PLANNING COMMISSION RESOLUTION NO. 2111
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF CARLSBAD, CALIFORNIA, APPROVING SITE
DEVELOPMENT PLAN NO. 78-1(C), TO DEVELOP A
RESEARCH/DEVELOPMENT PARK ON 8.5 ACRES OF PROPERTY GENERALLY LOCATED ON THE NORTH SIDE OF
GOLDENBEAR COURT.
APPLICANT: IMTERAMERICAN DEVELOPMENT
CASE NO: SDP 78-1(C)
WHEREAS, a verified application has been filed with
City of Carlsbad and referred to the Planning Commission; an(
WHEREAS, said verified application constitutes a re(
as provided by Title 21 of the Carlsbad Municipal Code; and
WHEREAS, the Planning Commission approved Site neve:
Plan, SDP 78-1(B), with Resolution No. 1854, dated Auqust 26
and
WHEREAS, pursuant to the provisions of the Municipa:
the Planning Commission did, on the 27th day of April, 1983,
consider a modification to approved Site Development Plan 78-
on property described as:
A resubdivision of Parcel 2 of Parcel Map No. 1QQ6Q
filed in San Diego County on May 23, 1980;
WHEREAS, at said hearinq, u?on hearing and consider:
testimony and arguments, if any, of all persons desiring to 1
heard, said Commission considered all factors relating to Sii
Development Plan No. 78-1(C).
NOW, THEREFORE, RE IT HEREBY RESOLVED by the Plannil
Commission of the City of Carlsbad as follows:
A) That the foregoing recitations are true and correct.
B) That based on the evidence presented at the hearing, the
Commission recommends approval of SDP 78-1(C), based on i
following findings and subject to the followinq conditio]
i- e e
1 Findings:
2
3
4
5
6
1) The project is consistent with the City's General Plan f the proposed development is consistent with the P-I, Ple
Industrial, land use designation specified for this pro:
by the General Plan.
2) The site is physically suitable for the type and density
the development since the site is adequate' in size and i
to accommodate the proposed development.
7 icies and ordinances since: 3) The project is consistent with all City public facility
8
9
x0
11
12
13
14
15
16
1'7
18
4)
a) The Planning Commission has, by inclusion of an appr
ate condition to this project, insured that the buil
permits will not be issued unless the City Council f that sewer service is available to serve the project b) All necessary public irn?rovements have been provided
will be required as conditions of approval. c) The applicant has agreed and is required by the incl
of an appropriate condition to pay a public faciliti
fee. Performance of that contract and payment of th
will enable this body to find that public facilities
be available concurrent with need as required by the
general plan. d) Assurances have been given that adequate sewer for t
project will be provided by the City of Carlsbad.
The proposed project is compatible with the surroundinq
land uses since surrounding properties to the south and
are designated for industrial development on the General
and a canyon separates the property from residentially
designated property to the north.
15) The proposed project, as proposed, will not cause any environmental impacts and a Notice of Prior Compliance h been issued by the Land TJse Planning Manager and approve
the Planning Commission on April 4, 1983.
Conditions:
1) Approval is granted €or SDP 78-1 (C) , as shown on Exhibit
and "B", dated April 8, 1983, incorporated by reference
file in the Land Use Planning Office. Development shall substantially as shown unless otherwise noted in these
conditions.
2) This project is aDproved upon the express condition that final map shall not be approved unless the City Council as of the time of such approval that sewer service is available to serve the project.
3) This project is approved upon the express condition that
PC RES0 NO. 2111 2.
.* 0 e
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
building permits will not be issued for development of
subject property unless the City Engineer determines t:
sewer facilities are available at the time of applicat
such sewer permits and will continue to be available u:
time of occupancy.
4) This project is approved upon the express condition th
applicant shall pay a public facilities fee as require
City Council Policy No. 17, dated April 2, 1982, on fi
the City Clerk and incorporated herein by reference, a
according to the agreement executed by the applicant f
payment of said fee, a copy of that agreement, dated M
1981, is on file with the City Clerk and incorporated
by reference. If said fee is not paid as promised, th
application will not be consistent with the General P1
approval for this project shall be void.
5) Approval of this request shall not excuse compliance w
sections of the Zoning Ordinance and all other applica ordinances in effect at time of building permit issuan
6) This approval shall become null and void if building p
are not issued for this project within two years from
of project approval.
7) Water shall be provided by the City of Carlsbad unless
other arrangement is approved by the City Council.
Land Use Planning:
8) The applicant shall prepare a reproducible mylar of the site plan incorporating the conditions contained herein
site plan shall be submitted to and approved by the Lan
Planning Manager prior to the issuance of building perm
9) The applicant shall establish an owner's association an
corresponding covenants, conditions and restrictions.
CC&R's shall be submitted to and approved by the Land U
Planning Manager prior to final map approval.
10) The applicant shall prepare a detailed landscape and i
tion plan which shall be submitted to and approved by
Use Planning Manager prior to the issuance of building
permits.
