HomeMy WebLinkAbout2001-06-20; Planning Commission; Resolution 49871
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PLANNING COMMISSION RESOLUTION NO. 4987
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF CARLSBAD, CALIFORNIA, RECOMMENDING
ADOPTION OF A NEGATIVE DECLARATION FOR A ZONE
CHANGE, FROM L-C TO R-1-7,500-Q, LOCAL COASTAL
PROGRAM AMENDMENT, AND A COASTAL
DEVELOPMENT PERMIT FOR A MINOR SUBDIVISION ON
PROPERTY GENERALLY LOCATED ON THE WEST SIDE OF
BLACK RAIL ROAD, SOUTH OF POINSETTIA LANE AND
NORTH OF AVIARA PARKWAY IN LOCAL FACILITIES
MANAGEMENT ZONE 20.
CASE NAME: LYNN PARCEL MAP
CASE NO.: ZC 0 l -03/LCPA Ol -04/CDP 0 l-07
WHEREAS, William R. Lynn and Candace C. Lynn, “Developer and
“Owner,” has filed a verified application with the City of Carlsbad regarding property described
as
That portion of the south half of the northeast quarter of the
southeast quarter of Section 22, Township 12 south, Range 4
west, San Bernardino Meridian, in the City of Carlsbad,
County of San Diego, State of California, according to the
official plat thereof
(“the Property”); and
WHEREAS, a Negative Declaration was prepared in conjunction with said
project; and
WHEREAS, the Planning Commission did on the 20th day of June 2001, hold a
duly noticed public hearing as prescribed by law to consider said request; and
WHEREAS, at said public hearing, upon hearing and considering all testimony
and arguments, examining the initial study, analyzing the information submitted by staff, and
considering any written comments received, the Planning Commission considered all factors
relating to the Negative Declaration.
NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning
Commission as follows:
A) That the foregoing recitations are true and correct.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
B) That based on the evidence presented at the public hearing, the Planning
Commission hereby RECOMMENDS ADOPTION of the Negative Declaration
according to Exhibit “ND” dated April 4, 2001, and “PII” dated March 28,2001,
attached hereto and made a part hereof, based on the following findings:
Findims:
1. The Planning Commission of the City of Carlsbad does hereby find:
A. It has reviewed, analyzed and considered Negative Declaration ZC Ol-03/LCPA
Ol-04KDP 01-07 the environmental impacts therein identified for this project
and any comments thereon prior to RECOMMENDING APPROVAL OF the
project; and
B. The Negative Declaration has been prepared in accordance with requirements of
the California Environmental Quality Act, the State Guidelines and the
Environmental Protection Procedures of the City of Carlsbad; and
C. It reflects the independent judgment of the Planning Commission of the City of
Carlsbad; and
D. Based on the EIA Part II and comments thereon, there is no substantial evidence
the project will have a significant effect on the environment.
. . .
. . .
. . .
. . .
. . .
. . .
. . .
. . .
. . .
. . .
. . .
. . .
. . .
PC RESO NO. 4987 -2-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a regular meeting of the Planning
Commission of the City of Carlsbad, California, held on the 20th day of June 2001, by the
following vote, to wit:
AYES: Chairperson Segall, Commissioners Baker, Heineman, Nielsen,
and Trigas
NOES:
ABSENT: Commissioners Compas and L’Heureux
ABSTAIN:
1
CARLSBAD PLANNING COMMISSION
ATTEST:
Planning Director
PC RESO NO. 4987 -3-
City of Carlsbad
NEGATIVE DECLARATION
Project Address/Location: 5675 Black Rail Rd. Carlsbad CA 92009. Adjacent and west of
Black Rail Road and 330 feet south of future Poinsettia Lane and is
identified by Assessors Parcel Number 2 15-070-09-00.
Project Description: Proposed Local Coastal Program Amendment and Zone Change to
change the land use designation from Limited Control (L-C) to
One-Family Residential, 7,500 square foot lot size minimum (R-l-
7,500), with a Qualified Overlay Zone (-Q), on a 2.027 acre parcel
of land. Also proposed is a minor subdivision to create 4
residential lots and a Coastal Development Permit.
