Loading...
HomeMy WebLinkAbout1984-11-28; Planning Commission; Resolution 2384> 1 0 e I. II PLANNING COMMISSION RESOLUTION NO. 2384 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING A REQUEST TO EXPAND AN AUTO DEALERSHIP ON PROPERTY GENERALLY LOCATED AT 5434 PASEO DEL NORTE ON THE EAST SIDE OF PASEL DEL NORTE IN CAR COUNTRY e APPLICANT: NORTH COUNTY LINCOLN-MERCURY CASE NO: PCD-68 WHEREAS, a verified application for certain propert wit: Lot 5 of Carlsbad Tract 72-3, Map 7492 fied in the of the County Recorder of San Diego County, Novembe 1972, has been filed with the City of Carlsbad, and referred to th Planning Commission; and WHEREAS, said verified application constitutes a re as provided by Title 21 of the Carlsbad Municipal Code; and WHEREAS, the Planning Commission did on the 28th dz November, 1984, consider said request; and WHEREAS, at said hearing, upon hearing and considc all testimony and arguments, if any, of all persons desirinc heard, said Commission considered all factors relating to tk Planning Commission Determination; and NOW, THEREFORE, BE IT HEREBY RESOLVED by the Plannj Commission as follows: (A) That the foregoing recitations are true and correct. (B) That based on the evidence presented at the hearing, the 24 25 mission APPROVES PCD-68, based on the following finding; subject to the following conditions: 11 Findings: 26 1) The project is consistent with the General Plan since tl 27 proposed use, an automobile dealership, is consistent w. this property in the Land Use Element of the General P1i 28 RRE, (Extensive Regional Retail), designation establishc I ? 0 0 1 2 2) The project is consistent with the aproved Specific Plan Car Country as discussed in the staff report. 3) The site is physically suitable for the type of developml 3 significant environmental impacts. 4 since the site is adequate in size and shape to accommod, the project and still meet all city regulations without 5 4) The project is consistent with all city public facility policies and ordinances since: 6 7 a 9 10 11 12 13 14 15 16 17 18 5) 19 6) 20 1 a) The Planning Commission has, by inclusion of an appropriate condition to this project, insured that building permits will not be issued for the project unless the City Council finds that sewer service is available to serve the project, and building cannot within the project unless sewer service remains available, thus the Planning Commission is satisfit the requirements of the public facilities element ( General Plan have been met insofar as they apply tc sewer service for this project. b) All necessary public improvements have been providf will be required as conditions of approval. c) The applicant has agreed and is required by the in1 of an appropriate condition to pay a public facili, fee. Performance of that contract and payment of will enable this body to find that public faciliti be available concurrent with need as required by t General Plan. The proposed project is compatible with existing and pr developments in Car Country as discussed in the staff r This project will not cause any significant environment impacts and a Negative Declaration was issued by the La Planning Manager on July 28, 1984 and approved by the F Commission on November 28, 1984. 21 Conditions ll 22 1) Approval is granted for PCD-68, as shown on Exhibits ' substantially as shown unless otherwise noted in thesf file in the Land Use Planning Office. Development shz 23 "F", , dated June 25, 1984, incorporated by reference i 24 conditions. 25 26 27 28 2) This project is approved upon the express condition tl building permits will not be issued for development 0' subject property unless the City Engineer determines sewer facilities are available at the time of applica such sewer permits and will continue to be available time of occupancy. PC RES0 NO. 2384 -2- > il 0 0 1 2 3 4 5 6 3) This project is approved upon the express condition that applicant shall pay a public facilities fee as required 1: Council Policy No. 17, dated April 2, 1982, on file with City Clerk and incorporated herein by reference, and accc to the agreement executed by the applicant for payment 0: fee, a copy of that agreement, dated May 30, 1984, is on with the City Clerk and incorporated herein by reference said fee is not paid as promised, this application will 1 consistent with the General Plan and approval for this PI shall be void. 7 4) Approval of this request shall not excuse compliance wit1 sections of the Zoning Ordinance and all other applicablc a ordinances in effect at time of building permit issuance 9 5) This approval shall become null and void if building per] are not issued for this project within one year from the 10 of project approval. 11 12 6) All landscaped areas shall be maintained in a healthy an( 7) All roof appurtenances, including air conditioners, shal: 13 architecturally integrated and concealed from view and tl sound buffered from adjacent properties and streets to tl 14 satisfaction of the Land Use Planning Manager and Buildil Planning Director. 