HomeMy WebLinkAbout2000-04-05; Planning Commission; Resolution 47470 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PLANNING COMMISSION RESOLUTION NO. 4747 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING A MITIGATED NEGATIVE DECLARATION AND MITIGATION MONITORING AND REPORTING PROGRAM FOR THE DELAYED ARCHITECTURAL REVIEW OF THE BUILDING HOMES ON PROPERTY GENERALLY LOCATED SOUTH OF PALOMAR AIRPORT ROAD AND EAST OF MELROSE DRIVE IN LOCAL FACILITIES MANAGEMENT ZONE 18. CASE NAME: RANCHO CARRILLO VILLAGE “G” CASE NO. : PUD 97-03(D) WHEREAS, Continental Residential, Inc., “Owner” and “Developer”, has fil ELEVATIONS AND FLOOR PLANS OF 39 SINGLE-FAMILY a verified application with the City of Carlsbad regarding described as: Lots 1 through 42 of Carlsbad Tract No. 97-03 Rancho Carrillo Village “G” in the City of Carlsbad, County of San Diego, State of California, according to Map thereof No. 13837 filed in the office of the County Recorder of San Diego County August 23,1999 as file no. 1999-581947 (“the Property”); and WHEREAS, a CEQA document was prepared in conjunction with said project; and WHEREAS, the Planning Commission did on the 5th day of April, 2000, holc duly noticed public meeting as prescribed by law to consider said request; and WHEREAS, at said public meeting, upon hearing and considering all testimo~ and arguments, examining the initial study, analyzing the information submitted by staff, a] considering any written comments received, the Planning Commission considered all factc relating to the Mitigated Negative Declaration. NOW, THEREFORE, BE IT HEREBY RESOLVED by the Plannil Commission as follows: I A) That the foregoing recitations are true and correct. B) That based on the evidence presented at the public meeting, the Planni: Commission hereby APPROVES the Mitigated Negative Declaration accordi: 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 to Exhibit “ND” dated February 23, 2000, and “PII” dated February 10, 20( attached hereto and made a part hereof, based on the following findings: Findinps: 1. The Planning Commission of the City of Carlsbad does hereby find: A. it has reviewed, analyzed and considered the Mitigated Negative Declaration a Mitigation Monitoring and Reporting Program and the environmental impal therein identified for this project and any comments thereon prior APPROVING the project; and B. the Mitigated Negative Declaration and the Mitigation Monitoring and Reporti: Program have been prepared in accordance with requirements of the Califon Environmental Quality Act, the State Guidelines and the Environmen Protection Procedures of the City of Carlsbad; and C. they reflect the independent judgment of the Planning Commission of the City Carlsbad; and D. based on the EIA Part I1 and comments thereon, there is no substantial eviden the project will have a significant effect on the environment. Conditions: 1. The Developer shall implement, or cause the implementation of, the Rancho Carril Village “G” Project Mitigation Monitoring and Reporting Program. ... ... ... ... ... ... ... . .. ... ... I 11 PC RES0 NO. 4747 -2- 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a regular meeting of the Planni Commission of the City of Carlsbad, California, held on the 5th day of April, 2000, by t following vote, to wit: AYES: Chairperson Compas, Commissioners L'Heureux, Nielsen, Segal and Trigas NOES: ABSENT: Commissioners Heineman and Baker ABSTAIN: ih!kef-&u WILLIAM COMPAS, Chairperson b' CARLSBAD PLANNING COMMISSION ATTEST: Planning Director PC RES0 NO. 4747 -3 - - MITIGATED NEGATIVE DECLARATION Project Address/Location: On the south side of Palomar Airport Road, east of Melrose Drive, and east of Carrillo Way. Village “G” is within the Rancho Carrillo Master Plan. Project Description: The delayed architectural review of 39 single-family homes for compliance with the architectural guidelines established for Village “G” within the Rancho Carrillo Master Plan. Property has an approved tentative map, planned unit development permit and has been graded to finish pad elevations. The City of Carlsbad has conducted an environmental review of the above described project pursuant to the Guidelines for Implementation of the California Environmental Quality