The City of Carlsbad has conducted an environmental review of the above described project
pursuant to the Guidelines for Implementation of the California Environmental Quality Act and
the Environmental Protection Ordinance of the City of Carlsbad. As a result of said review, a
Negative Declaration (declaration that the project will not have a significant impact on the
environment) is hereby issued for the subject project. Justification for this action is on file in the
Planning Department.
A copy of the Negative Declaration with supportive documents is on file in the Planning
Department, 1635 Faraday Avenue, Carlsbad, California 92008. Comments from the public are
invited. Please submit comments in writing to the Planning Department within 30 days of date
of issuance. If you have any questions, please call Van Lynch in the Planning Department at
(760) 602-4613.
DATED: APRIL 4,200l
CASE NO: ZC Ol-03/LCPA Ol-04/CDP Ol-07MS 01-04
CASE NAME: LYNN PARCEL MAP
PUBLISH DATE: APRIL 4,200l
Planning Director
1635 Faraday Avenue l Carlsbad, CA 92008-7314 l (760) 602-4600 l FAX (760) 602-8559 l www.ci.carlsbad.ca.us @
ENVIRONMENTAL IMPACT ASSESSMENT FORM - PART II
CASE NO: ZC Ol-03/LCPA Ol-04/CDP Ol-07/MS 01-04
DATE: March 28,200l
BACKGROUND
1. CASE NAME: LYNN PARCEL MAP
2. APPLICANT: WILLIAM AND CANDACE LYNN
3. ADDRESSES AND PHONE NUMBER OF APPLICANT: 5675 Black Rail Rd., Carlsbad, CA
92009 (760) 93 l-2793
4. DATE EIA FORM PART I SUBMITTED: February 22,200l
5. PROJECT DESCRIPTION: Pronosed Local Coastal Program Amendment and Zone Change to
chance the land use designation from Limited Control (L-C) to One-Family Residential, 7,500
square foot lot size minimum (R-1-7,500), with a Qualified Overlay Zone C-0). on a 2.027 acre
parcel of land. Also proposed is a minor subdivision to create 4 residential lots and a Coastal
Development Permit. The proiect site is located adiacent and west of Black Rail Road and 330
feet south of future Poinsettia Lane and is identified by Assessors Parcel Number 215-070-09-00.
SUMMARY OF ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED:
The summary of environmental factors checked below would be potentially affected by this project,
involving at least one impact that is a “Potentially Significant Impact,” or “Potentially Significant Impact
Unless Mitigation Incorporated” as indicated by the checklist on the following pages.
0 Land Use and Planning lxl Transportation/Circulation cl Public Services
q Population and Housing q Biological Resources q Utilities & Service Systems
q Geological Problems q Energy & Mineral Resources q Aesthetics
q Water q Hazards q Cultural Resources
q Air Quality q Noise q Recreation
q Mandatory Findings of Significance
Rev. 03/28/96
El
q
q
q
q
DETERMINATION.
I find that the proposed project COULD NOT have a significant effect on the
environment, and a NEGATIVE DECLARATION will be prepared.
I find that although the proposed project could have a significant effect on the
environment, there will not be a significant effect in this case because the mitigation
measures described on an attached sheet have been added to the project. A NEGATIVE
DECLARATION will be prepared.
I find that the proposed project MAY have a significant effect on the environment, and an
ENVIRONMENTAL IMPACT REPORT is required.
I find that the proposed project MAY have significant effect(s) on the environment, but at
least one potentially significant effect 1) has been adequately analyzed in an earlier
document pursuant to applicable legal standards, and 2) has been addressed by mitigation
measures based on the earlier analysis as described on attached sheets. An Negative
declaration is required, but it must analyze only the effects that remain to be addressed.
I find that although the proposed project could have a significant effect on the
environment, there WILL NOT be a significant effect in this case because all potentially
significant effects (a) have been analyzed adequately in an earlier Master Environmental
Impact Review (MEIR 93-01) pursuant to applicable standards and (b) have been voided
or mitigated pursuant to that earlier Master Environmental Review (MEIR 93-Ol),
including revisions or mitigation measures that are imposed upon the proposed project.
