PLANNING COMMISSION RESOLUTION NO. 5801
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF CARLSBAD, CALIFORNIA, ADOPTING A
NEGATIVE DECLARATION FOR THE DEVELOPMENT OF A
34,500 SQUARE FOOT RETAIL CENTER INCLUDING A
GENERALLY LOCATED AT THE NORTHWEST CORNER OF
PALOMAR AIRPORT ROAD AND LOKER AVENUE WEST
IN LOCAL FACILITIES MANAGEMENT ZONE 5.
CASE NAME: LOKER BUSINESS CENTER
DRIVE-THRU BANK ON A 4.27-ACRE PROPERTY
CASE NO.: CUP 04-01/SDP 04-01
WHEREAS, Franz-Loker, LLC, “Developer and Owner,” has filed a verified
application with the City of Carlsbad regarding property described as
Lot 1 of Carlsbad Tract No. 74-21, in the City of Carlsbad,
County of San Diego, State of California, according to Map
thereof No. 10372, filed in the Office of the County Recorder of
San Diego County, April 13,1982
(“the Property”); and
WHEREAS, a Negative Declaration was prepared in conjunction with said
project; and
WHEREAS, the Planning Commission did on the 15th day of December, hold a
duly noticed public hearing as prescribed by law to consider said request; and
WHEREAS, at said public hearing, upon hearing and considering all testimony
and arguments, examining the initial study, analyzing the information submitted by staff, and
considering any written comments received, the Planning Commission considered all factors
relating to the Negative Declaration.
NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning
Commission as follows:
A) That the foregoing recitations are true and correct.
B) That based on the evidence presented at the public hearing, the Planning
Commission hereby ADOPTS the Negative Declaration, Exhibit “ND,” dated
December 15, 2004 according to Exhibits “NOI” dated October 13, 2004, and
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
“PII” dated October 6, 2004, attached hereto and made a part hereof, based on
the following findings:
Findings:
1. The Planning Commission of the City of Carlsbad does hereby find:
a. it has reviewed, analyzed and considered the Negative Declaration, the
environmental impacts therein identified for this project and any comments
thereon prior to APPROVING the project; and
b. the Negative Declaration has been prepared in accordance with requirements of
the California Environmental Quality Act, the State Guidelines and the
Environmental Protection Procedures of the City of Carlsbad; and
c. it reflects the independent judgment of the Planning Commission of the City of
Carlsbad; and
d. based on the EIA Part I1 and comments thereon, there is no substantial evidence
the project will have a significant effect on the environment.
PASSED, APPROVED AND ADOPTED at a regular meeting of the Planning
Commission of the City of Carlsbad, California, held on the 15th day of December 2004, by the
following vote, to wit:
AYES: Chairperson Whitton, Commissioners Baker, Cardosa, Dominguez,
Heineman, Montgomery, and Segall
NOES:
ABSENT:
ABSTAIN:
@NK H. WHITTON, Chairperson
CARLSBAD PLANNING COMMISSION
ATTEST:
Planning Director
PC RES0 NO. 5801 -2-
- City of Carlsbad
NOTICE OF INTENT TO ADOPT A
NEGATIVE DECLARATION
CASE NAME: Loker Business Center
PROJECT LOCATION:
CASE NO: SDP 04-01/CUP 04-01MS 04-04
Northwest corner of Palomar Airport Road and Loker Avenue
West, City of Carlsbad, County of San Dieno
PROJECT DESCRIPTION: Development of a 34,500 square foot commercial center with
three buildings on a 4.27 acre industrially zoned property on a previously graded pad.
PROPOSED DETERMINATION: The City of Carlsbad has conducted an environmental
review of the above described project pursuant to the Guidelines for Implementation of the
California Environmental Quality Act and the Environmental Protection Ordinance of the City of
Carlsbad. As a result of said review, the initial study (EL4 Part 2) did not identify any potentially
significant impacts on the environment. Therefore, a Negative Declaration will be
recommended for adoption by the City of Carlsbad Planning Commission.
A copy of the initial study (EIA Part 2) documenting reasons to support the proposed Negative
Declaration are on file in the Planning Department, 1635 Faraday Avenue, Carlsbad, California
92008. Comments from the public are invited. Please submit comments in writing to the
Planning Department within 20 days of the date of this notice.
The proposed project and Negative Declaration are subject to review and approval/adoption by
the City of Carlsbad Planning. Additional public notices will be issued when those public
hearings are scheduled. If you have any questions, please call Christer Westman in the Planning
Department at (760) 602-4614.
PUBLIC REVIEW PERIOD October 13,2004 to November 12.2004
PUBLISH DATE October 13,2004
1635 Faraday Avenue Carlsbad, CA 92008-7314 (760) 602-4600 FAX (760) 602-8559 www.ci.car1sbad.ca.us January 30,2003
- City of Carlsbad
NEGATIVE DECLARATION
CASE NAME: LOKER BUSINESS CENTER
PROJECT LOCATION:
CASE NO: CUP 04-01 / SDP 04-01
Northwest corner of Palomar Airport Road and Loker Avenue West
PROJECT DESCRIPTION: A Conditional Use Permit and Site Development Plan for the
development of a 34,500 square foot retail center including a drive through bank on a 4.27 acre
property.
DETERMINATION: The City of Carlsbad has conducted an environmental review of the above
described project pursuant to the Guidelines for Implementation of the California Environmental
Quality Act and the Environmental Protection Ordinance of the City of Carlsbad. As a result of said
review, the initial study (EL4 Part 2) did not identify any potentially significant impacts on the
environment, and the City of Carlsbad finds as follows:
The proposed project COULD NOT have a significant effect on the environment.