Act and the Environmental Protection Ordinance of the City of Carlsbad. As a result of said review, the initial study (EIA Part 2) identified potentially significant effects on the environment, but (1) revisions in the project plans or proposals made by, or agreed to by, the applicant before the proposed negative declaration and initial study are released for public review would avoid the effects or mitigate the effects to a point where clearly no significant effect on the environment would occur, and (2) there is no substantial evidence in light of the whole record before the City that the project “as revised” may have a significant effect on the environment. Therefore, a Mitigated Negative Declaration is hereby issued for the subject project. Justification for this action is on file in the Planning Department. A copy of the Mitigated Negative Declaration with supportive documents is on file in the Planning Department, 1635 Faraday Avenue, Carlsbad, California 92008. Comments from the public are invited. Please submit comments in writing to the Planning Department within 20 days of date of issuance. If you have any questions, please call Van Lynch in the Planning Department at (760) 602-4613. DATED: FEBRUARY 23,2000 CASE NO: PUD 97-03 (D) CASE NAME: RANCHO CARRILLO VILLAGE “G” PUBLISH DATE: FEBRUARY 23,2000 \* ’ .. ,“9 ( e 0 ENVIRONMENTAL IMPACT ASSESSMENT FORM - PART I1 (TO BE COMPLETED BY THE PLANNING DEPARTMENT) BACKGROUND CASE NO: PUD 97-03(D) DATE: February 10,2000 1. CASE NAME: Rancho Carrillo Village “G” 2. APPLICANT: Hofinan Planning Associates 3. ADDRESS AND PHONE NUMBER OF APPLICANT: 5900 Pasteur Court, Carlsbad CA 92008 4. DATE EIA FORM PART I SUBMITTED: November 12, 1999 5. PROJECT DESCRIPTION: Architectural review of 39 single familv homes for a Dreviouslv subdivided and graded property with the Rancho Carrillo Master Plan. SUMMARY OF ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED: The summary of environmental factors checked below would be potentially affected by this project, involving at least one impact that is a “Potentially Significant Impact,” or “Potentially Significant Impact Unless Mitigation Incorporated” as indicated by the checklist on the following pages. c] Land Use and Planning [XI TransportationlCirculation c] Public Services 0 Population and Housing [7 Biological Resources 0 Utilities & Service Systems c] Geological Problems Energy & Mineral Resources c] Aesthetics 0 Water Hazards Cultural Resources H Air Quality 0 Noise 0 Recreation 0 Mandatory Findings of Significance 1 Rev. 03/28/96 0 0 DETERMINATION. (To be completed by the Lead Agency) [7 I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared. H I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because the mitigation measures described on an attached sheet have been added to the project. A MITIGATED NEGATIVE DECLARATION will be prepared. 0 I find that the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required. 0 I find that the proposed project MAY have significant effect(s) on the environment, but at least one potentially significant effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. A Negative Declaration is required, but it must analyze only the effects that remain to be addressed. - u I find that although the proposed project could have a significant effect on the environment, there WILL NOT be a significant effect in this case because all potentially significant effects (a) have been analyzed adequately in an earlier Master Environmental Impact Review (MEIR 93-01) and the Ranch Carrillo Master Plan EIR 91-04 pursuant to applicable standards and (b) have been voided or mitigated pursuant to that earlier Master Environmental Review (MEIR 93-01) and Ranch Carrillo Master Plan EIR 91-04, including revisions or mitigation measures that are imposed upon the proposed project. Therefore, a Notice of Prior Compliance has been prepared. Jc+& 2--/6- 00 Planner Signature Date a-/7d Date 2 Rev. 03/28/96 a e ENVIRONMENTAL IMPACTS STATE CEQA GUIDELINES, Chapter 3, Article 5, Section 15063 requires that the City conduct an Environmental Impact Assessment to determine if a project may have a significant effect on the environment. The Environmental Impact Assessment appears in the