PLANNING COMMISSION RESOLUTION NO. 2296
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF CARLSBAD, CALIFORNIA, RECOMMENDING APPROVAL OF A TENTATIVE TRACT MAP AND 11 3 UNIT MOBILE HOME PARK PERMIT ON 29 ACRES GENERALLY
LOCATED ON THE WEST SIDE OF EL CAMINO REAL
IMMEDIATELY NORTH OF CARLSBAD RESEARCH CENTER. APPLICANT: CAMINO HILLS CASE NO: CT 83-25/MHP 83-2
WHEREAS, a verified application for certain propert
wit:
All that portion of Lot "F" of Rancho Agua Hedionda the County of San Diego, State of California, accor to map thereof No. 823, filed in the office of the Recorder of said County
has been filed with the City of Carlsbad, and referred to th
Planning Commission; and
WHEREAS, said verified application constitutes a re
as provided by Title 21 of the Carlsbad Municipal Code; and
WHEREAS, the Planning Commission did, on the 9th di
May, 1984, hold a duly noticed public hearing as prescribed
to consider said request; and
WHEREAS, at said public hearing, upon hearing and
considering all testimony and arguments, if any, of all pers
desiring to be heard, said Commission considered all factors
relating to the Tentative Tract Map and Condominium Permit.
NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planni
Commission as follows:
(A) That the foregoing recitations are true and correct.
(B) That based on the evidence presented at the public heal
the Commission recommends APPROVAL of CT 83-25/MHP 83-: on the following findings and subject to the following
conditions:
I /I//
////
> 0 e
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
Findinas: 2
1) The project is consistent with the City's general plan
the proposed density of 3.79 du's/acre is within the de
range of 0-4 du's/acre specified for the site as indicc
the land use element of the general plan.
2) The site is physically suitable for the type and densit
the development at the density proposed.
3) The project is consistent with all City public facilitl
icies and ordinances since:
a) The Planning Commission has, by inclusion of an appropriate condition to this project, insured that final map will not be approved unless the City Cour finds that sewer service is available to serve the project. In addition, the Planning Commission has
condition that a note shall be placed on the final
that building permits may not be issued for the prc
unless the City Engineer determines that sewer sen
available, and building cannot occur within the prc
unless sewer service remains available, and the P1;
Commission is satisfied that the requirements of tl
public facilities element of the general plan have met insofar as they apply to sewer service for thiz project .
b) The Carlsbad School District has written a
letter, dated September 2, 1983, stating that schoc
facilities will be available to this project.
c) Park-in-lieu fees are required as a condition of ay
proval .
d) All necessary public improvements have been providt
will be required as conditions of approval.
e) The applicant has agreed and is required by the inc
of an appropriate condition to pay a public facilil fee. Performance of that contract and payment of ' will enable this body to find that public facilitic
be available concurrent with need as required by tl
general plan.
4) The proposed project is consistent with the City's Mob:
Home Park Ordinance.
5) The proposed project is compatible with the surroundin! land uses since surrounding properties are designated : residential development on the general plan.
////
28 PC RES0 NO. 2296 -2-
I
t e e
1 I' That all significant impacts have been mitigated, or the
project has been changed so as to mitigate these impacts described below: 2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
A) Geology/Grading
Impact: A possible ancient landslide has been
identified, covering approximately hal:
site. This area may be susceptible to
failure. Mitigation: The project has been conditioned so as reduce the likelihood of movement in t area. Such measures will include
buttressing and other common engineeri
techniques.
B) Biological Resources Impact: Two rare and endangered species exist onsite. Mitigation: The San Diego Thornmint species is loc in a natural open space area onsite. Brodiaea Filifolia species will remain partially undisturbed and partially transplanted onto an onsite fenced pre
area .
C) Land Use Impacts : Approximately 3 acres of the project 1 within the PI land use designation. Mitigation: The project has been redesigned to avo this area. Impacts: The project does not incorporate desig features which would justify the reque dens i ty . Mitigation: The project has been redesigned to inc
these features .
l9 I! Dl Traffic Circulation
2o I1 Impacts: The proposed on site circulation is in conflict with the City's roadway desig
21
22
standards.
incorporate City roadway design stande
Mitigation: The project has been redesigned to
23 lponditions:
24
25
26
27
28
1) Approval is granted for CT 83-25, as shown on Exhibits I'
on file in the Land Use Planning Office. Development SI occur substantially as shown unless otherwise noted in t conditions.
