Loading...
HomeMy WebLinkAbout1986-06-25; Planning Commission; Resolution 2558* .. a 0 1 2 3 4 5 6 7 a 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 PLANNING COMMISSION RESOLUTION NO. 2558 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIAf APPROVING A SITE DEVELOPMENT PLAN NO. 85-19, TO ALLOW CONSTRUCTION OF A NEIGHBORHOOD COMMERCIAL CENTER (61,000 SQ. FT.), WITH 44 APARTMENT UNITS, A TOURIST COMMERCIAL CENTER (58,600 SQ. FT.), A 150 SUITE EXECUTIVE HOTEL WITH 25,000 SQ. FT. ) CONFERENCE CENTER AND 220 HOTEL SUITES ON PROPERTY GENERALLY LOCATED IMMEDIATELY NORTH OF BATIQUITOS LAGOON BETWEEN CARLSBAD BOULEVARD AND THE AT&SF RAILWAY (Phase I11 Of MP-175) APPLICANT: BATIQUITOS LAGOON EDUCATIONAL PARK CASE NO: SDP 85-19 ~~ ~ WHEREAS, a verified application has been filed with the City of Carlsbad and referred to the Planning Commission; and WHEREAS, said verified application constitutes a request as provided by Title 21 of the Carlsbad Municipal Code; and WHEREASf pursuant to the provisions of the Municipal code, the Planning Commission did, on the 25th day of June, 1986, consider said request on property described as: A subdivision of Lots 1, 2 and 3 of Carlsbad Tract 82-18 (Batiquitos Pointe), in the City of Carlsbad, County of San Diego, State of California, according to Map thereof No. 11290, filed in the Office of the County Recorder of San Diego County, July 16, 1985; WHEREAS, at said hearing, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, said Commission considered all factors relating to Site Development Plan No. 85-19. NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning Commission of the City of Carlsbad as fOllOW5: (A) That the foregoing recitations are true and correct. (SI That based on the evidence presented at the public hearing, the Commission APPROVES SDP 85-19, based on the following findings and subject to the following conditions: 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 2Q 21 22 23 24 25 26 27 2% 0 0 Findings: 1) The proposed commercial development is consistent with the Neighborhood Commercial and Travel Service Commercial designations as indicated on the Land Use Element of the General Plan. 2) The project is consistent with Master Plan PIP-175 because the uses proposed are permitted in MP-175. 3) The site is physically suitable for the type and density of the development since the site is adequate in size and shape to accommodate residential development at the density pro- posed. 4) The project is consistent with all City public facility pol- icies and ordinances since: a) The Planning Commission has, by inclusion of an appropriate condition to this project, ensured that the final map will not be approved unless the City Council finds that sewer service is available to serve the project. In addition, the Planning Commission has added a condition that a note shall be placed on the final map that building permits may not be issued for the project unless the City Engineer determines that sewer service is available, and building cannot occur within the project unless sewer service remains available, and the Planning Commission is satisfied that the requirements of the Public Facilities Element of the General Plan and the proposed Growth Management Ordinance have been met insofar as they apply to sewer service for this project. b) The Carlsbad School District has written a letter, dated September 10, 1985, stating that school facilities will be available to this project. c) Park land dedication or fees or park improvements in lieu of, are required as a condition of approval. dl All necessary public improvements have been provided or will be required as conditions of approval. e) The applicant has agreed and is required by the inclusion of an appropriate condition to pay a public facilities fee. The applicant has also agreed by condition to pay all Growth Management Fees. Performance of those contracts and payment of the fees will enable this body to find that public facilities will be available concurrent with need as required by the General Plan. //// //// PC RES0 NO. 2558 -2- e 0 1 2 f) Assurances have been given that adequate sewer for the project will be provided by the City of Carlsbad. 5 1 The proposed project is consistent with the City's Planned 3 4 5 6 7 8 9 10 11 12 13 14 15 Development Ordinance and also complies with the Design Guidelines Manual. 6 1 The proposed project is compatible with the surrounding futuxe land uses since surrounding properties are designated for residential private school, recreation commercial or travel service commercial development on the General Plan. 7) This project will not cause any significant environmental impacts and a Negative Declaration has been issued by the Planning Director on April 23, 1986 and approved by the Planning Commission on June 25, 1986. 8) This project requires the construction of the improvements or facilities listed in the conditions of approval or the payment of fees in lieu of construction. This project creates a direct need for the improvements or facilities identified in the Master Plan. This project will provide all of the facilities and services needed in Phase I1 of the Master Plan. If the improvements or facilities are not provided, the project will create an unmitigated burden on existing improvements and facilities. Further, the improvements and facilities are necessary to provide safe, adequate and appropriate service to future residents of the project consistent with City goals, policies and plans. 