0 The proposed project MAY have “potentially significant impact(s)” on the environment, but
at least one potentially significant impact 1) has been adequately analyzed in an earlier
document pursuant to applicable legal standards, and 2) has been addressed by mitigation
measures based on the earlier analysis as described on attached sheets. (Negative
Declaration applies only to the effects that remained to be addressed).
0 Although the proposed project could have a significant effect on the environment, there
WILL NOT be a significant effect in this case because all potentially significant effects (a)
have been analyzed adequately in an earlier ENVIRONMENTAL IMPACT REPORT or
NEGATIVE DECLARATION pursuant to applicable standards and (b) have been avoided
or mitigated pursuant to that earlier ENVIRONMENTAL IMPACT REPORT or
NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed
upon the proposed project. Therefore, nothing further is required.
A copy of the initial study (EIA Part 2) documenting reasons to support the Negative Declaration is
on file in the Planning Department, 1635 Faraday Avenue, Carlsbad, California 92008.
ADOPTED: December 15, 2004, pursuant to Planning Commission Resolution No. 5801
ATTEST:
MICHAEL J. HOLZMILLER
Planning Director
1635 Faraday Avenue Carlsbad, CA 92008-7314 (760) 602-4600 FAX (760) 602-8559 w.ci.carlsbad.ca.us @
ENVIRONMENTAL IMPACT ASSESSMENT FORM - PART I1
CASE NO: SDP 04-01/CUP 04-01/MS 04-04
DATE: October 6,2004
BACKGROUND
1. CASE NAME: Loker Business Center
2. LEAD AGENCY NAME AND ADDRESS: City of Carlsbad
3. CONTACT PERSON AND PHONE NUMBER: Christer Westman (760) 602-4164
4. PROJECT LOCATION: Northwest corner of Palomar Airport Road and Loker Avenue West
5. PROJECT SPONSOR’S NAME AND ADDRESS: Franz-Loker LLC. 2710 Loker Avenue West
Suite 100 Carlsbad CA 92008 (760) 93 1-7700
6. GENERAL PLAN DESIGNATION: Planned Industrial (PI)
7. ZONING: Planned Industrial (PM)
8. OTHER PUBLIC AGENCIES WHOSE APPROVAL IS REQUIRED (i.e., permits, financing
approval or participation agreements): None
9. PROJECT DESCRIPTION/ ENVIRONMENTAL SEnING AND SURROUNDING LAND
USES:
Development of a three building commercial center to serve the needs of the adiacent industrial
park. The site is approximately 4.25 acres and has been m-aded pursuant to a grading plan
adopted for the development of the industrial park. Access to the site is taken from Loker
Avenue West which is also the east proper@ boundarv. There are no significant plant or animal
species present on or immediately adjacent to the site. Properties to the north and east are
developed with office buildings and parking, Palomar Airport Road is adjacent to the south and
west is disturbed open space reserved by the County of San Diego for the approach to McClellan-
Palomar Airport.
1 Rev. 07/03/02
ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED:
The summary of environmental factors checked below would be potentially affected by this project,
involving at least one impact that is a “Potentially Significant Impact,” or “Potentially Significant Impact
Unless Mitigation Incorporated” as indicated by the checklist on the following pages.
0 Aesthetics Geology/Soils 0 Noise
0 Agricultural Resources [7 Hazards/Hazardous Materials and Housing
Air Quality 0 HydrologyNater Quality 0 Public Services
0 Biological Resources Land Use and Planning 0 Recreation
0 Cultural Resources 0 Mineral Resources [XI TransportatiodCirculation
0 Utilities & Service Systems Mandatory Findings of
Significance
2 Rev. Q7lQ3IO2
DETERMINATION.
IXI
0
0
0
0
I find that the proposed project COULD NOT have a significant effect on the environment, and a
NEGATIVE DECLARATION will be prepared.
I find that although the proposed project could have a significant effect on the environment, there will not
be a significant effect in this case because the mitigation measures described on an attached sheet have
been added to the project. A MITIGATED NEGATIVE DECLARATION will be prepared.
I find that the proposed project MAY have a significant effect on the environment, and an
ENVIRONMENTAL IMPACT REPORT is required.
I find that the proposed project MAY have “potentially significant impact(s)” on the environment, but at
least one potentially significant impact 1) has been adequately analyzed in an earlier document pursuant to
applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis
as described on attached sheets. A Negative Declaration is required, but it must analyze only the effects
that remain to be addressed.
I find that although the proposed project could have a significant effect on the environment, there WILL
NOT be a significant effect in this case because all potentially significant effects (a) have been analyzed
adequately in an earlier ENVIRONMENTAL IMPACT REPORT or NEGATIVE DECLARATION
pursuant to applicable standards and (b) have been avoided or mitigated pursuant to that earlier
ENVIRONMENTAL IMPACT REPORT or NEGATIVE DECLARATION, including revisions or
mitigation measures that are imposed upon the proposed project. Therefore, nothing further is required.
\ 0 107) 6
Date I I t
3 Rev. 07/03/02
ENVIRONMENTAL IMPACTS
STATE CEQA GUIDELINES, Chapter 3, Article 5, Section 15063 requires that the City conduct an Environmental
Impact Assessment to determine if a project may have a significant effect on the environment. The Environmental
Impact Assessment appears in the following pages in the form of a checklist. This checklist identifies any physical,
biological and human factors that might be impacted by the proposed project and provides the City with information
to use as the basis for deciding whether to prepare an Environmental Impact Report (EIR), Negative Declaration, or
to rely on a previously approved EIR or Negative Declaration.