11 c I1 , and "D", dated May 9, 1984, incorporated by referer
2) This project is approved upon the express condition that
final map shall not be approved unless the City Council
as of the time of such approval that sewer service is
available to serve the subdivision.
PC RES0 NO. 2296 -3-
, 0 e
1
2
3
4
3) This project is approved upon the express condition the building permits will not be issued for development of subject property unless the City Engineer determines tk sewer facilities are available at the time of applicati
such sewer permits and will continue to be available ur time of occupancy. This note shall be placed on the fi map.
5 4,
6
7
8
9
10
11
12
13
5)
6)
This project is approved upon the express condition th;
applicant shall pay a public facilities fee as required City Council Policy No. 17, dated April 2, 1982, on fil the City Clerk and incorporated herein by reference, ar
payment of said fee, a copy of that agreement, dated Mr 1982, is on file with the City Clerk and incorporated 2
by reference. If said fee is not paid as promised, thj application will not be consistent with the General Plz
approval for this project 'shall be void.
The applicant shall pay park-in-lieu fees to the City, to the approval of the final map as required by Chapter
of the Carlsbad Municipal Code.
Approval of this request shall not excuse compliance wj sections of the Zoning Ordinance and all other applicak ordinances in effect at time of building permit issuanc
according to the agreement executed by the applicant €(
14
15
16
17
7) This approval shall become null and void if building PC are not issued for this project within one year from tl
of project approval.
8) Water shall be provided to this project pursuant to thr ' Service Agreement between the City of Carlsbad and the
Real Water District, dated May 25, 1983.
18
19
Land use Planning Conditions:
9) The applicant shall prepare a reproducible mylar of the
site plan shall be submitted to and approved by the Lar 20
Planning Manager prior to the issuance of building per5 21
site plan incorporating the conditions contained hereir
22
23
24
25
26
27
10) The applicant shall establish a homeowner's associatior corresponding covenants, conditions and restrictions.
CC&R's shall be submitted to and approved by the Land I
Planning Manager prior to final map approval. Said CC6 shall include provisions guaranteeing the maintenance ( common areas .
////
////
////
28 PC RES0 NO. 2296 ""
I,
-4-
I/ e 0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
11) The applicant shall prepare a detailed landscape and il tion plan which shall be submitted to and approved by 1
Use Planning Manager prior to the issuance of building permits. This plan shall include special treatment alc
El Camino Real frontage, including extensive landscapil
mounding, and decorative walls. The overall slope alol
frontage shall vary from 2: 1 to 4: 1.
12) A 500' scale map of the subdivision shall be submitted
Land Use Planning Manager prior to the recordation of ' final map. Said map shall show all lots and streets w
and adjacent to the project.
13) All landscaped areas shall be maintained in a healthy i
thriving condition, free from weeds, trash, and debris,
14) Any signs proposed for this development shall be desigr
conformance with the City's Sign Ordinance and shall rc review and approval of the Land Use Planning Manager PI
installation of such signs.
15) Trash receptacle areas shall be enclosed by a six-foot masonry wall with gates pursuant to City standards. LC of said receptacles shall be approved by the Land Use I
Manager. 1
16) All roof appurtenances, including air conditioners, shz architecturally integrated and concealed from view and sound buffered from adjacent properties and streets, PC to Building Department Policy No. 80-6, to the satisfac the Land Use Planning Manager and Building and Planninc
Director.
17) Approval of Tentative Tract No. CT 83-25/MHP 83-2 is gr
subject to approval of Zone Change 290.
19 1 18) The developer shall hire a biological expert to transpl salvage, to the greatest extent possible, the Brodiaea
shall be accomplished into a fenced biological area as
done prior to the issuance of grading permits. The des
at the time of recordation of the final map.
20
23
shall dedicate this area as a permanent open space ease 22
approved by the Land Use Planning Manager. This shall 21
Filifolia plant populations. This transplantation proc
19) Noise generated from El Camino Real and College Bouleva
24 shall be attenuated to a level no higher than 65 DBA as measured anywhere within the boundaries of the mobile h
25 park.
26 Engineering Conditions:
27 20) The developer shall obtain a grading permit prior to th
28
commencement of any clearing or grading of the site.
PC RES0 NO. 2296 -5-
e 0
1 21)
2
3
4
5
6
7
8
9
x0
11
12
13
14 25)
15
16
17
18
19
20
21
22
22)
23)
24 1
The grading for this project is defined as "controlled ing" by Section 11.06.170(a) of the Carlsbad Municipal Grading shall be performed under the observation of a c engineer whose responsibility it shall be to coordinate inspection and testing to insure compliance of the work the approved grading plan, submit required reports to t
Engineer and verify compliance with Chapter 11.06 of tk Carlsbad Municipal Code.
