PLANNING COMMISSION RESOLUTION NO. 5596
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF CARLSBAD, CALIFORNIA, APPROVING SITE
GENERALLY LOCATED ON THE EAST SIDE OF EL
CAMINO REAL AND NORTH OF CARLSBAD VILLAGE
DRIVE IN LOCAL FACILITIES MANAGEMENT ZONE 2.
CASE NAME: CARLSBAD MEDICAL PLAZA
DEVELOPMENT PLAN SDP 03-16 ON PROPERTY
CASE NO.: SDP 03-16
WHEREAS, John White, “Developer,” has filed a verified application with the
City of Carlsbad regarding property owned by HSP El Camino North, Inc., “Owner,” described
as
That portion of Parcel 2 of Parcel Map No. 13206, in the city of
Carlsbad, County of San Diego, State of California, according
to Map thereof in the Office of the County Recorder of said
County, March 14,1984
(“the Property”); and
WHEREAS, said verified application constitutes a request for a Site Development
Plan as shown on Exhibits “A” - “G”- dated April 7,2004, on file in the Planning Department,
CARLSBAD MEDICAL PLAZA - SDP 03-16 as provided by Chapter 21.06/Section
2 1.53.120 of the Carlsbad Municipal Code; and
WHEREAS, the Planning Commission did, on the 7th day of April, 2004, hold a
duly noticed public hearing as prescribed by law to consider said request; and
WHEREAS, at said public hearing, upon hearing and considering all testimony
and arguments, if any, of all persons desiring to be heard, said Commission considered all factors
relating to the Site Development Plan; and
NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning
Commission of the City of Carlsbad as follows:
A) That the foregoing recitations are true and correct.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
B) That based on the evidence presented at the public hearing, the Planning
Commission APPROVES CARLSBAD MEDICAL PLAZA - SDP 03-16
based on the following findings and subject to the following conditions:
Findinm:
1.
2.
3.
4.
5.
6.
That the requested use is properly related to the site, surroundings and environmental
settings, is consistent with the various elements and objectives of the General Plan, will
not be detrimental to existing uses or to uses specifically permitted in the area in which
the proposed use is to be located, and will not adversely impact the site, surroundings or
traffic circulation, in that the proposed medical office building will provide medical
services to a growing population in the Carlsbad area. The Residential
MediudOffice (NO) land use designations allow for medical offices, and the
project is compatible with permitted uses in the vicinity.
That the site for the intended use is adequate in size and shape to accommodate the use, in
that the proposed medical office building meets all development standards of the
Residential Professional (R-P) Zone.
That all yards, setbacks, walls, fences, landscaping, and other features necessary to adjust
the requested use to existing or permitted future uses in the neighborhood will be
provided and maintained, in that no adjustments are necessary to allow the proposed
medical office building to be located on the subject site. The proposed medical office
building meets all development standards of the Residential Professional (R-P)
Zone.
That the street systems serving the proposed use is adequate to properly handle all traffic
generated by the proposed use, in that a traffic report was prepared analyzing the
existing street system and no new street system improvements are required for this
approval.
That the Planning Director has determined that the project belongs to a class of projects
that the State Secretary for Resources has found do not have a significant impact on the
environment, and it is therefore categorically exempt from the requirement for the
preparation of environmental documents pursuant to Section 15322 - Construction of
Infill Development of the state CEQA Guidelines. In making this determination, the
Planning Director has found that the exceptions listed in Section 15300.2 of the state
CEQA Guidelines do not apply to this project.
The Planning Commission has reviewed each of the exactions imposed on the Developer
contained in this resolution, and hereby finds, in this case, that the exactions are imposed
to mitigate impacts caused by or reasonably related to the project, and the extent and the
degree of the exaction is in rough proportionality to the impact caused by the project.
Conditions:
Note: Unless otherwise specified herein, all conditions shall be satisfied prior to issuance of a
grading permit or building permit, whichever occurs first.
PC RES0 NO. 5596 -2-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
1.
2.
3.
4.
5.
6.
7.
8.
If any of the following conditions fail to occur; or if they are, by their terms, to be
implemented and maintained over time, if any of such conditions fail to be so
implemented and maintained according to their terms, the City shall have the right to
revoke or modify all approvals herein granted; deny or further condition issuance of all
future building permits; deny, revoke or further condition all certificates of occupancy
issued under the authority of approvals herein granted; institute and prosecute litigation to
compel their compliance with said conditions or seek damages for their violation. No
vested rights are gained by Developer or a successor in interest by the City’s approval of
this Site Development Plan.
Staff is authorized and directed to make, or require the Developer to make, all corrections
and modifications to the Site Development Plan documents, as necessary to make them
internally consistent and in conformity with the final action on the project. Development
shall occur substantially as shown on the approved Exhibits. Any proposed development
different from this approval, shall require an amendment to this approval.