A brief explanation is required for all answers except “No Impact” answers that are adequately supported
by an information source cited in the parentheses following each question. A “No Impact” answer is
adequately supported if the referenced information sources show that the impact simply does not apply to
projects like the one involved. A “No Impact” answer should be explained when there is no source
document to refer to, or it is based on project-specific factors as well as general standards.
“Less Than Significant Impact” applies where there is supporting evidence that the potential impact is not
significantly adverse, and the impact does not exceed adopted general standards and policies.
“Potentially Significant Unless Mitigation Incorporated” applies where the incorporation of mitigation
measures has reduced an effect from “Potentially Significant Impact” to a “Less Than Significant Impact.”
The developer must agree to the mitigation, and the City must describe the mitigation measures, and briefly
explain how they reduce the effect to a less than significant level.
“Potentially Significant Impact” is appropriate if there is substantial evidence that an effect is significantly
adverse.
Based on an “EIA-Part 11”, if a proposed project could have a potentially significant adverse effect on the
environment, but glJ potentially significant adverse effects (a) have been analyzed adequately in an earlier
EIR or Mitigated Negative Declaration pursuant to applicable standards and (b) have been avoided or
mitigated pursuant to that earlier EIR or Mitigated Negative Declaration, including revisions or mitigation
measures that are imposed upon the proposed project, and none of the circumstances requiring a
supplenient to or supplemental EIR are present and all the mitigation measures required by the prior
environmental document have been incorporated into this project, then no additional environmental
document is required.
When “Potentially Significant Impact” is checked the project is not necessarily required to prepare an EIR
if the significant adverse effect has been analyzed adequately in an earlier EIR pursuant to applicable
standards and the effect will be mitigated, or a “Statement of Overriding Considerations” has been made
pursuant to that earlier EIR.
A Negative Declaration may be prepared if the City perceives no substantial evidence that the project or
any of its aspects may cause a significant adverse effect on the environment.
If there are one or more potentially significant adverse effects, the City may avoid preparing an EIR if there
are mitigation measures to clearly reduce adverse impacts to less than significant, and those mitigation
measures are agreed to by the developer prior to public review. In this case, the appropriate “Potentially
Significant Impact Unless Mitigation Incorporated” may be checked and a Mitigated Negative Declaration
may be prepared.
4 Rev. 07/03/02
0 An EIR
the following circumstances: (1) the potentially significant adverse effect has not been discussed or
mitigated in an earlier EIR pursuant to applicable standards, and the developer does not agree to mitigation
measures that reduce the adverse impact to less than significant; (2) a “Statement of Overriding
Considerations” for the significant adverse impact has not been made pursuant to an earlier EIR; (3)
proposed mitigation measures do not reduce the adverse impact to less than significant; or (4) through the
EIA-Part I1 analysis it is not possible to determine the level of significance for a potentially adverse effect,
or determine the effectiveness of a mitigation measure in reducing a potentially significant effect to below a
level of significance.
be prepared if “Potentially Significant Impact” is checked, and including but not limited to
A discussion of potential impacts and the proposed mitigation measures appears at the end of the form under
DISCUSSION OF ENVIRONMENTAL EVALUATION. Particular attention should be given to discussing
mitigation for impacts, which would otherwise be determined significant.
5 Rev. Q7lQ3102
h
Issues (and Supporting Information Sources).
I.
11.
111.
AESTHETICS - Would the project:
a) Have a substantial adverse effect on a scenic vista?
b) Substantially damage scenic resources, including but
not limited to, trees, rock outcroppings, and historic
buildings within a State scenic highway?
Substantially degrade the existing visual character or
quality of the site and its surroundings?
d) Create a new source of substantial light and glare,
which would adversely affect day or nighttime views
in the area?
c)
AGRICULTURAL RESOURCES - Would the project:
Convert Prime Farmland, Unique Farmland, or
Farmland of Statewide Importance (Farmland), as
shown on the maps prepared pursuant to the
Farmland Mapping and Monitoring Program of the
California Resources Agency, to non-agricultural
use?
Conflict with existing zoning for agricultural use, or
a Williamson Act contract?
Involve other changes in the existing environment,
which, due to their location or nature, could result in
conversion of Farmland to non-agricultural use?
AIR QUALITY - Would the project:
Conflict with or obstruct implementation of the
applicable air quality plan?
Violate any air quality standard or contribute
substantially to an existing or projected air quality
violation?
Result in a cumulatively considerable net increase of
any criteria pollutant for which the project region is
in non-attainment under an applicable federal or state
ambient air quality standard (including releasing
emissions which exceed quantitative thresholds for
ozone precursors)?
Expose sensitive receptors to substantial pollutant
concentrations?
Create objectionable odors affecting a substantial
number of people?
IV. BIOLOGICAL RESOURCES - Would the project:
6
Potentially Significant
Impact
0
0
0
0
0
0
0
0
0
0
Potentially
Significant Unless
Mitigation Incorporated
0
0
0
0
0
0
0
0
0
0
0
0
Less Than
Significant Impact
0
0
0
0
0
0
0
0
IXI
[XI
0
0
No Impact
IXI
IXI
IXI
Ixl
IXI
IXI
IXI
IXI
0
0
IXI
(XI
Rev. 07/03/02
Issues (and Supporting Information Sources).
a) Have a substantial adverse effect, either directly or
through habitat modifications, on any species
identified as a candidate, sensitive, or special status
species in local or regional plans, policies, or
regulations, or by California Department of Fish and
Game or U.S. Fish and Wildlife Service?
b) Have a substantial adverse effect on any riparian,
aquatic or wetland habitat or other sensitive natural
community identified in local or regional plans,
policies, or regulations or by California Department
of Fish and Game or U.S. Fish and Wildlife Service?
c) Have a substantial adverse effect on federally
protected wetlands as defined by Section 404 of the
Clean Water Act (including but not limited to marsh,
vernal pool, coastal, etc.) through direct removal,
filing, hydrological interruption, or other means?
d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species
or with established native resident or migratory
wildlife corridors, or impede the use of native
wildlife nursery sites?
e) Conflict with any local policies or ordinances
protecting biological resources, such as a tree
preservation policy or ordinance?
