PLANNING COMMISSION RESOLUTION NO. 5307
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF CARLSBAD, CALIFORNIA, RECOMMENDING
ADOPTION OF A NEGATIVE DECLARATION TO ALLOW
THE SUBDIVISION AND CONSTRUCTION OF A 115 UNIT
VILLAGE X OF THE CALAVERA HILLS MASTER PLAN
LOCATED ON THE WEST SIDE OF FUTURE COLLEGE
BOULEVARD, SOUTH OF CARLSBAD VILLAGE DRIVE IN
LOCAL FACILITIES MANAGEMENT ZONE 7.
CASE NAME: CALAVERA HILLS VILLAGE X
CASE NO.: CT 01-06PUD 01-07
WHEREAS, Calavera Hills 11, LLC, “Developer”/“Owner,” has filed a verified
SINGLE-FAMILY PLANNED UNIT DEVELOPMENT WITHIN
application with the City of Carlsbad regarding property described as
Portion of Lots “D,” “E,” and “J” of the Rancho Agua
Hedionda, in the City of Carlsbad, County of San Diego, State
of California, according to Map 823, filed in the Office of the
San Diego County Recorder on November 6, 1896, also being
Lot 1 of Carlsbad Tract No. 00-02
(“the Property”); and
WHEREAS, a Negative Declaration was prepared in conjunction with said
project; and
WHEREAS, the Planning Commission did on the 6th day of November, 2002,
hold a duly noticed public hearing as prescribed by law to consider said request; and
WHEREAS, at said public hearing, upon hearing and considering all testimony
and arguments, examining the initial study, analyzing the information submitted by staff, and
considering any written comments received, the Planning Commission considered all factors
relating to the Negative Declaration.
NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning
Commission as follows:
A) That the foregoing recitations are true and correct.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
B) That based on the evidence presented at the public hearing, the Planning
Commission hereby RECOMMENDS ADOPTION of the Negative Declaration
according to Exhibit "ND" dated September 26, and "PII" dated September 17,
2002, attached hereto and made a part hereof, based on the following findings:
FindinPs:
1. The Planning Commission of the City of Carlsbad does hereby find:
A.
B.
C.
D.
It has reviewed, analyzed and considered Negative Declaration and the
environmental impacts therein identified for this project and any comments
thereon prior to RECOMMENDING APPROVAL of the project; and
The Negative Declaration has been prepared in accordance with requirements of
the California Environmental Quality Act, the State Guidelines and the
Environmental Protection Procedures of the City of Carlsbad; and
It reflects the independent judgment of the Planning Commission of the City of
Carlsbad; and
Based on the EIA Part I1 and comments thereon, there is no substantial evidence
the project will have a significant effect on the environment.
PASSED, APPROVED AND ADOPTED at a regular meeting of the Planning
Commission of the City of Carlsbad, California, held on the 6th day of November, 2002, by the
following vote, to wit:
AYES: Chairperson Trigas, Commissioners Baker, Dominguez,
Heineman, White, and Whitton
NOES: None
ABSENT: Commissioner Segall
n
SEENA TRIGAS, Chairperson
CARLSBAD PLANNING COMMISSION
ATTEST:
MICHAEL J. HWZMIEER
Planning Director
PC RES0 NO. 5307 -2-
- City of Carlsbad
NEGATIVE DECLARATION
Project Address/Location: Villages X and W within the Calavera Hills Master Plan, generally
located east and west of future College Boulevard south of the
College BlvdCarlsbad Village Drive intersection in the Northeast
Quadrant.
Project Description: 1 15 single-family detached homes (Village X)
1 14 single-family detached homes (Village W)
The City of Carlsbad has conducted an environmental review of the above-described project
pursuant to the Guidelines for Implementation of the California Environmental Quality Act and
the Environmental Protection Ordinance of the City of Carlsbad. As a result of said review, a
Negative Declaration (declaration that the project will not have a significant impact on the
environment) is hereby issued for the subject project. Justification for this action is on file in the
Planning Department.
A copy of the Negative Declaration with supportive documents is on file in the Planning
Department, 1635 Faraday Avenue, Carlsbad, California 92008. Comments from the public are
invited. Please submit comments in writing to the Planning Department within 20 days of date
of issuance. If you have any questions, please call Eric Munoz in the Planning Department at
(760) 602-4608.
