HomeMy WebLinkAbout1997-09-03; Planning Commission; Resolution 4170r
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
e 0
PLANNING COMMISSION RESOLUTION NO. 4170
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF CARLSBAD, CALIFORNIA, RECOMMENDING
APPROVAL OF A SPECIAL USE PERMIT TO ALLOW A 3-
LOT INDUSTRIAL OFFICE DEVELOPMENT AND AN OPEN
SPACE PARCEL ON PROPERTY GENERALLY LOCATED
SOUTH OF COUGAR DRIVE ON THE EAST AND WEST
SIDES OF PALMER WAY IN LOCAL FACILITIES
MANAGEMENT ZONE 15
CASE NAME: PALMER WAY INDUSTRIAL PARK
CASE NO: SUP 96-09
WHEREAS, Ron Lister, d.b.a. Lister Construction, “Developer”, has fil
verified application with the City of Carlsbad regarding property owned by Ronald Craig L:
and Colleen Marie Lister, Trustees, “Owner”, described as
A portion of Parcel 1 of Parcel Map 10060, and a portion of
Lot “B” of Rancho Agua Hedionda, all in the City of Carlsbad
(‘the Property”); and
WHEREAS, said verified application constitutes a request for a Special
Permit as shown on Exhibit(s) “A” - “I” dated September 3, 1997, on file in the Plan
Department (Palmer Way Industrial Park - SUP 96-09), as provided by the condition
approval of SUP 96-09 and Chapter 21.40 of the Carlsbad Municipal Code; and
WHEREAS, the Planning Commission did on the 3rd day of September 11
hold a duly noticed public hearing as prescribed by law to consider said request; and
WHEREAS, at said public hearing, upon hearing and considering all testim
and arguments, if any, of all persons desiring to be heard, said Commission considered all fac
relating to the Special Use Permit;
NOW, THEREFORE, BE IT HEREBY RESOLVED by the Plm
Commission of the City of Carlsbad as follows:
A) That the foregoing recitations are true and correct.
I
0 a
i
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
B) That based on the evidence presented at the public hearing, the Commi
APPROVES Special Use Permit SUP 96-09 based on the following finding
subject to the following conditions:
Findings:
1. The project is consistent with the El Camino Real Corridor Development Stanc
in that, although no development of Parcel 3 is proposed at this time, the gr;
proposed to create the future building pad is consistent with the grading allowc
the El Camino Real Corridor Development Standards, and the building pad I
created can accommodate the required 30-foot building setback.
2. An amendment to this SDP will be required to approve any development of P
3, and that development will be required to comply with all applicable develop]
standards contained in the El Camino Real Corridor Development Standards.
Conditions:
1. The Planning Commission does hereby APPROVE the Special Use Permit fo
project entitled Palmer Way Industrial Park (Exhibits “A” - “G” dated Septemk
1997 on file in the Planning Department and incorporated by this reference, subject 1
conditions herein set forth.) Staff is authorized and directed to make, or re
Developer to make, all corrections and modifications to the Special Use P
document(s), as necessary, to make them internally consistent and in conformity
final action on the project. Development shall occur substantially as shown ir
approved Exhibits. Any proposed development substantially different from this appr
shall require an amendment to this approval.
2. Approval of SUP 96-09 is granted subject to the approval of SDP 96-13, and LFMI
OS(D)/LFMP 15(A). SUP 96-09 is subject to all conditions contained in Plan
Commission Resolutions No. 4169 and 4171 for SDP 96-13 and LFMP
OS(D)/LFMP 15(A).
...
...
...
...
...
I ...
PC RES0 NO. 4170 -2-
r
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
a (I)
PASSED, APPROVED AND ADOPTED at a regular meeting of the pla
Commission of the City of Carlsbad, California, held on the 3rd day of September 1997,k
following vote, to wit:
AYES: Chairperson Nielsen, Commissioners Compas, Heinc
Monroy, Noble, Savary and Welshons
NOES: None
AB SENT: None
ABSTAIN: None
”,:pe2T:Lq-\
/.q. prX2’ a .,&&- />B ,,,
,t,.,@ -,-2.4>c“
F ,J
.j‘ /+7- “c. “\”” .AzA”’””~,;’4~~. . ,
-MI *< “i_
RO3ERT NIELSEN, Chairperson
CARLSBAD PLANNING COMMISSION
ATTEST:
,
MICHAEL J. HOBMILWR
Planning Director
,
PC RES0 NO. 4170 -3-