0 Conflict with the provisions of an adopted Habitat
Conservation Plan, Natural Community Conservation
Plan, or other approved local, regional, or state
habitat conservation plan?
g) Impact tributary areas that are environmentally
sensitive?
Potentially
Significant
Potentially Unless
Significant Mitigation
Impact Incorporated 0 0
0 0
0 0
0 0
0 0
0 0
0
Less Than Significant
Impact 0
0
0
0
0
0
0
No Impact Ixl
[XI
[XI
[XI
Ixl
[XI
[XI
7 Rev. 07/03/02
14
Issues (and Supporting Information Sources).
V. CULTURAL RESOURCES - Would the project:
Cause a substantial adverse change in the
significance of a historical resource as defined in 9 15064.5?
Cause a substantial adverse change in the signifi-
cance of an archeological resource pursuant to
§15064.5?
Directly or indirectly destroy a unique paleontologi-
cal resource or site or unique geologic feature?
Disturb any human remains, including those interred
outside of formal cemeteries?
VI. GEOLOGY AND SOILS - Would the project:
Expose people or structures to potential substantial
adverse effects, including the risk of loss, injury or
death involving:
i.
11.
... 111.
iv.
Rupture of a known earthquake fault, as
delineated on the most recent Alquist-Priolo
Earthquake Fault Zoning Map issued by the
State Geologist for the area or based on other
substantial evidence of a known fault? Refer to
Division of Mines and Geology Special
Publication 42.
Strong seismic ground shaking?
Seismic-related ground failure, including
liquefaction?
Landslides?
Result in substantial soil erosion or the loss of
topsoil?
Be located on a geologic unit or soil that is unstable,
or that would become unstable as a result of the
project, and potentially result in on- or off-site
landslide, lateral spreading, subsidence, liquefaction,
or collapse?
Be located on expansive soils, as defined in Table 18 - 1-B of the Uniform Building Code (1997), creating
substantial risks to life or property?
Potentially Significant
Impact
0
0
0
0
0
0
0
0
0
0
0
c-\
Potentially
Significant
Unless Mitigation
Incorporated
0
0
0
0
0
0
0
17
0
0
0
Less Than Significant
Impact
0
0
0
0
0
0
0
0
0
0
0
No Impact
IXI
IXI
IXI
IXI
IXI
IXI
IXI
IXI
IXI
Ixl
IXI
8 Rev. 07/03/02
fi
Issues (and Supporting Information Sources).
e) Have soils incapable of adequately supporting the
use of septic tanks or alternative wastewater disposal
systems where sewers are not available for the
disposal of wastewater?
VII. HAZARDS AND HAZARDOUS MATERIALS -
Would the project:
Create a significant hazard to the public or the
environment through the routine transport, use, or
disposal of hazardous materials?
Create a significant hazard to the public or
environment through reasonably foreseeable upset
and accident conditions involving the release of
hazardous materials into the environment?
Emit hazardous emissions or handle hazardous or
acutely hazardous materials, substances, or waste
within one-quarter mile of an existing or proposed
school?
Be located on a site which is included on a list of
hazardous materials sites compiled pursuant to
Government Code Section 65962.5 and, as a result,
would it create a significant hazard to the public or
environment?
For a project within an airport land use plan, or
where such a plan has not been adopted, within two
miles of a public airport or public use airport, would
the project result in a safety hazard for people
residing or working in the project area?
For a project within the vicinity of a private airstrip,
would the project result in a safety hazard for people
residing or working in the project area?
Impair implementation of or physically interfere with
an adopted emergency response plan or emergency
evacuation plan?
Expose people or structures to a significant risk of
loss, injury or death involving wildland fires,
including where wildlands are adjacent to urbanized
areas or where residences are intermixed with
wildlands'?
VIII. HYDROLOGY AND WATER QUALITY - Would the
project:
a) Violate any water quality standards or waste
discharge requirements?
9
Potentially
Significant
Impact
0
0
0
0
0
0
0
0
0
h,
Potentially
Significant Unless
Mitigation Incorporated
0
0
0
0
0
0
0
0
Less Than
Significant Impact
0
0
0
0
0
Ixl
0
0
0
0
No
Impact
IXI
IXI
Ixl
IXI
IXI
17
IXI
IXI
El
IXI
Rev. 07/03/02
n
Issues (and Supporting Information Sources).
Substantially deplete groundwater supplies or
interfere substantially with ground water recharge
such that there would be a net deficit in aquifer
volume or a lowering of the local ground water table
level (i.e., the production rate of pre-existing nearby
wells would drop to a level which would not support
existing land uses or planned uses for which permits
have been granted)?
Impacts to groundwater quality?
Substantially alter the existing drainage pattern of the
site or area, including through the alteration of the
course of a stream or river, in a manner, which would
result in substantial erosion or siltation on- or off-
site?
Substantially alter the existing drainage pattern of the
site or area, including through the alteration of the
course of a stream or river, or substantially increase
the flow rate or amount (volume) of surface runoff in
a manner, which would result in flooding on- or off-
site?
Create or contribute runoff water, which would
exceed the capacity of existing or planned
stormwater drainage systems or provide substantial
additional sources of polluted runoff?
Otherwise substantially degrade water quality?