11) A 500' scale map of the subdivision shall be submitted
Land Use Planning Manager prior to the recordation of
final map. Said map shall show all lots and streets w
and adjacent to the project.
12) All parking lot trees shall be a minimum of 15 gallons
size.
13) All landscaped areas shall be maintained in a healthy
thriving condition, free from weeds, trash, and debris
PC RES0 NO. 2111 3.
.* I/ 0 0
1
2
14)
4
3
5
6
7
17) 8
9
10
11
12
13
14
15
16
17
18
15)
16)
18)
19)
Any signs proposed for this development shall be design
conformance with the City's Sign Ordinance and shall re
review and approval of the Land Use Planning Manager pr
installation of such signs.
A uniform sign program €or this development shall be st
to the Land Use Planning Manaqer for his review and apy prior to occupancy of any building.
Trash receptacle areas shall be enclosed by a six-foot
masonry wall with gates pursuant to City standards. La
of said receptacles shall be approved by the Land Use P Manager.
All roof appurtenances, including air conditioners, sha
architecturally integrated and shielded from view and t sound buffered from adjacent properties and streets, pu to Building Department Policy No. 80-6, to the satisfac
the Land Use Planning Manager and Building and Planning
Director .
The developer shall grant an open space easement over t
entire slope area on the northern Portion of the site.
easement shall extend from the edge of the buildable pa
the top of the existinq natural slope to the northern F
line. This area shall be considered a natural preserve
allowing no development. This easement shall be dedica
prior to the issuance of building permits. This area s
maintained by the property owners and a statenent so
indicating shall he included in the CC&R's.
No permanent landscaping shall be planted within the 36
wide centerline-to-curb access easement to the City Ope
property. Any landscaping placed within this area shal removed immediately upon request by the City of Carlsba
19 1 Engineering: I, 20
21
20) The developer shall obtain a grading permit prior to th
commencement of any clearing or grading of the site.
21 ) The grading for this project is defined as "regular qra
developer shall submit a grading plan for approval whic' 23 include all required drainage structures and any requir, erosion control measures. The developer shall also sub 24
comply with all provisions of Chapter 11.06 of the Carl
soils, geologic or compaction reports if required and s
25 Municipal Code.
26 22) No grading shall occur outside the limits of the subdiv
unless a letter of permission is obtained from the owne 27 the affected properties.
28 PC RES0 NO. 2111 4.
22 by Section 11.06.170(a) of the Carlsbad Municipal Code.
a' /I 0 *
23) All manufactured slopes within this project shall be no
1
2
steeper than 2:1, unless otherwise approved by the City Engineer.
24) The developer shall install street trees at the equival
conformance with City of Carlsbad Standards. The trees
and shall be approved by the Parks and Recreation Direc
3
be of a variety selected from the anproved Street Tree 4
40-foot intervals along all public street frontages in
5
6
7
8
9
10
11
25) The developer shall comply with all the rules, regulati
design requirements of the respective sewer and water a
regarding services to the project.
26) The design of all private streets and drainage systems
be approved by the City Engineer prior to approval of t
building permits. The structural section of all privat
streets shall conform to City of Carlsbad Standards bas
R-value tests. All private streets and drainage svstem
be inspected by the City, and the standard immovement
check and inspection fees shall be naid mior to approv
the buildinq permits.
12 27) A11 private streets and drainage systems shall be maint by the homeowners association in perpetuity. This rem
13 sibility shall be clearly stated in the CCbR's.
14 Fire:
15
Department. 16
28) Prior to the issuance of buildinq permits, complete bui
plans shall be submitted to and approved by the Fire
17
18
19
20
21
22
23
24
25
29) Additional public and/or on site fire hydrants shall be
quired if deemed necessary by the Fire Marshall.
30) The applicant shall submit two (2) copies of a site pla showing locations of existing and proposed fire hydrant
on site roads and drives subject to the approval of the
Marshall.
31) All fire alarm systems, fire hydrants, extinguishing sy automatic sprinklers, and other systems pertinent to th
project shall be submitted to the Fire Department for aJ prior to construction.
32) Buildinq exceeding 10,000 sq.ft. aggregate floor area SI
sprinklered or have four-hour fire walls with no ooeninc
therein which shall split the buildinq into 10,000 sq.f'
less) areas.
26
27
////
PC RES0 NO. 2111 5. 28
////
I
Ad.
1
2
3
4
5
9 e
PASSED, APPROVED AND ADOPTED at a regular meetinq 0:
Planning Commission of the City of Carlsbad, California, bel(
the 27th day of April, 1983, by the following vote, to wit:
AYES : Chairman Schlehuber, Commissioners Marcus,
NOES : None.
Rornbotis, Farrow, Jose, Friestedt and Rawlj
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
ABSENT : None.
ABSTAIN: None.
CARLSBAD PLANNING COYMISSIO?
LAND USE PLANNING MANAGER
PC RES0 NO. 2111 6.