following pages in the form of a checklist. This checklist identifies any physical, biological and human factors that might be impacted by the proposed project and provides the City with information to use as the basis for deciding whether to prepare an Environmental Impact Report (EIR), Negative Declaration, or to rely on a previously approved EIR or Negative Declaration. A brief explanation is required for all answers except “No Impact” answers that are adequately supported by an information source cited in the parentheses following each question. A “No Impact” answer is adequately supported if the referenced information sources show that the impact simply does not apply to projects like the one involved. A “No Impact” answer should be explained when there is no source document to refer to, or it is based on project-specific factors as well as general standards. 0 “Less Than Significant Impact” applies where there is supporting evidence that the potential impact is not adversely significant, and the impact does not exceed adopted general standards and policies. 0 “Potentially Significant Unless Mitigation Incorporated” applies where the incorporation of mitigation measures has reduced an effect from “Potentially Significant Impact” to a “Less Than Significant Impact.” The developer must agree to the mitigation, and the City must describe the mitigation measures, and briefly explain how they reduce the effect to a less than significant level. 0 “Potentially Significant Impact” is appropriate if there is substantial evidence that an effect is significant. 0 Based on an “EIA-Part 11”, if a proposed project could have a potentially significant effect on the environment, but fl potentially significant effects (a) have been analyzed adequately in an earlier EIR or Mitigated Negative Declaration pursuant to applicable standards and (b) have been avoided or mitigated pursuant to that earlier EIR or Mitigated Negative Declaration, including revisions or mitigation measures that are imposed upon the proposed project, and none of the circumstances requiring a supplement to or supplemental EIR are present and all the mitigation measures required by the prior environmental document have been incorporated into this project, then no additional environmental document is required (Prior Compliance). 0 When “Potentially Significant Impact” is checked the project is not necessarily required to prepare an EIR if the significant effect has been analyzed adequately in an earlier EIR pursuant to applicable standards and the effect will be mitigated, or a “Statement of Overriding Considerations” has been made pursuant to that earlier EIR. 0 A Negative Declaration may be prepared if the City perceives no substantial evidence that the project or any of its aspects may cause a significant effect on the environment. 3 Rev. 03/28/96 a a If there are one or more potentially significant effects, the City may avoid preparing an EIR if there are mitigation measures to clearly reduce impacts to less than significant, and those mitigation measures are agreed to by the developer prior to public review. In this case, the appropriate “Potentially Significant Impact Unless Mitigation Incorporated” may be checked and a Mitigated Negative Declaration may be prepared. An EIR must be prepared if “Potentially Significant Impact” is checked, and including but not limited to the following circumstances: (1) the potentially significant effect has not been discussed or mitigated in an Earlier EIR pursuant to applicable standards, and the developer does not agree to mitigation measures that reduce the impact to less than significant; (2) a “Statement of Overriding Considerations” for the significant impact has not been made pursuant to an earlier EIR; (3) proposed mitigation measures do not reduce the impact to less than significant, or; (4) through the EIA-Part I1 analysis it is not possible to determine the level of significance for a potentially adverse effect, or determine the effectiveness of a mitigation measure in reducing a potentially significant effect to below a level of significance. A discussion of potential impacts and the proposed mitigation measures appears at the end of the form under DISCUSSION OF ENVIRONMENTAL EVALUATION. Particular attention should be given to discussing mitigation for impacts which would otherwise be determined significant. 