16 17 9) 19 18 20 The applicant is by condition, required to pay any development fees and has agreed to abide by any additional requirements established by the City of Carlsbad pursuant to Chapter 21.90 of the Carlsbad Municipal Code or any other applicable laws, in order to implement and comply with the City's Growth Management System. This will ensure continued availability of public facilities and will mitigate any cumulative impacts created by the project. I1 Conditions: 21 1) Approval is granted for SDP 85-1 9, as shown on Exhibits "A" - 22 available to serve the subdivision. 26 final map shall not be approved unless the City Council finds 25 24 substantially as shown unless otherwise noted in these 23 "X" , dated April 29, 1986, incorporated by reference and on file in the Planning Department. Development shall occur conditions. 2 1 This project is approved upon the express condition that the as of the time of such approval that sewer service is 27 /I// I1 28 PC RES0 NO. 2558 -3- e 0 1 2 3 4 3) This project is approved upon the express condition that building permits will not be issued for development of the subject property unless the City Engineer determines that sewer facilities are available at the time of application for such sewer permits and will continue to be available until time of occupancy. This note shall be placed on the final map. I 5 6 4) 7 8 9 :Lo :L 1 This project is also approved under the express condition that the applicant pay the public facilities fee adopted by the City Council on April 22, 1986 and any development fees established by the City Council pursuant to Chapter 21.90 of the Carlsbad Municipal Code to implement the growth management system and to fulfill the subdivider's agreement to pay the public facilities fee dated July 9, 1986 a copy of which is on file with the City Clerk and is incorporated by this reference and to fulfill the requirements of the agreement to pay fees for facilities and improvements as required by the Growth Management System. If the fees are not paid this application will not be consistent with the General Plan and approval for this project shall be void. 12 5) The developer shall pay park fees pursuant to City Standards. In lieu of the required park fees, the City or make offsite improvements for park purposes. If the City this project, the applicant and the City shall enter into a :L 3 parks agreement as required by the Master Plan. 15 Council so determines prior to the occupancy of any units in :14 Council may require the developer to dedicate land offsite 2.6 x7 18 19 20 21 22 23 6) The applicant shall provide school fees to mitigate conditions of overcrowding as part of building permit application. These fees shall be based on the fee schedule in effect at the time of building permit application. 7) The applicant shall comply with all provisions of the Carlsbad Municipal Code Section 21.90.030(g) (Growth Management System). No residential building permits shall be issued until all Growth Management plans have been prepared to the satisfaction of the City Council. 8) Approval of this request shall not excuse compliance with the Batiquitos Lagoon Educational Park Master Plan, all sections of the Zoning Ordinance and all other applicable City ordinances in effect at time of building permit issuance. 25 I 24 ~ 9, Water shall be provided to this project pursuant to the Water Service agreement between the City of Carlsbad and the Costa Real Water District, dated May 25, 1983. 26 //// 27 /I //// 28 PC RES0 NO. 2558 -4- i 1 2 3 4 5 6 7 8 9 10 11 I_ :L2 13 :I. 4 :I 5 16 17 18 :I 9 20 21 22 23 24 25 26 27 28 l e 0 10) Before this project is reviewed by the City Council, the applicant shall execute the agreement to pay the fees for facilities and improvements as required by the Growth Management System and any other agreement required by Municipal Code Section 21.90.030(g). Planning Conditions: 11) All visitor parking spaces shall be striped a different color than the assigned resident parking spaces and shall be clearly marked with small pole signs to be approved by the Planning Director. 12) Approval of Site Development Plan No. 85-19 is granted subject to the approval of Tentative Tract Map No. 85-38. 13) Site Development Plan No. 85-19 is subject to all of the conditions of approval or' CT 85-38/PUD-96. 14) Approval of SDP 85-1 9 shall run concurrent with the approval of CT 85-38/PUD-96. 15) The applicant shall prepare a 24"x36" reproducible mylar of the final site plan incorporating the conditions contained herein. Said site plan shall be submitted to and approved by the Planning Director prior to the issuance of building permits. 