Loading...
HomeMy WebLinkAbout2004-05-19; Planning Commission; Resolution 56371 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PLANNING COMMISSION RESOLUTION NO. 5637 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA, RECOMMENDING APPROVAL OF SITE DEVELOPMENT PLAN 03-03 TO CONSTRUCT A 78 UNIT AIRSPACE CONDOMINIUM PROJECT ON PROPERTY GENERALLY LOCATED ON THE NORTH AND EAST SIDE OF HARRISON STREET, WEST OF ADAMS STREET AND SOUTH OF CHINQUAPIN AVENUE IN LOCAL FACILITIES MANAGEMENT ZONE 1 CASE NAME: BLUFFS CASE NO.: SDP 03-03 WHEREAS, Anastasi Development Company, LLC, a Limited Liability Company, “Developer/Owner,” described as Lot 3, 7, 8, 9 and 10 inclusive, in Block “A” and Lots 1, 2,3,5, and 6 inclusive in Block “D” of resubdivision of portions of Tract 238 and 243 of Thum Lands, in the City of Carlsbad, County of San Diego, State of California, according to map thereof no. 2103, filed in the Office of the County Recorder of San Diego, April 3,1928 (“the Property”); and WHEREAS, said verified application constitutes a request for a Site Development Plan as shown on Exhibits “A” - “JJ” dated May 19, 2004, on file in the Planning Department, BLUFFS - SDP 03-03 as provided by Chapter 21.06/Section 21.53.120 of the Carlsbad Municipal Code; and WHEREAS, the Planning Commission did, on the 19th day of May, 2004, hold a duly noticed public hearing as prescribed by law to consider said request; and WHEREAS, at said public hearing, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, said Commission considered all factors relating to the Site Development Plan. NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning Commission of the City of Carlsbad as follows: A) That the foregoing recitations are true and correct. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 B) That based on the evidence presented at the public hearing, the Planning Commission RECOMMENDS APPROVAL of BLUFFS - SDP 03-03 based on the following findings and subject to the following conditions: Findings: 1. That the requested use is properly related to the site, surroundings and environmental settings, is consistent with the various elements and objectives of the General Plan, will not be detrimental to existing uses or to uses specifically permitted in the area in which the proposed use is to be located, and will not adversely impact the site, surroundings or traffic circulation, in that the project is located in an area of medium to high density projects and is in conformance with the Land Use Element of the General Plan by developing at 14.6 du/ac which is within the density range of 8 to 15 du/ac; the site or surroundings will not be adversely impacted as there are no significant habitats present and adjacent properties are already developed; and that the traffic circulation will not be affected as the local roadways are existing. The proposed vacation of Locust Street will not impact circulation, as the roadway does not presently exist as an improved roadway. 2. That the site for the intended use is adequate in size and shape to accommodate the use, in that all of the project’s buildings, parking, open space, and other amenities can be provided without the need for variances. 3. That dl yards, setbacks, walls, fences, landscaping, and other features necessary to adjust the requested use to existing or permitted future uses in the neighborhood will be provided and maintained, in that the project provides the required setbacks and incorporates architectural enhancements and landscaping consistent with the Planned Development Ordinance and City of Carlsbad Landscape Manual. 4. That the street systems serving the proposed use is adequate to properly handle all traffic generated by the proposed use, in that the additional 624 ADT generated by the project will not significantly impact the surrounding road segments or intersection levels of service. Conditions: Note: Unless otherwise specified herein, all conditions shall be satisfied prior to final map recordation or issuance of grading permit, whichever occurs first. 1. If any of the following conditions fail to occur; or if they are, by their terms, to be implemented and maintained over time, if any of such conditions fail to be so implemented and maintained according to their terms, the City shall have the right to revoke or modify all approvals herein granted; deny or further condition issuance of all future building permits; deny, revoke or further condition all certificates of occupancy issued under the authority of approvals herein granted; institute and prosecute litigation to compel their compliance with said conditions or seek damages for their violation. No vested rights are gained by Developer or a successor in interest by the City’s approval of this Site Development Plan. PC RES0 NO. 5637 -2- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 2. Staff is authorized and directed to make, or require the Developer to make, all corrections and modifications to the Site Development Plan documents, as necessary to make them internally consistent and in conformity with the final action on the project. Development shall occur substantially as shown on the approved Exhibits. Any proposed development different from this approval, shall require an amendment to this approval. 3. This approval is granted subject to the approval of the Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program, CT 02-18, CP 02-10, CDP 03- 35, and HDP 02-09 and is subject to all conditions contained in Planning Commission Resolutions No. 5634, 5635,5636,5638 and 5639 for those other approvals incorporated herein by reference. NOTICE Please take NOTICE that approval of your project includes the “imposition” of fees, dedications, reservations, or other exactions hereafter collectively referred to for convenience as “fees/exactions.” You have 90 days from date of final approval to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedure set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity charges, nor planning, zoning, grading or other similar application processing or service fees in connection with this project; NOR DOES IT APPLY to any feedexactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. ... ... ... ... PC RES0 NO. 5637 -3- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 2c 2; 28 PASSED, APPROVED AND ADOPTED at a regular meeting of the planning Commission of the City of Carlsbad, California, held on the 19th day of May 2004, by the following vote, to wit: AYES: Chairperson White, Commissioners Baker, Dominguez, Heineman, and Whitton NOES: None ABSENT: Commissioners Montgomery and Segall ABSTAIN: None MELISSA WHITE, Chairperson CARLSBAD PLANNING COMMISSION ATTEST: MICHAEL J. HOLmILLm Planning Director PC RES0 NO. 5637 -4-