DATED: SEPTEMBER 26,2002
CASE NO: CT 01-06PUD 01-07 AND CT 01-05PUD 01-06
CASE NAME: VILLAGE X AND VILLAGE W
PUBLISH DATE: SEPTEMBER 26,2002
Planning Director
7635 Faraday Avenue Carlsbad, CA 92008-7314 (760) 602-4600 FAX (760) 602-8559 www.ci.carlsbad.ca.us @
ENVIRONMENTAL IMPACT ASSESSMENT FORM - PART I1
(TO BE COlMPLETED BY THE PLANNING DEPARTMENT)
CASE NO: CT Ol-OS/PUD 01-06 and CT 01-06iPUD 01-07
DATE: September 17.2002
BACKGROUND
1. CASE NAME: Calavera Hills Village W and X
2. APPLICANT: McMillin Homes
3. ADDRESS AND PHONE NUMBER OF APPLICANT: 2727 Hoover Ave, National
Citv, CA 92950 (619) 336-3138
4. DATE EIA FORM PART I SUBMITTED: May 17,2001 -
5. PROJECT DESCRIPTION: Tentative Map and Planned Unit Development for the
construction of two single family Villages - within the Calavera Hills Master Plan: Village
X proposes 1 15 units and Village W proposes 114 units, generally located on both sides
of future College Blvd, south of the intersection of College Boulevard and Carlsbad
Village Drive, in Local Facilities Management Zone 7.
SUMMARY OF ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED:
The summary of environmental factors checked below would be potentially affected by this
project, involving at least one impact that is a “Potentially Significant Impact,” or “Potentially
Significant Impact Unless Mitigation Incorporated” as indicated by the checklist on the
following pages.
0 Land Use and Planning TransportatiodCirculation 0 Public Services
Population and Housing 0 Biological Resources [7 Utilities & Service Systems
Geological Problems 0 Energy & Mineral 0 Aesthetics
Water 0 Cultural Resources
Resources
Hazards
0 Noise
Air Quality 0 Recreation
0 Mandatory Findings of Significance
1 Rev. 03/28/96
DETERMINATION.
(To be completed by the Lead Agency)
0
0
IXI
0
I find that the proposed project COULD NOT ha\.e a significant effect on the
environment, and a NEGATIVE DECLARATION will be prepared.
I find that although the proposed project could have a significant effect on the
environment, there will not be a significant effect in this case because the mitigation
measures described on an attached sheet have been added to the project. A MITIGATED
NEGATIVE DECLARATION will be prepared.
I find that the proposed project MAY have a significant effect on the environment, and an
ENVIRONMENTAL IMPACT REPORT is required.
I find that the proposed project MAY have significaht effect(s) on the environment, but at
least one potentially significant effect 1) has been adequately analyzed in an earlier
document pursuant to applicable legal standards, and 2) has been addressed by mitigation
measures based on the earlier analysis as described on attached sheets. A Negative
Declaration is required, but it must analyze only the effects that remain to be addressed.
I find that although the proposed project could have a significant effect on the
environment, there WILL NOT be a significant effect in this case because all potentially
significant effects (a) have been analyzed adequately in an earlier pursuant to applicable
standards and (b) have been avoided or mitigated pursuant to that earlier, including
revisions or mitigation measures that are imposed upon the proposed project. Therefore,
a Notice of Prior Compliance has been prepared.
Planner Signature J Date
rslol, Date
2 Rev. 03/28/96
ENVIRONMENTAL IMPACTS
STATE CEQA GUIDELINES, Chapter 3, Article 5, Section 15063 requires that the City
conduct an Environmental Impact Assessment to determine if a project may have a significant
effect on the environment. The Environmental Impact Assessment appears in the follonilg
pages in the form of a checklist. This checklist identifies any physical, biological and human
factors that might be impacted by the proposed project and provides the City with information to
use as the basis for deciding whether to prepare an Environmental Impact Report (EIR), Negative
Declaration, or to rely on a previously approved EIR or Negative Declaration.
A brief explanation is required for all answers except “No Impact” answers that are
adequately supported by an information source cited in the parentheses following each
question. A “No Impact” answer is adequately supported if the referenced information
sources show that the impact simply does not apply to projects like the one involved. A
“No Impact” answer should be explained when there is no source document to refer to, or
it is based on project-specific factors as well as general standards.