16) If any condition for construction of any public improvements or facilities, or the payment of any fees in lieu thereof, imposed by this approval or imposed by law on this project are challenged, this approval shall be suspended as provided in Government Code Section 65913.5. If any such condition is determined to be invalid this approval shall be invalid unless the City Council determines that the project without the condition complies with all requirements of law. 17) This proposed project, SDP 85-19, shall comply with all of the specific conditions of Local Coastal Program Permit No. 6-85-482. 18) All buildings approved with this application shall be constructed with as much consistency as possible with these architectural elevations, Any revisions to these approved elevations shall require the approval of the Planning Director. 19) Prior to the issuance of building permits, the applicant shall be required to submit elevations and parking level plans for all parking structures. These elevations and floor plans shall be subject to review and approval by the Planning Director andd the City Engineer. //// PC RES0 NO, 2558 -5- c e 1 2 3 20) Prior to final map approval, the project applicant shall be required to submit landscaping and irrigation plans for all parking structures. The top level of each parking structure shall be landscaped to include some trees along its center aisles, These plans shall be subject to the approval of the Planning Director and City Engineer. 4 21) The project applicant shall be required to pay to the State Coastal Conservancy an agricultural conversion mitigation 6 map approval, The specific fee amount per acre shall be decided upon by the City Council, and shall apply to the proposed conversion of 100 acres of non-prime agricultural 5 fee of between $5,000 and $10,000 per acre prior to final 7 lands located upon the subject Master Planned property. 8 9 10 I1 12 13 14 15 16 17 22) The fifty-five foot high atrium proposed as part of the hotel (Building C-4) , within Planning Area "L" is specifically not approved as part of this application. This portion of the building shall either be redesigned to reduce its height to a maximum of 35 feet, or the project applicant shall be required to process a Master Plan amendment for this height variance request. 23) In Area M there will be no commercial use on the 2nd floor where there are also residential units. Engineering Department: 24) No grading permits shall be issued for this project prior to recordation of the final map, unless this condition is waived by the Community Development Director. 25) The developer shall obtain a grading permit prior to the commencement of any clearing or grading of the site. ~ 18 26) The grading for this project is defined as "controlled grad- ing" by Section 11 .06.170(a) of the Carlsbad Municipal Code. engineer whose responsibility it shall be to coordinate site inspection and testing to ensure compliance of the work with the approved grading plan, submit required reports to the 19 Grading shall be performed under the observation of a civil 20 21 City Engineer and verify compliance with Chapter 11 .06 of the 22 /I Carlsbad Municipal Code. 23 27) Upon completion of grading, the developer shall ensure that an "as-graded" geologic plan shall be submitted to the City Engineer. The plan shall clearly show all the geology as 24 exposed by the grading operation, all geologic corrective 25 measures as actually constructed and must be based on a con- tour map which represents both the pre and post site grading. This plan shall be signed by both the soils engineer and the 26 engineering geologist. The plan shall be prepared on a mylar 27 or similar drafting film and shall become a permanent record, PC RES0 NO. 2558 28 -6- 1 2 3 4 5 6 7 8 9 10 11 12 x3 :14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 l e 0 28) No grading shall occur outside the limits of the project unless a letter of permission is obtained from the owners of the affected properties. 29) A separate grading plan shall be submitted and approved and a separate grading permit issued for the borrow or disposal site if located within the city limits. 30) All slopes within this project shall be no steeper than 2:l. 31) Prior to hauling dirt or construction materials to any proposed construction site within this project the developer shall submit to and receive approval from the City Engineer for the proposed haul route. The developer shall comply with all conditions and requirements the City Engineer may impose with regards to the hauling operation. 32) The developer shall exercise special care during the construction phase of this project to prevent any offsite siltation. The developer shall provide erosion control measures and shall construct temporary desiltation/detention basins of type, size and location as approved by the City Engineer. The basins and erosion control measures shall be shown and specified on the grading plan and shall be constructed to the satisfaction of the City Engineer prior to the start of any other grading operations. Prior to the removal of any basins or facilities so constructed the area served shall be protected by additional drainage facilities, slope erosion control measures and other methods required or approved by the City Engineer. The developer shall maintain the temporary basins and erosion control measures for a period of time satisfactory to the City Engineer and shall guarantee their maintenance and satisfactory performance through cash deposit and bonding in amounts and types suitable to the City Engineer. 