PLANNING COMMISSION RESOLUTION NO. 5914
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF CARLSBAD, CALIFORNIA, APPROVING A
PLANNING COMMISSION DETERMINATION FOR THE
DEMOLITION OF AN EXISTING 7,640 SQUARE FOOT
SERVICE FACILITY AND CONSTRUCTION OF NEW
SERVICE, SALES, AND PARTS STORAGE FACILITIES
TOTALING 20,845 SQUARE FEET AT AN EXISTING NEW
CAR DEALERSHIP IN CAR COUNTRY CARLSBAD ON
PROPERTY GENERALLY LOCATED AT 5425 PASEO DEL
NORTE IN THE MELLO I1 SEGMENT OF THE CARLSBAD
LOCAL COASTAL PROGRAM IN LOCAL FACILITIES
MANAGEMENT ZONE 3.
CASE NAME: NORTH COUNTY PONTIAC/GMC
CASE NO: PCD 04-02
WHEREAS, Carlsbad Auto Park Properties, LLC, “Developer/Owner,” has
filed a verified application with the City of Carlsbad regarding property described as
Lot No. 3, Carlsbad Tract No. 72-3, recorded as Map No. 7492
(“the Property”); and
WHEREAS, said verified application constitutes a request for a Planning
Commission Determination as shown on Exhibits “A” - “K” dated June 15,2005, on file in the
Planning Department NORTH COUNTY PONTIAUGMC - PCD 04-02 as provided by Title
21 of the Carlsbad Municipal Code; and
WHEREAS, the Planning Commission did on the 15th day of June 2005,
consider said request; and
WHEREAS, at said hearing, upon hearing and considering all testimony and
arguments, if any, of all persons desiring to be heard, said Commission considered all factors
relating to the Planning Commission Determination.
NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning
Commission as follows:
A) That the foregoing recitations are true and correct.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
B) That based on the evidence presented at the hearing, the Commission APPROVES
NORTH COUNTY PONTIACKMC - PCD 04-02 based on the following
findings and subject to the following conditions:
Findinm:
1.
2.
3.
4.
The Planning Commission finds that the project, as conditioned herein, is in
conformance with the Elements of the City’s General Plan and Specific Plan 19(G) based
on the facts set forth in the staff report dated June 15,2005.
The project is consistent with the City-Wide Facilities and Improvements Plan, the Local
Facilities Management Plan for Zone 3 and all City public facility policies and
ordinances. The project includes elements or has been conditioned to construct or
provide funding to ensure that all facilities and improvements regarding sewer collection
and treatment; water; drainage; circulation; fire; schools; parks and other recreational
facilities; libraries; government administrative facilities; and open space, related to the
project will be installed to serve new development prior to or concurrent with need.
That the Planning Director has determined that the project belongs to a class of projects
that the State Secretary for Resources has found do not have a significant impact on the
environment, and it is therefore categorically exempt from the requirement for the
preparation of environmental documents pursuant to Section 15332 - In-Fill
Development Projects of the state CEQA Guidelines. In making this determination, the
Planning Director has found that the exceptions listed in Section 15300.2 of the state
CEQA Guidelines do not apply to this project.
The Planning Commission has reviewed each of the exactions imposed on the Developer
contained in this resolution, and hereby finds, in this case, that the exactions are imposed
to mitigate impacts caused by or reasonably related to the project, and the extent and the
degree of the exaction is in rough proportionality to the impact caused by the project.
Conditions:
Note: Unless otherwise specified herein, all conditions shall be satisfied prior to issuance of a
grading or building permit whichever occurs first.
1. If any of the following conditions fail to occur; or if they are, by their terms, to be
implemented and maintained over time, if any of such conditions fail to be so
implemented and maintained according to their terms, the City shall have the right to
revoke or modify all approvals herein granted; deny or further condition issuance of all
future building permits; deny, revoke or further condition all certificates of occupancy
issued under the authority of approvals herein granted; record a notice of violation on the
property title; institute and prosecute litigation to compel their compliance with said
conditions or seek damages for their violation. No vested rights are gained by Developer
or a successor in interest by the City’s approval of this Planning Commission
Determination.
PC RES0 NO. 5914 -2-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
2.
3.
4.
5.
6.
7.
8.
9.
10.
