Loading...
HomeMy WebLinkAbout2005-06-15; Planning Commission; Resolution 59141 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PLANNING COMMISSION RESOLUTION NO. 5914 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING A PLANNING COMMISSION DETERMINATION FOR THE DEMOLITION OF AN EXISTING 7,640 SQUARE FOOT SERVICE FACILITY AND CONSTRUCTION OF NEW SERVICE, SALES, AND PARTS STORAGE FACILITIES TOTALING 20,845 SQUARE FEET AT AN EXISTING NEW CAR DEALERSHIP IN CAR COUNTRY CARLSBAD ON PROPERTY GENERALLY LOCATED AT 5425 PASEO DEL NORTE IN THE MELLO I1 SEGMENT OF THE CARLSBAD LOCAL COASTAL PROGRAM IN LOCAL FACILITIES MANAGEMENT ZONE 3. CASE NAME: NORTH COUNTY PONTIAC/GMC CASE NO: PCD 04-02 WHEREAS, Carlsbad Auto Park Properties, LLC, “Developer/Owner,” has filed a verified application with the City of Carlsbad regarding property described as Lot No. 3, Carlsbad Tract No. 72-3, recorded as Map No. 7492 (“the Property”); and WHEREAS, said verified application constitutes a request for a Planning Commission Determination as shown on Exhibits “A” - “K” dated June 15,2005, on file in the Planning Department NORTH COUNTY PONTIAUGMC - PCD 04-02 as provided by Title 21 of the Carlsbad Municipal Code; and WHEREAS, the Planning Commission did on the 15th day of June 2005, consider said request; and WHEREAS, at said hearing, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, said Commission considered all factors relating to the Planning Commission Determination. NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning Commission as follows: A) That the foregoing recitations are true and correct. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 B) That based on the evidence presented at the hearing, the Commission APPROVES NORTH COUNTY PONTIACKMC - PCD 04-02 based on the following findings and subject to the following conditions: Findinm: 1. 2. 3. 4. The Planning Commission finds that the project, as conditioned herein, is in conformance with the Elements of the City’s General Plan and Specific Plan 19(G) based on the facts set forth in the staff report dated June 15,2005. The project is consistent with the City-Wide Facilities and Improvements Plan, the Local Facilities Management Plan for Zone 3 and all City public facility policies and ordinances. The project includes elements or has been conditioned to construct or provide funding to ensure that all facilities and improvements regarding sewer collection and treatment; water; drainage; circulation; fire; schools; parks and other recreational facilities; libraries; government administrative facilities; and open space, related to the project will be installed to serve new development prior to or concurrent with need. That the Planning Director has determined that the project belongs to a class of projects that the State Secretary for Resources has found do not have a significant impact on the environment, and it is therefore categorically exempt from the requirement for the preparation of environmental documents pursuant to Section 15332 - In-Fill Development Projects of the state CEQA Guidelines. In making this determination, the Planning Director has found that the exceptions listed in Section 15300.2 of the state CEQA Guidelines do not apply to this project. The Planning Commission has reviewed each of the exactions imposed on the Developer contained in this resolution, and hereby finds, in this case, that the exactions are imposed to mitigate impacts caused by or reasonably related to the project, and the extent and the degree of the exaction is in rough proportionality to the impact caused by the project. Conditions: Note: Unless otherwise specified herein, all conditions shall be satisfied prior to issuance of a grading or building permit whichever occurs first. 1. If any of the following conditions fail to occur; or if they are, by their terms, to be implemented and maintained over time, if any of such conditions fail to be so implemented and maintained according to their terms, the City shall have the right to revoke or modify all approvals herein granted; deny or further condition issuance of all future building permits; deny, revoke or further condition all certificates of occupancy issued under the authority of approvals herein granted; record a notice of violation on the property title; institute and prosecute litigation to compel their compliance with said conditions or seek damages for their violation. No vested rights are gained by Developer or a successor in interest by the City’s approval of this Planning Commission Determination. PC RES0 NO. 5914 -2- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 2. 3. 4. 5. 6. 7. 8. 9. 