Loading...
HomeMy WebLinkAbout1989-05-17; Planning Commission; Resolution 2854" * // 0 Q 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PLANNING COMMISSION RESOLUTION NO. 2854 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA, FINDING THAT THE PROPOSED CANNON ROAD STREET IMPROVEMENT, SEWER INTERCEPTOR AND PUMP STATION BETWEEN CAR COUNTRY DRIVE AND FUTURE FARADAY AVENUE ARE CONSISTENT WITH THE GENERAL PLAN. APPLICANT: CITY OF CARLSBAD CASE NO.: PCD/GPC 89-2 WHEREAS, a verified application for certain property to wit: An unimproved strip of land 102 feet wide plus slope easements south of the Ague Hedionda Lagoon between Car Country Drive and the future Faraday Avenue located at the eastern edge of Macario Canyon and an unimproved existing waterline easement between the same 1 imits. strip of land 25 feet wide generally following an has been filed with the City of Carlsbad and referred to the P1 annin5 and WHEREAS, said verified application constitutes a request as Title 21 of the Carlsbad Municipal Code; and WHEREAS, the Planning Commission did on the 19th day of April the 17th day of May 1989, consider said request; and WHEREAS, at said hearing, upon hearing and considering a1 1 t arguments, if any, of all person desiring to be heard, said Commissic all factors relating to the Planning Commission Determination; NOW, THEREFORE, BE IT RESOLVED by the Planning Commission as A. That the foregoing recitations are true and correct. B. That based on the evidence presented at the public Commission APPROVES PCD/GPC 89-2, based on the followir FINDINGS: 1. As discussed in the staff report, the proposed street and sewel system improvements are consistent with the goals and objec General P1 an in that: a) The project will provide access to 1 and uses expres: elements of the General Plan such as residential propert, per the Land Use Element and Macario Canyon Park as iden. Parks and Recreation Element . b) The project is a part of a comprehensive circuli consistent with goal C.l.l of the Circulation Element. - , -J 0 e 1 2 3 4 5 6 7 8 9 3.0 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 c) This portion of the City's circulation system will develo with need consistent with goal C.1.2 of the Circulation d) The project wi 11 incl ude bi keways and sidewal ks cow objective C.2.2. and policy C.3.4 respectively of the El ement . e) The project wi 11 he1 p to discourage the use o-F 1 c (Tamarack Avenue) as thoroughfares consistent with goal Ci rcul at i on El ement . f) Both the road improvements and the sewer interceptor sew by siting the sewer system outside of wetlands areas i the roadway across the wetlands areas which is cons guide1 i ne D. 7 of the Open Space and Conservation El e General P1 an. "designed to preserve the unique and special resources 2. The project is consistent with the Agua Hedionda Local Coasta' that: a) The road foll ows the a1 ignment recommended in the Ague H' Use Plan. b) Neither the road nor the sewerline will cause any filling area. c) The riparian area to be fill ed has been reduced as much i and will be rep1 aced as required by resource agency pern PASSED, APPROVED AND ADOPTED at a regular meeting of tl Commission of the City of Carlsbad held on the 17th day of May, following vote, to wit: AYES: Chairman Hall, Commissioners: Schlehuber, Sc NOES: None. ABSENT: Commissioner McFadden. ABSTAIN : None. Erwin, Marcus E Holmes. CARLSBAD PLANNING COMMISSION ATTEST: /q1&$&;pi~,, k4 I '& * ..e ("J< i i, .~ \, \ +y"Li I & MICHAEL J. HOLZMILLEWJ PLANNING DIRECTOR PC RES0 NO. 2854 (I