuse compliance w sections of the Zoning Ordinance and all other applica ordinances in effect at time of building permit issuan Water shall be provided by the city of Carlsbad unless other arrangement is approved by the City Council. 10 6) The applicant shall prepare a detailed landscape and j plan which shall be submitted to and approved by the I 11 Planning Manager prior to the issuance of building pel 12 13 7) All parking lot trees shall be a minimum of 15 gallon: thriving condition, free from weeds, trash, and debrir 14 8) All landscaped areas shall be maintained in a healthy size. 15 16 9) 18 17 19 10) 2o I The applicant shall prepare a detailed lighting plan F shall be submitted to and approved by the Land Use Pli Manager prior to the issuance of building permits. A: lighting fixtures shall be of metallic vapor and quari variety and shielded form direct glare onto adjoining properties and roadways. Any signs proposed for this development shall be desi! conformance with the city's Sign Ordinance and shall 1 review and approval of the Land Use Planning Manager installation of such signs. 21 11) A uniform sign program for this development shall be to the Land Use Planning Manager for his review and a 22 prior to occupany of any building. 23 24 25 26 27 28 I 12) Trash receptacle areas shall be enclosed by a 6-foot masonry wall with gates pursuant to city standards. L of said receptacles shall be approved by the Land Use Manager. 13) All roof appurtenances, including air conditioners, s architecturally integrated and shielded from view and sound buffered from adjacent properties and streets t satisfaction of the land Use Planning Manager and Bui Planning Director. 1PC RES0 NO. 2022 .3 e e 1 14) Spaces shown as customer parking on Exhibit "A", shall be revised to 90" parking and shall be appropriately rn this area shall be incorporated in the overall sign pr 2 Land Use Planning Office review and approval. 3 and/or signed. Any signs or special striping or marki 4 15) A'striping plan for the parking lot shall be submitted utilized by customers and employees shall observe a mi approved by the Land Use Planning Manager prior to the 5 issuance of a building permit. All parking spaces to 6 24' of back-up space. 7 Eng ineer ing : I/ a 16) 9 10 11 12 13 17) The developer shall obtain a grading permit prior to t commencement of any clearing or grading of the site. The grading for this project is defined as "regular gr Section 11.06.170(a) of the Carlsbad Municipal Code. developer shall submit a grading plan for approval whi include all required drainage structures and any requi erosion control measures. The developer shall also SL soils, geologic or compaction reports if reuuired and comply with all provisions of Chapter 11.06 of the Car Municipal Code. 14 18) No grading shall occur outside the limits of the subdj occupancy of any building within this project. clean out and repair the A.B.M. lined ditch at the rei 19) As part of the overall grading operation the develope] 16 the affected properties. 15 unless a letter of permission is obtained from the owr 17 project site. This system shall be operative prior t( 18 19 20 21 22 20) As part of the overall grading operation the develope] hydroseed the slope adjacent to the rear of this projt insure against sloughing and silt runoff. 21) The developer shall install street trees at the equivi 40-foot intervals along all public street frontages il conformance with City of Carlsbad Standards. The trec be of a variety selected from the approved Street Trec 23 22) The developer shall comply with all the rules, regula, design requirements of the respective sewer and water 24 regarding services to the project. 25 Fire Department 26 PC RES0 NO. 2022 .4 28 Department. 27 23) Prior to the issuance of building permits, complete b plans shall be submitted to and approved by the Fire 1" * I1 e e I/ ' 2 24) Additional public and/or on site fire hydrants shall b quired if deemed necessary by the Fire Marshall. 3 4 5 6 25) All required fire hydrants, water mains and appurtenan be operational prior to combustible building materials located on the project site. 26) All fire alarm systems, fire hydrants, extinguishing s automatic sprinklers, and other systems pertinent to t project shall be submitted to the Fire Department for prior to construction. ~ 7 27) Storage of flammable liquids shall comply with Fire Cc a requirements. 9 PASSED, APPROVED AND ADOPTED at a regular meeting lo I1 Planning Commission of the city of Carlsbad, California, he 11 12 13 14 15 the 22nd day of September, 1982, by the following vote, to AYES: Chairman Farrow, Commissioners Marcus, Rc NOES : None- Schlehuber, Jose, Friestedt and Rawlins. ABSENT: None- ABSTAIN : None - 16 17 l8 ATTEST: CARLSB D PLANNING cW\ss: ""\J 19 I 20 1 21 22 LAND USE PLANNING MANAGER 23 24 25 26 27 28 PC RES0 NO. 2022 II .5