Place housing within a 100-year flood hazard area as
mapped on a Federal Flood Hazard Boundary or
Flood Insurance Rate Map or other flood delineation
map?
Place within 100-year flood hazard area structures,
which would impede or redirect flood flows?
Expose people or structures to a significant risk of
loss injury or death involving flooding, including
flooding as a result of the failure of a levee or dam?
Inundation by seiche, tsunami, or mudflow?
Increased erosion (sediment) into receiving surface
waters.
Increased pollutant discharges (e.g., heavy metals,
pathogens, petroleum derivatives, synthetic organics,
nutrients, oxygen-demanding substances and trash)
into receiving surface waters or other alteration of
receiving surface water quality (e.g., temperature,
dissolved oxygen or turbidity)?
Potentially
Significant Impact
0
0
0
0
0
0
0
0
0
0
0
0
-
Potentially
Significant Unless
Mitigation
Incorporated
0
0
0
0
0
0
17
0
0
0
0
Less Than
Significant Impact
0
0
0
0
0
0
0
0
0
0
0
0
No Impact
IXI
IXI
IXI
IXI
IXI
IXI
IXI
IXI
El
IXI
IXI
IXI
10 Rev. o7103102
h
Issues (and Supporting Information Sources).
IX.
x.
XI.
n) Changes to receiving water quality (marine, fresh or
wetland waters) during or following construction?
0) Increase in any pollutant to an already impaired
water body as listed on the Clean Water Act Section
303(d) list?
p) The exceedance of applicable surface or groundwater receiving water quality objectives or degradation of
beneficial uses?
LANDUSE AND PLANNING - Would the project:
a) Physically divide an established community?
b) Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the
project (including but not limited to the general plan,
specific plan, local coastal program, or zoning
ordinance) adopted for the purpose of avoiding or
mitigating an environmental effect?
c) Conflict with any applicable habitat conservation
plan or natural community conservation plan?
MINERAL RESOURCES - Would the project:
a) Result in the loss of availability of a known mineral
resource that would be of future value to the region
and the residents of the State?
b) Result in the loss of availability of a locally
important mineral resource recovery site delineated
on a local general plan, specific plan, or other land
use plan?
NOISE - Would the project result in:
a) Exposure of persons to or generation of noise levels
in excess of standards established in the local general
plan or noise ordinance or applicable standards of
other agencies?
b) Exposure of persons to or generation of excessive
groundbourne vibration or groundbourne noise
levels'?
c) A substantial permanent increase in ambient noise
levels in the project vicinity above levels existing
without the project?
d) A substantial temporary or periodic increase in
ambient noise levels in the project vicinity above
levels existing without the project'?
Potentially Significant
Impact
0
0
0
0
0
0
o
17
0
0
0
R
Potentially Significant
Unless Mitigation
Incorporated
0
17
17
0
0
0
0
0
0
0
0
0
Less Than Significant
Impact
0
0
0
0
0
0
17
0
0
0
0
11 Rev. 07/03/02
h
Issues (and Supporting Information Sources). Potentially
Significant Unless Less Than Mitigation Significant
Incorporated Impact
0 [XI
Potentially Significant
Impact
No
Impact
0 e) For a project located within an airport land use plan
or, where such a plan has not been adopted, within 2
miles of a public airport or public use airport, would
the project expose people residing or working in the
project area to excessive noise levels?
0
o f) For a project within the vicinity of a private airstrip,
would the project expose people residing or working
in the project area to excessive noise levels?
0 0 IXI
XII. POPULATION AND HOUSING - Would the project:
a) 0 Induce substantial growth in an area either directly
(for example, by proposing new homes and
businesses) or indirectly (for example, through
extension of roads or other infrastructure)?
0 0 [XI
o b) Displace substantial numbers of existing housing, necessitating the construction of replacement housing
elsewhere?
0 0 [XI
0 c) Displace substantial numbers of people, necessitating
the construction of replacement housing elsewhere? 0 0
XIII. PUBLIC SERVICES
a) Would the project result in substantial adverse
physical impacts associated with the provision of
new or physically altered government facilities, a
need for new or physically altered government
facilities, the construction of which could cause
significant environmental impacts, in order to
maintain acceptable service ratios, response times, or
other performance objectives for any of the public
services:
0 i) Fire protection? 0 0 IXI
IXI
IXI
IXI
IXI
ii) Police protection?
iii) Schools?
iv) Parks?
v) Other public facilities?
0 0 0
0 0
0 0
0 0
0
0
0
XIV. RECREATION
0 a) Would the project increase the use of existing
neighborhood and regional parks or other
recreational facilities such that substantial physical
deterioration of the facility would occur or be
accelerated?
0 0 IXI
Rev. 07/03/02
P
Issues (and Supporting Information Sources).
b) Does the project include recreational facilities or
require the construction or expansion of recreational
facilities, which might have an adverse physical
effect on the environment?
XV. TRANSPORTATION/TRAFFIC - Would the project:
Cause an increase in traffic, which is substantial in
relation to the existing traffic load and capacity of the
street system (i.e., result in a substantial increase in
either the number of vehicle trips, the volume to
capacity ratio on roads, or congestion at
intersections)?
Exceed, either individually or cumulatively, a level
of service standard established by the county
congestion management agency for designated roads
or highways?
Result in a change in air traffic patterns, including
either an increase in traffic levels or a change in
location that results in substantial safety risks?
Substantially increase hazards due to a design feature
(e.g., sharp curves or dangerous intersections) or
incompatible uses (e.g., farm equipment)?
Result in inadequate emergency access?
Result in insufficient parking capacity?
Conflict with adopted policies, plans, or programs
supporting alternative transportation (e.g., bus turn-
outs, bicycle racks)?
