PLANNING COMMISSION RESOLUTION NO. 3640
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF CARLSBAD, CALIFORNIA RECOMMENDING
APPROVAL OF A NEGATIVE DECLARATION FOR A PRECISE
PLAN AMENDMENT TO REMODEL AND EXPAND THE
EXISTING NCTD BUS TRANSIT CENTER AT PLAZA CAMINO
REAL.
CASE NAME: NORTH COUNTY TRANSIT DISTRICT
CASE NO: PP 24(F)
7
8 a duly noticed public hearing as prescribed by law to consider said request, and
WHEREAS, the Planning Commission did on the 20th day of April, 1994, holc
9 WHEREAS, at said public hearing, upon hearing and considering all testimony
lo 11 and arguments, examining the initial study, analyzing the information submitted by staff
11
12
13
14
15
A) That the foregoing recitations are true and correct. 16
as follows:
and considering any written comments received, the Planning Commission considered a1
factors relating to the Negative Declaration.
NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning Commissiol
17
18
19
20 I
B) That based on the evidence presented at the public hearing, the Plannin;
Commission hereby recommends APPROVAL of the Negative Declaratiol
according to Exhibit "ND", dated December 9, 1993, and "PII", date(
December 2, 1993, attached hereto and made a part hereof, based on thl
following findings:
21
22
Findings:
26
25
24
23
1. The initial study shows that there is no substantial evidence that the project ma:
27
have a significant impact on the environment.
2. The site has been previously graded and developed pursuant to an earlie
environmental analysis.
3. There will be no increase in traffic generated by the proposed project.
4. There are no sensitive resources located onsite or located so as to be significant1
impacted by this project.
28
0 0
11 5. The project will reduce on-site conflicts between vehicles (cars) and bus traffic.
1
2 I1 PASSED, APPROVED, AND ADOPTED at a regular meeting of the Planning
3
4 following vote, to wit:
Commission of the City of Carlsbad, California, held on the 20th day of April, 1994, by the
5
6
AYES: Chairperson Savary, Commissioners: Schlehuber, Noble
Welshons, Erwin & Hall.
7
8
9
ABSENT: Commissioner Betz.
ABSTAIN: None.
NOES: None.
10
11
12
l3 ATTEST:
/I n
CARLSBAD PLANNING COMMISSION
14
15
16
17
18
19
20
21
22
23
I
<
MICHAEL J. HMZMIMER
PLANNING DIRECTOR
24 ll
25
26
27
28 PC RES0 NO. 3640 -2-
NEGATIVE DECLARATION
PROJECT ADDRESS/LOCATION: The project site is located along the north side of
Marron Road at Plaza Camino Real.
PROJECT DESCRIPTION: Precise Development Plan Amendment to remodel and expand
the existing North County Transit District bus transit facility at
Plaza Camino Real.
The City of Carlsbad has conducted an environmental review of the above described project
pursuant to the Guidelines for Implementation of the California Environmental Quality Act
and the Environmental Protection Ordinance of the City of Carlsbad. As a result of said
review, a Negative Declaration (declaration that the project will not have a significant
impact on the environment) is hereby issued for the subject project. Justification for this
action is on file in the Planning Department.
A copy of the Negative Declaration with supportive documents is on file in the Planning
Department, 2075 Las Palmas Drive, Carlsbad, California 92009. Comments from the
public are invited. Please submit comments in writing to the Planning Department within
21 days of date of issuance. If you have any questions, please call Chris DeCerbo in the
Planning Department at (619) 438-1161, extension 4445.
DATED:
CASE NO:
DECEMBER 9, 1993
PDP 24(F) Planning Director
CASE NAME: PLAZA CAMINO REAL BUS TURNOUT
PUBLISH DATE: DECEMBER 9, 1993
CD:vd
2075 Las Palmas Drive - Carlsbad, California 92009-1 576 - (61 9) 438-1 161 (
0 0
PHYSICAL ENVIRONMENT
WILL THE PROPOSAL DIRECTLY OR INDIRECTLY:
1. Result in unstable earth conditions or
increase the exposure of people or property
to geologic hazards?
2. Appreciably change the topography or any
unique physical features?
3. Result in or be affected by erosion of soils
either on or off the site?
4. Result in changes in the deposition of beach
sands, or modification of the channel of a
river or stream or the bed of the ocean or
any bay, inlet or lake?
5. Result in substantial adverse effects on
ambient air quality?
6. Result in substantial changes in air
movement, odor, moisture, or temperature?
YES YES NO
big) (insig)
X
- X
- X
" - x
X
- X
7. Substantially change the course or flow of
water (marine, fresh or flood waters)? X
8. Affect the quantity or quality of surface
water, ground water or public water supply?
9. Substantially increase usage or cause
depletion of any natural resources?
10. Use substantial amounts of fuel or energy?
11. Alter a significant archeological,
paleontological or historical site,
structure or object?