Developer shall comply with all applicable provisions of federal, state, and local laws and
regulations in effect at the time of building permit issuance.
If any condition for construction of any public improvements or facilities, or the payment
of any fees in-lieu thereof, imposed by this approval or imposed by law on this Project are
challenged, this approval shall be suspended as provided in Government Code Section
66020. If any such condition is determined to be invalid this approval shall be invalid
unless the City Council determines that the project without the condition complies with
all requirements of law.
Developer/Operator shall and does hereby agree to indemnify, protect, defend and hold
harmless the City of Carlsbad, its Council members, officers, employees, agents, and
representatives, from and against any and all liabilities, losses, damages, demands, claims
and costs, including court costs and attorney’s fees incurred by the City arising, directly
or indirectly, from (a) City’s approval and issuance of this Site Development Plan, (b)
City’s approval or issuance of any permit or action, whether discretionary or non-
discretionary, in connection with the use contemplated herein, and (c)
Developer/Operator’s installation and operation of the facility permitted hereby, including
without limitation, any and all liabilities arising from the emission by the facility of
electromagnetic fields or other energy waves or emissions. This obligation survives until
all legal proceedings have been concluded and continues even if the City’s approval is not
validated.
Developer shall submit to Planning Department a reproducible 24” x 36” mylar copy of
the Site Plan reflecting the conditions approved by the final decision making body.
Prior to the issuance of a building permit, the Developer shall provide proof to the
Director from the Carlsbad Unified School District that this project has satisfied its
obligation to provide school facilities.
This approval shall become null and void if building permits are not issued for this
project within 18 months from the date of project approval.
PC RES0 NO. 5596 -3-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
9.
10.
11.
12.
13.
14.
15.
16.
17.
This project shall comply with all conditions and mitigation measures which are required
as part of the Zone 2 Local Facilities Management Plan and any amendments made to that
Plan prior to the issuance of building permits.
Building permits will not be issued for this project unless the local agency providing
water and sewer services to the project provides written certification to the City that
adequate water service and sewer facilities, respectively, are available to the project at the
time of the application for the building permit, and that water and sewer capacity and
facilities will continue to be available until the time of occupancy.
This approval is granted subject to the approval of SUP 03-08 and is subject to all
conditions contained in Planning Commission Resolution No. 5597 for those other
approvals incorporated herein by reference.
All roof appurtenances, including air conditioners, shall be architecturally integrated and
concealed from view and the sound buffered from adjacent properties and streets, in
substance as provided in Building Department Policy No. 80-6, to the satisfaction of the
Directors of Community Development and Planning.
Prior to the issuance of the building permit, Developer shall submit to the City a Notice
of Restriction to be filed in the office of the County Recorder, subject to the satisfaction
of the Planning Director, notifying all interested parties and successors in interest that the
City of Carlsbad has issued a Site Development Plan by Resolution No. 5596 on the
property. Said Notice of Restriction shall note the property description, location of the
file containing complete project details and all conditions of approval as well as any
conditions or restrictions specified for inclusion in the Notice of Restriction. The
Planning Director has the authority to execute and record an amendment to the notice
which modifies or terminates said notice upon a showing of good cause by the Developer
or successor in interest
Developer shall construct trash receptacle and recycling areas enclosed by a six-foot high
masonry wall with gates pursuant to City Engineering Standards and Carlsbad Municipal
Code Chapter 21.105. Location of said receptacles shall be approved by the Planning
Director. Enclosure shall be of similar colors and/or materials to the project to the
satisfaction of the Planning Director.
No outdoor storage of materials shall occur onsite unless required by the Fire Chief.
When so required, the Developer shall submit and obtain approval of the Fire Chief and
the Planning Director of an Outdoor Storage Plan, and thereafler comply with the
approved plan.
Developer shall submit and obtain Planning Director approval of an exterior lighting plan
including parking areas. All lighting shall be designed to reflect downward and avoid any
impacts on adjacent homes or property.
Compact parking spaces shall be located in large groups, and in locations clearly marked
to the satisfaction of the Planning Director.
PC RES0 NO. 5596 -4-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
18. Developer shall construct, install and stripe not less than 147 parking spaces, as shown
on Exhibit A .
Landscape
19. Developer shall submit and obtain Planning Director approval of a Final Landscape and
Irrigation Plan showing conformance with the approved Preliminary Landscape Plan and
the City’s Landscape Manual. Developer shall construct and install all landscaping as
shown on the approved Final Plans, and maintain all landscaping in a healthy and thriving
condition, free from weeds, trash, and debris.
20. The first submittal of Final Landscape and Irrigation Plans shall be pursuant to the
landscape plan check process on file in the Planning Department and accompimied by the
project’s building, improvement, and grading plans.