XVI. UTILITIES AND SERVICES SYSTEMS - Would the
project:
a) Exceed wastewater treatment requirements of the
applicable Regional Water Quality Control Board?
b) Require or result in the construction of new water or wastewater treatment facilities or expansion of
existing facilities, the construction of which would
cause significant environmental effects?
c) Require or result in the construction of new storm
water drainage facilities or expansion of existing
facilities, the construction of which could cause
significant environmental effects?
d) Have sufficient water supplies available to serve the
project from existing entitlements and resources, or
are new or expanded entitlements needed?
Potentially
Significant Impact
0
0
0
0
0
0
0
0
0
0
El
0
?
Potentially
Significant Unless
Mitigation
Incorporated
0
0
0
17
0
0
0
0
0
0
0
0
Less Than Significant
Impact
0
0
0
0
0
0
0
0
0
0
El
0
No
Impact
KJ
IXI
KJ
IXI
IXI
IXI
IXI
IXI
IXI
IXI
lzl
IXI
13 Rev. 07/03/02
h -
Issues (and Supporting Information Sources). Potentially Significant
Potentially Unless Less Than Significant Mitigation Significant No
Impact Incorporated Impact Impact
0 0 ON e) Result in a determination by the wastewater
treatment provider, which serves or may serve the
project that it has adequate capacity to serve the
project’s projected demand in addition to the
provider’s existing commitments?
Be served by a landfill with sufficient permitted
capacity to accommodate the project’s solid waste
disposal needs?
Comply with federal, state, and local statutes and
regulations related to solid waste?
0 0 OIXI
0 0 OH
f)
g)
XVII. MANDATORY FINDINGS OF SIGNIFICANCE
0 0 om a) Does the project have the potential to degrade the
quality of the environment, substantially reduce the
habitat of a fish or wildlife species, cause a fish or
wildlife population to drop below self-sustaining
levels, threaten to eliminate a plant or animal
community, reduce the number or restrict the range
of a rare or endangered plant or animal or eliminate
important examples of the major periods of
California history or prehistory‘?
o 0 OIXI b) Does the project have impacts that are individually
limited, but cumulatively considerable? (“Cumula-
tively considerable” means that the incremental
effects of a project are considerable when viewed in
connection with the effects of past projects, the
effects of other current projects, and the effects of
probable future projects?)
Does the project have environmental effects, which
will cause the substantial adverse effects on human
beings, either directly or indirectly?
0 0 ON c)
’
XVIII. EARLIER ANALYSES
Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, one or
more effects have been adequately analyzed in an earlier EIR or negative declaration. Section
15063(c)(3)(D). In this case a discussion should identify the following on attached sheets:
a) Earlier analyses used. Identify earlier analyses and state where they are available for review.
b) Impacts adequately addressed. Identify which effects from the above checklist were within the
scope of and adequately analyzed in an earlier document pursuant to applicable legal standards,
and state whether such effects were addressed by mitigation measures based on the earlier
analysis.
Mitigation measures. For effects that are “Less Than Significant with Mitigation Incorporated,”
describe the mitigation measures, which were incorporated or refined from the earlier document
and the extent to which they address site-specific conditions for the project.
c)
14 Rev. 07/03/02
n r?
DISCUSSION OF ENVIRONMENTAL EVALUATION
AESTHETICS
There are no significant natural aesthetic features of the site. The site is a previously graded pad within an industrial
subdivision.
AGRICULTURAL RESOURCES
There is no agricultural significance to the site. The site is a previously graded pad withm an industrial subdivision.
AIR QUALITY-Would the project:
a) Conflict with or obstruct implementation of the applicable air quality plan?
No Impact. The project site is located in the San Diego Air Basin which is a federal and state non-attainment area
for ozone (03), and a state non-attainment area for particulate matter less than or equal to 10 microns in diameter
(PM,,). The periodic violations of national Ambient Air Quality Standards (AAQS) in the San Diego Air Basin
(SDAB), particularly for ozone in inland foothdl areas, requires that a plan be developed outlining the pollution
controls that will be undertaken to improve air quality. In San Diego County, this attainment planning process is
embodied in the Regional Air Quality Strategies (RAQS) developed jointly by the Air Pollution Control District
(APCD) and the San Diego Association of Governments (SANDAG).
A plan to meet the federal standard for ozone was developed in 1994 during the process of updating the 1991 state-
mandated plan. This local plan was combined with plans from all other California non-attainment areas having
serious ozone problems and used to create the California State Implementation Plan (SIP). The SIP was adopted by
the Air Resources Board (ARB) after public hearings on November 9th through 10th in 1994, and was forwarded to
the Environmental Protection Agency (EPA) for approval. After considerable analysis and debate, particularly
regarding airsheds with the worst smog problems, EPA approved the SIP in mid-1996.
The proposed project relates to the SIP andor RAQS through the land use and growth assumptions that are
incorporated into the air quality planning document. These growth assumptions are based on each city’s and the
County’s general plan. If a proposed project is consistent with its applicable General Plan, then the project
presumably has been anticipated with the regional air quality planning process. Such consistency would ensure that
the project would not have an adverse regional air quality impact.
Section 15125(B) of the State of California Environment Quality Act (CEQA) Guidelines contains specific
reference to the need to evaluate any inconsistencies between the proposed project and the applicable air quality
management plan. Transportation Control Measures (TCMs) are part of the RAQS. The RAQS and TCM plan set
forth the steps needed to accomplish attainment of state and federal ambient air quality standards. The California
Air Resources Board provides criteria for determining whether a project conforms with the RAQS which include the
following:
0
Is a regional air quality plan being implemented in the project area?
Is the project consistent with the growth assumptions in the regional air quality plan?