“Less Than Significant Impact” applies where there is supporting evidence that the
potential impact is not adversely significant, and the impact does not exceed adopted
general standards and policies.
“Potentially Significant Unless Mitigation Incorporated” applies where the incorporation
of mitigation measures has reduced an effect fiom “Potentially Significant Impact” to a
“Less Than Significant Impact.” The developer must agree to the mitigation, and the
City must describe the mitigation measures, and briefly explain how they reduce the
effect to a less than significant level.
“Potentially Significant Impact” is appropriate if there is substantial evidence that an
effect is significant.
Based on an “EIA-Part 11”, if a proposed project could have a potentially significant
effect on the environment, but potentially significant effects (a) have been analyzed
adequately in an earlier EIR or Mitigated Negative Declaration pursuant to applicable
standards and (b) have been avoided or mitigated pursuant to that earlier EIR or Mitigated
Negative Declaration, including revisions or mitigation measures that are imposed upon
the proposed project, and none of the circumstances requiring a supplement to or
supplemental EIR are present and all the mitigation measures required by the prior
environmental document have been incorporated into this project, then no additional
environmental document is required (Prior Compliance).
When “Potentially Significant Impact” is checked the project is not necessarily required
to prepare an EIR if the significant effect has been analyzed adequately in an earlier EIR
pursuant to applicable standards and the effect will be mitigated, or a “Statement of
Overriding Considerations” has been made pursuant to that earlier EIR.
A Negative Declaration may be prepared if the City perceives no substantial evidence that
the project or any of its aspects may cause a significant effect on the environment.
3 Rev. 03/28/96
8 If there are one or more potentially significant effects, the City may avoid preparing an
EIR if there are mitigation measures to clearly reduce impacts to less than significant, and
those mitigation measures are agreed to by the developer prior to public review. In this
case, the appropriate “Potentially Significant Impact Unless Mitigation Incorporated”
may be checked and a Mitigated Negative Declaration may be prepared.
An EIR must be prepared if “Potentially Significant Impact” is checked, and including
but not limited to the following circumstances: (1) the potentially significant effect has
not been discussed or mitigated in an Earlier EIR pursuant to applicable standards, and
the developer does not agree to mitigation measures that reduce the impact to less than
significant; (2) a “Statement of Overriding Considerations’’ for the significant impact has
not been made pursuant to an earlier EIR; (3) proposed mitigation measures do not reduce
the impact to less than significant, or; (4) through the EIA-Part I1 analysis it is not
possible to determine the level of significance for a potentially adverse effect, or
determine the effectiveness of a mitigation measure in reducing a potentially significant
effect to below a level of significance.
A discussion of potential impacts and the proposed mitigation measures appears at the end of the
form under DISCUSSION OF ENVIRONMENTAL EVALUATION. Particular attention
should be given to discussing mitigation for impacts which would otherwise be determined
significant.
Issues (and Supporting Information Sources).
I. LAND USE AND PLANNING. Would the proposal:.
a) Conflict with general plan designation or zoning?
(Source #(s): (#l:Pgs 5.6-1 - 5.6-18)
b) Conflict with applicable environmental plans or
policies adopted by agencies with jurisdiction
over the project? (#l:Pgs 5.6-1 - 5.6-18)
c) Be incompatible with existing land use in the
vicinity? (#l:Pgs 5.6-1 - 5.6-18)
d) Affect agricultural resources or operations (e.g.
impacts to soils or farmlands, or impacts from
incompatible land uses? (#1 :Pgs 5.6- 1 - 5.6-1 8)
e) Disrupt or divide the physical arrangement of an
established community (including a low-income
or minority community)? (#1 :Pgs 5.6- 1 - 5.6-1 8)
Potentially Potentially
Significant Significant
Impact Unless
Mitigation
Incorporated
0 0
0 0
0
11. POPULATION AND HOUSING. Would the
proposal:
population projections? (#l:Pgs 5.5-1 - 5.5-6)
directly or indirectly (e.g. through projects in an
undeveloped area or extension of major
infrastructure)? (#l:Pgs 5.5-1 - 5.5-6)
housing? (#l:Pgs 5.5-1 - 5.5-6)
a) Cumulatively exceed official regional or local
b) Induce substantial growth in an area either
c) Displace existing housing, especially affordable
cl
0
Less Than No
Significant Impact Impact
0 IXI
0 IXI
0 IXI
0 IXI
0 IXI
0 IXI
0 IXI
4 Rev. 03/28/96
Issues (and Supporting Information Sources).