33) Additional drainage easements and drainage structures shall be provided or installed as may be required by the the City Engineer. 34) The developer shall pay the current local drainage area fee prior to issuance of any grading or building permit for this project or shall construct drainage systems in conformance with the Master Drainage Plan and City of Carlsbad Standards as required by the City Engineer. //// //// //I/ //// PC RES0 NO. 2558 -7- a 1 35) 2 3 4 5 6 7 8 36) 9 10 11 12 13 14 38) 15 16 17 37) 39) 18 19 20 21 22 23 24 25 26 I 27 28 The developer shall construct desiltation/detention basins of a type and size and at locations as approved by the City Engineer. The developer shall enter into a desiltation basin maintenance agreement and submit a maintenance bond satisfactory to the City Engineer prior to the approval of any grading, building permit or final map for this project. Each desiltation basin shall be serviced by an all-weather access/maintenance road. The provisions of this agreement shall apply to any offsite borrow sites which may be utilized in the construction of this project as required by the City Engineer. The owner of the subject property shall execute a hold harmless agreement regarding drainage across the adjacent property prior to approval of any grading or building permit for this project. The developer shall make an offer of dedication to the City for all public streets and easements required by these conditions or shown on the site development plan. The offer shall be made by a Certificate on the Final Map for this project. All land so offered shall be granted to the City free and clear of all liens and encumbrances and without cost to the City. Streets that are already public are not required to be rededicated. Direct access rights for all lots abutting Avenida Batiquitos and Carlsbad Boulevard and Ponto Drive (except specific openings as shown on the tentative map/site plan), shall be waived on the final map. Plans, specifications, and supporting documents for all improvements shall be prepared to the satisfaction of the City Engineer. Prior to the issuance of building permits, and/or final map, the Subdivider shall install, or agree to install and secure with appropriate security as provided by law, improvements shown on the tentative map and the following improvements to City Standards to the satisfaction of the City Engineer: A) All facilities and improvements identified in the Citywide and local facilities plans required pursuant to the City's Growth Management System, Chapter 21.90 of the Carlsbad Municipal Code. B) All public and private drainage systems to serve this project. C) Fully actuated traffic signals at: 1. Poinsettia Lane and Avenida Encinas 2. Avenida Encinas and Windrose Circle 3. Windrose Circle and Avenida Batiquitos 4. Avenida Batiquitos and Carlsbad Boulevard 5. Avenida Batiquitos and Ponto Drive Batiquitos as a major arterial/secondary arterial intersection (as shown on the tentative map). D) The full intersection of Carlsbad Boulevard and Avenida PC RES0 NO. 2558 -8- ~ I ~ ~ i i I I a 0 1 2 3 4 5 6 7 a E) Widening and/or relocation of on and off ramps to P) The Avenida Batiquitos Bridge and appurtenances over G) Sewer pump station and offsite force main. H) Relocation and abandonment of water mains across this development. I) The parking structures and access for all parking areas within this subdivision. J) All improvements identified as mitigation measures in the Developmental and Community Facility Program. K) Provide for the construction of the beach parking facility and frontage road as identified in the Master Plan for the project. Carlsbad Boulevard (see Condition No. 64). AT&SF Railroad. ll 40) Improvements listed above shall be constructed within 12 9 months of final map approval and/or improvement plan 10 nl 1 2 13 14 I 5 3.6 17 1.8 19 20 21 22 23 approval, whichever occurs first. 41) Should the proposed assessment district of Carlsbad Boulevard, Poinsettia Lane, etc., not be approved prior to final map approval or issuance of building permits for this project (Unit 1111, the developer shall be responsible for the following improvements; (in addition to above mentioned requirements) Carlsbad Boulevard intersection with Avenida Batiquitos, including northbound and southbound lane widenings (4) of Carlsbad Boulevard. a) A fully actuated traffic signal at Poinsettia Lane. b) Northbound and southbound on and off ramp widenings (4 each) at La Costa Avenue and at Poinsettia Lane intersection with 1-5 Freeway. on/of f ramps. c) Fully actuated traffic signals at the above-mentioned 42) Reimbursement agreements may be requested by the developer for the above-mentioned improvements which are not adjacent to this project (all units). Prior to final map approval or issuance of building permits, the developer may submit to and receive approval of specific reimbursement agreements and the percentage of developer's responsibility for each item to be reimbursed. Reimbursement shall be established by Benefit District and paid by future development. Reimbursement shall not be granted if the City Council