Loading...
HomeMy WebLinkAbout2005-11-02; Planning Commission; Resolution 59801 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PLANNING COMMISSION RESOLUTION NO. 5980 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA, RECOMMENDING APPROVAL OF AN AMENDMENT TO THE LOCAL FACILITIES MANAGEMENT PLAN FOR ZONE 10 TO CHANGE THE LAND USE AND ZONING DESIGNATIONS ON PROPERTY GENERALLY LOCATED ON THE NORTHEAST CORNER OF EL CAMNO REAL AND CASSIA ROAD IN LOCAL FACILITIES MANAGEMENT ZONE 10. CASE NAME: CASSIA PROFESSIONAL OFFICES CASE NO. : LFMP 87- 1 O(A) WHEREAS, Franz-Yut El Camino, A Limited Liability Company has filed a verified application with the City of Carlsbad which has been referred to the Planning Commission; and WHEREAS, said application constitutes a request for a Local Facilities Management Plan Amendment for Zone 10 (dated September, 2005, on file in the Planning Department) and incorporated by this reference (collectively referred to as the “Local Facilities Management Plan Amendments”), as provided in Section 21.90.125 of the Carlsbad Municipal Code; and WHEREAS, the Planning Commission did, on the 2nd day of November 2005, hold a duly noticed public hearing as prescribed by law to consider said request; and WHEREAS, at said public hearing, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, said Commission considered all factors relating to the Local Facilities Management Plan for Zone 10. NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning Commission of the City of Carlsbad as follows: A) B) That based on the evidence presented at the public hearing, the Commission RECOMMENDS APPROVAL of an amendment for Local That the above recitations are true and correct. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Facilities Management Plan - Zone 10, based on the following findings and subject to the following conditions: Findings: 1. That the Local Facilities Management Plan amendment for Zone 10 is consistent with Chapter 21.90 of the Carlsbad Municipal Code (Growth Management), and with the Citywide Facilities and Improvement Plan, in that it contains all matters required by Section 2 1.90.1 10 and thereby ensures implementation of and consistency with the General Plan and to protect the public health, safety and welfare by ensuring that public facilities and improvements will be installed to serve new development prior to or concurrently with need. 2. The Planning Commission has reviewed each of the exactions imposed on the Developer contained in this resolution, and hereby finds, in this case, that the exactions are imposed to mitigate impacts caused by or reasonably related to the project, and the extent and the degree of the exaction is in rough proportionality to the impact caused by the project. Conditions: 1. 2. 3. ... ... ... ... ... Approval is granted for an amendment to Local Facilities Management Plan - Zone 10 as contained in the Plan titled Local Facilities Management Plan Zone 10, dated June 2001, on file in the Planning Department, and incorporated herein by reference. The amended pages of Zone 10 Local Facilities Management Plan, dated September, 2005 shall replace the respective pages of the Zone 10 LFMP dated June 2001. This approval is granted subject to the approval of the Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program, GPA 05-03, ZC 05-01, HMPP 05-06, CT 05-06, PUD 05-04, SDP 05-03, CUP 05-01, HDP 05-02 and SUP 05-01, and is subject to all conditions contained in Planning Commission Resolutions No. 5977, 5978,5979,5981,5982,5983,5984,5985,5986 and 5987 for those other approvals. Prior to the issuance of any permits for the project, the applicant shall submit to the Planning Director a digital copy and a camera ready master copy of the Local Facilities Management Plan - Zone 10, in addition to the required number of bound copies. PC RES0 NO. 5980 -2- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED AND ADOPTED at a regular meeting of the Planning Commission of the City of Carlsbad on the 2nd day of November 2005, by the following vote, to wit: AYES: Chairperson Segall, Commissioners Baker, Cardosa, Dominguez, Heineman, Montgomery, and Whitton NOES: ABSENT: ABSTAIN: