PLANNING COMMISSION RESOLUTION NO. 3744
A RESOLUTION OF THE PLANNING COMMISSION OF
THE CITY OF CARLSBAD, CALIFORNIA,
DEVELOPMENT OF 90 AFFORDABLE HOUSING UNITS
ON PROPERTY GENERALLY LOCATED NORTH OF
THE BATIQUITOS LAGOON WITHIN PLANNING AREA
“D” OF THE POINSETTIA SHORES MASTER PLAN
CASE NAME POINSE’ITIA SHORES PLANNING
AREA “D”
CASE NO: SDP 94-08
WHEREAS, a verified application has been filed with the City of Q
RECOMMENDING APPROVAL OF SDP 94-08 FOR THE
and referred to the Planning Commission; and
WHEREAS, said verified application constitutes a request for
Development Plan as provided by Chapters 21.06 and 21.86 of the Carlsbad Mu
Code; and
WHEREAS, pursuant to the provisions of the Municipal Code, the P1;
Commission did on the 15th day of February, 1995, hold a public hearing on pr
described as:
Lot 8 of Carlsbad Tract 94-01, in the City of Carlsbad, County
of San Diego, State of California, according to Map No. 13181
filed in the office of the San Diego County Recorder.
WHEREAS, at said public hearing, upon hearing and considering all tesl
and arguments, if any, of all persons desiring to be heard, said Commission conside
factors relating to SDP 94-08.
NOW, THEREFORE, BE IT HEREBY RESOLVED by the P1:
Commission of the City of Carlsbad as follows:
A) That the foregoing recitations are true and correct.
B) That based on the evidence presented at the public hearing, the P1i
Commission RECOMMENDS APPROVAL of Site Development Plan, SDP
based on the following findings and subject to the following conditions:
I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
0 0
Findings:
1. That the requested use is properly related to the site, surrounding
environmental setting, is consistent with the various elements and objectives
general plan, will not be detrimental to existing uses or to uses specifically per
in the area which the proposed use is to be located, and will not adversely
the site, surroundings or traffic circulation since the project is in conformanc
the adopted Poinsettia Shores Master Plan for which a Mitigated NI
Declaration was also approved on January 4, 1994. On that date the City C
also adopted a General Plan Amendment which reflects the land uses of the 1
Plan. The contents of the Master Plan include graphic plans of the pr
development, location of the various land uses, an integrated open space prl
processing protocol for planned developments, the location of and provisi
public facilities, the location of the circulation system, a master plan level
system, identification of constrained lands and a mass grading concept,
proposed development of Area D with 90 affordable housing units conforms
master plan including the following aspects:
a The proposed development is consistent with the provisions
General Plan and the site's master plan.
b. All necessary public facilities can be provided concurrent wit1
and adequate provisions have been provided consistent with th,
9 Local Facilities Management Plan and Finance Plan.
constitute an environment of sustained desirability and stabilil
that it will be in harmony with or provide compatible variety
character of the surrounding area, and that the sites propos
common facilities, such as parking, recreation areas and tra
adequate to serve the project.
d. The project will not be detrimental to uses specifically permil
the master plan for the adjacent area.
e. The streets and thoroughfares proposed are suitable and adeql
serve the anticipated traffic and meet all applicable City stand
developed in coordination and substantial compatibility wi
proposed development.
implementing and building out the Poinsettia Shores Master 1
2. That the site for the intended use as designed and conditioned is adequate
and shape to accommodate the use, since the site is designated for affa
dwelling units at the density proposed by the General Plan and Master Plar
grading for the site represents finish grading beyond the approved mass grac
CT 94-01 and produces a net usable area sufficient for proposed developmc
review of the Master Plan indicates a substantial conformance between the 1
and the Plan. As required by the Carlsbad Municipal Code, a Site Devela
Plan is required for the processing of affordable housing units and the gran
incentives in order to facilitate affordable housing development.
C. The residential and open space portions of the communi1
f. The area surrounding the development is or can be planm
g* Development of this planning area is consistent with objec
PC RES0 NO. 3744 -2-
I1 0 0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
3. That all of the yards, setbacks, walls, fences, landscaping, and other fc
necessary to adjust the requested use to existing or permitted future uses
neighborhood will be provided and maintained per the requirements of the a
Master Plan and as additionally conditioned through the approval of this 1
The incentives involved with this project include: (1) the reduction of a st
covered parking space from 8% ft by 20 ft (standard) to 8% feet by 17
(incentive), (2) the provision of storage space per unit per the Planned Develc
Ordinance ranging from 377-409 cubic feet (incentive) which is less th
standard of 480 cubic feet per unit, and (3) the allowance of three compac
spaces to share the same parking aisle as standard sized covered resident g
spaces. These incentives will allow the development of the requested use s
corresponding provision of affordable housing units consistent and compatit
all components of the Poinsettia Shores Master Plan. All other aspects
project designed to adjust the requested use with future permitted uses, s
setbacks, building height, landscaping, trails and walls/fences will be provid
maintained as part of the project.
4. That the street system serving the proposed use is adequate to properly haK
traffic generated by the proposed use as indicated in the Poinsettia Shores 1
Plan and corresponding Mitigated Negative Declaration. The street system !
Area ‘ID” meets all applicable policies and standards of the City.
5. All requirements of the California Environmental Quality Act have been met tl
the environmental review performed for the Master Plan (MP 175(D)) and 1
Tentative Map (CT 94-01) which resulted in two publicly noticed Mitigated N
Declarations. All applicable mitigation measures identified have either been i
completed or are designed into the project so that no environmental impac
result from the proposed project. A Notice of Prior Compliance was issl
January 4,1995.
Planning Conditions:
1. Approval is granted for SDP 94-08, as shown on Exhibits “A” - “K”,
February 15, 1995, incorporated by reference and on file in the P1
Department. Development shall occur substantially as shown unless 0th
noted in these conditions.
2. Approval of SDP 94-08 is granted subject to the approval of C-T 94-
PUD 94-03. SDP 94-08 is approved subject to all conditions of apprc
CI’ 94-10, as contained in Planning Commission Resolution No
incorporated herein by reference and on file in the Planning Departn
I
~ .***
~
....
....
PC RES0 NO. 3744 -3-
II
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
0 a
PASSED, APPROVED, AND ADOPTED at a regular meeting
Planning Commission of the City of Carlsbad, held on the 15th of February, 1995,
following vote, to wit:
AYES: Chairperson Welshons; Commissioners Compas,
Monroy, Nielsen, Noble, and Savary.
NOES: None.
ABSENT: None.
ABSTAIN None.
ATTEST
KIM WE~HONS, Chairperson
CARLSBAD PLANNING COMMISSIO:
\~aQK+& 2/ 6
MICHAEL J. HOL~~ILLER
Planning Director
PC RES0 NO. 3744 -4-