111. GEOLOGIC PROBLEMS. Would the proposal result
IV. WATER. Would the DroDosal result in:
Potentially Potentially Less Than No
Significant Significant Significant Impact Impact Unless Impact
Mitigation
Incorporated
in or expose people to potential impacts
involving:
Fault rupture? (#l:Pgs 5.1-1 - 5.1-15) 0
Seismic ground shaking? (#l:Pgs 5.1-1 - 5.1-15) 0
Seismic ground failure, including liquefaction? 0
Seiche, tsunami, or volcanic hazard? (#l:Pgs 5.1- 0
..
(#l:PgS 5.1-1 - 5.1.15)
1 - 5.1-15) ~
Landslides or mudflows? (#l:Pgs 5.1-1 - 5.1-15) 0
Erosion, changes in topography or unstable soil 0
conditions from excavation, grading, or fill?
(#l:PgS 5.1-1 - 5.1-15)
Subsidence of the land? (#l:Pgs 5.1-1 - 5.1-15) 0
Expansive soils? (# 1 :Pgs 5.1 - 1 - 5.1 - 1 5) 0
Unique geologic or physical features? (#l:Pgs 0
5.1-1 - 5.1-15)
Changes in absorption rates, drainage patterns, or
the rate and amount of surface runoff! (#l:Pgs
Exposure of people or property to water related
hazards such as flooding? (#l:Pgs 5.2-1 - 5..2-11)
Discharge into surface waters or other alteration
of surface water quality (e.g. temperature,
dissolved oxygen or turbidity)? (#l:Pgs 5.2-1 -
Changes in the amount of surface water in any
water body? (#l:Pgs 5.2-1 - 5..2-11)
Changes in currents, or the course or direction of
water movements? (#l:Pgs 5.2-1 - 5..2-11) .
Changes in the quantity of ground waters, either
through direct additions or withdrawals, or
through interception of an aquifer by cuts or
excavations or through substantial loss of
groundwater recharge capability? (#1 :Pgs 5.2-1 -
Altered direction or rate of flow of groundwater?
Impacts to groundwater quality? (#1 :Pgs 5.2-1 -
Substantial reduction in the amount of
groundwater otherwise available for public water
supplies? (#l:Pgs 5.2-1 - 5.2-1 1)
A.
5.2-1 - 5.2-1 1)
5..2-11)
5 ..2- 1 1)
(#l:PgS 5.2-1 - 5..2-11)
5..2-11)
0
0
0
0
0
0
0
0
0
V. AIR QUALITY. Would the proposal:
a) Violate any air quality standard or contribute to an IX1
existing or projected air quality violation? (#l:Pgs
5.3-1 - 5.3-12)
0 0 IXI 0 0 IXI 0 0 IXI
0 0 IX1
0 0 IXI 0 0 IXI 0 0 IXI
0
0
0
0 IXI
0 IXI
0 IXI
0 IXI
0 IXI
0 IXI
5 Rev. 03/28/96
Issues (and Supporting Information Sources). Potentially Significant
Impact
b) Expose sensitive receptors to pollutants? (#l:Pgs c7
c) Alter air movement, moisture, or temperature, or
5.3-1 - 5.3-12)
cause any change in climate? (#l:Pgs 5.3-1 - 5.3-
12)
12)
d) Create objectionable odors? (#l:Pgs 5.3-1 - 5.3- 0
VI. TRANSPORTATION/CIRCULATION. Would the
proposal result in:
Increased vehicle trips or traffic congestion?
Hazards to safety from design features (e.g. sharp
curves or dangerous intersections) or
incompatible uses (e.g. farm equipment)? (#1 :Pgs
Inadequate emergency access or access to nearby
uses? (#l:Pgs 5.7-1 - 5.7.22)
Insufficient parking capacity on-site or off-site?
Hazards or barriers for pedestrians or bicyclists?