JEFFRE N.WALL, Cwerson CAFUSBAD PLANNING COMMISSION ATTEST: h DON NEU Assistant Planning Director PC RES0 NO. 5980 -3- CITY OF CARLSBAD GROWTH MANAGEMENT PROGRAM LOCAL FACILITIES MANAGEMENT PLAN ZONE 10 Prepared For: City of Carlsbad Growth Management Division 163 5 Faraday Avenue Carlsbad, California 92008 Prepared By: Document Preparation: Jack Henthorn & Associates Engineering: O’Day Consultants Tmfic: Linscott Law & Greenspan June, 2000 Revised June, 2001 Revised September, 2005 [LFMP 87-1O(A)] Local Facilities Management Plan Zone 10 In addition, it is assumed that slopes of 25% to 40% may be developed at half the usual density. Using this methodology it is estimated that approximately 1,236 dwelling units could be constructed within Zone 10. The actual number of units that are ultimately constructed in the zone may vary. However, the estimate is useful and valid for purposes of this plan and is consistent with all applicable requirements of the Growth Management Program, particularly Proposition E. In addition to the residential land uses proposed, the plan proposes nonresidential uses for the zone including an existing golf course, a future park site, elementary school site, open space, and Planned Industrial uses. The plan includes phasing schedules, which indicate the property owners estimated amount of development for each year from 2000 to 2020. The phasing estimates are intended for facility planning purposes only. The phasing schedule (Exhibits 14 through 19) also includes the projections for other zones with adopted Local Facilities Management Plans. The schedules are based upon those adopted Local Facilities Management Plans and are used to determine approximate threshold years for constructing or upgrading various public facilities to maintain compliance with the Performance Standards in the Growth Management Program. The threshold years arrived at in this way are only projections for facility planning purposes. The actual thresholds must be monitored as development takes place in this zone. Facilities may be needed earlier or later than the threshold years shown in this zone plan, depending upon the actual timing of development. B. ZONE 10 REQUIREMENTS FOR PUBLIC FACILITIES The development assumptions outlined above are used to estimate the demand for public facilities generated by development in Zone 10 based on the eleven adopted Performance Standards in the Growth Management Program. The following table (Exhibit 2 on page 1-5) shows the current status of each facility with respect to the performance standards, given the existing amount of development in the zone. Because there is currently no developed land in Zone 10, with the exception of the golf course, the public facility demands are zero. Therefore, all eleven Performance Standards are currently being met. Exhibit 3 on page 1-6 summarizes the status of each facility with respect to the performance standards through buildout. In order to assure compliance with the Performance Standards as development occurs in the zone, the zone plan contains specific conditions of approval which are listed on Exhibits 4 and 5. Exhibit 4 contains the General Conditions that are applicable to all zones of the City. Exhibit 5 contains Special Conditions for Zone September, 2005 1-2 Local Facilities Management Plan Zone 10 XVII- XVIII- XIX- Finance: Provides a smary of the proposed method of financing each facility. References: Provides a list of public documents used in the preparation of this plan but not included in the Appendices due to the length of the individual documents. All References are available to the public by request of the respective publishing agency. Appendices: Provides the technical materials used in preparation of this plan. B. OVERVIEW OF MANAGEMENT ZONE 10 Local Facilities Management Zone 10 is located in the southeast quadrant of Carlsbad as shown on Exhibit 1. The zone is bounded by El Camino Real to the west, Zone 6 to the south, Zones 6 and 18 to the east and Zone 17 to the north and east. Zone 10 comprises approximately 756.6 gross acres. Exhibit 6 lists the property owners within Zone 10 and shows the location of their holdings. Zone 10 is primarily