HomeMy WebLinkAbout2001-04-04; Planning Commission; Resolution 49291
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
PLANNING COMMISSION RESOLUTION NO. 4929
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF CARLSBAD, CALIFORNIA, APPROVING A
CONDITIONAL USE PERMIT CUP 00-32 TO ALLOW THE
INSTALLATION OF A MONO-PALM WITH TWELVE
ANTENNAS AND AN ASSOCIATED 200 SQUARE FOOT
EQUIPMENT BUILDING ON PROPERTY GENERALLY
LOCATED AT 4901 EL CAMINO REAL IN LOCAL
FACILITIES MANAGEMENT ZONE 1.
CASE NAME: TAMARACK WIRELESS
CASE NO.: CUP 00-32
WHEREAS, Nextel Communications, “Developer”, has filed a verified
application with the City of Carlsbad regarding property owned by Jay Franklin Hoffman and
Maryon Dooley Hoffman, “Owner”, described as
Parcel 1 of Parcel Map 34.51, in the City of Carlsbad, County
of San Diego, State of California, filed January 31, 1975, in the
Office of the County Recorder of San Diego County, and that
portion of Parcels 2 and 3 of Parcel Map No. 3451 in the City
of Carlsbad, County of San Diego, State of California, as
shown on Parcel Map filed on page 3451 of Parcel Maps on
January 31,1975, under file No. 75-023997
(“the Property”); and
WHEREAS, said verified application constitutes a request for a Conditional Use
Permit as shown on Exhibits “A” - “E” dated April 4, 2001, on file in the Carlsbad Planning
Department, TAMARACK WIRELESS - CUP 00-32, as provided by Chapter 21.42 and 21.50
of the Carlsbad Municipal Code; and
WHEREAS, the Planning Commission did, on the 4th day of April 2001, hold a
duly noticed public hearing as prescribed by law to consider said request; and
WHEREAS, at said public hearing, upon hearing and considering all testimony
and arguments, if any, of all persons desiring to be heard, said Commission considered all factors
relating to the CUP.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning
Commission of the City of Carlsbad as follows:
A) That the foregoing recitations are true and correct.
B) That based on the evidence presented at the public hearing, the Commission
APPROVES TAMARACK WIRELESS - CUP 00-32, based on the following
findings and subject to the following conditions:
Findinus:
1. That the requested use is necessary or desirable for the development of the community, is
essentially in harmony with the various elements and objectives of the General Plan, and
is not detrimental to existing uses specifically permitted in the zone in which the
proposed use is located, in that the proposed use benefits the community because of
! the demand for mobile voice and data transmissions and the site’s residential-
agricultural and commercial land use designations do not preclude the provision of
quasi-public utility uses.
2. That the site for the intended use is adequate in size and shape to accommodate the use, in
that the project meets all City standards and policies without the need for a variance
from standards.
3. That all the yards, setbacks, walls, fences, landscaping, and other features necessary to
adjust the requested use to existing or permitted future uses in the neighborhood will be
provided and maintained, in that no adjustments are necessary to allow the proposal to
be located within the project boundaries. To minimize potential visual impacts
created by the project, the project has been designed as a mono-palm and will be
surrounded by mature palm trees of varying heights which will aid in creating a
.natural appearance when viewed from El Camino Real and the equipment building
will be designed to match the existing shopping center. A 30 foot radius open space
easement will be provided around the base of the pole to protect the safety of future
residents and homes in the event of structural failure of the mono-palm due to an
unforeseen natural disaster.
4. That the street system serving the proposed use is adequate to properly handle all traffic
generated by the proposed use, in that the proposed use would not generate additional
vehicle trips beyond that necessary for regular maintenance.
5. The Planning Commission finds that the project, as conditioned herein, is in
conformance with the City’s General Plan, based on the facts set forth in the staff report
dated April 4, 2001 and recognizing that telecommunications are an integral part of
the built environment defined by the General Plan and that telecommunications
facilities are necessary and essential for the provision of the service.
6. The Planning Commission has reviewed each of the exactions imposed on the Developer
contained in this resolution, and hereby finds, in this case, that the exactions are imposed
PC RESO NO. 4929 -2-
1
2
1
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
to mitigate impacts caused by or reasonably related to the project, and the extent and the
degree of the exaction is in rough proportionality to the impact caused by the project.
Conditions:
Note:
1.
2.
3.
4.
5.
6.
Unless otherwise specified herein, all conditions shall be satisfied prior to issuance of a
building permit.
