Loading...
HomeMy WebLinkAbout1990-07-18; Planning Commission; Resolution 30720 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 PLANNING COMMISSION RESOLUTION NO. 3072 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSI CALIFORNIA, RECOMMENDING CERTIFICATION OF ENVIRONMENTAL IMF REPORT, EIR 86-5, FOR A PROJECT GENERALLY INCLUDING RESTOMTI01 TIDAL FLUSHING TO BATIQUITOS LAGOON THROUGH DREDGING CONSTRUCTION OF A TIDAL INLET STRUCTURE. CASE NAME: BATIQUITOS LAGOON ENHANCEMENT PROJECT CASE NO.: EIR 86-5 WHEREAS, a verified application for certain property to wit: Batiquitos Lagoon as bounded by El Camino Real on the east, La Costa Avenue and the shoreline on the south, the shoreline on the north and the Pacific Ocean on the west. has been filed with the City of Carlsbad and referred to the Planning Commission; i WHEREAS, said verified application constitutes a request as provided by Til Carlsbad Municipal Code; and WHEREAS, the Planning Commission did, on the 18th day of July, 1990, noticed public hearing as prescribed by law to consider said request; and WHEREAS, at said public hearing, upon hearing and considering all tes arguments, if any, of all persons desiring to be heard, said Commission considerel relating to the project and; NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning Commissior A) That the FOREGOING recitations are true and correct. B) That the Environmental Impact Report EIR 86-5 will be amended to include tl and documents of those teshfying at the public hearing and responses tht hearings into the report. found to be in good faith and reason by incorporating a copy of the minutes o C) That the Environmental Impact Report EIR 86-5 as so amended and ev; attached errata sheets dated May 16. 1990 are recommended for accc certification as the final Environmental Impact Report and that the final En Impact Report as recommended is adequate and provides reasonable inform project and all reasonable and feasible alternatives thereto, including no prc PC RES0 NO. 3072 -1- 28 e e 1 D) That among the alternatives evaluated, it is recommended that Mitigated Alten "Agency Preferred'' and Environmentally Preferred" alternatives), which 2 mitigation measures as discussed below, be approved for implementation. 3 Findin-: 4 5 1. 6 7 2. a 9 10 11 12 13 14 15 16 17 18 3. That the Planning Commission finds and determines that the Environmental 11: EIR 86-5 has been completed in conformance with the California Environmf Act, the state guidelines implementing said Act, and the provisions of Tit Carlsbad Municipal Code and that the Planning Commission has reviewed, co; evaluated the information contained in the report. That with the exception of impacts identified in 3) below, each and ever environmental impact identified in the Environmental Impact Report would 1 or counterbalanced by changes or alteration in the project which would miti said adverse impacts or, in certain circumstances, that mitigation of such adv would not be feasible under the circumstances and under the economic and objectives and concerns in providing the improvements if the project were to t would be included as conditions of approval of the project. That, while the project has been mitigated to the extent possiile with regarc water quality and recreation by the conditions to be included in projec significant adverse impacts will still exist. With regard to these items, t Commission finds there are overriding considerations which are as follows: k Biology - That, the unavoidable short-term loss of existing benthic 1 overridden by the long-term project benefit of replacement of thea marine resources which would establish following tidal restoration. B. Water Quality - That, the unavoidable short-term impacts to water qx the lagoon during project constmctioddredging, is overridden by th project benefits of enhanced water quality following tidal restoratio1 I.9 I 2o I C. Recreation - That, the unavoidable, short-term impacts to recreatioIx the lagoon enhancement and the longer term benefits of increased opportunities due to beach nourishment beach during construction/beach nourishment, is overridden by the in 21 /I Conditions: 22 1. Refer to attached Exhibit A (Mitigation Measures) for all conditions, mitigatio 23 and monitoring programs applicable to development of the Batiquit 24 25 ... Enhancement Project. 26 27 ... --- 28 11 b e e l. /I 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED, AND ADOPTED at a regular meeting of the Planning of the City of Carlsbad, California, held on the 18th day of July, 1990, by the follov wit: AYES: Chairperson Schramm, Commissioners: McFadden, Erwi NOES: Holmes, Schlehuber, Marcus & Hall. None; ' .. _- . ABSENT: None. ABSTAIN: None. dh&.*v & -- _"."._ &+?2z .. SHARON SCHRAIdM, Chairperson CARLSBAD PLANNING COMMISSIOP ATTEST: PLANNING DIRECTOR I1 PC RES0 NO. 3072 -3-