Therefore, a Notice of Prior Compliance has been prepared.
3-29-O/
Date
Date I
2 Rev. 03/28/96
ENVIRONMENTAL IMPACTS
STATE CEQA GUIDELINES, Chapter 3, Article 5, Section 15063 requires that the City
conduct an Environmental Impact Assessment to determine if a project may have a significant
effect on the environment. The Environmental Impact Assessment appears in the following
pages in the form of a checklist. This checklist identifies any physical, biological and human
factors that might be impacted by the proposed project and provides the City with information to
use as the basis for deciding whether to prepare an Environmental Impact Report (EIR), Negative
Declaration, or to rely on a previously approved EIR or Negative Declaration.
A brief explanation is required for all answers except “No Impact” answers that are
adequately supported by an information source cited in the parentheses following each
question. A “No Impact” answer is adequately supported if the referenced information
sources show that the impact simply does not apply to projects like the one involved. A
“No Impact” answer should be explained when there is no source document to refer to, or
it is based on project-specific factors as well as general standards.
“Less Than Significant Impact” applies where there is supporting evidence that the
potential impact is not adversely significant, and the impact does not exceed adopted
general standards and policies.
“Potentially Significant Unless Mitigation Incorporated” applies where the incorporation
of mitigation measures has reduced an effect from “Potentially Significant Impact” to a
“Less Than Significant Impact.” The developer must agree to the mitigation, and the
City must describe the mitigation measures, and briefly explain how they reduce the
effect to a less than significant level.
“Potentially Significant Impact” is appropriate if there is substantial evidence that an
effect is significant.
Based on an “EIA-Part II”, if a proposed project could have a potentially significant
effect on the environment, but aJ potentially significant effects (a) have been analyzed
adequately in an earlier EIR or Mitigated Negative Declaration pursuant to applicable
standards and (b) have been avoided or mitigated pursuant to that earlier EIR or Mitigated
Negative Declaration, including revisions or mitigation measures that are imposed upon
the proposed project, and none of the circumstances requiring a supplement to or
supplemental EIR are present and all the mitigation measures required by the prior
environmental document have been incorporated into this project, then no additional
environmental document is required (Prior Compliance).
When “Potentially Significant Impact” is checked the project is not necessarily required
to prepare an EIR if the significant effect has been analyzed adequately in an earlier EIR
pursuant to applicable standards and the effect will be mitigated, or a “Statement of
Overriding Considerations” has been made pursuant to that earlier EIR.
A Negative Declaration may be prepared if the City perceives no substantial evidence that
the project or any of its aspects may cause a significant effect on the environment.
3 Rev. 03128196
l If there are one or more potentially significant effects, the City may avoid preparing an
EIR if there are mitigation measures to clearly reduce impacts to less than significant, and
those mitigation measures are agreed to by the developer prior to public review. In this
case, the appropriate “Potentially Significant Impact Unless Mitigation Incorporated”
may be checked and a Mitigated Negative Declaration may be prepared.
l An EIR must be prepared if “Potentially Significant Impact” is checked, and including
but not limited to the following circumstances: (1) the potentially significant effect has
not been discussed or mitigated in an Earlier EIR pursuant to applicable standards, and
the developer does not agree to mitigation measures that reduce the impact to less than
significant; (2) a “Statement of Overriding Considerations” for the significant impact has
not been made pursuant to an earlier EIR; (3) proposed mitigation measures do not reduce
the impact to less than significant, or; (4) through the EIA-Part II analysis it is not
possible to determine the level of significance for a potentially adverse effect, or
determine the effectiveness of a mitigation measure in reducing a potentially significant
effect to below a level of significance.
A discussion of potential impacts and the proposed mitigation measures appears at the end of the
form under DISCUSSION OF ENVIRONMENTAL EVALUATION. Particular attention
should be given to discussing mitigation for impacts which would otherwise be determined
significant.