Conflicts with adopted policies supporting
alternative transportation (e.g. bus turnouts,
bicycle racks)? (#l:Pgs 5.7-1 - 5.7.22)
Rail, waterborne or air traffic impacts? (#l:Pgs
(#l:PgS 5.7-1 - 5.7.22)
5.7-1 - 5.7.22)
(#l:PgS 5.7-1 - 5.7.22)
(#l:PgS 5.7-1 - 5.7.22)
5.7-1 - 5.7.22)
BIOLOGICAL RESOURCES. Would the
proposal result in impacts to:
Endangered, threatened or rare species or their
habitats (including but not limited to plants, fish,
insects, animals, and birds? (#l:Pgs 5.4-1 - 5.4-
24) Locally designated species (e.g. heritage trees)?
Locally designated natural communities (e.g. oak
forest, coastal habitat, etc.)? (#l:Pgs 5.4-1 - 5.4-
24) Wetland habitat (e.g. marsh, riparian and vernal
Wildlife dispersal or migration corridors? (#1 :Pgs
(#l:PgS 5.4-1 - 5.4-24)
pool)? (#l:Pgs 5.4-1 - 5.4-24)
5.4-1 - 5.4-24)
ENERGY AND MINERAL RESOURCES.
Would the proposal?
Conflict with adopted energy conservation plans?
Use non-renewable resources in a wasteful and
inefficient manner? (#l:Pgs 5.12.1-1 -5.12.1-5 &
(#l:Pgs 5.12.1-1 - 5.12.1-5 & 5.13-1 - 5.13-9)
5.13-1 - 5.13-9)
6
Potentially Less Than No
Significant Significant Impact
Mitigation
Incorporated
Unless Impact
0 0 151
0 IXI
Rev. 03/28/96
Issues (and Supporting Information Sources). Potentially Significant
Impact
c) Result in the loss of availability of a known
mineral resource that would be of future value to
the region and the residents of the State? (#l:Pgs
5.12.1-1 - 5.12.1-5 & 5.13-1 - 5.13-9)
IX. HAZARDS. Would the proposal involve:
A risk of accidental explosion or release of 0
hazardous substances (including, but not limited
Potentially Less Than No
Significant Significant lmpact
Mitigation Incorporated
Unless Impact
0 1si
0 0 IXI
to: oil, pesticides, chemicals or radiation)?
Possible interference with an emergency response 0 0 IXI
plan or emergency evacuation plan? (#l:Pgs
(#l:PgS 5.10.1-1 - 5.10.1-5)
5.10.1-1 - 5.10.1-5)-
The creation of any health hazard or potential 0 0 0 IXI
healthhazards? (#l:Pgs 5.10.1-1 - 5.10.1-5)
Exposure of people to existing sources of 0 SI 0 Ix1
potential health hazards? (#l:Pgs 5.10.1-1 -
5.10.1-5)
Increase fire hazard in areas with flammable 0 0 IxI
brush, grass, or trees? (#l:Pgs 5.10.1-1 - 5.10.1-5)
X. NOISE. Would the proposal result in:
a) Increases in existing noise levels? (#l:Pgs 5.9-1 -
b) Exposure of people to severe noise levels?
5.9-15)
(#l:PgS 5.9-1 - 5.9-15)
XI. PUBLIC SERVICES. Would the proposal have an
effect upon, or result in a need for new or altered
government services in any of the following
areas:
a) Fire protection? (#l:Pgs 5.12.5-1 - 5.12.5-6)
b) Police protection? (#l:Pgs 5.12.6-1 - 5.12.6-4)
d) Maintenance of public facilities, including roads?
e) Other governmental services? (#l:Pgs 5.12.1-1 -
C) Schools? (#l:Pgs 5.12.7.1 - 5.12.7-5)
5.12.8-7)
XII. UTILITIES AND SERVICES SYSTEMS. Would
the proposal result in a need for new systems or
supplies, or substantial alterations to the following
utilities:
a) Power or natural gas? (#l:Pgs 5.12.1-1 - 5.12.1-5
b) Communications systems?