X
X
X
X
-2-
0 0
HUMAN ENVIRONMENT
WILL THE PROPOSAL DIRECTLY OR INDIRECTLY: YES YES NO
(si@ (insig)
19. Result in the need for new or modified sewer
systems, solid waste or hazardous waste
control systems? - - X
20. Increase existing noise levels? X
21. Produce new light or glare? X
22. Involve a significant risk of an explosion
or the release of hazardous substances
(including, but not limited to, oil,
pesticides, chemicals or radiation)?
23. Substantially alter the density of the
human population of an area?
24. Affect existing housing, or create a demand
for additional housing?
- ~ X
X
- - - X
25. Generate substantial additional traffic? X
26. Affect existing parking facilities, or
create a large demand for new parking?
27. Impact existing transportation systems or
alter present patterns of circulation or
movement of people and/or goods?
X
X
28. Alter waterborne, rail or air traffic? X
29. Increase traffic hazards to motor
vehicles, bicyclists or pedestrians?
30. Interfere with emergency response plans or
emergency evacuation plans?
31. Obstruct any scenic vista or create an
aesthetically offensive public view?
32. Affect the quality or quantity of
existing recreational opportunities?
X
- X
- X
X
-4-
0 0
DISCUSSION OF ENVIRONMENTAL EVALUATION
This project is a Precise Plan Amendment to remodel and expand the existing North County Transit Distr
(NCTD) bus transit facility at Plaza Camino Real. The existing transit facility is located along a shoppi:
center entry driveway off of Marron Road which currently accommodates auto and truck traffic. The existi:
transit facility provides parking for a maximum of five buses at a time with its current design, The propos
revision would create adequate space for eight buses at a time while eliminating bus, pedestrian a
automobile conflicts which currently exist because the buses must travel through the existing parking lot
exit onto Marron Road. The additional three bus parking spaces created through this proposal revision v
be necessary for purposes of responding to anticipated bus ridership demand. For this environmental analys
staff conducted several field trips to the project site. In that; (1) the parking lot currently exists, (2) tht
are no sensitive environmental resources located upon or in close proximity to it, (3) the improved bus serv
will reduce automobile traffic and pedestrian/vehicular traffic conflicts, no environmental impacts :
anticipated.
Physical Environment
1-4. Because the project site is already developed with a parking lot, and no significant grading activitj
are proposed with this project, no geologic, topographic or soil erosion impact are anticipated.
5. In that this project will create three more bus parking bays for the NCTD at Plaza Camino Real, t
potential exists for automobile trip generation to the mall to be reduced and air quality to be improv
consistent with the Regional Air Quality Strategies.
6. This project, which may result in reduced automobile traffic generation, should not affect or have a
substantial negative impacts upon air movement, odor, moisture or temperature.
7. This project will not change the course or flow of waters as no streams are located in the immediz
area and all drainage waters will be handled by existing drainage facilities.
8. In that the site is already developed and existing drainage facilities exist, no impacts to surface wat,
groundwater or public water supplies are anticipated.
9. Implementation of this project, (construction, paving, operation) will incrementally contribute to t.
depletion of fossil fuels. This incremental impact is not regarded as significant.
10. See #9 above.
11. This previously developed site does not have a significant potential of containing archaeological
paleontological objects which have not already been mitigated.
12. The only vegetation that exists on site is parking lot landscaping.
13. Since there is no vegetation (other than parking lot landscaping) on site, no impacts to native speci
are anticipated.
-6-
a e
DISCUSSION OF ENVIRONMENTAL EVALUATtON (cont’d)
28. This project will have no impacts upon water, rail or air traffic.
29. Traffic conflicts (hazards) will be reduced as discussed above.
30. This ,project will not interfere with emergency response plans.
31. The project will not obstruct any scenic vista, and will create an improved appearance over the existi
situation.
32. This project will have no effect upon recreational opportunities.
-8-
I- o 0
DETERMINATION (To Be Completed By The Planning Department)
On the basis of this initial evaluation:
X I find the proposed project COULD NOT have a significant effect on the environment, and a NEGATl
DECLARATION will be prepared.
- t find that the proposed project COULD NOT have a significant effect on the environment, because 1
environmental effects of the proposed project have already been considered in conjunction w
previously certified environmental documents and no additional environmental review is requir
Therefore, a Notice of Determination has been prepared.
- I find that although the proposed project could have a significant effect on the environment, there P
not be a significant effect in this case because the mitigation measures described on an attached
sheet have been added to the project. A Conditional Negative Declaration will be proposed.
- I find the proposed project MAY have a significant effect on the environment, and an ENVIRONMENT
IMPACT REPORT is required.
1.2- 6-73
Date Signature
I .Z/b/q 3
Date Planning Directoy U
LIST MITIGATING MEASURES (IF APPLICABLE)
ATTACH MITIGATION MONITORING PROGRAM (IF APPLICAELE)
-10-