Loading...
HomeMy WebLinkAbout1995-04-19; Planning Commission; Resolution 3762* \ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1 0 0 ]PLANNING COMMISSION RESOLUTION NO. 3762 A EWOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING A GENERAL PLAN CONSISTENCY DETERMINATION FOR THE REPLACEMENT OF THE EXISTING CARLSBAD BOULEVARD EAST BRIDGE LOCATED OVER SAN MARCOS CREEK AT THE MOUTH OF BATIQUITOS LAGOON. CASE NAME CARLSBAD BOULEVARD EAST - CASE NO: PCD/GPC 95-01 WHEREAS, a verified application for certain property to wit: The eastern bridge of Carlsbad Boulevard located over Sara Ma.rcos Creek at the mouth of Batiquitos Lagoon; BRIDGE REPLACEMENT has been filed with the City of Carlsbad and referred to the Planning Commission WHEREAS, said verified application constitutes a request by the ( Carlsbad as provided by Title 2 of the Carlsbad Municipal Code for a Genera Consistency; and WHEREAS, the Planning Commission did on the 19th day of April, consider said reqyest; and WHEREAS, at said meeting, upon hearing all arguments, if any, persons desiring to be heard, said Commission considered all factors relating Planning Commission Determination; and NOW, THEREFORE, BE IT HEREBY RESOLVED by the PI Commission as follows: A) That the foregoing recitations are true and correct. B) That based on the evidence presented at the hearing, the Commission APPR I PCD/GPC: 95-01, based on the following findings: i Findings: 1. The proposed public works project is consistent with the various elements General Plan because it provides for the replacement and upgrade of an e M 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 20 I1 e I) public falcility concurrent with the need. The project provides safe pedestrian, and bicycle traffic flow, a more reliable and aesthetically E bridge st~mcture, and a reduction in future bridge maintenance measures an 2. a) The Planning Director has found that, based on the EIA Part- Subsequent Project was described in the FEIR/EIS for BLEP as w scope; and there will be no additional significant effect, not analyzed ' and that no new or additional mitigation measures or alternati required; and that therefore this Project is within the scope of the pri and no new environmental document nor Public Resources Codt findings are required. b) The Planning Commission finds that all feasible mitigation meas project alternatives identified in the FEIWIS for BLEP wh appropriate to this Project have been incorporated into this Projecl Conditions: 1. The Devleloper shall diligently implement, or cause the implementation mitigation measures identified in the Final EIR/EIS for BLEP that are ap to the Project, including but not limited to, noise, air quality, and hazard; PASSED, APPROVED, AND ADOPTED at a regular meeting Planning Commission of the City of Carlsbad, California, held on the 19th day a 1995, by the following vote, to wit: AYES: Chairperson Welshons; Commissioners Compas, Monroy, Nielsen, Noble and Savary. NOES: None. ABSENT: None. ABSTAIN: None. KIM WELSHONS, Chairperson CARLSBADPLANNINGCOMM ATTEST \ MICHAEL J.Y-IOL&ILLER PC RES0 NO 3762 -2-