10. Staff is authorized and directed to make, or require the Developer to make, all corrections and modifications to the Planning Commission Determination documents, as necessary to make them internally consistent and in conformity with the final action on the project. Development shall occur substantially as shown on the approved Exhibits. Any proposed development different from this approval, shall require an amendment to this approval. Developer shall comply with all applicable provisions of federal, state, and local laws and regulations in effect at the time of building permit issuance. If any condition for construction of any public improvements or facilities, or the payment of any fees in-lieu thereof, imposed by this approval or imposed by law on this Project are challenged, this approval shall be suspended as provided in Government Code Section 66020. If any such condition is determined to be invalid this approval shall be invalid unless the City Council determines that the project without the condition complies with all requirements of law. Developer/Operator shall and does hereby agree to indemnifl, protect, defend and hold harmless the City of Carlsbad, its Council members, officers, employees, agents, and representatives, from and against any and all liabilities, losses, damages, demands, claims and costs, including court costs and attorney’s fees incurred by the City arising, directly or indirectly, from (a) City’s approval and issuance of this Planning Commission Determination, (b) City’s approval or issuance of any permit or action, whether discretionary or non-discretionary, in connection with the use contemplated herein, and (c) Developer/Operator’s installation and operation of the facility permitted hereby, including without limitation, any and all liabilities arising from the emission by the facility of electromagnetic fields or other energy waves or emissions. This obligation survives until all legal proceedings have been concluded and continues even if the City’s approval is not validated. Developer shall submit to the Planning Director a reproducible 24” x 36” mylar copy of the Site Plan reflecting the conditions approved by the final decision making body. Prior to the issuance of a building permit, the Developer shall provide proof to the Director from the Carlsbad Unified School District that this project has satisfied its obligation to provide school facilities. This project shall comply with all conditions and mitigation measures which are required as part of the Zone 3 Local Facilities Management Plan and any amendments made to that Plan prior to the issuance of building permits. This approval is granted subject to the approval of CDP 04-42 and is subject to all conditions contained in Planning Commission Resolution No. 5915 for those other approvals incorporated herein by reference. This approval shall become null and void if building permits are not issued for this project within 24 months from the date of project approval. PC RES0 NO. 5914 -3- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 11. 12. 13. 14. 15. Building permits will not be issued for this project unless the local agency providing water and sewer services to the project provides written certification to the City that adequate water service and sewer facilities, respectively, are available to the project at the time of the application for the building permit, and that water and sewer capacity and facilities will continue to be available until the time of occupancy. Developer is aware that the City is preparing a non-residential housing impact fee (linkage fee) consistent with Program 4.1 of the Housing Element. The applicant is further aware that the City may determine that certain non-residential projects may have to pay a linkage fee, in order to be found consistent with the Housing Element of the General Plan. If a linkage fee is established by City Council ordinance and/or resolution and this project becomes subject to a linkage fee pursuant to said ordinance and/or resolution, then the Developer, or his/her/their successor(s) in interest shall pay the linkage fee. The linkage fee shall be paid at the time of issuance of building permits, except for projects involving a request for a non-residential planned development for an existing development, in which case, the fee shall be paid on approval of the final map, parcel map or certificate of compliance, required to process the non-residential PUD, whichever pertains. If linkage fees are required for this project, and they are not paid, this project will not be consistent with the General Plan and approval for this project will become null and void. All construction activities shall be planned so that grading will occur in units that can be easily completed within the summer construction season. All grading operations shall be limited to April 1 to October 1 of each year. All areas disturbed by grading shall be planted within 60 days of initial disturbance and prior to October 1 with temporary or permanent (in the case of finished slopes) erosion control methods. The October 1 grading season deadline may be extended with the approval of the City Engineer subject to implementation by October 1 of erosion control measures designed to prohibit discharge of sediments offsite during and after the grading operation is completed. Extensions beyond November 15 may be allowed in areas of very low risk of impact to sensitive coastal resources and may be approved either as part of the original coastal development permit or as a formal amendment to an existing coastal development permit. Developer shall submit and obtain Planning Director approval of a Final Landscape and Irrigation Plan showing conformance