4 Rev. 03/28/96 0 a Issues (and Supporting Information Sources). I. LAND USE AND PLANNING. Would the proposal:. a) Conflict with general plan designation or zoning? (Source #(s): (#l:Pgs 5.6-1 - 5.6-18, #2 Pg. 122-143) b) Conflict with applicable environmental plans or policies adopted by agencies with jurisdiction over the project? (#l:Pgs 5.6-1 - 5.6-18 #2 Pg. 122-143) c) Be incompatible with existing land use in the vicinity? d) Affect agricultural resources or operations (e.g. impacts to soils or farmlands, or impacts from incompatible land uses? (#l:Pgs 5.6-1 - 5.6-18, #2 Pg. 122-143) e) Disrupt or divide the physical arrangement of an established community (including a low-income or minority community)? (#l:Pgs 5.6-1 - 5.6-18 #2 Pg. 122-143) (#l:PgS 5.6-1 - 5.6-18 #2 Pg. 122-143) Potentially Significant Impact 0 0 0 0 Potentially Significant Unless Mitigation Incorporated 0 0 0 0 11. POPULATION AND HOUSING. Would the proposal: a) Cumulatively exceed official regional or local population projections? (#l:Pgs 5.5-1 - 5.5-6 #2 Pg. 0 0 122-143) b) Induce substantial growth in an area either directly or indirectly (e.g. through projects in an undeveloped area 0 0 or extension of major infrastructure)? (#l:Pgs 5.5-1 - c) Displace existing housing, especially affordable housing? (#l:Pgs 5.5-1 - 5.5-6 #2 Pg. 122-143) 0 0 5.5-6 #2 Pg. 122-143) 111. GEOLOGIC PROBLEMS. Would the proposal result in or expose people to potential impacts involving: a) Fault rupture? (#l:Pgs 5.1-1 - 5.1-15, #2 Pgs 102-111) b) Seismic ground shaking? (#l:Pgs 5.1-1 - 5.1-15, #2 Pgs c) Seismic ground failure, including liquefaction? (#l:Pgs d) Seiche, tsunami, or volcanic hazard? (#l:Pgs 5.1-1 - e) Landslides or mudflows? (#l:Pgs 5.1-1 - 5.1-15, #2 f) Erosion, changes in topography or unstable soil conditions from excavation, grading, or fill? (#l:Pgs g) Subsidence of the land? (#l:Pgs 5.1-1 - 5.1-15, #2 Pgs h) Expansive soils? (#l:Pgs 5.1-1 - 5.1-15, #2 Pgs 102- i) Unique geologic or physical features? (#1 :Pgs 5.1-1 - 102-1 11) 5.1-1 - 5.1.15, #2 PgS 102-1 11) 5.1-15, #2 Pgs 102-1 11) Pgs 102-1 11) 5.1-1 - 5.1-15, #2Pg~ 102-111) 102-1 11) 111) 5.1-15, #2 PgS 102-1 11) 0 0 0 0 0 0 0 0 0 0 0 0 0 I7 0 0 IV. WATER. Would the proposal result in: a) Changes in absorption rates, drainage patterns, or the rate and amount of surface runoff! (#l:Pgs 5.2-1 - 5..2- 11, #2 Pgs 95-101) 0 0 5 Less Than No Significant Impact Impact OH 0151 0151 UIXI UEI UH ow ow OH ow UH om OB OH om ow OH otxl Rev. 03/28/96 0 Issues (and Supporting Information Sources). Potentially Significant Impact b) Exposure of people or property to water related hazards such as flooding? (#l:Pgs 5.2-1 - 5..2-11, #2 Pgs 95- c) Discharge into surface waters or other alteration of surface water quality (e.g. temperature, dissolved oxygen or turbidity)? (#l:Pgs 5.2-1 - 5..2-11, #2 Pgs 95-101) d) Changes in the amount of surface water in any water e) Changes in currents, or the course or direction of water movements? (#l:Pgs 5.2-1 - 5..2-11, #2 Pgs 95-101) f) Changes in the quantity of ground waters, either through direct additions or withdrawals, or through interception of an aquifer by cuts or excavations or through substantial loss of groundwater recharge capability? (#l:Pgs 5.2-1 - 5..2-11, #2 Pgs 95-101) g) Altered direction or rate of flow of groundwater? h) Impacts to groundwater quality? (#l:Pgs 5.2-1 - 5..2- i) Substantial reduction in the amount of groundwater otherwise available for public water supplies? (#l:Pgs 101) body? (#l:Pgs 5.2-1 - 5..2-11, #2 PgS 95-101) (#l:PgS 5.2-1 - 5..2-11, #2 PgS 95-101) 11, #2 Pgs 95-101) 5.2-1 - 5..2-11, #2 Pgs 95-101) 0 0 0 0 0 0 0 0 V. AIR QUALITY. Would the proposal: a) Violate any air quality standard or contribute to an existing or projected air quality violation? (#l:Pgs 5.3- Ixl 1 - 5.3-12, #2 Pgs 112-121) b) Expose sensitive receptors to pollutants? (#l:Pgs 5.3-1 c) Alter air movement, moisture, or temperature, or cause - 5.3-12, #2 PgS 112-121) 0 any change in climate? (#l:Pgs 5.3-1 - 5.3-12, #2 Pgs 0 112-121) d) Create objectionable odors? (#l:Pgs 5.3-1 - 5.3-12, #2 Pgs 