Loading...
HomeMy WebLinkAbout1998-04-01; Planning Commission; Resolution 42591 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 0 0 PLANNING COMMISSION RESOLUTION NO. 4259 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING COASTAL DEVELOPMENT PERMIT NO. CDP 98-07 TO ALLOW FOR THE REPLACEMENT OF THE GRAVITY SEWER PIPELINE ALONG JEFFERSON STREET BETWEEN LAS FLOES DRIVE AND LAGUNA DRIVE IN LOCAL FACILITIES MANAGEMENT ZONE 1. CASE NAME: VISTNCARLSBAD INTERCEPTOR SEWER REPLACEMENT REACHES VC5B - VC9 CASE NO.: CDP 98-07 WHEREAS, the City’s Engineeringmublic Works Department, “Del has filed a verified application with the City of Carlsbad regarding property owned bq Carlsbad, “Owner”, described as The public right-of-way of Jefferson Street between Las Flores Drive and Laguna Drive. (“the Property”); and WHEREAS, said verified application constitutes a request for a Development Permit as shown on Exhibits “A”-“J” dated April 1, 1998, on file in the Department, VistaKarlsbad Interceptor Sewer Replacement Reaches VCSB - VC9, 07 as provided by Chapter 21.201.040 of the Carlsbad Municipal Code; and WHEREAS, the Planning Commission did, on the 1st day of April 199 duly noticed public hearing as prescribed by law to consider said request; and WHEREAS, at said public hearing, upon hearing and considering all t and arguments, if any, of all persons desiring to be heard, said Commission considered 5 relating to the CDP 98-07. NOW, THEREFORE, BE IT HEREBY RESOLVED by the Commission of the City of Carlsbad as follows: I 0 0 b 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 l I A) That the foregoing recitations are true and correct. B) That based on the evidence presented at the public hearing, the Cor APPROVES VistaICarlsbad Interceptor Sewer Replacement Reachc - VC9, CDP 98-07 based on the following findings and subject to the fl conditions: Findings: 1. The project is consistent with the General Plan in that it fbllfills a public utility infra, need in support of demand generated by existing and proposed land uses establishe land use element of the General Plan. 2. That the proposed development is in conformance with the Certified Local Coastal and all applicable policies in that a) The project proposes the repair and replacement of an existing sewer pipeline within an existing public street and the LCP Land Use Plan designates the subjec transportation and public utility uses. b) The proposal is in conformity with the public access policies of Chapter 3 of the Act in that the replacement of the underground pipeline would not permanentl! traffic circulation and patterns, or restrict access to coastal resources. c) The planned construction would take place within an existing public street, there: project construction will not impact coastal resources such as coastal bluffs, steel or native coastal vegetation. Conditions: 1. Staff is authorized and directed to make, or require Developer to make, all COT and modifications to the document(s) necessary to make them internally consisl in conformity with final action on the project. Development shall occur substanl shown in the approved Exhibits “A”-“J” dated, April 1, 1998. Any p development different from this approval, shall require an amendment to this apprf ... ... I I ... PC RES0 NO. 4259 -2- e 0 b 1 I1 PASSED, APPROVED AND ADOPTED at a regular meeting of the 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Commission of the City of Carlsbad, California, held on the 1st day of April 199$ following vote, to wit: AYES: Chairperson Noble, Commissioners Compas, Heineman, rU Nielsen, Savary, and Welshons NOES: ABSENT: ABSTAIN: ri. BAILEY NdLE, Chairperson CARLSBAD PLANNING COMMISSION ATTEST: I1 t 16 17 18 19 20 21 22 23 24 25 26 27 28 Planning Director ~ i 1 PC RES0 NO. 4259 -3 -