The project area is located in the San Diego Air Basin, and as such, is located in an area where a RAQS is being
implemented. The project is consistent with the growth assumptions of the City’s General Plan and the RAQS.
Therefore, the project is consistent with the regional air quality plan and will in no way conflict or obstruct
implementation of the regional plan.
b) Violate any air quality standard or contribute substantially to an existing or projected air quality
violation?
Less Than Significant Impact. The closest air quality monitoring station to the project site is in the City of
Oceanside. Data available for this monitoring site through April, 2002 indicate that the most recent air quality
violations recorded were for the state one hour standard for ozone (one day in both 2000 and 2001) and one day in
2001 for the federal 8-hour average for ozone and one day for the 24-hour state standard for suspended particulates
in 1996. No violations of any other air quality standards have been recorded recently. (Add the following text
addressing short-term emissions, if there is grading associated with the project.) The project would involve
15 Rev. 07/03/02
minimal short-term emissions associated with grading and construction. Such emissions would be minimized
through standard construction measures such as the use of properly tuned equipment and watering the site for dust
control. Long-term emissions associated with travel to and from the project will be minimal. Although air pollutant
emissions would be associated with the project, they would neither result in the violation of any air quality standard
(comprising only an incremental contribution to overall air basin quality readings), nor contribute substantially to an
existing or projected air quality violation. Any impact is assessed as less than significant.
c) Result in a cumulatively considerable net increase of any criteria pollutant for which the project
region is non-attainment under an applicable federal or state ambient air quality standard?
Less Than Significant Impact. The Air Basin is currently in a non-attainment zone for ozone and suspended frne
particulates. The proposed project would represent a contribution to a cumulatively considerable potential net
increase in emissions throughout the air basin. As described above, however, emissions associated with the
proposed project would be minimal. Given the limited emissions potentially associated with the proposed project,
air quality would be essentially the same whether or not the proposed project is implemented. According to the
CEQA Guidelines Section 15 130 (a)(4), the proposed project’s contribution to the cumulative impact is considered
de rninirnus. Any impact is assessed as less than significant.
d) Expose sensitive receptors to substantial pollutant concentrations?
No Impact. As noted above, the proposed project would not result in substantial pollutant emissions or
concentrations. In addition, there are no sensitive receptors (e.g., schools or hospitals) located in the vicinity of the
project. No impact is assessed.
e) Create objectionable odors affecting a substantial number of people?
No Impact. The construction of the proposed project could generate fumes from the operation of construction
equipment, which may be considered objectionable by some people. Such exposure would be short-term or
transient. In addition, the number of people exposed to such transient impacts is not considered substantial.
BIOLOGICAL RESOURCES
There are no significant biological resources on the site. The site is a previously graded pad within an industrial
subdivision. Adjacent properties to the north, east and south have been developed with industrial uses. Property to
the west is undeveloped, however, has been cleared of significant vegetation partially because it is the approach to
the airport.
CULTURAL RESOURCES
There are no known significant cultural resources on the site. The site is a previously graded pad within an industrial
subdivision. The site was part of a larger project analyzed by an EIR (EIR 93-01) and no resources were identified
at that time.
GEOLOGY/SOILS
A geotechnical investigation was conducted by GEOCON and the results submitted in a report dated December 17,
2003. No significant geologic issues were identified.
HAZARDSMAZARDOUS MATERIALS
The project does not propose uses that will introduce hazards or hazardous materials to the industrial park. The
project site is located within the approach to the airport. The project has been reviewed by the Airport Land Use
Commission and a determination of consistency with the CLUP was made. Review by the FAA will be conducted
to determine the maximum allowable height of any buildings within the project site.
HYDROLOGYmATER QUALITY
All currently acceptable water quality measures have been incorporated into the design of the project.
LAND USE AND PLANNING
16 Rev. 07/03/02
The project is an industrial serving commercial project which is allowed by the Carlsbad Airport Business center
Specific Plan. No change to land us is proposed.
MINERAL RESOURCES
There are no known mineral resources onsite.
NOISE
The property is located within the 70 dBA CNEL according to the Comprehensive Airport Land Use Plan.
Commercial uses are acceptable according to the CLUP. The project will not generate significant levels of noise.
POPULATION AND HOUSING
The project will provide services to the existing industrial population. It is not anticipated that the project will
generate the need for additional housing. The project will provide services to the existing industrial park users and
will not create a significant new employment source requiring new housing.
PUBLIC SERVICES
All necessary services to support the project are available.
RECREATION
The project will neither replace existing recreational opportunities within the City nor will will it generate the need
for additional recreational resources.
TRANSPORTATION/TRAFFIC-Would the project:
a) Cause an increase in traffic that is substantial in relation to the existing traffic load and capacity
of the street system?
Less Than Significant Impact. The project will generate 2,900 Average Daily Trips (ADT) and 234 P.M. peak
hour trips. This traffic will utilize the following roadways Loker Avenue West, Palomar Airport Road, and El
Camino Real. Existing traffic on these arterials are up to 57,000 ADT on Palomar Airport Road and up to 49,000
ADT on El Camino Real (2003) and the 2003 peak hour level of service at the arterial intersection impacted by the
project is LOS D. The design capacities of the arterial roads affected by the proposed project are 40,000 or more
vehicles per day. The entire project ADT would represent 5% and 7% of the existing traffic volume and the design
capacity respectively. While the increase in traffic from the proposed project may be slightly noticeable, the street
system has been designed and sized to accommodate traffic from the project and cumulative development in the City
of Carlsbad. The proposed project would not, therefore, cause an increase in traffic that is substantial in relation to
the existing traffic load and capacity of the street system. The impacts from the proposed project are, therefore, less
than significant.
b) Exceed, either individually or cumulatively, a level of service standard established by the county
congestion management agency for designated roads or highways?