112-121) 0 VI. TRANSPORTATION/CIRCULATION. Would the a) Increased vehicle trips or traffic congestion? (#l:Pgs b) Hazards to safety from design features (e.g. sharp curves or dangerous intersections) or incompatible uses (e.g. farm equipment)? (#l:Pgs 5.7-1 - 5.7.22, #2 Pgs c) Inadequate emergency access or access to nearby uses? d) Insufficient parking capacity on-site or off-site? e) Hazards or barriers for pedestrians or bicyclists? f) Conflicts with adopted policies supporting alternative transportation (e.g. bus turnouts, bicycle racks)? g) Rail, waterborne or air traffic impacts? (#l:Pgs 5.7-1 - proposal result in: 5.7-1 - 5.7.22, #2 Pgs 164-188, #3) 164-188) (#l:PgS 5.7-1 - 5.7.22, #2 PgS 164-188) (#l:PgS 5.7-1 - 5.7.22, #2 PgS 164-188) (#l:PgS 5.7-1 - 5.7.22, #2 PgS 164-188) (#l:PgS 5.7-1 - 5.7.22, #2 PgS 164-188) 5.7.22, #2 Pgs 164-188) Ixl 0 0 0 0 0 0 6 e Potentially Significant Unless Mitigation Incorporated 0 0 0 0 0 0 0 17 El I7 0 0 0 0 Less Than No Significant Impact Impact ow om om urn OH ow ow DEI no ow OH ow no OH ow OH OH OBI ow Rev. 03/28/96 0 0 Issues (and Supporting Information Sources). Potentially Potentially Less Than No Significant Significant Significant Impact Impact Unless Impact Mitigation Incorporated VII. BIOLOGICAL RESOURCES. Would the proposal result in impacts to: a) Endangered, threatened or rare species or their habitats (including but not limited to plants, fish, insects, animals, and birds? (#l:Pgs 5.4-1 - 5.4-24, #2 Pgs 54- b) Locally designated species (e.g. heritage trees)? c) Locally designated natural communities (e.g. oak forest, coastal habitat, etc.)? (#l:Pgs 5.4-1 - 5.4-24, #2 d) Wetland habitat (e.g. marsh, riparian and vernal pool)? e) Wildlife dispersal or migration corridors? (#l:Pgs 5.4-1 0 0 OBI 0 0 UEI 0 0 OBI OB 0 OIXI 81) (#l:PgS 5.4-1 - 5.4-24, #2 Pgs 54-81) Pgs 54-81) (#l:PgS 5.4-1 - 5.4-24, #2 Pgs 54-81) - 5.4-24, #2 Pgs 54-8 1) VIII. ENERGY AND MINERAL RESOURCES. Would the prouosal? a) Conflict with adopted energy conservation plans? b) Use non-renewable resources in a wasteful and inefficient manner? (#l:Pgs 5.12.1-1 -5.12.1-5 & 5.13- " (#l:PgS 5.12.1-1 - 5.12.1-5 & 5.13-1 - 5.13-9) 0 I7 am 0 0 UKI 1 - 5.13-9) c) Result in 'the loss of availability of a known mineral resource that would be of future value to the region and the residents of the State? (#l:Pgs 5.12.1-1 - 5.12.1-5 & 5.13-1 - 5.13-9) 0 0 OB IX. HAZARDS. Would the proposal involve: a) A risk of accidental explosion or release of hazardous substances (including, but not limited to: oil, pesticides, chemicals or radiation)? (#l:Pgs 5.10.1-1 - 5.10.1-5, #2 Pgs 126) b) Possible interference with an emergency response plan or emergency evacuation plan? (#l:Pgs 5.10.1-1 - c) The creation of any health hazard or potential health hazards? (#l:Pgs 5.10.1-1 - 5.10.1-5) d) Exposure of people to existing sources of potential health hazards? (#l:Pgs 5.10.1-1 - 5.10.1-5, #2 Pgs 47) e) Increase fire hazard in areas with flammable brush, grass, or trees? (#l:Pgs 5.10.1-1 - 5.10.1-5) 0 0 0 0 0 5.10.1-5, #2 Pgs 218) 0 OKI 0 OBI UIXI 0 OH n[xI X. NOISE. Would the proposal result in: a) Increases in existing noise levels? (#l:Pgs 5.9-1 - 5.9- b) Exposure of people to severe noise levels? (#l:Pgs 5.9- 15, #2 Pgs 189-207) 0 0 ON 0 UIXI 1 - 5.9-15, #2 Pgs 189-207) XI. PUBLIC SERVICES. Would the proposal have an effect upon, or result in a need for new or altered government services in any of the following areas: 7 Rev. 03/28/96 e Issues (and Supporting Information Sources). Potentially Significant Impact a) Fire protection? (#l:Pgs 5.12.5-1 - 5.12.5-6, #2 Pgs b) Police protection? (#l:Pgs 5.12.6-1 - 5.12.6-4, #2 Pgs 208-221) o 208-221) 0 PgS 5.12.1-1 - 5.12.8-7, #2 PgS 208-221) B 5.12.8-7, #2 PgS 208-221) 0 C) Schools? (#l:PgS 5.12.7.1 - 5.12.7-5, #2 PgS 208-221) d) Maintenance of public facilities, including roads? (1, e) Other governmental services? (#l:Pgs 5.12.1-1 - XII.UTILITIES AND SERVICES SYSTEMS. Would the proposal result in a need for new systems or supplies, or substantial alterations to the following utilities: a) Power or natural gas? (#l:Pgs 5.12.1-1 - 5.12.1-5 & b) Communications systems? (#l; Pgs 5.12.1-1 - 5.12.8-7, #2 Pgs 208-221) c) Local or regional water treatment or