PLANNING COMMISSION RESOLUTION NO. 3354
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF CARLSBAD, CALIFORNIA, RECOMMENDING
APPROVAL OF A SPECIAL USE PERMIT FOR A 205 LOT
TENTATIVE TRACT MAP CONSISTING OF 199 RESIDENTIAL
LOTS AND 6 OPEN SPACE LOTS ON PROPERTY GENERALLY
LOCATED ON THE SOUTHWESTERLY SIDE OF EL CAMINO
REAL, BETWEEN THE FUTURE EXTENSION OF CANNON
ROAD AND EXISTING CAMINO HILLS Dm.
CASE NAME: EVANS POINT
CASE NO: SUP 91-2
7 11 WHEREAS, a verified application for certain property, to wit:
8
9
10
A portion of Lot "F" of Rancho Agua Hedionda, in the County
of San Diego, State of California, according to the map thereof
No. 823, filed in the office of the County Recorder of San
Diego County, November 16, 1896,
XI. has been Tied with the City of Carlsbad, and referred to the Planning Commission; and /I
l2 II WHEREAS, said application constitutes a request as provided by Title 21 c
13
14
15
the Carlsbad Municipal Code; and
WHEREAS, the Planning Commission did on the 19th day of February, 199;
16 hold a duly noticed public hearing as prescribed by law to consider said request; and
17
and arguments, if any, of all persons desiring to be heard, said Commission considered a 18
WHEREAS, at said public hearing, upon hearing and considering all testimon
19 factors relating to the Special Use Pedt; and
20
21
22
23
24 B) That based on the evidence presented at the public hearing, the Commissic
RECOMMENDS APPROVAL of SUP 91-2, based on the following findings ar 25 subject to the following conditions:
26
27
NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning Commissic
of the City of Carlsbad as follows:
A) That the foregoing recitations are true and correct.
...
28
...
.,' , . 9 9
1
the corridor.
El Camino Real, and extensive landscaping which incorporates the theme trees for
with the corridor's development standards by providing an attractive development
1. The project enhances the scenic qualities of the Ez Camino Real Corridor consistent 2
Findings:
3 which complies with the specified building heights, required building setbacks along
4
5 2. The project protects scenic views and traffic safety along El Camino Real by
6 providing attractive buildings, extensively landscaping proposed slopes, making
street improvements along the project's frontage, and taking access off of El Camina 7
3.03 du's/acre is within the density range of 0-4 du's/acre specified for the site as 9
Real at an existing signalized intersection.
8 3. The project is consistent with the City's General Plan since the proposed density oi
indicated on the Land Use Element of the General Plan, and is at or below the 10 growth control point of 3.2.
11
12
13
14
15
16
l?
18
19
20
21
4. The site is physically suitable for the type and density of the development since the
site is adequate in size and shape to accommodate residential development at the
density proposed.
5. The Planning Commission has, by inclusion of an appropriate condition to thi:
project, ensured building permits will not be issued for the project unless the Ciq
Engineer determines that sewer service is available, and building cannot OCCUI
within the project unless sewer service remains available, and the Planning
Commission is satisfied that the requirements of the Public Facilities Element of thc
General Plan have been met insofar as they apply to sewer service for this project
6. School fees will be paid to ensure the availability of school facilities in the Carlsbac
School District.
7. Park-in-lieu fees are required as a condition of approval.
8. All necessary public improvements have been provided or will be required a
conditions of approval.
22 9. The applicant has agreed and is required by the inclusion of an appropriatl
23 condition to pay a public facilities fee. Performance of that contract and paymen
concurrent with need as required by the General Plan. 24
of the fee will enable this body to find that public facilities will be availabl
25 10. The proposed project is compatible with the surrounding residential land uses c
26
27
28 PC RES0 NO. 3354 -2-
RLM and RM. Provisions are provided to mitigate potential land use conflicts wit
the adjacent non-residential land uses of PI/RS/C/TS/U in Zone 5.
*. . x* e
1
2
3
4
11.
5 12.
6
7
8
g 13.
10 'I. 14.
12
13
14 15.
1E
An EIR was prepared for this project and has been recommended for certification
by the Planning Commission. The EIR (EIR 91-2) identified a number of potentially
significant impacts created by this project and possible mitigation measures to
reduce these impacts to a level of insignificance. These mitigation measures have
been incorporated into the project through redesign or conditions of approval, to
reduce all impacts to a level of insignificance.
The applicant is by condition, required to pay any increase in public facility fee, or
new construction tax, or development fees, and has agreed to abide by any
additional requirements established by a Local Facilities Management Plan prepared
pursuant to Chapter 21.90 of the Carlsbad Municipal Code. This will ensure
continued availability of public facilities and will mitigate any cumulative impacts
created by the project.
This project is consistent with the City's Growth Management Ordinance as it has
been conditioned to comply with any requirement approved as part of the Local
Facilities Management Plan for Zone 24.
This project was subject to Chapter 21.95 of the Carlsbad Municipal Code (Hillside
Ordinance) and meets all the requirements of that Chapter to ensure the sensitive
treatment of the City's hillside resources.
This Special Use Permit required pursuant to Section 21.40.040 of the Scenic
Preservation Overlay Zone is approved as the project complies with all requirement
of the El Camino Real Corridor Development Standards for Area 3.
AiJ
16 Conditions:
17
18
19
20
21
22
23
1. Approval is granted for SUP 91-2, as shown on Exhibit(s) "A" - "AA", dated Februaq
19, 1992, incorporated by reference and on file in the Planning Department
Development shall occur substantially as shown unless otherwise noted in thesl
conditions.
2. The developer shall provide the City with a reproducible 24" x 36', mylar copy c
the Tentative Map (Exhibit "H", Composite Tentative Map, and Exhibits "Q! - "A-A'
50 scale Tentative Map) as approved by the Planning Commission. The Tentativ
Map shall reflect the conditions of approval by the City. The map copy shall b
submitted to the City Engineer prior to issuance of building permits or improvemer
plan submittal, whichever occurs first.
24
25
3. All conditions of EIR 91-2, as contained in Resolution No. 3348, GPA 91-3, LCP
26 ."
91-1, ZC 91-6, CI' 91-3, and HDP 91-3 are incorporated by reference herein.
27 // ...
28 // PC RES0 NO. 3354 -3- il
'1. . t c 0 8
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED, AND ADOPTED at a regular meeting of the Planning
Commission of the City of Carlsbad, California, held on the 19th day of February, 1992,
by the following vote, to wit:
AYES: Chairman Erwin, Commissioners: Schlehuber, Schramm,
Holmes, Savary, Noble & Hall.
NOES: None.
ABSENT: None.
ABSTAIN: None.
z-
TOM ERWIN, Chairperson
CARLSBAD PLANNING COMMISSION
ATTEST:
,
MICHAEL J. HOTZMILYER
PLANNING DIRECTOR
PC RES0 NO. 3354 -4-