Rev. 03128196
I. LAND USE AND PLANNING. Would the proposal:.
4
b)
c>
4
e)
Conflict with general plan designation or zoning?
(Source #l:Pgs 5.6-l - 5.6-18, #2)
Conflict with applicable environmental plans or
policies adopted by agencies with jurisdiction over the
project? (#l:Pgs 5.6-l - 5.6-18, #2)
Be incompatible with existing land use in the vicinity?
(#l:Pgs 5.6-l - 5.6-18, #2)
Affect agricultural resources or operations (e.g. impacts
to soils or farmlands, or impacts from incompatible
land uses)? (#l:Pgs 5.6-l - 5.6-18, #2)
Disrupt or divide the physical arrangement of an
established community (including a low-income or
minority community) (#l:Pgs 5.6-l - 5.6-18, #2)
Issues (and Supporting Information Sources).
II. POPULATION AND HOUSING. Would the proposal:
a) Cumulatively exceed official regional or local
population projections? (#l:Pgs 5.5-l - 5.5-6, #2)
b) Induce substantial growth in an area either directly or
indirectly (e.g. through projects in an undeveloped area
or extension of major infrastructure)? (#l:Pgs 5.5-l -
5.5-6,#2)
c) Displace existing housing, especially affordable
housing? (#l:Pgs 5.5-l - 5.5-6, #2)
III. GEOLOGIC PROBLEMS. Would the proposal result in or
expose people to potential impacts involving:
a) Fault rupture? (#l:Pgs 5.1-1 - 5.1-15 #2)
b) Seismic ground shaking? (#l:Pgs 5.1-1 - 5.1-15, #2)
c) Seismic ground failure, including liquefaction? (#l :Pgs
5.1-1 - 5.1.15, #2)
d) Seiche, tsunami, or volcanic hazard? (#l :Pgs 5. l-l -
5.1-15, #2)
e) Landslides or mudflows? (#l:Pgs 5.1-1 - 5.1-15, #2)
f) Erosion, changes in topography or unstable soil
conditions from excavation, grading, or fill? (#l:Pgs
5.1-1 - 5.1-15, #2)
g) Subsidence ofthe land? (#l:Pgs 5.1-1 - 5.1-15, #2)
h) Expansive soils? (#l:Pgs 5.1-1 - 5.1-15, #2)
i) Unique geologic or physical features? (#l:Pgs 5.1-1 -
5.1-15, #2)
IV. WATER. Would the proposal result in:
a) Changes in absorption rates, drainage patterns, or the
rate and amount of surface runoff? (#l:Pgs 5.2-l - 5.2-
11, #2)
b) Exposure of people or property to water related hazards
such as flooding? (#l:Pgs 5.2-l - 5.2-11, #2)
c) Discharge into surface waters or other alteration of
surface water quality (e.g. temperature, dissolved
oxygen or turbidity)? (#l:Pgs 5.2-l - 5.2-l 1, #2)
Potentially Significant
Impact
q
q
q
q
q
q
q
q
q q q
q
q q
q q q
q
q
q
Potentially Less Than No
Significant Significant Impact Unless Impact
Mitigation Incorporated
q
q
q
q
q
q
q
q
q Ix]
q lxl
q IXI
q IXI
q la
q lxl
q lz
q El
III q El q q El 0 q IXI
q q Ix1
q q lxl q q Ix]
q q lzl q q IXI q q lxl
q
q
0
q El
q lz
0 IXI
5 Rev. 03128196
Issues (and Supporting Information Sources).
4
e)
f)
d
h)
9
Changes in the amount of surface water in any water
body? (#l:Pgs 5.2-l - 5.2-11, #2)
Changes in currents, or the course or direction of water
movements? (#l:Pgs 5.2-l - 5.2-11, #2)
Changes in the quantity of ground waters, either
through direct additions or withdrawals, or through
interception of an aquifer by cuts or excavations or
through substantial loss of groundwater recharge
capability? (#l:Pgs 5.2-l - 5.2-11, #2)
Altered direction or rate of flow of groundwater?