Staff is authorized and directed to make, or require the Developer to make, all corrections
and modifications to the Planning Commission Determination documents, as necessary
to make them internally consistent and in conformity with the final action on the project.
Development shall occur substantially as shown on the approved Exhibits. Any proposed
development different from this approval, shall require an amendment to this approval.
Developer shall comply with all applicable provisions of federal, state, and local laws and
regulations in effect at the time of building permit issuance.
If any condition for construction of any public improvements or facilities, or the payment
of any fees in-lieu thereof, imposed by this approval or imposed by law on this Project are
challenged, this approval shall be suspended as provided in Government Code Section
66020. If any such condition is determined to be invalid this approval shall be invalid
unless the City Council determines that the project without the condition complies with
all requirements of law.
Developer/Operator shall and does hereby agree to indemnifl, protect, defend and hold
harmless the City of Carlsbad, its Council members, officers, employees, agents, and
representatives, from and against any and all liabilities, losses, damages, demands, claims
and costs, including court costs and attorney’s fees incurred by the City arising, directly
or indirectly, from (a) City’s approval and issuance of this Planning Commission
Determination, (b) City’s approval or issuance of any permit or action, whether
discretionary or non-discretionary, in connection with the use contemplated herein, and
(c) Developer/Operator’s installation and operation of the facility permitted hereby,
including without limitation, any and all liabilities arising from the emission by the
facility of electromagnetic fields or other energy waves or emissions. This obligation
survives until all legal proceedings have been concluded and continues even if the City’s
approval is not validated.
Developer shall submit to the Planning Director a reproducible 24” x 36” mylar copy of
the Site Plan reflecting the conditions approved by the final decision making body.
Prior to the issuance of a building permit, the Developer shall provide proof to the
Director from the Carlsbad Unified School District that this project has satisfied its
obligation to provide school facilities.
This project shall comply with all conditions and mitigation measures which are required
as part of the Zone 3 Local Facilities Management Plan and any amendments made to that
Plan prior to the issuance of building permits.
This approval is granted subject to the approval of CDP 04-42 and is subject to all
conditions contained in Planning Commission Resolution No. 5915 for those other
approvals incorporated herein by reference.
This approval shall become null and void if building permits are not issued for this
project within 24 months from the date of project approval.
PC RES0 NO. 5914 -3-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
11.
12.
13.
14.
15.
Building permits will not be issued for this project unless the local agency providing
water and sewer services to the project provides written certification to the City that
adequate water service and sewer facilities, respectively, are available to the project at the
time of the application for the building permit, and that water and sewer capacity and
facilities will continue to be available until the time of occupancy.
Developer is aware that the City is preparing a non-residential housing impact fee
(linkage fee) consistent with Program 4.1 of the Housing Element. The applicant is
further aware that the City may determine that certain non-residential projects may have
to pay a linkage fee, in order to be found consistent with the Housing Element of the
General Plan. If a linkage fee is established by City Council ordinance and/or resolution
and this project becomes subject to a linkage fee pursuant to said ordinance and/or
resolution, then the Developer, or his/her/their successor(s) in interest shall pay the
linkage fee. The linkage fee shall be paid at the time of issuance of building permits,
except for projects involving a request for a non-residential planned development for an
existing development, in which case, the fee shall be paid on approval of the final map,
parcel map or certificate of compliance, required to process the non-residential PUD,
whichever pertains. If linkage fees are required for this project, and they are not paid, this
project will not be consistent with the General Plan and approval for this project will
become null and void.
All construction activities shall be planned so that grading will occur in units that can be
easily completed within the summer construction season. All grading operations shall be
limited to April 1 to October 1 of each year. All areas disturbed by grading shall be
planted within 60 days of initial disturbance and prior to October 1 with temporary or
permanent (in the case of finished slopes) erosion control methods. The October 1
grading season deadline may be extended with the approval of the City Engineer subject
to implementation by October 1 of erosion control measures designed to prohibit
discharge of sediments offsite during and after the grading operation is completed.
Extensions beyond November 15 may be allowed in areas of very low risk of impact to
sensitive coastal resources and may be approved either as part of the original coastal
development permit or as a formal amendment to an existing coastal development permit.
Developer shall submit and obtain Planning Director approval of a Final Landscape and
Irrigation Plan showing conformance with the approved Preliminary Landscape Plan and
the City’s Landscape Manual. Developer shall construct and install all landscaping as
shown on the approved Final Plans, and maintain all landscaping in a healthy and thriving
condition, free from weeds, trash, and debris.