Upon completion of grading, the developer shall insure
"as-graded" geologic plan shall be submitted to the Cil
Engineer. The plan shall clearly show all the geology
exposed by the grading operation, all geologic correct: measures as actually constructed and must be based on i tour map which represents both the pre and post site g~ This plan shall be signed by both the soils engineer a1 engineering geologist. The plan shall be prepared on i or similar drafting film and shall become a permanent 1
No grading shall occur outside the limits of the subdi7 unless a letter of permission is obtained from the own6
the affected properties.
All slopes within this project shall be no steeper thal
The developer shall place the following notes on the f: map : Geotechnical Caution:
1) The possible existence of ancient landslides withil
boundaries of this subdivision has been noted in tl
Environmental Impact Report for this subdivision.
2) Mitigation measures to alleviate the hazards assoc:
with the possible landslides have been required as condition of approval for the tentative map for th:
subdivision.
3) The owner of this property on behalf of itself and
its successors in interest has agreed to hold harm:
and indemnify the City of Carlsbad from any action may arise through any geological failure and subsec damage that may occur on, or adjacent to, this subdivision due to its construction, operation or maintenance.
23 26) The developer shall execute an agreement which satisfic
and content satisfactory to the City Council. City Col 24
Condition No. 25 Article 3. The agreement shall be of
approval of said agreement shall be obtained prior to
25 the final map.
26 27) The developer shall have a full-scale soil investigatic
geological reconnaisance, including the excavation of 27 minimum of seven borings, performed prior to preparatic improvement plans. The improvement plans shall ref lec 28 incorporate the findings and mitigation measures of thl geotechnical investigations.
PC RES0 NO. 2296 -6-
I/ e e
1
2
28)
9
8
7
6
5
4
29) 3
10
11
12
13
14
15
30)
31 1
32)
Additional drainage easements and drainage structures s provided or installed as may be required by the County Department of Sanitation and Flood Control or the City neer . The developer shall construct desiltation/detention bas
a type and size and at locations as approved by the Cit Engineer. The developer shall enter into a desiltatior maintenance agreement and submit a maintenance bond
satisfactory to the City Engineer prior to the approval final map for this project. Each desiltation basin sh:
serviced by an all weather access/maintenance road. T1
provisions of this agreement shall apply to any off-sit borrow sites which may be utilized in the construction project as required by the City Engineer.
The owner of the subject property shall execute a hold
harmless agreement regarding drainage across the adjacc
property prior to approval of the final map.
All land and/or easements required by this project sha! granted to the City, without cost to the City, free ani of all liens and encumbrances.
Improvements including, but not limited to, the follow: items shall be installed by the developer and approved
City Engineer prior to filing the final map. Alternatc installation of said improvements shall be guaranteed 1 security agreement obtained by the developer in an am01 of a type required by the Carlsbad Municipal Code. To
16
17
18
19
20
21
22
23
24
25
26
27
28
a)
b)
c)
d)
e)
f)
9)
h)
i)
Domestic water facilities including water mains anc laterals on and off site. Sanitary sewer facilities including sewer mains, 1: and pump station(s) on and off site.
All improvements shown on the tentative map includ:
private facilities.
Slippery Hill Lane from El Camino Real to the projt boundary to Collector Street standards except that curb, gutter and sidewalk may be omitted, the pavec may be reduced to 28 feet, R7-1 "no parking" signs be provided on both sides, and asphalt berms shall
provided on both sides.
One half width plus a 12 foot wide lane improvement Collector Street Standards for the portion of Slip1
Hill Lane fronting the project site. Storm sewer facilities including valley gutters, iI structures, storm drains, discharge structures,
desiltation basin(s), drainage ditches, and erosiol protection on and offsite. Street trees for all streets required to have side1 these conditions. Street lights for all streets required by these conditions.
Fire access road constructed as a 20 foot wide comr
driveway at the easterly corner of the project. TI driveway shall be gated at each end. The gates shi
locked with Nox locks. 11 PC RES0 NO. 2296 -7-
e e
1
2
3
4
33)
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23 36)
24
25
26
27
28
34)
35)
37)
j) One half street improvements to prime arterial sta~
for the portion of El Camino Real fronting the pro:
Median improvements shall be omitted from this itel
The developer shall exercise special care during the construction phase of this project to prevent any off-! siltation. The developer shall provide erosion control measures and shall construct temporary desiltation/dett
basins of type, size and location as approved by the C Engineer. The basins and erosion control measures sha:
shown and specified on the grading plan and shall be constructed to the satisfaction of the City Engineer pi the start of any other grading operations. Prior to tl
removal of any basins or facilities so constructed the
served shall be protected by additional drainage facil:
slope erosion control measures and other methods requil
approved by the City Engineer. The developer shall ma.
the temporary basins and erosion control measures for ,
of time satisfactory to the City Engineer and shall gui
their maintenance and satisfactory performance through deposit and bonding in amounts and types suitable to tl
Engineer.