(#l:Pgs 5.2-l - 5.2-11, #2)
Impacts to groundwater quality? (#l:Pgs 5.2-l - 5.2-l 1,
79) Substantial reduction in the amount of groundwater
otherwise available for public water supplies? (#l:Pgs
5.2-l - 5.2-l 1, #2)
V. AIR QUALITY. Would the proposal:
a) Violate any air quality standard or contribute to an
existing or projected air quality violation? (#l:Pgs 5.3-
1 - 5.3-12)
b) Expose sensitive receptors to pollutants? (#l:Pgs 5.3-l
- 5.3-12, #2)
c) Alter air movement, moisture, or temperature, or cause
any change in climate? (#l:Pgs 5.3-l - 5.3-12, #2)
d) Create objectionable odors? (#l:Pgs 5.3-l - 5.3-12, #2)
VI. TRANSPORTATION/CIRCULATION. Would the
4
b)
c)
4
e>
f)
s>
proposal result in:
Increased vehicle trips or traffic congestion? (#l:Pgs
5.7-l - 5.7-22, #2)
Hazards to safety from design features (e.g. sharp
curves or dangerous intersections) or incompatible uses
(e.g. farm equipment)? (#l:Pgs 5.7-l - 5.7-22, #2)
Inadequate emergency access or access to nearby uses?
(#l:Pgs 5.7-l - 5.7-22, #2)
Insufficient parking capacity on-site or off-site?
(#l:Pgs 5.7-l - 5.7-22, #2)
Hazards or barriers for pedestrians or bicyclists?
(#l:Pgs 5.7-l - 5.7-22, #2)
Conflicts with adopted policies supporting alternative
transportation (e.g. bus turnouts, bicycle racks)?
(#l:Pgs 5.7-l - 5.7-22, #2)
Rail, waterborne or air traffic impacts? (#l:Pgs 5.7-l -
5.7-22, #2)
VII. BIOLOGICAL RESOURCES. Would the proposal result
in impacts to:
a) Endangered, threatened or rare species or their habitats
(including but not limited to plants, fish, insects,
animals, and birds)? (#l:Pgs 5.4-l - 5.4-24, #2)
b) Locally designated species (e.g. heritage trees)?
(#l:Pgs 5.4-l - 5.4-24, #2)
c) Locally designated natural communities (e.g. oak
forest, coastal habitat, etc.)? (#l:Pgs 5.4-l - 5.4-24, #2)
Potentially
Significant Impact
Potentially
Significant Unless
Mitigation Incorporated
0
0
0
q
El
0
El
0
0
0
17
17
q
0
0
0
0
0
0
Less Than
Significant Impact
0
0
0
No
Impact
lx’l
IXI
IXI
0 0
0 lxl
0 El
cl lxl
0 Ix]
0 IXI
0 lxl
0 IXI
cl lxl
0 lxl
0 lxl
6 Rev. 03128196
Issues (and Supporting Information Sources).
4
e>
VIII.
4
b)
c>
Wetland habitat (e.g. marsh, riparian and vernal pool)?
(#l:Pgs 5.4-l - 5.4-24, #2)
Wildlife dispersal or migration corridors? (#l:Pgs 5.4-l
- 5.4-24, #2)
ENERGY AND MINERAL RESOURCES. Would the
proposal:
Conflict with adopted energy conservation plans?