En~ineerin~ :
General
2 1. Prior to hauling dirt or construction materials to or from any proposed construction site
within this project, Developer shall apply for and obtain approval from, the City Engineer
for the proposed haul route.
22. Prior to issuance of any building permit, Developer shall comply with the requirements of
the City’s anti-graffiti program for wall treatments if and when such a program is
formally established by the City.
23. Prior to the issuance of a grading permit, the developer shall complete processing of
a lot line adjustment to consolidate Parcel A and Parcel B into one lot.
FeedAgreements
24. Developer shall cause property owner to execute and submit to the City Engineer for
recordation the City’s standard form Drainage Hold Harmless Agreement regarding
drainage across the adjacent property.
25. Developer shall cause property owner to execute, record and submit a recorded copy to
the City Engineer, a deed restriction on the property which relates to the proposed cross
lot drainage as shown on the site plan. The deed restriction document shall be in a form
acceptable to the City Engineer and shall:
A. Clearly delineate the limits of the drainage course;
B. State that the drainage course is to be maintained in perpetuity by the underlying
property owner; and
C. State that all future use of the property along the drainage course will not restrict,
impede, divert or otherwise alter drainage flows in a manner that will result in
PC RES0 NO. 5596 -5-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
damage to the underlyng and adjacent properties or the creation of a public
nuisance.
26. Prior to approval of any grading or building permits for this project, Developer shall
cause Owner to give written consent to the City Engineer to the annexation of the area
shown within the boundaries of the subdivision into the existing City of Carlsbad Street
Lighting and Landscaping District No. 1 and/or to the formation or annexation into an
additional Street Lighting and Landscaping District. Said written consent shall be
on a form provided by the City Engineer.
Grading
27. Prior to the issuance of a grading permit or building permit, whichever occurs first,
Developer shall submit to the City Engineer proof that a Notice of Intention for the start
of work has been submitted to the State Water Resources Control Board.
28. Based upon a review of the proposed grading and the grading quantities shown on the site
plan, a grading permit for this project is required. Developer shall apply for and obtain a
grading permit from the City Engineer prior to issuance of a building permit for the
project.
Dedications/Improvements
29.
30.
31.
32.
Developer shall cause Owner to make an irrevocable offer of dedication to the City andor
other appropriate entities for all public streets and other easements shown on the site plan.
The offer shall be made by a separate recorded document. All land so offered shall be
offered free and clear of all liens and encumbrances and without cost. Streets that already
public are not required to be rededicated.
Additional drainage easements may be required. Developer shall dedicate and provide or
install drainage structures, as may be required by the City Engineer, prior to or concurrent
with any grading or building permit.
Developer shall execute and record a City standard Development Improvement
Agreement to install and secure with appropriate security as provided by law, public
improvements shown on the site plan. The improvements are:
a) Water pipelines, fire hydrants and related appurtenances
Improvements listed above shall be constructed within 18 months of approval of the
subdivision or development improvement agreement or such other time as provided in
said agreement.
Prior to the issuance of grading permit or building permit, whichever occurs first,
Developer shall submit for City approval a “Storm Water Pollution Prevention Plan
(SWPPP).” The SWPPP shall be in compliance with current requirements and provisions
established by the San Diego Region of the California Regional Water Quality Control
PC RES0 NO. 5596 -6-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
33,
34.
Board and City of Carlsbad Requirements. The SWPPP shall address measures to reduce
to the maximum extent practicable storm water pollutant runoff during construction of
the project. At a minimum, the SWPPP shall:
a.
b.
c.
include all content as established by the California Regional Water Quality
Control Board requirements;
include the receipt of “Notice of Intent” issued by the California Regional Water
Quality Control Board;
recommend source control and treatment control Best Management Practices
(BMPs) that will be implemented with this project to avoid contact or filter said
pollutants from storm water to the maximum extent practicable before discharging
to City right-of-way or natural drainage course; and
establish specific procedures for handling spills and routine clean up. Special
considerations and effort shall be applied to employee education on the proper
procedures for handling clean up and disposal of pollutants.
d.
Prior to the issuance of grading permit or building permit, whichever occurs first,
Developer shall submit for City approval a “Storm Water Management Plan (SWMP).”
The SWMP shall demonstrate compliance with the City of Carlsbad Standard Urban
Stormwater Mitigation Plan (SUSMP), Order 2001-01 issued by the San Diego Region of
the California Regional Water Quality Control Board and City of Carlsbad Municipal
Code. The SWMP shall address measures to avoid contact or filter said pollutants from
storm water, to the maximum extent practicable, for the post-construction stage of the
project. At a minimum, the SWMP shall:
a.
b.
c.
identify existing and post-development on-site pollutants-of-concern;
identify the hydrologic unit this project contributes to and impaired water bodies
that could be impacted by this project;
recommend source controls and treatment controls that will be implemented with
this project to avoid contact or filter said pollutants from storm water to the
maximum extent practicable before discharging to City right-of-way;
establish specific procedures for handling spills and routine clean up. Special
considerations and effort shall be applied to employee education on the proper
procedures for handling clean up and disposal of pollutants;
ensure long-term maintenance of all post construct BMPs in perpetuity; and
identify how post-development runoff rates and velocities from the site will not
exceed the pre-development runoff rates and velocities to the maximum extent
practicable.
d.
e.
f.