distribution facilities? (#l:Pgs 5.12.2-1 - 5.12.3-7, #2 Pgs 208-221) d) Sewer or septic tanks? (#l:Pgs 5.12.3-1 - 5.12.3-7, #2 Pgs 208-221) e) Storm water drainage? (#l:Pg 5.2-8, #2 Pgs 208-221) f) Solid waste disposal? (#l:Pgs 5.12.4-1 - 5.12.4-3, #2 g) Local or regional water supplies? (#l:Pgs 5.12.2-1 - 5.13-1 - 5.13-9, #2 PgS 208-221) PgS 222-224) 5.12.3-7, #2 Pgs 219) 0 0 0 0 0 0 0 XIII. AESTHETICS. Would the proposal: a) Affect a scenic or vista or scenic highway? (#l:Pgs b) Have a demonstrate negative aesthetic effect? (#l:Pgs c) Create light or glare? (#l:Pgs 5.11-1 - 5.11-5, #2 Pgs 5.1 1-1 - 5.11-5, #2 PgS 145-163) 5.11-1 - 5.11-5, #2 PgS 145-163) 0 145- 163) 0 0 XIV. CULTURAL RESOURCES. Would the proposal: a) Disturb paleontological resources? (#l:Pgs 5.8-1 - 5.8- b) Disturb archaeological resources? (#l:Pgs 5.8-1 - 5.8- c) Affect historical resources? (#l:Pgs 5.8-1 - 5.8-10, #2 d) Have the potential to cause a physical change which would affect unique ethnic cultural values? (#l:Pgs 5.8-1 - 5.8-10, #2 Pg 82-93) e) Restrict existing religious or sacred uses within the potential impact area? (#l:Pgs 5.8-1 - 5.8-10, #2 Pg 10, #2 Pg 93,94) 10, #2 Pg 82-93) Pg 82-93) 82-93) 0 0 0 0 I7 XV.RECFG3ATIONAL. Would the proposal: a) Increase the demand for neighborhood or regional parks or other recreational facilities? (#l:Pgs 5.12.8-1 - 0 5.12.8-7, #2 PgS 210) 8 e Potentially Significant Unless Mitigation Incorporated 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I7 0 0 0 0 0 0 Less Than No Significant Impact Impact OBI om urn OB om om om OBI OB om nEl om om OH OB OB om om om OB om Rev. 03/28/96 a 0 Issues (and Supporting Information Sources). Potentially Potentially Significant Significant Impact Unless Mitigation Incorporated b) Affect existing recreational opportunities? (#1 :Pgs 5.12.8-1 - 5.12.8-7, #2 Pgs 210) 0 XVI. MANDATORY FINDINGS OF SIGNIFICANCE. a) Does the project have the potential to degrade the quality of the environment, substantially reduce the 0 habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? b) Does the project have impacts that are individually limited, but cumulatively considerable? 0 17 (“Cumulatively considerable” means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects)? c) Does the project have environmental effects which will cause the substantial adverse effects on human beings, 0 0 either directly or indirectly? Less Than No Significant Impact Impact OB ON UIXI ow 9 Rev. 03/28/96 a 0 XVII. EARLIER ANALYSES. Referenced in the above checklist are the earlier environmental analysis that have been conducted for the project site. Source #1 is the Master Environmental Impact Report for the City’s General Plan Update (GPA 94-01) and related Master Environmental Impact Report (MEIR 93-01) which reviewed the potential impacts of buildout of the City’s General Plan, including transportation and air quality impacts. Source #2 is the Environmental Impact Report for the Rancho Carrillo Master Plan (EIR 91 -04) for MP 139(F) certified on July 27, 1993, analyzed all the potential impacts for the development and occupation of the over 1800 unit residential master plan. 10 Rev. 03128196 0 0 DISCUSSION OF ENVIRONMENTAL EVALUATION I. PROJECT DESCRIPTION/ENVIRONMENTAL SETTING This project is for the architectural review of 39 single-family homes within a pre-graded subdivision located in Village "G" of the Ranch Carrillo Master Plan. The area is located on 18.3 acres south of Palomar Airport Road, east of Melrose Drive, and east of Cawillo Way. 11 Rev. 03128196 0 0 11. ENVIRONMENTAL ANALYSIS B. Environmental Impact Discussion Air Quality The implementation of subsequent projects that are consistent with and included in the updated 1994 General Plan will result in increased gas and electric power consumption and vehicle miles traveled. These subsequently result in increases in the emission of carbon monoxide, reactive organic gases, oxides of nitrogen and sulfur, and suspended particulates. These aerosols are the major contributors to air pollution in the City as well as in the San Diego Air Basin. Since the San Diego Air Basin is a “non-attainment basin”, any additional air emissions are considered cumulatively significant: therefore, continued development