c) Local or regional water treatment or distribution
d) Sewer or septic tanks? (#l:Pgs 5.12.3-1 - 5.12.3-
e) Storm water drainage? (#1 :Pg 5.2-8)
& 5.13-1 - 5.13-9)
facilities? (#l:Pgs 5.12.2-1 - 5.12.3-7)
7)
0
0 0
0
0 0 0
0 0
0 0
0 Ixl
0 Ix1 IXI
IXI
0 IXI
7 Rev. 03/28/96
Issues (and Supporting Information Sources). Potentially Potentially Less Than No
Significant Significant Significant Impact Impact Unless Impact
Mitigation
Incorporated
f) Solid waste disposal? (#l:Pgs 5.12.4-1 - 5.12.4-3) 0 0 Ix1 g) Local or regional water supplies? (#l:Pgs 5.12.2-1 0 0 0 Ixl - 5.12.3-7)
XIII. AESTHETICS. Would the proposal:
a) Affect a scenic or vista or scenic highway? 0
b) Have a demonstrated negative aesthetic effect? 0
c) Create light or glare? (#l:Pgs 5.1 1-1 - 5.1 1-5) 0
(#l:PgS 5.1 1-1 - 5.1 1-5)
(#l:PgS 5.11-1 - 5.1 1-5)
2UV. CULTURAL RESOURCES. Would the proposal:
a) Disturb paleontological resources? (#l:Pgs 5.8-1 -
b) Disturb archaeological resources? (#l:Pgs 5.8-1 -
c) Affect historical resources? (#l:Pgs 5.8-1 - 5.8-
d) Have the potential to cause a physical change
which would affect unique ethnic cultural values?
e) Restrict existing religious or sacred uses within
5.8-10)
5.8-10)
10)
(#l:PgS 5.8-1 - 5.8-10)
the potential impact area? (#l:Pgs 5.8-1 - 5.8-10)
0
0
0
0
XV. RECREATIONAL. Would the proposal:
a) Increase the demand for neighborhood or regional
parks or other recreational facilities? (#1 :Pgs
5.12.8-1 - 5.12.8y7)
b) Affect existing recreational opportunities?
(#l:PgS 5.12.8-1 - 5.12.8-7)
XVI. MANDATORY FINDINGS OF
SIGNIFICANCE.
quality of the environment, substantially reduce
the habitat of a fish or wildlife species, cause a
fish or wildlife population to drop below self-
sustaining levels, threaten to eliminate a plant or
animal community, reduce the number or restrict
the range of a rare or endangered plant or animal
or eliminate important examples of the major
periods of California history or prehistory?
individually limited, but cumulatively
considerable? (“Cumulatively considerable”
means that the incremental effects of a project are
considerable when viewed in connection with the
effects of past projects, the effects of other current
projects, and the effects of probable future
projects)?
a) Does the project have the potential to degrade the 0
b) Does the project have impacts that are 0
0
0
0
0
0
0
0
0 IXI
cl IXI
0 IXI
0 IXI
0 IXI
1x1
0 IXI
0 0 IXI
0 0 IXI
0 IXI
0 0 IXI
8 Rev. 03/28/96
Issues (and Supporting Information Sources). Potentially Potentially Less Than No Significant Significant Significant lmpact Impact Unless Impact
Mitigation
Incorporated
c) Does the project have environmental effects 0 0 0
which will cause the substantial adverse effects on
human beings, either directly or indirectly?
XVII. EARLIER ANALYSES.
The following site-specific technical studies were used in the analysis and design of this project
and are on file in the City of Carlsbad Planning Department, 1635 Faraday Avenue, Carlsbad,
California, 92008. (760) 602-4600.
1.
2.
3.
4.
Update of Geotechnical Report, Calavera Hills Villages W, X and Y City of Carlsbad,
California, dated October 20, 1999, Geosoils, Inc.
Interim Report of Geotechnical Investigation, Calavera Heights Villages W. X and Y
Carlsbad, California, dated March 20, 1990, Southern California Soil and Testing, Inc.
Noise Technical Report for Calavera Hills Master Plan Phase I1 Village W. City of
Carlsbad, California, dated May 1,2002.
Noise Technical Report for Calavera Hills Master Plan Phase I1 Village X, City of
Carlsbad. California, dated August 13,2002.
9 Rev. 03/28/96
DISCUSSION OF ENVIRONMENTAL EVALUATION
The project involves the construction and occupation of two single-family villages within the
Calavera Hills Master Plan: 1 15 detached single-family units within Village X and 1 14 detached
single-family units in Village W. Both sites will be created through the recordation of the Master
Tentative Map for Calavera Hills Phase I1 (CT 00-02) and will be mass graded in accordance
with that map.
