Loading...
HomeMy WebLinkAbout1984-02-22; Planning Commission; Resolution 2251?e 1 I/ e 0 1 2 3 4 PLANNING COMMISSION RESOLUTION NO. 2251 I A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY CARLSBAD, CALIFORNIA, APPROVING A PLANNING COMMISSIl DETERMINATION TO ALLOW A FOURTEEN UNIT APARTMENT PR( ON A .72 ACRE SITE LOCATED AT 41 5 CHESTNUT AVENUE. APPLICANT: STABILE CASE NO.: PCD-53 5 6 7 8 9 10 11 wi b t: WHEREAS, a verified application for certain propert All that portion of Fractional Block "D" of the Tow of Carlsbad according to Map thereof No. 775, filed Office of the Recorder of San Diego County on Febru 1894, lying Northwesterly of the Parcel of land con to Richard R. Coe and Marguerette I. Coe, by deed d May 1, 1947, Book 2402, Page 299 of Official Record San Diego County also all of the vacated alley adja said premises on the Southwest, 12 Planning Commission Determination; and 21 heard, said Commission considered all factors relating to tl: 20 testimony and arguments, if any, of all persons desiring to 19 WHEREAS, at said hearing, upon hearing and consider 18 February, 1984, consider said request; and 17 WHEREAS, the Planning Commission did, on the 22nd 1 16 as provided by Title 21 of the Carlsbad Municipal Code; and 15 WHEREAS, said verified application constitutes a re 14 Planning Commission; and 13 has been filed with the City of Carlsbad and referred to the 22 NOW, THEREFORE, BE IT HEREBY RESOLVED by the Plannj 23 B) That based on the evidence presented at the public heal 25 A) That the foregoing recitations are true and correct. 24 Commission as follows: the Commission APPROVES PCD-53, based on the following 26 findings and subject to the following conditions: 27 11 //// 28 II 1 0 0 1 Findings: 2 1) The proposed project complies with all requirements of 3 4 density as discussed in the staff report. 5 3) The project is consistent with the City's general plan the proposed density of 19.4 du's/acre is within the de 6 range of 10-20 du's/acre specified for the site as indi 7 the land use element of the general plan. Carlsbad Zoning Ordinance. 2) The site location and proposed design justifies the req a 4) The site is physically suitable for the type and densit development since the site is adequate in size and shaF accommodate residential development at the density proE 5) The project is consistent with all City public facilitl 9 10 icies and ordinances since: 11 12 13 14 15 16 17 18 19 I 20 21 22 23 24 a) The Planning Commission has, by inclusion of an apE condition to this project, insured that the final n not be approved unless the City Council finds that service is available to serve the project. In addj the Planning Commission has added a condition that shall be placed on the final map that building pern not be issued for the project unless the City Engir determines that sewer service is available, and buj cannot occur within the project unless sewer servic remains available, and the Planning Commission is : that the requirements of the public facilities eler the general plan have been met insofar as they app: sewer service for this project. ~ 1 b) The Carlsbad School District has written a letter, December 1, 1983, stating that school facilities w: available to this project. c) All necessary public improvements have been providt will be required as conditions of approval. d) The applicant has agreed and is required by the inc of an appropriate condition to pay a public facilii Performance of that contract and payment of the fc enable this body to find that public facilities wi: available concurrent with need as required by the ( plan, 25 27 Use Planning Manager on December 23, 1983 and approved 26 6) This project will not cause any significant environmen, impacts and a Negative Declaration has been issued by Planning Commission on February 22, 1983, I/// 28 PC RES0 NO. 2251 -2- i e 0 1IlConditions: 2 1) 3 4 5 6 7 2) a 9 3) 10 I1 12 13 14 15 16 17 4) 5) Approval is granted for PCD-53, as shown on Exhibits "A dated February 2, 1984, "B" - "D", dated January 11, 19 "X", dated