a residential area. The Carlsbad General Plan calls for residential land uses in Zone 10 ranging in density from Residential Low Medium (0-4.0 dwelling unitdacre) to Residential Medium High (8-1 5 dwelling unitdacre). Nonresidential development consists of a potential elementary school site, a community facilities site, a planned industrial site and an ofice building site. The School Facilities section provides the location and details of the proposed school site. The zone will also include a proposed park site and the 80.8-acre existing golf course. The Park and Open Space Facilities sections provide the location and details of the park and golf course sites. The General Plan land use designations within Zone 10 are shown on Exhibit 7. The land use zoning within Zone 10 is shown on Exhibit 8. The Villages of La Costa Master Plan Amendment was completed concurrently with this Local Facilities Management Plan. September, 2005 11-2 Zoning Designations Exclusive Agriculture Qualified Overlay Zone Limited Control LP-C I Planned Community Flood Plain Local Facilities Management Plan Zone 10 - D.0 13.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 13.7 EXHIBIT IO LFMP Build Out Proiections - Constraints 1.0 0.0 0.0 0.0 RLM-3 80.0 5.5 15.7 0.0 18.2 0.0 0.0 0.0 0.0 346.3 RLM-4 RLM-6 RLM-7 RLM-8 RLM-10 RLM-11 RLM-12 388.7 65.1 32.6 7.2 328.1 39.9 126.2 30.4 35.4 3.0 5.9 2.9 RLM TOTAL 323.7 RM-1 C RMH-5 PI -IA 0-1 E os os-I os-2 OS-3 os4 os4 0s-6 OS-7 OS-8 7.5 34.4 139.1 36.4 3.4 30.6 80.8 26.9 6.5 3.1 OS TOTAL 361.2 STREETS TOTAL ZONE 756.6 NOTES: A - MAJ( Full Constraints ABCDEFGHI- 0.0 0.4 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 0.0 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.9 0.0 16.5 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 139.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 36.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 30.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 80.8 4.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 22.2 3.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 27.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.5 tal 1.8 2.5 1.5 1 .0 2.9 3.1 3.9 3.4 - 1.7 18.0 ,.s ).8 3.2 - Partial J JI2 0.4 0.2 17.0 8.5 7.5 3.8 25.2 12.6 4.0 2.0 4.5 2.3 0.0 0.0 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Schools K 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Net Developable Acres 6.9 69.8 33.6 105.1 27.4 30.2 2.9 4.9 2.5 276.4 7.8 26.9 7.6 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 K YUWtKLINt tAStMtN I t - KIFAKIAN I - W I HtK tNVIK. PtA I UKt B - CIRCULATION F- WETLANDS C - RAILROAD ROW D - SLOPES >40% J - SLOPES 25% TO 40% K - SCHOOL SITE OVERLAY G - FLOODPLAIN H - PERMANENT BODY OF WATER September, 2005 111-3 Local Facilities Management Plan Zone 10 Non-residential uses within the Zone 10 area consist of the existing La Costa Hotel and Spa Golf Course, the potential school site, the future park site, the community facility site, the planned industrial site and the office building site. The future school site location or the need for an elementary school has not yet been determined. If a school site is determined not necessary by the Carlsbad Unified School District, then the area reserved for the school site shall have a land use designation consistent with the underlying General Plan land use designation. 3. BUILD OUT POPULATION PROJECTION The build out population projection for Management Zone 10 was determined by applying a population generation rate of 2.3178 persons/dwelling unit. The build out population projections for Zone 10 are shown on Exhibit 12. These build out population projections are used consistently throughout this plan for the purpose of predicting demand for public facilities. The total number of units ultimately constructed within Zone 10 may vary fiom the projections used in this plan, without requiring an amendment to the plan if facility requirements are not significantly changed. Sources of variance include the uncertainty of the school site, possible density bonuses for affordable housing as well as other undetermined factors. September, 2005 111-7 Local Facilities Management Plan Zone 10 General