with the approved Preliminary Landscape Plan and the City’s Landscape Manual. Developer shall construct and install all landscaping as shown on the approved Final Plans, and maintain all landscaping in a healthy and thriving condition, free from weeds, trash, and debris. Developer shall pay the citywide Public Facilities Fee imposed by City Council Policy #17, the License Tax on new construction imposed by Carlsbad Municipal Code Section 5.09.030, and CFD #1 special tax (if applicable), subject to any credits authorized by Carlsbad Municipal Code Section 5.09.040. Developer shall also pay any applicable Local Facilities Management Plan fee for Zone 3, pursuant to Chapter 21.90. All such taxedfees shall be paid at issuance of building permit. If the taxedfees are not paid, this approval will not be consistent with the General Plan and shall become void PC RES0 NO. 5914 -4- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 16. 17. 18. 19. 20. All roof appurtenances, including air conditioners, shall be architecturally integrated and concealed from view and the sound buffered from adjacent properties and streets, in substance as provided in Building Department Policy No. 80-6, to the satisfaction of the Directors of Community Development and Planning. Prior to the issuance of the building permit, Developer shall submit to the City a Notice of Restriction to be filed in the office of the County Recorder, subject to the satisfaction of the Planning Director, notifying all interested parties and successors in interest that the City of Carlsbad has issued a Planning Commission Determination and Coastal Development Permit by Resolutions No. 5914 and 5915 on the property. Said Notice of Restriction shall note the property description, location of the file containing complete project details and all conditions of approval as well as any conditions or restrictions specified for inclusion in the Notice of Restriction. The Planning Director has the authority to execute and record an amendment to the notice which modifies or terminates said notice upon a showing of good cause by the Developer or successor in interest. Developer shall construct trash receptacle and recycling areas enclosed by a six-foot high masonry wall with gates pursuant to City Engineering Standards and Carlsbad Municipal Code Chapter 21.105. Location of said receptacles shall be approved by the Planning Director. Enclosure shall be of similar colors and/or materials to the project to the satisfaction of the Planning Director. No outdoor storage of materials shall occur onsite unless required by the Fire Chief. When so required, the Developer shall submit and obtain approval of the Fire Chief and the Planning Director of an Outdoor Storage Plan, and thereafter comply with the approved plan. Developer shall submit and obtain Planning Director approval of an exterior lighting plan including parking areas. All lighting shall be designed to reflect downward and avoid any impacts on adjacent homes or property. En pineering 21. Developer shall submit to the Planning Director a reproducible 24" x 36" mylar copy of the Site Plan and Preliminary Grading Plans reflecting the conditions approved by the final decision making body including any applicable coastal commission approvals. The reproducible shall be submitted to the Planning Director, reviewed and, if acceptable, signed by the City's project engineer and project planner prior to submittal of the building plans, landscape plans, and improvement or grading plans, whichever occurs first. 22. Prior to hauling dirt or construction materials to or from any proposed construction site within this project, Developer shall apply for and obtain approval from, the City Engineer for the proposed haul route. 23. Prior to issuance of any building permit, Developer shall comply with the requirements of the City's anti-graffiti program for wall treatments if and when such a program is formally established by the City. PC RES0 NO. 5914 -5- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 FeedAgreements 24. Developer shall cause property owner to execui and submit to the City Engineer for recordation the City's standard form Drainage Hold Harmless Agreement regarding drainage across the adjacent property. Prior to approval of any grading or building permits for this project, Developer shall cause Owner to give written consent to the City Engineer to the annexation of the area shown within the boundaries of the subdivision into the existing City of Carlsbad Street Lighting and Landscaping District No. 1 and/or to the formation or annexation into an additional Street Lighting and Landscaping District. Said written consent shall be on a form provided by the City Engineer. 