(#l:Pgs 5.12.1-l - 5.12.1-5 & 5.13-1 - 5.13-9, #2)
Use non-renewable resources in a wasteful and
inefficient manner? (#l:Pgs 5.12.1-1 -5.12.1-5 & 5.13-
1 - 5.13-9, #2)
Result in the loss of availability of a known mineral
resource that would be of future value to the region and
the residents of the State? (#l:Pgs 5.12.1-1 - 5.12.1-5
& 5.13-1 - 5.13-9, #2)
IX. HAZARDS. Would the proposal involve:
a) A risk of accidental explosion or release of hazardous
substances (including, but not limited to: oil, pesticides,
chemicals or radiation)? (#l:Pgs 5.10.1-l - 5.10.1-5,
#2) b) Possible interference with an emergency response plan
or emergency evacuation plan? (#l:Pgs 5.10.1-l -
5.10.1-5, #2)
c) The creation of any health hazard or potential health
hazards? (#l:Pgs 5.10.1-l - 5.10.1-5, #2)
d) Exposure of people to existing sources of potential
health hazards? (#l:Pgs 5.10.1-l - 5.10.1-5, #2)
e) Increase fire hazard in areas with flammable brush,
grass, or trees? (#l:Pgs 5.10.1-l - 5.10.1-5, #2)
X. NOISE. Would the proposal result in:
a) Increases in existing noise levels? (#l:Pgs 5.9-l - 5.9-
15, #2)
b) Exposure of people to severe noise levels? (#l:Pgs 5.9-
1 - 5.9-15, #2)
XI. PUBLIC SERVICES. Would the proposal have an effect
upon, or result in a need for new or altered government
services in any of the following areas:
a) Fire protection? (#l:Pgs 5.12.5-1 - 5.12.5-6, #2)
b) Police protection? (#l:Pgs 5.12.6-1 - 5.12.6-4, #2)
c) Schools? (#l:Pgs 5.12.7.1 - 5.12.7-5, #2)
d) Maintenance of public facilities, including roads?
(#l:Pgs 5.12.1-1 - 5.12.8-7, #2)
e) Other governmental services? (#l:Pgs 5.12.1-1 -
5.12.8-7, #2)
Potentially Significant
Impact
III
El
cl
El
El
0
El
q
0
El
0
El
0 0 0 El
q
Potentially
Significant Unless
Mitigation Incorporated
cl
cl
El
III
0
El
0
0
0
0
0
0
0
0 q El
0
Less Than Significanl
Impact
q
q
No
Impact
Ix1
IXI
El
lxl
El
lxl
la
Ix]
Ia
lxl
lxl
la
El
1s)
la
lxl
El
XII. UTILITIES AND SERVICES SYSTEMS. Would the
proposal result in a need for new systems or supplies,
or substantial alterations to the following utilities:
7 Rev. 03/28/96
Issues (and Supporting Information Sources).
4
b)
cl
4 e> f-J !a
XIII.
a>
b)
c>
XIV.
4
b)
c)
4
e>
Power or natural gas? (#l:Pgs 5.12.1-1 - 5.12.1-5 &
5.13-1 - 5.13-9, #2)
Communications systems? (#l:Pgs 5.12.1-1 - 5.12.8-7,
w Local or regional water treatment or distribution
facilities? (#l:Pgs 5.12.2-1 - 5.12.3-7, #2)
Sewer or septic tanks? (#l:Pgs 5.12.3-1 - 5.12.3-7, #2)
Storm water drainage? (#l:Pg 5.2-8, #2)
Solid waste disposal? (#l:Pgs 5.12.4-1 - 5.12.4-3, #2)
Local or regional water supplies? (#l:Pgs 5.12.2-1 -
5.12.3-7, #2)
AESTHETICS. Would the proposal:
Affect a scenic or vista or scenic highway? (#l:Pgs
5.11-l - 5.11-5, #2)
Have or demonstrate a negative aesthetic effect?
(#l:Pgs 5.11-1 - 5.11-5, #2)
Create light or glare? (#l:Pgs 5.11-1 - 5.11-5, #2)
CULTURAL RESOURCES. Would the proposal:
Disturb paleontological resources? (#l:Pgs 5.8-l - 5.8-
10, #2)
Disturb archaeological resources? (#l:Pgs 5.8-l - 5.8-
10, #2)
Affect historical resources? (#l:Pgs 5.8-l - 5.8-10, #2)
Have the potential to cause a physical change which
would affect unique ethnic cultural values? (#l:Pgs
5.8-l - 5.8-10, #2)
Restrict existing religious or sacred uses within the
potential impact area? (#l:Pgs 5.8-l - 5.8-10, #2)
XV. RECREATIONAL. Would the proposal:
4
b)
XVI.