Less Than Significant Impact. SANDAG acting as the County Congestion Management Agency has designated
three roads (Rancho Santa Fe Rd., El Camino Real and Palomar Airport Rd.) and two highway segments in Carlsbad
as part of the regional circulation system. The Existing and Buildout average daily traffic (ADT) and Existing LOS
on these designated roads and highways in Carlsbad is:
Existing ADT* Los Buildout ADT*
Rancho Santa Fe Road 17-35 “A-D” 35-56
El Camino Real 27-49 ‘‘A-C’’ 33-62
Palomar Airport Road 10-57 “A-D” 30-73
SR 78 124-142 “F” 156-180
1-5 199-216 “D” 260-272
*The numbers are in thousands of daily trips.
17 Rev. 07/03/02
The Congestion Management Program’s (CMP) acceptable Level of Service (LOS) standard is “E”, or LOS “F” if
that was the LOS in the 1990 base year (e.g., SR 78 in Carlsbad was LOS “F” in 1990). Accordingly, all designated
roads and highways are currently operating at or better than the acceptable standard LOS.
Note that the buildout ADT projections are based on the full implementation of the region’s general and community
plans. The proposed project is consistent with the general plan and, therefore, its traffic was used in modeling the
buildout projections. Achievement of the CMP acceptable Level of Service (LOS) “E” standard assumes
implementation of the adopted CMP strategies. Based on the design capacity(ies) of the designated roads and
highways and implementation of the CMP strategies, they will function at acceptable level(s) of service in the short-
term and at buildout.
c) Result in a change in air traffic patterns, including either an increase in traffic levels or a change
in location that results in substantial safety risks?
No Impact. The proposed project does not include any aviation components. The project is consistent with the
Comprehensive Land Use Plan for the McClellan-Palomar Alrport. It would not, therefore, result in a change of air
traffic patterns or result in substantial safety risks. No impact assessed.
d) Substantially increase hazards due to a design feature or incompatible uses?
No Impact. All project circulation improvements will be designed and constructed to City standards; and, therefore,
would not result in design hazards. The proposed project is consistent with the City’s general plan and zoning.
Therefore, it would not increase hazards due to an incompatible use. No impact assessed.
e) Result in inadequate emergency access?
No Impact. The proposed project has been designed to satisfy the emergency requirements of the Fire and Police
Departments. No impact assessed.
f) Result in inadequate parking capacity?
No Impact. The proposed project is not requesting a parlung variance. Additionally, the project would comply
with the City’s parlung requirements to ensure an adequate parking supply. No impact assessed.
9) Conflict with adopted policies, plans or programs supporting alternative transportation (e.g., bus
turnouts, bicycle racks, etc.)?
No Impact. (Note whether the project is near public transportation. If not, then state that the project is not served
by or not located in an area conducive to public transportation.) (Note bike racks are not necessary for a single-
family residential project. Otherwise, condition the project to install bike racks and note here that the project has
been so conditioned.)
HAZARDS AND HAZAROUS MATERIAL
a) For a project within an airport land use plan, or where such a plan has not been adopted, within
two miles of a public airport or public use airport, would the project result in a safety hazard for
people residing or working in the project area?
No Impact. Commercial uses are allowed within the airport influence area and conditionally allowed within the
Flight Activity Zone. A determination was made by the County Airport Land Use Commission that this project was
conditionally consistent with the Comprehensive Land Use Plan for the airport and restricting assembly uses
significantly reduces the risk of hazard to the development. As a result, the project is subject to the use restriction.
NOISE
a) For a project located within an airport land use plan or, where such a plan has not been adopted,
within 2 miles of a public airport or public use airport, would the project expose people residing
or working in the project area to excessive noise levels
18 Rev. 07/03/02
No Impact. The project is located near the airport but is identified as being within the 65 CNEL noise contour. The
project includes proposed commercial uses that are identified in the airport Comprehensive Land Use Plan as being
compatible within the 65 CNEL noise contour.
EARLIER ANALYSIS USED AND SUPPORTING INFORMATION SOURCES
The following documents were used in the analysis of ths project and are on file in the City of Carlsbad Planning
Department located at 1635 Faraday Avenue, Carlsbad, California, 92008.
1.
2.
3.
4.
5.
6.
Final Master Environmental Impact Report for the City of Carlsbad General Plan Update (MEIR 93-01).
City of Carlsbad Planning Department. March 1994.
Commehensive Land Use Plan McClellan-Palomar Airport for the San Diego association of Governments.
March 1993.
Preliminary Vegetation Assessment of APN 209-08 1-0 1 for Franz-Loker LLC. Planning Systems, January
13, 2004.
Geotechnical Investigation: Carlsbad Oaks West Loker Avenue and Palomar Abort Road for Franz-Loker
LLC. Geocon Incorporated, December 17,2003.
Preliminary Storm Water Management Plan for Loker Business Center for Franz-Loker LLC. O’Day
Consultants, December 2003.
Preliminarv Drainage Study for Loker Business Center for Franz-Loker LLC. O’Day Consultants, January
7,2004.
19 Rev. 07fO3fQ2
P.
LIST OF MITIGATING MEASURES (IF APPLICABLE)
20 Rev. 07/03/02
APPLICANT CONCURRENCE WITH MITIGATION MEASURES
THIS IS TO CERTIFY THAT I HAVE REVIEWED THE ABOVE MITIGATING MEASURES AND CONCUR
WITH THE ADDITION OF THESE MEASURES TO THE PROJECT.
Date
21
Signature
Rev. 07/03/02