Developer shall pay the citywide Public Facilities Fee imposed by City Council Policy
#17, the License Tax on new construction imposed by Carlsbad Municipal Code Section
5.09.030, and CFD #1 special tax (if applicable), subject to any credits authorized by
Carlsbad Municipal Code Section 5.09.040. Developer shall also pay any applicable
Local Facilities Management Plan fee for Zone 3, pursuant to Chapter 21.90. All such
taxedfees shall be paid at issuance of building permit. If the taxedfees are not paid, this
approval will not be consistent with the General Plan and shall become void
PC RES0 NO. 5914 -4-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
16.
17.
18.
19.
20.
All roof appurtenances, including air conditioners, shall be architecturally integrated and
concealed from view and the sound buffered from adjacent properties and streets, in
substance as provided in Building Department Policy No. 80-6, to the satisfaction of the
Directors of Community Development and Planning.
Prior to the issuance of the building permit, Developer shall submit to the City a Notice
of Restriction to be filed in the office of the County Recorder, subject to the satisfaction
of the Planning Director, notifying all interested parties and successors in interest that the
City of Carlsbad has issued a Planning Commission Determination and Coastal
Development Permit by Resolutions No. 5914 and 5915 on the property. Said Notice of
Restriction shall note the property description, location of the file containing complete
project details and all conditions of approval as well as any conditions or restrictions
specified for inclusion in the Notice of Restriction. The Planning Director has the
authority to execute and record an amendment to the notice which modifies or terminates
said notice upon a showing of good cause by the Developer or successor in interest.
Developer shall construct trash receptacle and recycling areas enclosed by a six-foot high
masonry wall with gates pursuant to City Engineering Standards and Carlsbad Municipal
Code Chapter 21.105. Location of said receptacles shall be approved by the Planning
Director. Enclosure shall be of similar colors and/or materials to the project to the
satisfaction of the Planning Director.
No outdoor storage of materials shall occur onsite unless required by the Fire Chief.
When so required, the Developer shall submit and obtain approval of the Fire Chief and
the Planning Director of an Outdoor Storage Plan, and thereafter comply with the
approved plan.
Developer shall submit and obtain Planning Director approval of an exterior lighting plan
including parking areas. All lighting shall be designed to reflect downward and avoid any
impacts on adjacent homes or property.
En pineering
21. Developer shall submit to the Planning Director a reproducible 24" x 36" mylar copy of
the Site Plan and Preliminary Grading Plans reflecting the conditions approved by the
final decision making body including any applicable coastal commission approvals. The
reproducible shall be submitted to the Planning Director, reviewed and, if acceptable,
signed by the City's project engineer and project planner prior to submittal of the building
plans, landscape plans, and improvement or grading plans, whichever occurs first.
22. Prior to hauling dirt or construction materials to or from any proposed construction site
within this project, Developer shall apply for and obtain approval from, the City Engineer
for the proposed haul route.
23. Prior to issuance of any building permit, Developer shall comply with the requirements of
the City's anti-graffiti program for wall treatments if and when such a program is
formally established by the City.
PC RES0 NO. 5914 -5-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
FeedAgreements
24. Developer shall cause property owner to execui and submit to the City Engineer for
recordation the City's standard form Drainage Hold Harmless Agreement regarding
drainage across the adjacent property.
Prior to approval of any grading or building permits for this project, Developer shall
cause Owner to give written consent to the City Engineer to the annexation of the area
shown within the boundaries of the subdivision into the existing City of Carlsbad Street
Lighting and Landscaping District No. 1 and/or to the formation or annexation into an
additional Street Lighting and Landscaping District. Said written consent shall be
on a form provided by the City Engineer.
25.
Grading
26. Based upon a review of the proposed grading and the grading quantities shown on the
Site Plan and Preliminary Grading Plan, a grading permit for this project is required.
Developer shall apply for and obtain a grading permit from the City Engineer prior to
issuance of a building permit for the project.