January 30, 1984, incorporated by reference file in the Land Use Planning Office. Development shal substantially as shown unless otherwise noted in these conditions. This project is approved upon the express condition tha building permits will not be issued for development of subject property unless the City Engineer determines th facilities are available at the time of application for sewer permits and will continue to be available until t occupancy. This project is approved upon the express condition tha applicant shall pay a public facilities fee as required Council Policy No. 17, dated April 2, 1982, on file wit City Clerk and incorporated herein by reference, and ac to the agreement executed by the applicant for payment fee, a copy of that agreement, dated November 30, 1983, file with the City Clerk and incorporated herein by ref If said fee is not paid as promised, this application be consistent with the General Plan and approval for th project shall be void. Approval of this request shall not excuse compliance wi sections of the Zoning Ordinance and all other applicat ordinances in effect at time of building permit issuanc Water shall be provided by the City of Carlsbad unless other arrangement is approved by the City Council. l8 20 6) The applicant shall prepare a detailed landscape and il I' Land Use Planning Office plan which shall be submitted to and approved by the Lz Planning Manager prior to the issuance of building pen 21 7) All parking lot trees shall be a minimum of 15 gallons 22 23 8) All landscaped areas shall be maintained in a healthy i thriving condition, free from weeds, trash, and debris 24 9) Any signs proposed for this development shall be desigl 25 conformance with the City's Sign Ordinance and shall rt review and approval of the Land Use Planning Manager PI 26 installation of such signs. 27 28 size. 10) Trash receptacle areas shall be enclosed by a six-foot masonry wall with gates pursuant to City standards. LC of said receptacles shall be approved by the Land Use : Manager. PC RES0 NO. 2251 -3- 11 r. ll 0 0 I. 2 11 ) All roof appurtenances, including air conditioners, sha 3 buffered from adjacent properties and streets, pursuant architecturally integrated and shielded from view and t Building Department Policy No. 80-6, to the satisfactia Land Use Planning Manager and Building and Planning Dir * 12) Private balconies on units that face the railroad shall 5 provided with noise mitigation in the form of a patio r barrier. The noise barrier shall be any solid structur 6 no holes or cracks having a surface density of 4 pounds square foot or greater. The barrier shall completely E 7 all line of sight with the noise source. 8 9 10 I 13) Prior to issuance of a building permit, the Building Dj shall review the architectural plans to ensure compliar the State of California interior noise standard of 45 ( At that time, any additional measures (thicker glazing, absorption material, or shielding of vents) to further attenuate the noise to acceptable level shall be requil l1 14) A six foot high decorative block wall shall be construc along the property frontage adjacent to the AT&SF Rail1 units. 12 This wall shall be constructed prior to occupancy of a1 13 14 // Engineering 15 commencement of any clearing or grading of the site. l6 17 16) No grading shall occur outside the limits of the subdil unless a letter of permission is obtained from the ownc the affected properties. l8 17) Prior to the issuance of a grading permit, the haul rol 19 be submitted for review and approved by the City Enginc separate grading plan shall be submitted and approved , 20 separate grading permit issued for the borrow or dispor if located within the city limits. 21 18) Additional drainage easements and drainage structures ~ 22 provided or installed as may be required by the County Department of Sanitation and Flood Control or the City 23 neer. 24 15) The developer shall obtain a grading permit prior to tl 19) The developer shall dedicate for the portion of the st' cul-de-sac at the end of Chestnut Street that lays upo: project site. No building permits shall be issued unt dedication is complete. 