Plan Land Use Designation EXHIBIT 11 Residential Build Out Projections Residential Existing App. Future Build Out DU’s DU’s DU’s - RLM-3 Net Acres GMCP (1) Projections (2) 69.8 3.2 223 223 RLM-4 RLM-6 RLM-7 RLM-8 RLM-10 RLM-11 RLM-12 RM-1 C RM H-5 TOTAL September, 2005 33.6 3.2 107 107 105.1 3.2 336 259 27.4 3.2 87 38 30.2 3.2 96 91 2.9 3.2 9 9 4.9 3.2 15 15 2.5 3.2 8 8 7.8 6.0 46 44 26.9 11.5 309 276 31 I .I 1236 0 0 1070 111-8 Local Facilities Management Plan Zone 10 RMH-5 TOTAL RES. EXHIBIT 12 Build Out Powlation Proiections 309 276 I 2.3178 640 I 640 1236 I 1070 I 2480 I 2480 Base General Plan Land Residential Use Designation (1) DU Build Ou ‘rojections (: 223 223 RLM-3 RLM4 RLM-6 RLM-7 RLM-8 RLM-I 0 RLM-11 RLM-12 RM-IC 2.3178 107 336 87 96 9 15 8 46 51 7 248 600 88 21 1 21 35 19 102 51 7 248 600 88 21 1 21 35 19 102 107 259 38 91 9 15 a 44 2.3178 2.3178 2.3178 2.3178 2.3178 2.3178 2.3178 2.3178 September, 2005 111-9 Local Facilities Management Plan Zone 10 Exhibit 13 Non-Residential Build Out Proiections Genera I Net GMP Non- Base Non- Existing Approved Estimated Land Use Developable Residential Residential Sq. Sq. Ft. Future Sq. Designation Acres LU Buildout Ft. Ft. Intensity Projections Estimate PI -IA 7.6 40%+ 137,650 137,650 PI Total 7.6 40%+ 137,650 137,650 CF 6.9 30% 90,169 90,169 CF Total 6.9 30% 90,169 90,169 0-1 2.5 40%+ 11,800 11,800 0-1 Total 2.5 40%+ 11,800 11,800 Total Zone 17.0 239,619 239,619 Genera I Net GMP Non- Base Non- Existing Approved Estimated Land Use Developable Residential Residential Sq. Sq. Ft. Future Sq. Designation Acres LU Buildout Ft. Ft. Intensity Projections Estimate - - _. . - - - - - PI -IA 7.6 40%+ 137,650 137,650 PI Total 7.6 40%+ 137,650 137,650 CF 6.9 30% 90,169 90,169 CF Total 6.9 30% 90,169 90,169 0-1 2.5 40%+ 11,800 11,800 ~ ~~ 0-1 Total 2.5 40%+ 11,800 11,800 Total Zone 17.0 239,619 239,619 September, 2005 111- 10 Local Facilities Management Plan Zone 10 IV. PHASING Phasing projections estimate when, where and how much development will occur in Zone 10 between now and build out. Although difficult to predict exactly, phasing projections begin to make possible advance planning and programming of public facilities to assure adopted performance standards are continually met. The objectives of phasing projections are as follows: 1. Project estimated demands for public facilities on a yearly basis until build out. 2. Project and establish thresholds when and where public facilities improvements are needed. 3. Projecting facility thresholds allows sufficient lead-time for facility programming to assure that the performance standards are continually met. 4. Through threshold identification allow the City to efficiently and effectively implement public facility improvements. The 1986 CFIP projects residential phasing to be 1,250 dwelling units per year. This projection was based on a review of the San Diego Association of Governments (SANDAG) projections along with those utilized in the City’s Capital Improvement Program and the Public Facilities Management Systems, Monitoring Report of April 1986. The 1986 CFIP’s public facility programming was based in part on this projection. A. ZONE 10 LAND USE PHASING 1. RESIDENTIAL The Villages of La Costa Master Plan has limited the number of dwellings units for those portions of land within Zone 10 covered by the Master Plan. Therefore all population and facility projections will be based upon 1,038 dwelling units fiom the Master Plan and 32 dwelling units from non-Master Plan areas. The residential phasing projections for Zone 10 are shown on Exhibit 16. The residential phasing schedule is intended to be used for projecting future need and timing of public facilities. It is a tool to allow the City to anticipate future public facility needs and to budget moneys for their improvement. The projected residential phasing schedule is not absolute. The actual number of dwelling units to be built each year will vary depending on economic conditions. September, 2005 IV-1 EXHIBIT 14 Citywide Residential Phasing LFMPZONE Totals of LFMPS 64 49 0 100 0 11 63 5 0 0 01760 0 0 0168 0 010048 0100 0115011 0 015 648 44,951 104, 63 5 0 0 01760 0 0 016 0 010085 0100 