determines these improvements are necessary to serve the project. - 24 11 //// I 25 //// I) 26 //// ll I 27 /I //// I 28 PC RES0 NO. 2558 -9- // 0 0 1 2 3 4 5 6 7 8 9 20 11 12 13 14 15 16 17 :L 8 :L 9 20 ll I 21 22 23 24 25 26 27 43) Before and as a condition of obtaining a final map, or final development permit or site plan approval under Title 21 of the Carlsbad Municipal Code, the subdivider shall enter into a contract with the City whereby the subdivider covenants on behalf of the subdivider and subdivider's successors in interest to the following: a) Not opposing and consenting to the formation of a bridge and major thoroughfare district in the area of this project. b) Payment of the bridge and major thoroughfare fee for the area of the district in which this development is located. 44) Prior to final map approval or issuance of building permits, the applicant shall agree to participate in Poinsettia/I-5, Poinsettia/AT&SF Railroad, and La Costa Avenue/I-5 Bridge Benefit Districts. A note of this participation shall be placed on the final map. 45) Unless a standard variance has been issued, no variance from City Standards is authorized by virtue of approval of this tentative map/site plan. 46) The developer shall construct private street accesses to public streets in such a way as to clearly designate that the private streets are not a portion of the public street system. The developer shall place a plaque-type sign with the legend, "PRIVATE STREET BEYOND THIS POINT", at the acces5 point to private streets from public streets, The script on the sign shown above shall be capital letters of a size and contrast such as to be readable for a normally sighted person at a distance of 20 feet. The provisions of this condition shall be met to the satisfaction of the City Engineer prior to issuance of a Certificate of Occupancy for any portion of this project. 47) The developer shall install street lights along all public and private street frontages in conformance with City of Carlsbad Standards (including Carlsbad Boulevard). 48) The developer shall install street trees at the equivalent of 40-foot intervals along all public and private street frontages in conformance with this project, The trees shall be of a variety selected from the approved Street Tree List. 49) The developer shall install sidewalks along all public and private street frontages in conformance with this project prior to occupancy of any buildings. //// PC RES0 NO. 2558 -10- 28 a 1 2 3 4 50) The developer shall install a wheelchair ramp at all public and private street corners of this subdivision in conformance with City of Carlsbad Standards prior to occupancy of any buildings. 51) The developer shall install chain-link fence along Carlsbad Boulevard as required by the City Engineer. 5 6 52) The developer shall comply with all the rules, regulations agencies regarding services to the project. and design requirements of the respective sewer and water 7 8 53) 9 x0 I. 1 12 13 14 1.5 16 17 18 19 54) 55) The design of all private streets, sewer systems including pump station and force main, and drainage systems shall be approved by the City Engineer prior to issuance of any grading or building permit for this project. The structural section of all private streets shall conform to City of Carlsbad Standards based on R-value tests. All private streets and drainage systems shall be inspected by the City, and the standard improvement plan check and inspection fees shall be paid prior to issuance of any building or grading permit for this project. The developer shall provide an acceptable means for maintaining the easements and landscaped medians within the subdivision and all the private streets, sidewalks , street lights, storm drain facilities and sewer facilities located therein and to distribute the costs of such maintenance in an equitable manner among the owners of the units within the subdivision. All concrete terrace drains shall be maintained by the homeowner's association (if on commonly owned property) or the individual property owner (if on an individually owned lot). An appropriately worded statement clearly identifying the responsibility shall be placed in the CC&R's. 2o I 56) All private driveways shall. be kept clear of parked vehicles at all times, and shall have posted "NO Parking/Fire Lane Tow Away Zone" pursuant to Section 17.04.040, Carlsbad Municipal 21 Code. 22 57) The Subdivider shall provide separate sewer, water, gas, and 23 ll 24 25 26 electric services with meters to each of the units. 58) Irrigation systems to accommodate future reclaimed water shall be designed consistent with Title 17 of the California State Administrative Code. Offsite future reclaimed water distribution systems should be anticipated by the installation of adequately sized sleeves at crossing points to minimize street excavation. 