If any of the following conditions fail to occur; or if they are, by their terms, to be
implemented and maintained over time, if any of such conditions fail to be so
implemented and maintained according to their terms, the City shall have the right to
revoke or modify all approvals herein granted; deny or further condition issuance of all
future building permits; deny, revoke or further condition all certificates of occupancy
issued under the authority of approvals herein granted; institute and prosecute litigation to
compel their compliance with said conditions or seek damages for their violation. No
vested rights are gained by Developer or a successor in interest by the City’s approval of
this Conditional Use Permit.
Staff is authorized and directed to make, or require the Developer to make, all corrections
and modifications to the Conditional Use Permit documents, as necessary to make them
internally consistent and in conformity with the final action on the project. Development
shall occur substantially as shown on the approved Exhibits. Any proposed development
different from this approval, shall require an amendment to this approval.
The Developer shall comply with all applicable provisions of federal, state, and local
laws and regulations in effect at the time of building permit issuance.
If any condition for construction of any public improvements or facilities, or the payment
of any fees in-lieu thereof, imposed by this approval or imposed by law on this Project
are challenged, this approval shall be suspended as provided in Government Code Section
66020. If any such condition is determined to be invalid this approval shall be invalid
unless the City Council determines that the project without the condition complies with
all requirements of law.
The Developer shall implement, or cause the implementation of, the Tamarack Wireless
- CUP 00-32/SUP 00-ll/CUP 00-58 Project Mitigation Monitoring and Reporting
Program.
The Developer/Operator shall and does hereby agree to indemnify, protect, defend and
hold harmless the City of Carlsbad, its Council members, officers, employees, agents, and
representatives, from and against any and all liabilities, losses, damages, demands, claims
and costs, including court costs and attorney’s fees incurred by the City arising, directly
or indirectly. from (a) City’s approval and issuance of this Conditional Use Permit, (b)
City’s approval or issuance of any permit or action, whether discretionary or non-
discretionary, in connection with the use contemplated herein, and (c)
Developer/Operator’s installation and operation of the facility permitted hereby,
including without limitation, any and all liabilities arising from the emission by the
facility of electromagnetic fields or other energy waves or emissions. This obligation
PC RESO NO. 4929 -3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
7.
8.
9.
10.
11.
12.
13.
14.
1s.
survives until all legal proceedings have been concluded and continues even if the City’s
approval is not validated.
The Developer shall submit to’ the Planning Department a reproducible 24” x 36”,
mylar copy of the Site Plan reflecting the conditions approved by the final decision
making body.
The Developer shall include, as part of the plans submitted for any permit plan check, a
reduced legible version of all approving resolution(s) in a 24” x 36” blueline drawing
format (including any applicable Coastal Commission approvals).
Developer shall provide proof to the Director from the Carlsbad Unified School District
that this project has satisfied its obligation to provide school facilities.
This project shall comply with all conditions and mitigation measures which are required
as part of the Zone 1 Local Facilities Management Plan and any amendments made to
that Plan prior to the issuance of building permits, including, but not limited to the
following:
This approval is granted subject to the approval of the Mitigated Negative Declaration
and Mitigation Monitoring and Reporting Program, SUP 00-11 and CDP 00-58 and
is subject to all conditions contained in Resolutions No. 4928, 4930, and 4931 for those
other approvals.
This approval shall become null and void if building permits are not issued for this
project within 24 months from the date of project approval.
Building permits will not be issued for this project unless the local agency providing
water and sewer services to the project provides written certification to the City that
adequate water service and sewer facilities, respectively, are available to the project at the
time of the application for the building permit, and that water and sewer capacity and
facilities will continue to be available until the time of occupancy.
This Conditional Use Permit shall be reviewed by the Planning Director on a yearly basis
to determine if all conditions of this permit have been met and that the use does not have
a substantial negative effect on surrounding properties or the public health and welfare. If
the Planning Director determines that the use has such substantial negative effects, the
Planning Director shall recommend that the Planning Commission, after providing the
permittee the opportunity to be heard, add additional conditions to reduce or eliminate the
substantial negative effects.
This Conditional Use Permit is granted for a period of five (5) years from April 4,200l
through April 4,2006. This permit may be revoked at any time after a public hearing, if
it is found that the use has a substantial detrimental effect on surrounding land uses and
the public’s health and welfare, or the conditions imposed herein have not been met. This
permit may be extended for a reasonable period of time not to exceed five (5) years upon
written application of the permittee made no less than 90 days prior to the expiration
date. The Planning Commission may not grant such extension, unless it finds that there
are no substantial negative effects on surrounding land uses or the public’s health and
PC RESO NO. 4929 -4.