No grading for private improvements shall occur outside the limits of this approval unless
Developer obtains, records and submits a recorded copy to the City Engineer a grading or
slope easement or agreement from the owners of the affected properties. If Developer is
unable to obtain the grading or slope easement, or agreement, no grading permit will be
issued. In that case Developer must either apply for and obtain an amendment of this
approval or modify the plans so grading will not occur outside the project and apply for
and obtain a finding of substantial conformance from both the City Engineer and
Planning Director.
27.
Dedicationsflmprovements
28.
29.
30.
Developer shall execute and record a City standard Development Improvement
Agreement to install and secure with appropriate security as provided by law, public
improvements shown on the Site Plan and the following improvements including, but not
limited to trench resurfacing, public potable water system, fire hydrants, water meters and
appurtenances, all constructed to City Standards to the satisfaction of the City Engineer.
a. Public Potable Water System with fire hydrants, fire sprinkler services and
appurtenances and shown on the Site Plan and Preliminary Grading Plan.
Improvements listed above shall be constructed within 18 months of approval of the
development improvement agreement or such other time as provided in said agreement.
Developer shall comply with the City's requirements of the National Pollutant Discharge
Elimination System (NPDES) permit, latest version. Developer shall provide
improvements constructed pursuant to best management practices as referenced in the
"California Storm Water Best Management Practices Handbook" to reduce surface
pollutants to an acceptable level prior to discharge to sensitive areas. Plans for such
improvements shall be submitted to and subject to the approval of the City Engineer.
PC RES0 NO. 5914 -6-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
31.
32.
33.
Said plans shall include but not be limited to notifying prospective owners and tenants of
the following:
a. All owners and tenants shall coordinate efforts to establish or work with
established disposal programs to remove and properly dispose of toxic and
hazardous waste products.
b. Toxic chemicals or hydrocarbon compounds such as gasoline, motor oil,
antifreeze, solvents, paints, paint thinners, wood preservatives, and other such
fluids shall not be discharged into any street, public or private, or into storm drain
or storm water conveyance systems. Use and disposal of pesticides, fungicides,
herbicides, insecticides, fertilizers and other such chemical treatments shall meet
Federal, State, County and City requirements as prescribed in their respective
containers.
Best Management Practices shall be used to eliminate or reduce surface pollutants
when planning any changes to the landscaping and surface improvements.
c.
Prior to building permit or grading permit issuance, whichever occurs first, Developer
shall design and obtain approval of the City Engineer, for the structural section for the
access aisles with a traffic index of 5.0 in accordance with City Standards due to truck
access through the parking area andor aisles with an ADT greater than 500. The
structural pavement design of the aisle ways shall be submitted together with required R-
value soil test information and approved by the City Engineer as part of the building or
grading plan review whichever occurs first.
Prior to the issuance of grading permit or building permit, whichever occurs first,
Developer shall submit for City approval a “Storm Water Pollution Prevention Plan
(SWPPP).” The SWPPP shall be in compliance with current requirements and provisions
established by the San Diego Region of the California Regional Water Quality Control
Board and City of Carlsbad Requirements. The SWPPP shall address measures to reduce
to the maximum extent practicable storm water pollutant runoff during construction of
the project. At a minimum, the SWPPP shall:
a.
b.
c.
include all content as established by the California Regional Water Quality
Control Board requirements;
include the receipt of “Notice of Intent” issued by the California Regional Water
Quality Control Board;
recommend source control and treatment control Best Management Practices
(BMPs) that will be implemented with this project to avoid contact or filter said
pollutants from storm water to the maximum extent practicable before discharging
to City right-of-way or natural drainage course; and
establish specific procedures for handling spills and routine clean up. Special
considerations and effort shall be applied to employee education on the proper
procedures for handling clean up and disposal of pollutants.
d.
Prior to the issuance of grading permit or building permit, whichever occurs first,
Developer shall submit for City approval a “Storm Water Management Plan (SWMP).”