25. Grading 26. Based upon a review of the proposed grading and the grading quantities shown on the Site Plan and Preliminary Grading Plan, a grading permit for this project is required. Developer shall apply for and obtain a grading permit from the City Engineer prior to issuance of a building permit for the project. No grading for private improvements shall occur outside the limits of this approval unless Developer obtains, records and submits a recorded copy to the City Engineer a grading or slope easement or agreement from the owners of the affected properties. If Developer is unable to obtain the grading or slope easement, or agreement, no grading permit will be issued. In that case Developer must either apply for and obtain an amendment of this approval or modify the plans so grading will not occur outside the project and apply for and obtain a finding of substantial conformance from both the City Engineer and Planning Director. 27. Dedicationsflmprovements 28. 29. 30. Developer shall execute and record a City standard Development Improvement Agreement to install and secure with appropriate security as provided by law, public improvements shown on the Site Plan and the following improvements including, but not limited to trench resurfacing, public potable water system, fire hydrants, water meters and appurtenances, all constructed to City Standards to the satisfaction of the City Engineer. a. Public Potable Water System with fire hydrants, fire sprinkler services and appurtenances and shown on the Site Plan and Preliminary Grading Plan. Improvements listed above shall be constructed within 18 months of approval of the development improvement agreement or such other time as provided in said agreement. Developer shall comply with the City's requirements of the National Pollutant Discharge Elimination System (NPDES) permit, latest version. Developer shall provide improvements constructed pursuant to best management practices as referenced in the "California Storm Water Best Management Practices Handbook" to reduce surface pollutants to an acceptable level prior to discharge to sensitive areas. Plans for such improvements shall be submitted to and subject to the approval of the City Engineer. PC RES0 NO. 5914 -6- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 31. 32. 33. Said plans shall include but not be limited to notifying prospective owners and tenants of the following: a. All owners and tenants shall coordinate efforts to establish or work with established disposal programs to remove and properly dispose of toxic and hazardous waste products. b. Toxic chemicals or hydrocarbon compounds such as gasoline, motor oil, antifreeze, solvents, paints, paint thinners, wood preservatives, and other such fluids shall not be discharged into any street, public or private, or into storm drain or storm water conveyance systems. Use and disposal of pesticides, fungicides, herbicides, insecticides, fertilizers and other such chemical treatments shall meet Federal, State, County and City requirements as prescribed in their respective containers. Best Management Practices shall be used to eliminate or reduce surface pollutants when planning any changes to the landscaping and surface improvements. c. Prior to building permit or grading permit issuance, whichever occurs first, Developer shall design and obtain approval of the City Engineer, for the structural section for the access aisles with a traffic index of 5.0 in accordance with City Standards due to truck access through the parking area andor aisles with an ADT greater than 500. The structural pavement design of the aisle ways shall be submitted together with required R- value soil test information and approved by the City Engineer as part of the building or grading plan review whichever occurs first. Prior to the issuance of grading permit or building permit, whichever occurs first, Developer shall submit for City approval a “Storm Water Pollution Prevention Plan (SWPPP).” The SWPPP shall be in compliance with current requirements and provisions established by the San Diego Region of the California Regional Water Quality Control Board and City of Carlsbad Requirements. The SWPPP shall address measures to reduce to the maximum extent practicable storm water pollutant runoff during construction of the project. At a minimum, the SWPPP shall: a. b. c. include all content as established by the California Regional Water Quality Control Board requirements; include the receipt of “Notice of Intent” issued by the California Regional Water Quality Control Board; recommend source control and treatment control Best Management Practices (BMPs) that will be implemented with this project to avoid contact or filter said pollutants from storm water to the maximum extent practicable before discharging to City right-of-way or natural drainage course; and establish specific procedures for handling spills and routine clean up. Special considerations and effort shall be applied to employee education on the proper procedures for handling clean up and disposal of pollutants. d. Prior to the issuance of grading permit or building permit, whichever occurs first, Developer shall submit for City approval a “Storm Water Management Plan (SWMP).” The SWMP shall demonstrate compliance with the City of Carlsbad Standard Urban Stormwater Mitigation Plan (SUSMP), Order 2001-01 issued by the San Diego Region of PC RES0 NO. 5914 -7- . 