PLANNING COMMISSION RESOLUTION NO. 4190
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF CARLSBAD, CALIFORNIA, RECOMMENDING
APPROVAL OF A COASTAL DEVELOPMENT PERMIT TO
SUBDIVIDE, GRADE, AND CONSTRUCT RESIDENCES ON
53.7 ACRES INTO 157 LOTS ON PROPERTY GENERALLY
LOCATED SOUTH OF PALOMAR AIRPORT ROAD, EAST
AND WEST OF FUTURE AVIARA PARKWAY, AND NORTH
OF FUTURE POINSETTIA LANE IN LOCAL FACILITIES
MANAGEMENT ZONE 20.
CASE NAME: MARIANO
CASE NO.: CDP 97-34
WHEREAS, WHEREAS, PacWest Group, Inc., “Developer”, has filed a verified applic
with the City of Carlsbad regarding property owned by PacWest, Ltd., “Owner”, described
Being a portion of the land designated as “Description 4, 76.89
acres” as shown and delineated on record of survey map no.
5715, filed in the office of the County Recorder of San Diego
County, December 19,1960, also being a portion of Lot “G” of
the Rancho Agua Hedionda, in the City of Carlsbad, County of
San Diego, State of California, according to map thereof No.
823, filed in the office of the County Recorder of said San
Diego County, November 16,1896.
(“the Property”); and
WHEREAS, said verified application constitutes a request for a Cc
Development Permit as shown on Exhibit(s) “A” - “AAA” dated October 15, 1997, on f
the Planning Department, CDP 97-34 - MARIANO, as provided by Chapter 21.201.040 c
Carlsbad Municipal Code; and
WHEREAS, the Planning Commission did, on the 15th day of October 3
hold a duly noticed public hearing as prescribed by law to consider said request; and
WHEREAS, at said public hearing, upon hearing and considering all testir
and arguments, if any, of all persons desiring to be heard, said Commission considered all fa
relating to CDP 97-34.
5 e 0
8 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 ~
NOW, THEREFORE, BE IT HEREBY RESOLVED by the Plan
Commission of theCity of Carlsbad as follows:
A) That the foregoing recitations are true and correct.
B) That based on the evidence presented at the public hearing, the Commi:
RECOMMENDS APPROVAL of Coastal Development Permit CDP 9'
based on the following findings and subject to the following conditions:
Findings:
1. That the proposed development is in conformance with the Certified Local Coastal Pro
and all applicable policies and the Mello I1 Segment Coastal Resource Protection Ovc
Zone requiring the protection of steep slopes and adequate drainage facilities. Thc
consists of 4 acres of coastal deed restricted 25%+ slopes containing coastal sage w
the SDG&E easement and within and adjacent to the proposed alignment of AT
Parkway. Consistent with this policy, the .6 acres within the SDG&E easement w
preserved, however, the remaining 3.4 acres will be disturbed due to grading reql
for a circulation element roadway and thinning and pruning necessitated by
suppression zones to accommodate single family lots located at the ridgeline abov
roadway.
The project will disturb approximately 10.22 acres of 25%+ slopes (19% of site
geotechnical analysis, prepared for the project by Geotechnical Exploration,
concluded that the slope areas to be disturbed would be stable provided
recommendations are implemented and any corrective grading necessary for
project is completed. Grading of the 25%+ slopes is essential to the design o
project in that slope areas located in the southern half of the site between the SD(
easement and proposed Aviara Parkway alignment require corrective grading d.
previous disturbance that has resulted in severe erosion. Due to the fixed vel
alignment of the proposed roadway which is approximately 25 - 35 feet above exi
grade, the grading design also requires fill of a ravine containing 25%+ slopes loc
between the SDG&E easement and roadway to create building pads. The site i
predominated by steep slopes, and slopes proposed for disturbance are east and
facing and not required to be preserved.
The project is consistent with hydrology standards of the Mello I1 segmel
Carlsbad's LCP requiring the drainage system to be designed to ensure that r
resulting from a 10 year frequency storm of 6 hours and 24 hours duration I:
developed conditions are less than or equal to the runoff from a storm of the
frequency and duration under existing developed conditions. A permanent dete
facility is being provided to mitigate any storm runoff impacts, and drainage fro1
project will be routed through storm drains beneath Aviara Parkway and z
Cobblestone Road where it will flow into Encinas Creek through the Laurel
project to the north. The project will provide adequate drainage, siltation and er
control facilities as part of the approved grading permit, and the grading operatio] 1 PC RES0 NO. 4190 -2-
I( e 0
* 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
be limited to the summer construction season, April 1 to October 1.
2. The project is subject to and consistent with the Mello I1 LCP Segment Agriculr
Overlay Zone in that it is required to offset the conversion of non-prime agriculr
land to urban land uses through the payment of an agricultural mitigation fee an
sedimentation, erosion, and drainage measures were previously approved througl
issuance of a Coastal Development Permit for CT 95-05 by the California Co
Commission.
Conditions:
1. The Planning Commission does hereby RECOMMEND APPROVAL of the Cc
Development Permit for the project entitled CDP 97-34 - MARIAN0 (Exhibit(s) ‘
“AAA ” on file in the Planning Department and incorporated by this reference, subjc
the conditions herein set forth.) Staff is authorized and directed to make, or re
Developer to make, all corrections and modifications to the exhibits/document(!
necessary, to make them internally consistent and in conformity with final action o
project. Development shall occur substantially as shown in the approved Exhibits.
proposed development substantially different from this approval, shall requir
amendment to this approval.
2. Approval of CDP 97-34 is granted subject to the approval of CT 97-14, PUD 9
SDP 97-16, and HDP 97-13. CDP 97-34 is subject to all conditions containc
Resolutions No. 4186,4187,4188, and 4189 for CT 97-14, PUD 97-11, SDP 97-1(
HDP 97-13.
3. All grading operations shall be limited to the period from April 1 to October
each year. All areas disturbed by grading shall be planted within 60 days a
initial disturbance and prior to October 1 with temporary or permanent (in the
of finished slopes) erosion control methods.
...
...
...
...
...
...
...
I II *** 27
28 PC RES0 NO. 4190 -3 -
0 0
* 1
2
3
4
5
6
7
8
9
PASSED, APPROVED AND ADOPTED at a regular meeting of the Plan
Commission of the City of Carlsbad, California, held on the 15th day of October 1997, b!
following vote, to wit:
AYES: Chairperson Nielsen, Commissioner Compas, Heineman
Noble
NOES: None
ABSENT: Commissioner Monroy, Savary and Welshons
ABSTAIN: None
10
11
12
ROBERT NIELSEN, Chairperson
13 CARLSBAD PLANNING COMMISSION
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
ATTEST:
W MICHAEL J. HOLZMILI!&R
Planning Director
~ 1
PC RES0 NO. 4190 -4-