25 ! 26 //// 27 //// 2811PC RES0 NO. 2251 -4- 1 /a .1 (-1 , ? d"+i 'L<,.=- /3 ippi / i u..2z [ i .? &Sy=+? .,'! ;.A xr~~ ^.i (-J ..>: y (4" : .A. ; $ f" "-"- _/"" " J" -~ ! i ji ;Y I &,j / //' " : ^-. . .. . ./ . ,I , . <. \&,,,.'+X b" - I .. ., i,', I ~ . . : < '\, i" d' :,J*</ . .. J I .._ /- P .: -8 $ ,i' ,r.. , . I* ,i? " / 4- '> A% b /f-7s"-? e-%-#+' ,/:.: r' :.J- "a4. ,: i l., .- f j' b," Lz I* "... " ",, ,-.- -.--:-, _- ~"-~,~~-~~-.~-.~.=~~~-~-~ -7 C-~.;-~i:,~_,-l-P.r- ~ ..=%,-"~ . ". .. ,-,-:: :-- ....:,.:", c, .. ~ _." .. .- ~ L,- .. . '1 __. .I e * 1 20) 2 3 4 5 Improvements including, but not limited to, the followir shall be installed by the developer and approved by the Engineer. The developer shall obtain approval of the pl form the City Engineer and pay all associated fees and performance guarantees prior to issuance of any Buildin5 Permit. The developer shall install said improvements * satisfaction of the City Engineer prior to the issuance Certificate of Occuapancy or occupancy of any portion 0: project for any purpose. To wit: 6 7 8 9 10 11 12 13 14 15 a) Complete half street improvements plus a twelve lane on the portions of Chestnut Street that fr the project site. b) Cul-de-sac at the end of Chestnut Street extend prolongation of the northerly line of the requi paved section improvements. c) Street trees. d) A sanitary sewer manhole on the existing sewer south corner of the project. e) An asphalt berm to conduct storm water flowing the northerly side of Chestnut Avenue to the ne basin in the cul-de-sac of Chestnut Avenue. f) A catch basin at the end of Chestnut Avenue con to the existing 30 inch storm drain to the sati of the City Engineer. 9) The developer shall construct a pedestrian brid parallels the Santa Fe Railroad near the end of Chestnut Avenue over the existing drainage char 16 21) The developer shall coordinate his street improvement I and construction with those of the property to the easl project site, 17 22) The developer shall dedicate a 20 foot wide utility ear 18 along the westerly side of the project to the City. l9 123) The design of all private streets and drainage systems 20 approved by the City Engineer prior to approval of the map. The structural section of all private streets shi 21 conform to City of Carlsbad Standards based on R-value All private streets and drainage systems shall be inspc 22 the city, and the standard improvement plan check and inspection fees shall be paid prior to approval of the 23 map. 24 24) All private driveways shall be kept clear of parked ve all times, and shall have posted "NO Parking/Fire Lane Zone" pursuant to Section 17.04.040, Carlsbad Municipa 25 I 26 - Fire 27 25) An all weather access road shall be maintained through construction. 28ii PC RES0 NO. 2251 -5- 1. e I1 a 0 1 26) All required fire hydrants, water mains and appurtenance be operational prior to combustible building materials 1 2 located on the project site. 3 27) Proposed security gate systems shall be provided with "1 key operated override switch, as specified by the Fire I 4 partment. 5 28) All private driveways shall be kept clear of parked veh: Zone" pursuant to Section 17.04.040, Carlsbad Municipal 6 all times, and shall have posted "NO Parking/Fire Lane ! 7 29) All fire alarm systems, fire hydrants, extinguishing sy! automatic sprinklers, and other systems pertinent to thc 8 project shall be submitted to the Fire Department for a] 9 prior to construction. 10 11 12 13 14 15 PASSED, APPROVED AND ADOPTED at a regular meeting o Planning Commission of the City of Carlsbad, California, hell the 22nd day of February, 1984, by the following vote, to wi AYES: Chairman Rombotis, Commissioners Rawlins, p1 NOES: None. Lyttleton, Farrow, Schlehuber and Smith. ABSENT: None. II - - II ABSTAIN: None. -3 16 17 " -1 /& AEmY WMBOTIS, Chairman Lu I1 WARLS ' A ~ -B~D PLANNING COMMISSI 19 I 20 (ATTEST: 4 21 22 LAND USE PLANNING MANAGER 23 24 25 11 26 27 28 PC RES0 NO. 2251 -6-