4
Increase the demand for neighborhood or regional
parks or other recreational facilities? (#l:Pgs 5.12.8-1 -
5.12.8-7, #2)
Affect existing recreational opportunities? (#l :Pgs
5.12.8-1 - 5.12.8-7, #2)
MANDATORY FINDINGS OF SIGNIFICANCE.
Does the project have the potential to degrade the
quality of the environment, substantially reduce the
habitat of a fish or wildlife species, cause a fish or
wildlife population to drop below self-sustaining levels,
threaten to eliminate a plant or animal community,
reduce the number or restrict the range of a rare or
endangered plant or animal or eliminate important
examples of the major periods of California history or
prehistory?
Potentially Signiticanl
Impact
Potentially
Significant
Unless Mitigation
Incorporated
0
0
0
0
17
0
0
Less Than
Impact
No Impact
IXI
IXI
IXI
lxl
la
lxl
lxl
IXI
lxl
El
lxl
lxl
lzl
lxl
lxl
lxl
IXI
Ix1
Rev. 03128196
Issues (and Supporting Information Sources).
b) Does the project have impacts that are individually
limited, but cumulatively considerable?
(“Cumulatively considerable” means that the
incremental effects of a project are considerable when
viewed in connection with the effects of past projects,
the effects of other current projects, and the effects of
probable future projects)
c) Does the project have environmental effects which will
cause the substantial adverse effects on human beings,
either directly or indirectly?
Potentially Potentially Less Than No
Significant Significant Significant Impact Impact Unless Impact
Mitigation Incomorated 0 0 0 lxl
0 0 IXI
Rev. 03/28/96
XVII. EARLIER ANALYSES
Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA
process, one or more effects have been adequately analyzed in an earlier EIR or negative
declaration. Section 15063(c)(3)(D). In this case a discussion should identify the
following on attached sheets:
a) Earlier analyses used. Identify earlier analyses and state where they are available
for review.
b) Impacts adequately addressed. Identify which effects from the above checklist
were within the scope of and adequately analyzed in an earlier document pursuant
to applicable legal standards, and state whether such effects were addressed by
mitigation measures based on the earlier analysis.
4 Mitigation measures. For effects that are “Less than Significant with Mitigation
Incorporated,“ describe the mitigation measures which were incorporated or
refined from the earlier document and the extent to which they address site-
specific conditions for the project.
10 Rev. 03128196
DISCUSSION OF ENVIRONMENTAL EVALUATION
I. PROJECT DESCRIPTION/ENVIRONMENTAL SETTING
The project consist of amending the Local Coastal Program (LCP) and rezoning a 2.027 acre
parcel of land from Limited Control to Residential Single Family - 7,500 square foot lot size
minimum -Qualified overlay zone (R- 1-7,500-Q). Th e site is located within the Mello II
segment of the LCP and is in Local Facilities Management Zone 20. The proposed zoning will
conform to the existing General Plan Residential Low-Medium density land use designation as
well as surrounding residential zoned and general plan designated properties. The four lots
proposed with the minor subdivision exceed the minimum lot size required and are compatible
with the adjacent residential subdivision. The property will be conditioned with the minor
subdivision to provide improvements such as underground utilities, curb, sidewalk, and drainage
structures to match existing improvements.
The property is currently developed with a single-family residence and detached accessory
garage structure. The property has been disturbed with non-native plantings and does not contain
any significant habitats or endangered, threatened or rare species. This project would not impact
wildlife dispersal or migration corridors. The site has not been use for commercial agricultural
purposes and would not contain any significant residues from agricultural chemicals. The Zone
20 EIR does not identify any archaeological sites on the property.
11 Rev. 03128196
II. ENVIRONMENTAL ANALYSIS
B. Environmental Impact Discussion
Air Quality
The implementation of subsequent projects that are consistent with and included in the updated
1994 General Plan will result in increased gas and electric power consumption and vehicle miles
traveled. These subsequently result in increases in the emission of carbon monoxide, reactive
organic gases, oxides of nitrogen and sulfm, and suspended particulates. These aerosols are the
major contributors to air pollution in the City as well as in the San Diego Air Basin. Since the
San Diego Air Basin is a “non-attainment basin”, any additional air emissions are considered
cumulatively significant: therefore, continued development to buildout as proposed in the
updated General Plan will have cumulative significant impacts on the air quality of the region.