The potential environmental impacts associated with the grading of Villages X and W site were
reviewed through the Environmental Impact Report for the Calavera Hills Phase I1 Master
Tentative Map (EIR 98-02, SCH No. 991 11082), certified January 15,2002. The Environmental
Impact Report also reviewed the impacts associated with the development of Village X with up
to 117 single-family units; and Village W up to 121 units. These maps propose less units than
allowed by the master plan and comply with all design and development standards. EIR 98-02,
as certified, also reviewed the potential environmental impacts associated with the major public
improvements required for the buildout of the master plan including Villages X and W.
Since the development of Village X and W cannot proceed until the Master Tentative Map (CT
00-02) has been recorded, and the site has been graded in accordance with that map, the
following environmental analysis deals only with the development of Villages X and W and the
project differences compared to the EIR. The differences center on revised noise studies (which
does not result in more or higher walls than those analyzed in the EIR) and a reduced unit
amount (proposing less units than allowed by the master plan).
College Boulevard separates the Village X and W sites. The proposed single-family residential
uses are compatible with all of the existing and future uses allowed by the master plan.
The residential designation of both Villages is Residential Medium (RM) in the City’s General
Plan, allowing up to 8 dwelling units per developable acre. The proposed densities of 4.6
(Village X) and 4.8 (Village W) is within the RM range. The project site is zoned P-C (Planned
Community) and, according to the Calavera Hills Master Plan (MP 150(H)), both sites are to be
developed in accordance with the R-1 - Single Family Residential Zone, except as modified in
the Master Plan. The proposed developments will consist of single-family residential units with
open space and common recreation lots. The project is consistent with the City’s General Plan
and meets all development standards and design criteria of the Master Plan and the R-1 zone.
The proposed development would necessitate approximately 60,000 cubic yards (Village X) and
65,000 cubic yards (Village W) of balanced grading subsequent to the mass grading associated
the above referenced master tentative map (CT 00-02). All grading operations would be required
to conform to the recommendations of the site-specific geotechnical report, as well as the City of
Carlsbad Grading Ordinance. In addition, an all-weather access road would be provided
throughout construction and Fire Marshal approval would be required prior to the storage of any
hazardous materials on site.
The residential project would take access off of future College Blvd and would generate 11 50
(Village X) and 1140 (Village W) average daily traffic trips, which can be accommodated by
existing and required road segments in the area.
The project will be required to comply with the City’s National Pollutant Discharge Elimination
System (NPDES) Permit through the implementation of Best Management Practices, thus
reducing the amount of pollutants entering the public storm drain system. All facilities needed to
.lo Rev. 03/28/96
serve the single-family developments will be provided prior to occupancy, in association with the
Phase II Master Tentative Map grading and improvement plans. In addition, the Carlsbad
Unified School District has stated that there are adequate school facilities to serve the proposed
apartment project.
Noise wall locations and heights are not greater than those covered in the earlier analysis (EIR
98-02) and the proposed unit yields are less than the maximums allowed by the master plan.
These two elements represent the variation in the project as reviewed by the master plan’s
certified environmental review (EIR 98-02) and now proposed. Given the above analysis, the
previous environmental documentation and the site-specific technical reports, the proposed
projects for Calavera Hills Villages W and W would not create any significant adverse
environmental impacts as designed and conditioned.
AIR OUALITY:
In 1994 the City prepared and certified an EIR which analyzed the impacts which will result
from the build-out of the City under an updated General Plan. That document concludes that
continued development to build-out as proposed in the updated General Plan will have
cumulative significant impacts in the form of increased gas and electric power consumption and
vehicle miles traveled. These subsequently result in increases in the emission of carbon
monoxide, reactive organic gases, oxides of nitrogen and sulfur, and suspended particulates.
These aerosols are the major contributors to air pollution in the City as well as in the San Diego
Air Basin. Since the San Diego Air Basin is a “non-attainment basin”, any additional air
emissions are considered cumulatively significant: therefore, continued development to build-out
as proposed in the updated General Plan will have cumulative significant impacts on the air
quality of the region.