Prior to building permit or grading permit issuance, whichever occurs first Developer
shall have design, apply for and obtain approval of the City Engineer, for the structural
section for the access aisles with a traffic index of 5.0 in accordance with City Standards
due to truck access through the parking area and/or aisles with an ADT greater than 500.
The structural pavement design of the aisle ways shall be submitted together with
required R-value soil test information and approved by the City Engineer as part of the
building or grading plan review whichever occurs first.
PC RES0 NO. 5596 -7-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Special Conditions:
35. The Average Daily Trips (ADT) and floor area co tained in the staff report and
shown on the site plan are for planning purposes only. Developer shall pay traffic
impact and sewer impact fees based on Section 18.42 and Section 13.10 of the City of
Carlsbad Municipal Code, respectively.
Water:
36.
37.
38.
39.
40.
41.
42.
The Developer shall design and construct public facilities within public right-of-way or
within minimum 20-feet wide easements granted to the District or the City of Carlsbad.
At the discretion of the District Engineer, wider easements may be required for adequate
maintenance, access andor joint utility purposes.
Prior to issuance of building permits, Developer shall pay all fees, deposits, and charges
for connection to public facilities. Developer shall pay the San Diego County Water
Authority capacity charge(s) prior to issuance of Building Permits.
The Developer shall install potable water services and meters at a location approved by
the District Engineer. The locations of said services shall be reflected on public
improvement plans.
The Developer shall install sewer laterals and clean-outs at a location approved by the
District Engineer. The locations of sewer laterals shall be reflected on public
improvement plans.
The Developer shall design and construct public water and sewer facilities substantially
as shown on the Site Plan to the satisfaction of the District Engineer. Proposed public
facilities shall be reflected on public improvement plans.
This project is approved upon the express condition that building permits will not be
issued for the development of the subject property, unless the District Engineer has
determined that adequate water and sewer facilities are available at the time of
occupancy.
Prior to issuance of building permits, the entire potable water, recycled water, and sewer
system shall be evaluated in detail to ensure that adequate capacity, pressure, and flow
demands can be met to the satisfaction of the District Engineer.
Code Reminders
The project is subject to all applicable provisions of local ordinances, including but not limited to
the following:
43. Developer shall pay a landscape plan check and inspection fee as required by Section
20.08.050 of the Carlsbad Municipal Code.
44.
PC RES0 NO. 5596 -8-
Premise identification (addresses) shall be provided consistent with Carlsbad Municipal
Code Section 18.04.320.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
45.
46.
47.
Approval of this request shall not excuse compliance with all applicable sections of the
Zoning Ordinance and all other applicable City ordinances in effect at time of building
permit issuance, except as otherwise specifically provided herein.
The project shall comply with the latest non-residential disabled access requirements
pursuant to Title 24 of the State Building Code.
Any signs proposed for this development shall at a minimum be designed in conformance
with the City’s Sign Ordinance and shall require review and approval of the Planning
Director prior to installation of such signs.
NOTICE
Please take NOTICE that approval of your project includes the “imposition” of fees, dedications,
reservations, or other ’ exactions hereafter collectively referred to for convenience as
“fees/exactions.”
You have 90 days from date of final approval to protest imposition of these fees/exactions. If
you protest them, you must follow the protest procedure set forth in Government Code Section
66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely
follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or
annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified feedexactions
DOES NOT APPLY to water and sewer connection fees and capacity charges, nor planning,
zoning, grading or other similar application processing or service fees in connection with this
project; NOR DOES IT APPLY to any fees/exactions of which you have previously been given a
NOTICE similar to this, or as to which the statute of limitations has previously otherwise
expired.
...
...
...
...
...
...
...
PC RES0 NO. 5596 -9-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
2€
PASSED, APPROVED AND ADOPTED at a regular meeting of the planning
Commission of the City of Carlsbad, California, held on the 7th day of April 2004, by the
following vote, to wit:
AYES: Vice-Chairperson Whitton, Commissioners Dominguez,
Heineman, Montgomery, and Segall
NOES: None
ABSENT: Commissioners Baker and White
ABSTAIN: None
FRANK WHITTON, Vice-Chairperson
CARLSBAD PLANNING COMMISSION
/
ATTEST:
Planning Director