To lessen or minimize the impact on air quality associated with General Plan buildout, a variety
of mitigation measures are recommended in the Final Master EIR. These include: 1) provisions
for roadway and intersection improvements prior to or concurrent with development; 2) measures
to reduce vehicle trips through the implementation of Congestion and Transportation Demand
Management; 3) provisions to encourage alternative modes of transportation including mass
transit services; 4) conditions to promote energy efficient building and site design; and 5)
participation in regional growth management strategies when adopted. The applicable and
appropriate General Plan air quality mitigation measures have either been incorporated into the
design of the project or are included as conditions of project approval.
Operation-related emissions are considered cumulatively significant because the project is
located within a “non-attainment basin”, therefore, the “Initial Study” checklist is marked
“Potentially Significant Impact”. This project is consistent with the General Plan, therefore, the
preparation of an EIR is not required because the certification of Final Master EIR 93-01, by City
Council Resolution No. 94-246, included a “Statement Of Overriding Considerations” for air
quality impacts. This “Statement Of Overriding Considerations” applies to all subsequent
projects covered by the General Plan’s Final Master EIR, including this project, therefore, no
further environmental review of air quality impacts is required. This document is available at the
Planning Department.
Transportation/Circulation
The implementation of subsequent projects that are consistent with and included in the updated
1994 General Plan will result in increased traffic volumes. Roadway segments will be adequate
to accommodate buildout traffic; however, 12 full and 2 partial intersections will be severely
impacted by regional through-traffic over which the City has no jurisdictional control. These
generally include all freeway interchange areas and major intersections along Carlsbad
Boulevard. Even with the implementation of roadway improvements, a number of intersections
are projected to fail the City’s adopted Growth Management performance standards at buildout.
To lessen or minimize the impact on circulation associated with General Plan buildout, numerous
mitigation measures have been recommended in the Final Master EIR. These include measures
to ensure the provision of circulation facilities concurrent with need; 2) provisions to develop
alternative modes of transportation such as trails, bicycle routes, additional sidewalks, pedestrian
linkages, and commuter rail systems; and 3) participation in regional circulation strategies when
12 Rev. 03/28/96
adopted. The diversion of regional through-traffic from a failing Interstate or State Highway
onto City streets creates impacts that are not within the jurisdiction of the City to control. The
applicable and appropriate General Plan circulation mitigation measures have either been
incorporated into the design of the project or are included as conditions of project approval.
Regional related circulation impacts are considered cumulatively significant because of the
failure of intersections at buildout of the General Plan due to regional through-traffic, therefore,
the “Initial Study” checklist is marked “Potentially Significant Impact”. This project is
consistent with the General Plan, therefore, the preparation of an EIR is not required because the
recent certification of Final Master EIR 93-01, by City Council Resolution No. 94-246, included
a “Statement Of Overriding Considerations” for circulation impacts. This “Statement Of
Overriding Considerations” applies to all subsequent projects covered by the General Plan’s
Master EIR, including this project, therefore, no further environmental review of circulation
impacts is required.
III. EARLIER ANALYSES USED
The following documents were used in the analysis of this project and are on file in the City of
Carlsbad Planning Department located at 1635 Faraday Avenue, Carlsbad, California, 92008,
(760) 602-4600.
1. Final Master Environmental Imnact Report for the City of Carlsbad General Plan Update
(MEIR 93-Ol), dated March 1994, City of Carlsbad Planning Department.
2. “Final Program Environmental Impact Report for the Zone 20 Specific Plan” (EIR 90-
03), dated June 1992, Brian F. Mooney Associates.
LIST OF MITIGATING MEASURES
None
ATTACH MITIGATION MONITORING PROGRAM
Not applicable
13 Rev. 03/28/96