27 #'6/f;ESO NO. 2558 28 -1 1- 1 0 0 1 59) 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 60) 19 I 20 ~ Some improvements shown on the tentative map and/or required by these conditions are located offsite on property which neither the City nor the subdivider has su€ficient title or interest to permit the improvements to be made without i acquistion of title or interest. The subdivider shall conform to Section 20.16.095 of the Carlsbad Municipal Code. i 1 All plans, specifications, and supporting documents for the ~ improvements of this project shall be signed and sealed by the Engineer in responsible charge of the work. Each sheet shall be signed and sealed, except that bound documents may i be signed and sealed on their first page. Additionally, the first sheet of each set of plans shall have the following certificate: "DECLARATION OF RESPONSIBLE CHARGE" I hereby declare that I am the Engineer of Work for this project, that I have exercised responsible charge over the design of the project as defined in Section 6703 of the Business and Professions Code, and that the design is consistent with current standards. I understand that the check of project drawings and specifications by the City of Carlsbad is confined to a review only and does not relieve me, as Engineer of Work, of my responsibilities for project design. (Name, Address and Telephone of Engineering firm) I I Firm: Address: City, St.: Telephone: BY Date: (Name of Engineer) 2111 R.C.E. NO. # I 22 61) The developer shall provide the City with a reproducible 23 mylar copy of the site plan as approved by the Planning PC RES0 NO. 2558 -12- and Landscaping District No. 1. 28 site plan into the existing City of Carlsbad Street Lighting annexation of the area shown within the boundaries of the 27 this project, the owner shall give written consent to the 62) Prior to approval of any grading or building permits for 26 satisfactory to the City Engineer. 25 shall be 24" x 36" in size and of a quality and material the City Engineer prior to improvement plan submittal and 24 approval by the City. The plan copy shall be submitted to Commission. The site plan shall reflect the conditions of I I II e e 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 63) Approval of this tentative tract map shall expire twenty-four months from the date of City Council approval unless a final map is recorded. An extension may be requested by the applicant. Said extension shall be approved or denied at the discretion of the City Council. In approving an extension, the City Council may impose new conditions and may revise existing conditions. 64) Should the realignment of Carlsbad Boulevard and Ponto Drive not be approved, this project approval (Phase 111) shall be null and void. The applicant shall redesign (this phase) in accordance with City standards in effect at the time of reapplication. Parks and Recreation Department Conditions: 65) Prior to final map approval, final median designs and plantings shall be subject to the approval of the Director of Parks and Recreation. 66) Prior to final map approval, specific plant selections shall be subject to the approval of the Director of Parks and Recreation and may vary from the plants listed on the conceptual landscape plan. 67) Prior to occupancy of any structure within the Master Planned project, the applicant and the City shall enter into a parks agreement so that land for park purposes can be dedicated upfront to bring the City up to standard for community parks in this district based upon current population levels. Fire Department Conditions: 68) Prior to the issuance of building permits, complete building plans shall be submitted to and approved by the Fire Department. 69) Additional public and/or onsite fire hydrants shall be provided if deemed necessary by the Fire Marshal. 70) The applicant shall submit two (2 1 copies of a site plan showing locations of existing and proposed fire hydrants and onsite roads and drives to the Fire Marshal for approval. 71 1 An all-weather access road shall be maintained throughout ~ construction. ~ 72) All required fire hydrants, water mains and appurtenances shall be operational prior to combustible building materials I being located on the project site. //// PC RES0 NO. 2558 -13- 0 e 1 2 3 4 5 6 7 8 9 73) Proposed security gate systems shall be provided with "Knox" key operated override switch, as specified by the Fire De- partment. 74) All fire alarm systems, fire hydrants, extinguishing systems, automatic sprinklers, and other systems pertinent to the project shall be submitted to the Fire Department for approval prior to construction. 75) ~ll non-residential buildings shall be provided with an automatic fire sprinkler system, to be approved by the Fire Marshal. All residential buildings shall also be provided with an automatic sprinkler system unless the City's proposed new fire station at Buttercup Lane is already constructed and operating. At that time, the applicant shall contact the Fire Marshal for a determination on whether residential structures shall be exempted from this requirement. 10 PASSED, APPROVED AND ADOPTED at a regular meeting of the 11 the 25th day of June, 1986, by the following vote, to wit: 12 Planning Commission of the City of Carlsbad, California, held on 13 14 15 16 17 AYES: Chairman Schlehuber, Commissioners: McBane, Marcus, McFadden, Schramm, Holmes h Hall. NOES: None. ABSENT: None. ABSTAIN: None. l8 I 19 I 2o 1 ATTEST: (%"-La CLARENCE SCHLEHUBER, Chairman CARLSBAD PLANNING COMMISSION 21 22 23 PLANNING DIRECTOR 24 25 26 /I 27 28 PC RES0 NO. 2558 -1 4-