Direct access rights for all lots abutting El Camino RI
Slippery Hill Lane shall be waived on the final map, e:
for the approved access points as shown on the TentatiT
The developer shall design the following improvements.
developer shall obtain the City Engineer's approval of
plans, pay all associated fees and provide a surety agl in an amount and of a type required by the Carlsbad Mu] Code to guarantee the installation of the improvements
on the plans. To wit:
a) Right in/out only island, lanes, signs, and stripil the intersection of El Camino Real and Slippery Hi:
Lane.
b) One half median improvements to prime arterial sta~
for the portion of El Camino Real fronting the pro: c) Cul-de-sac, demolition and removal of the right in, only island, lanes and striping of item (a) preced landscaping the portion of El Camino Real vacated demolition and removal.
The CC&R's shall contain a waiver of the right to objec the eventual closing and cul-de-sacing of Slippery Hil:
The design of all private streets and drainage systems be approved by the City Engineer prior to approval of final map. The structural section of all private strec
shall conform to City of Carlsbad Standards based on R. tests. All private streets and drainage systems shall inspected by the city, and the standard improvement pl, and inspection fees shall be paid prior to approval of
final map.
PC RES0 NO. 2296 -8-
I/
-3
,A e 0
1 38) Cut and fill slopes at intersections shall be pulled bi
the curb line to provide sight distance in conformance
2 City Standards.
3 39) All private streets and drainage systems shall be maini
by the homeowner's association in perpetuity, This re:
4 sibility shall be clearly stated in the CC&R's.
5 40) Prior to recordation of any final map for this developr the owner shall give written consent to the annexation
6 area shown within the boundaries of the Tentative Map : existing City of Carlsbad Street Lighting and Landscap:
7 District No. 1 .
8 41) Approval of this tentative tract map shall expire twenl months from the date of City Council approval unless a
applicant. Said extension shall be approved or denied
the City Council may impose new conditions and may rev:
9
discretion of the City Council. In approving an extent 10
map is recorded. An extension may be requested by the
existing conditions. 11
12
43) This subdivision contains a remainder parcel. No builc 15
acre area at the southerly corner of the subdivision. 14
common area laying to the northeast. The remaining 13
42) The panhandle portion of the approximately 1.75 acre ax
permit shall be issued for the remainder parcel until E
16 access satisfactory to the City Engineer is provided ar
development plan is approved by the City. This note SI
17 placed on the final map.
the westerly corner of the subdivision shall be joined
triangular portion shall be joined to the approximatell
18
19
20
21
22
23
24
25
26
27
44) This subdivision is not a condominium subdivision and t fact shall be indicated on the final map.
Fire Conditons:
45) Additional public and/or on site fire hydrants shall be
quired if deemed necessary by the Fire Marshall. I
46) An all weather access road shall be maintained throughc
construction.
47) All required fire hydrants, water mains and appurtenanc
shall be operational prior to combustible building mate
being located on the project site.
48) Adequate emergency vehicle turn-arounds shall be provid
cul-de-sac or a hammerhead when driveway is more than 1
deep from property line at street.
PC RES0 NO. 2296 -9-
28
,-
II 0 a
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
I
49) All private streets shall be kept clear of parked vehic all times, and shall have posted “No Parking/Fire Lane
Away Zone” pursuant to Section 17.04.040, Carlsbad Munj
Code .
50) Fire retardant roofs shall be required on all structurt
51 ) The developer shall submit a 400 scale street map of tl project to the fire marshal prior to the issuance of bt
permits.
PASSED, APPROVED AND ADOPTED at a regular meeting (
Planning Commission of the City of Carlsbad, California, hel
the 9th day of May, 1984, by the following vote, to wit:
AYES : Chairman Rombotis, Commissioners Rawlins,
Schlehuber , Marcus, Farrow and Smith
NOES : None
ABSENT: None .
ABSTAIN : None .
i j ATTEST :
LAND USE PLANNING MANAGER
PC RES0 NO. 2296 -1 0-