To lessen or minimize the impact on air quality associated with General Plan build-out, a variety
of mitigation measures are recommended in the Final Master EIR. These include: 1) provisions
for roadway and intersection improvements prior to or concurrent with development; 2) measures
to reduce vehicle trips through the implementation of Congestion and Transportation Demand
Management; 3) provisions to encourage alternative modes of transportation including mass
transit services; 4) conditions to promote energy efficient building and site design; and 5)
participation in regional growth management strategies when adopted. The applicable and
appropriate General Plan air quality mitigation measures have either been incorporated into the
design of the project or are included as conditions of project approval.
Operation-related emissions are considered cumulatively significant because the project is
located within a “non-attainment basin”, therefore, the “Initial Study” checklist is marked
“Potentially Significant Impact”. This project is consistent with the General Plan, therefore, the
preparation of an EIR is not required because the certification of Final Master EIR 93-01, by City
Council Resolution No. 94-246, included a “Statement Of Overriding Considerations’’ for air
quality impacts. This “Statement Of Overriding Considerations” applies to all projects covered
by the General Plan’s Final Master EIR. This project is within the scope of that MEIR
11 Rev. 03/28/96
CIRCULATION:
In 1994 the City prepared and certified a Master EIR which analyzed the impacts which would
result from the build-out of the City under an updated General Plan. That document concluded
that continued development to build-out as proposed in the updated General Plan \\-auld result in
increased traffic volumes. Roadway segments will be adequate to accommodate build-out
traffic; however, 12 full and 2 partial intersections will be severely impacted by regional
through-traffic over which the City has no jurisdictional control. These generally include all
freeway interchange areas and major intersections along Carlsbad Boulevard. Even with the
implementation of roadway improvements, a number of intersections are projected to fail the
City’s adopted Growth Management performance standards at build-out.
To lessen or minimize the impact on circulation associated with General Plan build-out,
numerous mitigation measures have been recommended in the Final Master EIR. These include:
1) measures to ensure the provision of circulation facilities concurrent with need; 2) provisions to
develop alternative modes of transportation such as trails, bicycle routes, additional sidewalks,
pedestrian linkages, and commuter rail systems; and 3) participation in regional circulation
strategies when adopted. The diversion of regional through-traffic from a failing Interstate or
State Highway onto City streets creates impacts that are not within the jurisdiction of the City to
control. The applicable and appropriate General Plan circulation mitigation measures have either
been incorporated into the design of the project or are included as conditions of project approval.
Regional related circulation impacts are considered cumulatively significant because of the
failure of intersections at build-out of the General Plan due to regional through-traffic, therefore,
the “Initial Study” checklist is marked “Potentially Significant Impact”. This project is
consistent with the General Plan, therefore, the preparation of an EIR is not required because the
recent certification of Final Master EIR 93-01, by City Council Resolution No. 94-246, included
a “Statement Of Overriding Considerations” for circulation impacts. This “Statement Of
Overriding Considerations” applies to all projects covered by the General Plan’s Master EIR.
This project is within the scope of that MER This document is available at the Planning
Department.
A MEIR may not be used to review projects if it was certified more than five years prior to the
filing of an application for a later project. The City is currently reviewing the 1994 MEIR to
determine whether it is still adequate to review subsequent projects. Although the MEIR was
certified more than five years ago, the City’s preliminary review of its adequacy finds that no
substantial changes have occurred with respect to the circumstances under which the MEIR was
certified. The only potential changed circumstance, the intersection failure at Palomar Airport
Rd. and El Camino Real, is in the process of being mitigated to below a level of significance.
Additionally, there is no new available information, which was not known and could not have
been known at the time the MEIR was certified. Therefore, the MEIR remains adequate to
review later projects.
EARLIER ANALYSES USED/SOURCE DOCUMENTS CITED
The following documents were used in the analysis of this project and are on file in the City of
Carlsbad Planning Department, 1635 Faraday Avenue, Carlsbad, California, 92008.
1. Final Master Environmental Impact Reoort for the City of Carlsbad General Plan Update
(MEIR 93-01), dated March 1994, City of Carlsbad Planning Department.
12 Rev. 03/28/96
2. Calavera Hills Master Plan Phase 11. Bridge and Thoroughfare District No. 4 & Detention
Basins Final Environmental Impact Report (EIR 98-02), dated November 2001, RECON.
3. Noise Technical Report for Calavera Hills Master Plan Phase 11, Villages X and W, dated
August 13,2002 and May 1,2002, respectively, by RECON.
13 Rev. 03/28/96