PLANNING COMMISSION RESOLUTION NO. 2397
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF CARLSBAD, CALIFORNIA, APPROVING A CONDITIONAL USE PERMIT FOR THE DEVELOPMENT OF A
3.5 ACRE NEIGHBORHOOD PARR ON PROPERTY GENERALLY
LOCATED ADJACENT TO THE EL FUERTE SCHOOL AT THE
NORTH CORNER OF EL FUERTE STREET AND CORINTIA
STREET. APPLICANT: CITY OF CARLSBAD
CASE NO: CUP-264
WHEREAS, a verified application has been filed witl:
City of Carlsbad and referred to the Planning Commission; ar
WHEREAS, said verified application constitutes a rc
as provided by Title 21 of the Carlsbad Municipal Code; and
WHEREAS, pursuant to the provisions of the Municipz
the Planning Commission did, on the 9th day of January, 1985
a duly noticed public hearing to consider said application c
property described as:
Lot 748 of La Costa Meadows Unit No. 4 according tc
No. 7367 filed July 19, 1972,
WHEREAS, at said hearing, upon hearing and considel
testimony and arguments, if any, of all persons desiring to
heard, said Commission considered all factors relating to CI
NOW, THEREFORE, BE IT HEREBY RESOLVED by the Plannj
Commission of the City of Carlsbad as follows:
(A) That the foregoing recitations are true and correct.
(B) That based on the evidence presented at the public hear]
Commission APPROVES CUP-264, based on the following fini and subject to the following conditions:
Findings:
1) That the proposed use is necessary and desirable for tk development of the community, is essentially in harmon: the various elements and objectives of the General Plal is not detrimental to existing uses specifically permii
.- .
8 I) a
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
this zone, since the site has been designated as a
neighborhood park in the La Costa Master Plan and the development of this park site will provide much needed playing fields in the northern part of La Costa.
2) The subject property is adequate in size and shape to
accommodate the proposed use for the reasons stated in staff report.
3) All of the yards, setbacks, walls, fences, landscaping other features necessary to adjust the requested use to
existing and permitted future uses in the neighborhood
be provided and maintained.
4) The street system serving the subject property is adequ properly handle all traffic generated by the proposed u
5) This project will not cause any significant environment
impacts and a Negative Declaration has been issued by t
Use Planning Manager on November 19, 1984 and approved
Planning Commission on January 9, 1985.
Conditions :
1) Approval is granted for CUP-264, as shown on Exhibits "
"C", dated October 15, 1984, incorporated by reference
file in the Land Use Planning Office. Development shal
substantially as shown unless otherwise noted in these conditions.
2) Approval of this request shall not excuse compliance wi sections of the Zoning Ordinance and all other applicab ordinances in effect at time of building permit issuanc
3) Water shall be provided by the San Marcos Municipal Wat
District.
4) The applicant shall prepare a detailed landscape and ir
tion plan which shall be submitted to and approved by t
Use Planning Manager prior to the issuance of building permits.
5) All landscaped areas shall be maintained in a healthy a
thriving condition, free from weeds, trash, and debris.
Engineering Conditions:
6) The developer shall conform to the plans, specification other requirements of grading permit PE 2.82.36.
7) Prior to hauling dirt or construction materials to any
proposed construction site within this project the deve
shall submit to and receive approval from the City Engi for the proposed haul route. The developer shall compl all conditions and requirements the City Engineer may i
with regards to the hauling operation.
PC RES0 NO. 2397 -2-
>. I) I)
1
2
3
4
5
6
7
8
9
10
I1
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
8) The developer shall exercise special care during the
construction phase of this project to prevent any off-s
siltation. The developer shall provide erosion control
measures and shall construct temporary desiltation/dete basins of type, size and location as approved by the Ci Engineer. The basins and erosion control measures shal shown and specified on the grading plan and shall be
constructed to the satisfaction of the City Engineer pr the start of any other grading operations. Prior to th
removal of any basins or facilities so constructed the
served shall be protected by additional drainage facili slope erosion control measures and other methods requir
approved by the City Engineer. The Developer shall mai
the temporary basins and erosion control measures for a of time satisfactory to the City Engineer and shall gua
their maintenance and satisfactory performance through deposit and bonding in amounts and types suitable to th Engineer.
9) The developer shall install the improvements listed in
section prior to allowing public use of the park. The developer shall obtain approval of the plans from the C
Engineer and pay all associated fees and performance
guarantees prior to installing the improvements listed herein.
a) D-25 outlets for storm water leads.
b) Removal and replacement of all public facilities da
c) Street lights.
by the Developer's agent(s) or contractor(s).
PASSED, APPROVED AND ADOPTED at a regular meeting c
Planning Commission of the City of Carlsbad, California, hel
the 9th day of January, 1985, by the following vote, to wit:
AYES : Chairman Farrow, Commissioners Marcus, Smi
NOES: None.
ABSENT: Commissioners L'Heureux and Rombotis.
ABSTAIN : None.
McFadden and Schlehuber.
ATTEST:
dill VERNONfJ. WROW, Jf?. , Chai CARLSBA PL NNING COMMLSSIC '8\3
LAND USE PLANNING MANAGER
II -3-