1
2
3
4
5
6
I
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
16.
17.
18.
19.
welfare. If a substantial negative effect on surrounding land uses or the public’s health
and welfare is found, the extension shall be denied or granted with conditions which will
eliminate or substantially reduce such effects. There is no limit to the number of
extensions the Planning Commission may grant.
The Developer/Operator shall comply with ANSI/IEEE standards for EMF emissions.
Within six (6) months after the issuance of occupancy, the Developer/Operator shall
submit a project implementation report which provides cumulative field measurements of
radio frequency (EMF) power densities of all antennas installed at the subject site. The
report shall quantify the EMF emissions and compare the results with currently accepted
ANSIiIEEE standards. Said report shall be subject to review and approval by the
Planning Director for consistency with the Project’s preliminary proposal report and the
accepted ANSI/IEEE standards. If on review, the City finds that the Project does not
meet ANSVIEEE standards, the City may revoke or modify this conditional use permit.
The Developer shall submit and obtain Planning Director approval of a Final Landscape
and Irrigation Plan showing conformance with the approved Preliminary Landscape Plan
and the City’s Landscape Manual. The Developer shall construct and install all
landscaping as shown on the approved Final Plans, and maintain all landscaping in a
healthy and thriving condition, free from weeds, trash, and debris.
The first submittal of Final Landscape and Irrigation Plans shall be pursuant to the
landscape plan check process on file in the Planning Department and accompanied by the
project’s building, improvement, and grading plans.
Developer shall submit to the City a Notice of Restriction to be filed in the office of the
County Recorder, subject to the satisfaction of the Planning Director, notifying all
interested parties and successors in interest that the City of Carlsbad has issued a(n)
Conditional Use Permit, Special Use Permit, and Coastal Development Permit by
Resolution(s) No. 4928, 4930, and 4931 on the real property owned by the Developer.
Said Notice of Restriction shall note the property description, location of the tile
containing complete project details and all conditions of approval as well as any
conditions or restrictions specified for inclusion in the Notice of Restriction. The
Planning Director has the authority to execute and record an amendment to the notice
which modifies or terminates said notice upon a showing of good cause by the Developer
or successor in interest.
Code Reminders:
20. Developer shall pay the citywide Public Facilities Fee imposed by City Council Policy
#17, the License Tax on new construction imposed by Carlsbad Municipal Code Section
5.09.030, and CFD #l special tax (if applicable), subject to any credits authorized by
Carlsbad Municipal Code Section 5.09.040. Developer shall also pay any applicable
Local Facilities Management Plan fee for Zone 1 pursuant to Chapter 21.90. All such
taxes/fees shalt be paid at issuance of building permit. If the taxes/fees are not paid, this
approval will not be consistent with the General Plan and shall become void.
21. Developer shall pay a landscape plan check and inspection fee as required by Section
20.08.050 of the Carlsbad Municipal Code.
PC RESO NO. 4929 -5-
1
2
3
4
5
6
I
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
I .-
22. Approval of this request shall not excuse compliance with all applicable sections of the
Zoning Ordinance and all other applicable City ordinances in effect at time of building
permit issuance, except as otherwise specifically provided herein.
NOTICE
Please take NOTICE that approval of your project includes the “imposition” of fees,
dedications, reservations, or other exactions hereafter collectively referred to for convenience as
“fees/exactions.”
You have 90 days from date of final approval to protest imposition of these fees/exactions. If
you protest them, you must follow the protest procedure set forth in Government Code Section
66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely
follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or
annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions
DOES NOT APPLY to water and sewer connection fees and capacity charges, nor planning,
zoning, grading or other similar application processing or service fees in connection with this
project; NOR DOES IT APPLY to any fees/exactions of which you have previously been given
a NOTICE similar to this, or as to which the statute of limitations has previously otherwise
expired.
PC RESO NO. 4929 -6.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a regular meeting of the Planning
Commission of the City of Carlsbad, California, held on the 4th day of April 2001 by the
following vote, to wit:
AYES: Chairperson Segall, Commissioners Baker, Compas, Heineman,
L’Heureux, Nielsen, and Trigas
NOES:
ABSENT:
ABSTAIN:
ATTEST:
MICHAEL J.tiL&&LLER
Planning Director
PC RESO NO. 4929