The SWMP shall demonstrate compliance with the City of Carlsbad Standard Urban
Stormwater Mitigation Plan (SUSMP), Order 2001-01 issued by the San Diego Region of
PC RES0 NO. 5914 -7-
.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
the California Regional Water Quality Control Board and City of Carlsbad Municipal
Code. The SWMP shall address measures to avoid contact or filter said pollutants from
storm water, to the maximum extent practicable, for the post-construction stage of the
project. At a minimum, the SWMP shall:
a.
b.
c.
identify existing and post-development on-site pollutants-of-concern;
identify the hydrologic unit this project contributes to and impaired water bodies
that could be impacted by this project;
recommend source controls and treatment controls that will be implemented with
this project to avoid contact or filter said pollutants from storm water to the
maximum extent practicable before discharging to City right-of-way;
establish specific procedures for handling spills and routine clean up. Special
considerations and effort shall be applied to employee education on the proper
procedures for handling clean up and disposal of pollutants;
ensure long-term maintenance of all post construct BMPs in perpetuity; and
identify how post-development runoff rates and velocities from the site will not
exceed the pre-development runoff rates and velocities to the maximum extent
practicable.
d.
e.
f.
34. Developer shall maintain, in perpetuity, all post-construction water quality treatment
measures (vegetated-swales and inlet filters) reflected on the Site Plan and Preliminary
Grading Plan to ensure their effectiveness at removing pollutants from storm water prior
to discharge to the right-of-way, adjacent property or natural watercourse in accordance
with the City SUSMP.
- Water
35.
36.
37.
38.
39.
Prior to approval of improvement plans or final map, Developer shall meet with the Fire
Marshal to determine if fire protection measures (fire flows, fire hydrant locations,
building sprinklers) are required to serve the project. Fire hydrants, if proposed, shall be
considered public improvements and shall be served by public water mains to the
satisfaction of the District Engineer.
The Developer shall design and construct public facilities within public right-of-way or
within minimum 20-feet wide easements granted to the District or the City of Carlsbad.
At the discretion of the District Engineer, wider easements may be required for adequate
maintenance, access andor joint utility purposes.
Prior to issuance of building permits, Developer shall pay all fees, deposits, and charges
for connection to public facilities. Developer shall pay the San Diego County Water
Authorit, caDacitv charae(s) prior to issuance of Building Permits.
The Developer shall design and construct public water facilities substantially as shown on
the Site Plan and Preliminary Grading Plan to the satisfaction of the District Engineer.
Proposed public facilities shall be reflected on public improvement plans.
This project is approved upon the express condition that building permits will not be
issued for the development of the subject property, unless the District Engineer has
PC RES0 NO. 5914 -8-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
determined that adequate water and sewer facilities are available at the time of
occupancy.
The Developer shall coordinate with the District Engineer regarding the looped water
system and easements.
40.
Code Reminders
41.
42.
43.
44.
45.
Approval of this request shall not excuse compliance with all applicable sections of the
Zoning Ordinance and all other applicable City ordinances in effect at time of building
permit issuance, except as otherwise specifically provided herein.
The project shall comply with the latest non-residential disabled access requirements
pursuant to Title 24 of the State Building Code.
Premise identification (addresses) shall be provided consistent with Carlsbad Municipal
Code Section 18.04.320.
Any signs proposed for this development shall at a minimum be designed in conformance
with the City’s Sign Ordinance and shall require review and approval of the Planning
Director prior to installation of such signs.
Developer shall exercise special care during the construction phase of this project to
prevent offsite siltation. Planting and erosion control shall be provided in accordance
with Carlsbad Municipal Code Chapter 15.16 (the Grading Ordinance) to the satisfaction
of the City Engineer.
NOTICE
Please take NOTICE that approval of your project includes the “imposition” of fees, dedications,
reservations, or other exactions hereafter collectively referred to for convenience as
“feedexactions.”
You have 90 days from date of final approval to protest imposition of these fees/exactions. If
you protest them, you must follow the protest procedure set forth in Government Code Section
66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely
follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or
annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified feedexactions
DOES NOT APPLY to water and sewer connection fees and capacity charges, nor planning,
zoning, grading or other similar application processing or service fees in connection with this
project; NOR DOES IT APPLY to any feedexactions of which you have previously been given a
NOTICE similar to this, or as to which the statute of limitations has previously otherwise
expired.
PC RES0 NO. 5914 -9-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a regular meeting of the Planning
Commission of the City of Carlsbad, California, held on the 15th day of June 2005, by the
following vote, to wit:
AYES: Chairperson Segall, Commissioners Baker, Cardosa, Dominguez,
Heineman, Montgomery, and Whitton
NOES:
ABSENT:
ABSTAIN:
CARLSBAD PLANNING COMMISSION
ATTEST:
n
DON NEU
Assistant Planning Director
PC RES0 NO. 5914 -10-