to buildout as proposed in the updated General Plan will have cumulative significant impacts on the air quality of the region. To lessen or minimize the impact on air quality associated with General Plan buildout, a variety of mitigation measures are recommended in the Final Master EIR. These include: 1) provisions for roadway and intersection improvements prior to or concurrent with development; 2) measures to reduce vehicle trips through the implementation of Congestion and Transportation Demand Management; 3) provisions to encourage alternative modes of transportation including mass transit services; 4) conditions to promote energy efficient building and site design; and 5) participation in regional growth management strategies when adopted. The applicable and appropriate General Plan air quality mitigation measures have either been incorporated into the design of the project or are included as conditions of project approval. Operation-related emissions are considered cumulatively significant because the project is located within a “non-attainment basin”, therefore, the “Initial Study” checklist is marked “Potentially Significant Impact”. This project is consistent with the General Plan, therefore, the preparation of an EIR is not required because the certification of Final Master EIR 93-01, by City Council Resolution No. 94-246, included a “Statement Of Overriding Considerations’’ for air quality impacts. This “Statement Of Overriding Considerations” applies to all subsequent projects covered by the General Plan’s Final Master EIR, including this project, therefore, no further environmental review of air quality impacts is required. This document is available at the Planning Department. TransportatiodCirculation The implementation of subsequent projects that are consistent with and included in the updated 1994 General Plan will result in increased traffic volumes. Roadway segments will be adequate to accommodate buildout traffic; however, 12 full and 2 partial intersections will be severely impacted by regional through-traffic over which the City has no jurisdictional control. These generally include all freeway interchange areas and major intersections along Carlsbad Boulevard. Even with the implementation of roadway improvements, a number of intersections are projected to fail the City’s adopted Growth Management performance standards at buildout. To lessen or minimize the impact on circulation associated with General Plan buildout, numerous mitigation measures have been recommended in the Final Master EIR. These include measures to ensure the provision of circulation facilities concurrent with need; 2) provisions to develop alternative modes of transportation such as trails, bicycle routes, additional sidewalks, pedestrian linkages, and commuter rail systems; and 3) participation in regional circulation strategies when 12 Rev. 03/28/96 0 0 adopted. The diversion of regional through-traffic from a failing Interstate or State Highway onto City streets creates impacts that are not within the jurisdiction of the City to control. The applicable and appropriate General Plan circulation mitigation measures have either been incorporated into the design of the project or are included as conditions of project approval. Regional related circulation impacts are considered cumulatively significant because of the failure of intersections at buildout of the General Plan due to regional through-traffic, therefore, the “Initial Study” checklist is marked “Potentially Significant Impact”. This project is consistent with the General Plan, therefore, the preparation of an EIR is not required because the recent certification of Final Master EIR 93-01, by City Council Resolution No. 94-246, included a “Statement Of Overriding Considerations” for circulation impacts. This “Statement Of Overriding Considerations” applies to all subsequent projects covered by the General Plan’s Master EIR, including this project, therefore, no further environmental review of circulation impacts is required. The City has received its annual Growth Management Traffic Monitoring Report. The Report has recorded an unanticipated intersection “level of service” (LOS) failure at Palomar Airport Road (PAR) and El Camino Real (ECR) during both the a.m. and p.m. peak hours. This potentially creates a changed circumstance negating reliance on previous environmental documentation. Pursuant to $15162 of the CEQA Guidelines a lead agency must prepare a “Subsequent” environmental documentation if substantial evidence (i.e., the recorded intersection failure) determines that a changed circumstance exists. However, case law has interpreted this section of the CEQA Guidelines to not require the preparation of a “Subsequent EIR” if mitigation measures are adopted which reduce the identified impacts to a level of insignificance. A mitigation measure has been identified which, if implemented, will bring the peak hours LOS into the acceptable range. The mitigation measure involves construction of two dual right turn lanes-northbound to eastbound and westbound to northbound. This project has been conditioned to pay its fair share of the intersection “short-term improvements”, thereby guaranteeing mitigation to a level of insignificance. 13 Rev. 03/28/96 0 e 111. EARLIER ANALYSES USED The following documents were used in the analysis of this project and are on file in the City of Carlsbad Planning Department located at 1635 Faraday Avenue, Carlsbad, California, 92008, (760) 602-4613. 1, Final Master Environmental ImDact Report for the City of Carlsbad General Plan Update (MEIR 93-01), dated March 1994, City of Carlsbad Planning Department. 2. Final Environmental Impact Report for the Rancho Canillo Master Plan and General Plan Amendment (EIR 91-04), dated February 8, 1993, City of Carlsbad Planning Department. 3. 1998 Traffic Monitoring Report for the City of Carlsbad, Valley Research and Planning Associates. 14 Rev. 03/28/96 e e LIST OF MITIGATING MEASURES The Developer shall pay their fair share for the “short-tern improvements” to the El Camino Real/ Palomar Airport Road intersection prior to the issuance of a building permit. The amount shall be determined by the methodology ultimately selected by Council, including but not limited to, an increase in the city-wide traffic impact fee; an increased or new Zone 18 LFMP fee; the creation of a fee or assessment district; or incorporation into a Mello-Roos taxing district. ATTACH MITIGATION MONITORING PROGRAM See Attached 15 Rev. 03128196 e 0 APPLICANT CONCURRENCE WITH MITIGATION MEASURES THIS IS TO CERTIFY THAT I HAVE REVIEWED THE ABOVE MITIGATING MEASURES AND CONCUR WITH THE ADDITION OF THESE MEASURES TO THE PROJECT. .n Date $/\\ 16~ .\ 16 Rev. 03/28/96 ENVIRONMENTAL MlTl a ION MONITORING CHECKLIST: cea ge I of 1 7 0 0 E8 ?? Q, 2, nm m I- 22 2: w mi zn 3 z6 En ww -Iz W 2 0 != 2 c3 W c3 4 i i s 0 -I PC 0 I 0 3 ii+ w za an ~a 5E 21 0> wo oin aa $%a .P+ E mc-c) .- +ma, m I c+ -00 -00 a, .- + SQ ES $ ,o .o Q $2a, 8 €25 " c '3 PO .v, .o, g 5 .= E LEF P 3 '5 922 250 a .v, ,o m2 E ptn 'E u "A - a, -= c ru 0 n$ 0 .P a, a? m 5 ms ,o%? .- a, ? WQm + 56 b 02 ga g oE .r $ a, a,5g & .o .- 3%- . m.P5g- 5.GSZ 3% sz E 2.2 c .G $ 3 + Q.= s m -0- Q+ .s a+ L. hY c - .- 000 .- e+ am a,-ucu ~2 Q.P 0 E5 .=moa, m3 m om .= m a,- sa, E5a0 - m-c)g 5 Qtn c2 €%E3 'c3Z -$EO s s mK a, g E.2 -3 a,%& - _o -g .PO pG.=03 'E E ;;; 2 s.v,= .- $.E m z Oam m.5 c -c) - KSo3 FESZ v) m 2 5 E - c 0 .- c 8" .- s ka) $E >32 " E. C !=C Ov) $? a - anE -5 .E Q 0-l Cgm E E 9r .- E$ LLFE 2 P-0-l m .- S .t: .- c 2 E - e m .F .s' 5+ r L?Q c OE-a, -0FLS = W-E! m a,c 011" Az-1.g &sE,.& a, 'j SL'iS 3 g)"? s .- m u4 bw yz E EgCo 55 5 a,-+ g &g z "- EO m c eQgq a, v) 5% 2 6.6 m pga %+ s 0 c $.; a, s ZL 8 -~oSO-u .- --N m,m g y" L. !IF52 g $j L v) v)u-l.g 0)r 0 m II 0 8 - >5c+.smya, g m 003 ."o--E! .- CI e,o-= 02 a, (rjz is z=v)v)rmm $W2k&2 gom c+ v) 52 L ;z$g" s g,o % E.t: $+ 3o',.E.G :;; a, >smms a, L 05 r2.E 53s > QfY -"g"" a, F n-5 0 r o ~55 g a,€ s E.?$$& mb eGo t-sa EO ~-2.Es.s +mdpa.~ag L- .f > 5 .G e 2 - .- -- +o v) e .- g r 0 QmZs 2 L a,q .- - 40-l k 5 UL 92 58 0 - E$ $5 gz $ E Ed F .- q C a, v) .= mm = .cs, 0 25- caO P-0 v) mo 0 .= c 3 Earn s-z a,s 0, s: v) II .- 6 0-$ 63L E E gS 222 == $2; .E ." -&$ E a, % .- >K $E g+p L - l% 5 3 0 ._ Q 0) m C .- 8 I .- C E L e P a v) C 0 Q v) - $? 5 ._ i: ;5 : C a cs) - 5 0- ' ..SE ' In oy @ *e .r a, m : c 6g2 2 5 'I. c mg,ng : 0 5 gg Y- " 0 .O '9 mz - ). 1::; 5 a, II .? 6 i w~2 i