15 8) Prior to the issuance of a building permit, the applican- 16 agree in a written form acceptable to the City Attorney': office not to oppose the formation of either an assessme] 17 district or some other mechanism to ensure the maintenanc 1) the Car Country park site located on the west side of 18 del Norte and 2) the median island in Paseo del Norte ru1 thriving condition, free from weeds, trash, and debris. 19 )I from Cannon Road to Palomar Airport Road. Engineering Conditions 9) Pretreatment of the sanitary sewer discharge from this p: connection permit the developer shall conform to the The developer shall apply for an industrial waste discha: 23 permit concurrently with the building permit for this prc No Certificates of Occupancy for the project will be issl 24 before the industrial waste discharge permit application requirements have been met, all applicable fees paid and 25 permit issued. 26 10) Prior to hauling dirt or construction materials to any p: construction site within this project the developer shal. 27 submit to and receive approval from the City Engineer fo: proposed haul route. The developer shall comply with al. 28 conditions and requirements the City Engineer may impose regards to the hauling operation. 20 21 requirements of Chapter 13.16 of the Carlsbad Municipal I 22 is required. In addition to the requirements for a sewe: PC RES0 NO. 2384 -3- I e 0 1 2 3 4 5 6 7 11 1 12) a 9 3.0 The developer shall exercise special care during the construction phase of this project to prevent any off-sit siltation. The developer shall provide erosion control measures and shall construct temporary desiltationjdetent basins of type, size and location as approved by the Cit] Engineer. The basins and erosion control measures shall shown and specified on the grading plan and shall be Storm water drainage from this site shall be intercepted two compartment sediment/grease trap. The sum of the acl volumes of the compartments shall be not less than 30 CUI feet. The design and location of the trap shall be to tl: satisfaction of the City Engineer. The developer shall ( approval of the design from the City Engineer prior to issuance of any building permit for this project. The developer shall complete the trap to the satisfaction of City Engineer prior to issuance of any Certificate of Occupancy for this project. 11 13) Unless a standard variance has been issued, no variance City Standards are authorized by virtue of approval of tl 12 project plan or tentative map. 13 14) The developer shall comply with all the rules, regulatiol regarding services to the project. 14 design requirements of the respective sewer and water agc 15 15) All plans, specifications, and supporting documents for . improvements of this project shall be signed and sealed 1 16 Engineer in responsible charge of the work. Each sheet ~ be signed and sealed, except that bound documents may be 17 and sealed on their first page. Additionally the first of each set of plans shall have the following certificatl 18 19 20 21 22 23 24 25 "DECLARATION OF RESPONSIBLE CHARGE" I hereby declare that I am the Engineer of Work for thi project, that I have exercised responsible charge over design of the project as defined in Section 6703 of the Business and Professions Code, and that the design is consistent with current standards. I understand that the check of project drawings and specifications by the City of Carlsbad is confined to a only and does not relieve me, as Engineer of Work, of m responsibilities for project design. (Name, Address and Telephone of Engineering firm) .~ / // /// /// /// 26 ).I 28 1 C RES0 NO. 2384 -4- 'b I( e 0 1 2 3 plans shall be submitted to and approved by the Fire Fire Conditions 16) Prior to the issuance of building permits, complete buil Department. 4 Ill71 Additional public and/or on site fire hydrants shall be 5 provided if- deemed necessary by the Fire Marshal. 6 18) The applicant shall submit two (2) copies of a site plar showing locations of existing and proposed fire hydrants 7 on site roads and drives to the Fire Marshal for approvi 8 19) Building exceeding 10,000 sq.ft. aggregate floor area SI sprinklered or have four-hour fire walls with no openins less) areas. 9 therein which shall split the building into 10,000 sq. fl 10 11 12 13 14 15 16 Marcus, Schlehuber, McFadden, L' Heureux a] 17 18 19 PASSED, APPROVED AND ADOPTED at a regular meeting 0: Planning Commission of the City of Carlsbad, California, helc the 28th day of November, 1984, by the following vote, to wit: AYES : Chairman Rombotis, Commissioners Farrow, Smith. NOES : None. ABSENT : None. ABSTAIN: None. 20 I1 21 22 23 24 I TTEST: - 3, Chairman Q CA SEGAD PLANNING COMMISSIOI II 4 25 26 "1 AND USE PLANNING MANAGER 28 C RES0 NO. 2384 -5-