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 the California Regional Water Quality Control Board and City of Carlsbad Municipal Code. The SWMP shall address measures to avoid contact or filter said pollutants from storm water, to the maximum extent practicable, for the post-construction stage of the project. At a minimum, the SWMP shall: a. b. c. identify existing and post-development on-site pollutants-of-concern; identify the hydrologic unit this project contributes to and impaired water bodies that could be impacted by this project; recommend source controls and treatment controls that will be implemented with this project to avoid contact or filter said pollutants from storm water to the maximum extent practicable before discharging to City right-of-way; establish specific procedures for handling spills and routine clean up. Special considerations and effort shall be applied to employee education on the proper procedures for handling clean up and disposal of pollutants; ensure long-term maintenance of all post construct BMPs in perpetuity; and identify how post-development runoff rates and velocities from the site will not exceed the pre-development runoff rates and velocities to the maximum extent practicable. d. e. f. 34. Developer shall maintain, in perpetuity, all post-construction water quality treatment measures (vegetated-swales and inlet filters) reflected on the Site Plan and Preliminary Grading Plan to ensure their effectiveness at removing pollutants from storm water prior to discharge to the right-of-way, adjacent property or natural watercourse in accordance with the City SUSMP. - Water 35. 36. 37. 38. 39. Prior to approval of improvement plans or final map, Developer shall meet with the Fire Marshal to determine if fire protection measures (fire flows, fire hydrant locations, building sprinklers) are required to serve the project. Fire hydrants, if proposed, shall be considered public improvements and shall be served by public water mains to the satisfaction of the District Engineer. The Developer shall design and construct public facilities within public right-of-way or within minimum 20-feet wide easements granted to the District or the City of Carlsbad. At the discretion of the District Engineer, wider easements may be required for adequate maintenance, access andor joint utility purposes. Prior to issuance of building permits, Developer shall pay all fees, deposits, and charges for connection to public facilities. Developer shall pay the San Diego County Water Authorit, caDacitv charae(s) prior to issuance of Building Permits. The Developer shall design and construct public water facilities substantially as shown on the Site Plan and Preliminary Grading Plan to the satisfaction of the District Engineer. Proposed public facilities shall be reflected on public improvement plans. This project is approved upon the express condition that building permits will not be issued for the development of the subject property, unless the District Engineer has PC RES0 NO. 5914 -8- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 determined that adequate water and sewer facilities are available at the time of occupancy. The Developer shall coordinate with the District Engineer regarding the looped water system and easements. 40. Code Reminders 41. 42. 43. 44. 45. Approval of this request shall not excuse compliance with all applicable sections of the Zoning Ordinance and all other applicable City ordinances in effect at time of building permit issuance, except as otherwise specifically provided herein. The project shall comply with the latest non-residential disabled access requirements pursuant to Title 24 of the State Building Code. Premise identification (addresses) shall be provided consistent with Carlsbad Municipal Code Section 18.04.320. Any signs proposed for this development shall at a minimum be designed in conformance with the City’s Sign Ordinance and shall require review and approval of the Planning Director prior to installation of such signs. Developer shall exercise special care during the construction phase of this project to prevent offsite siltation. Planting and erosion control shall be provided in accordance with Carlsbad Municipal Code Chapter 15.16 (the Grading Ordinance) to the satisfaction of the City Engineer. NOTICE Please take NOTICE that approval of your project includes the “imposition” of fees, dedications, reservations, or other exactions hereafter collectively referred to for convenience as “feedexactions.” You have 90 days from date of final approval to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedure set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified feedexactions DOES NOT APPLY to water and sewer connection fees and capacity charges, nor planning, zoning, grading or other similar application processing or service fees in connection with this project; NOR DOES IT APPLY to any feedexactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. PC RES0 NO. 5914 -9- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a regular meeting of the Planning Commission of the City of Carlsbad, California, held on the 15th day of June 2005, by the following vote, to wit: AYES: Chairperson Segall, Commissioners Baker, Cardosa, Dominguez, Heineman, Montgomery, and Whitton NOES: ABSENT: ABSTAIN: CARLSBAD PLANNING COMMISSION ATTEST: n DON NEU Assistant Planning Director PC RES0 NO. 5914 -10-