01132 0 0 014 503 45,454 105, 63 5 0 0 01750 0 0 015 0 010085 0’100 01115 0 0 0 0 461 45,915 106, 63 5 0 0 O17M 0 0 015 0 010085 0100 01115 0 0 0 0 461 46,376 107, 63 5 0 0 01750 0 0 012 0 010085 0100 01115 0 0 0 0 458 46,834 108, 63 5 0 0 01650 0 0 0 0 0 010085 018 01215 0 0 0 0 389 47,223 109, 63 5 0 0 016 0 0 0 0 0 0 010058 0 0 01515 0 0 0 0 302 47,525 110, 63 5 0 0 015 0 0 0 0 0 0 010068 0 0 01515 0 0 0 0 311 47,836 110, 63 5 0 0 0 0 0 0 0 0 0 0 0100 68 0 0 0 15 0 0 0 0 0 281 48,117 111, 62 10 0 0 0 0 0 0 0 0 0 0 0 68 0 0 0 15 0 0 0 0 0 176 48,293 111, 61 0 0 0 0 0 0 0 0 0 0 0 0 0 30 0 0 0 15 0 0 0 0 0 136 48429 112 Buildout 2020 I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 015 0 0 0 0 0 ofi 15 48,444 112,2 Totals I 11,186 2,578 239 3,065 138 8,525 2,321 909 908 1,070 3,694 1,665 0 1,066 1,769 0 918 1,713 2,026 1,980 930 962 171 427 1761 48,436 48,444 112,2 Local Facilities Management Plan Zone 10 Year 2000 2000 Status lxisting ipproved 'rojeded luildout 6(SE) 10 11 12 17 18 7,688 0 1,885 1,252 0 1,694 12,519 29,017 40 0 80 125 0 0 12,764 29,584 Total of LFh4Ps 2020 Totals Total Quadrant Total DUs as of Quadrant 0 0 0 0 0 0 17,079 39,586 8,019 1,070 3,694 1,665 918 1,713 17,079 39,586 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 40 17 17 17 17 17 17 17 17 17 17 17 17 16 16 15 0 0 0 150 210 150 210 150 210 150 209 150 166 150 166 150 166 20 166 0 168 0 16 0 15 0 15 0 12 0 0 0 0 0 0 0 0 0 0 0 0 125 125 38 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 18 0 0 0 0 0 0 0 0 0 19 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13,289 13,791 14,206 14,582 15,034 15,467 15,900 16,203 16,489 16,621 16,753 16,885 17,014 17,048 17,064 17,079 17,079 17,079 17,079 30,801 31,965 32,927 33,798 34,846 35,849 36,853 37,555 38,218 38,524 38,830 39,136 39,435 39,514 39,551 39,586 39,586 39,586 39,586 September, 2005 1v-4 Local Facilities Management Plan Zone 10 EXHIBIT 16 Zone 10 Residential Phasing; Proiections Years as status of 111 Existing 2000 Proposed 2000 2001 2002 2003 2004 2005 2006 2007 2008 2008 TOTAL Total Zone DU’s as of Zone 10 1 /I 0 0 0 0 150 150 150 150 150 150 150 150 150 150 150 150 150 150 20 20 0 0 1070 1070 Total Zone Population 0 0 348 348 348 348 348 348 348 46 0 2480 September, 2005 IV-5 Local Facilities Management Plan Zone 10 Status EXHIBIT 17 - NON RESIDENTIAL PHASING PROJECTIONS Year Land Use 1 Southheast Quadrant Sq. 1 TOTAL Buildout 2008 2009 2010 201 1 2012 0 0 0 0 0 ~ TOTAL 2013 0 2014 0 2015 0 20 16 0 2017 0 2018 0 2019 0 Buildout 3,425,331 September, 2005 IV-6 Local Facilities Management Plan Zone 10 IT 18 Souiheast Qudrmt Non-Resid- Projechons .. Total Quadrant Non-Res Status Existing Approved Projected Buildout Year 2000 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2010 2012 2013 2014 2015 2016 2017 2018 2019 2020 Totals Local Facilities Management Zones as of Jan 1 0 0 344 11,001 0 0 11,345 0 0 11,345 6(SE) 10 11 12 17 18 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 56,954 56,955 56,955 56,955 11,800 0 0 0 0 0 0 0 0 0 0 0 0 0 0 56,192 403,801 95,396 83,635 53,579 11,761 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 30,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 44,280 44,280 44,280 0 0 0 0 0 0 0 0 0 0 0 0 0 0 740,333 740,333 740,334 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 807,870 2,038,958 2,975,923 3,160,793 3,315,607 3,339,168 3,339,168 3,339,168 3,339,168 3,339,168 3,339,168 3,339,168 3,339,168 3,339,168 3,339,168 3,339,168 3,339,168 3,339,168 3,339,168 0 0 3,339,168 0 239,619 704,708 41,001 132,840 2,221,000 3,339,168 September, 2005 1v-7 Local Facilities Management Plan Zone 10 Exhibit 19 Zone 10 Non-Residential Phasing Proiections Year as of Zone 10 Sq. status 1 /I Ft. Existing 2000 0 2000 0 200 1 0 2002 56,954 2003 56,955 2004 56,955 2005 56,955 2006 1 1,800 2007 0 2008 0 2009 0 2010 0 201 1 0 2012 0 2013 0 2014 0 2015 0 2016 0 2017 0 2018 0 2019 0 2020 0 Total 239.619 September, 2005 rv-8 Local Facilities Management Plan Zone 10 VI. CITY ADMINISTRATIVE FACILITIES A. PERFORMANCE STANDARD 1,500 square feet per 1,000 population must be scheduled for construction within a five year period. B. FACILITY PLANNING AND ADEQUACY ANALYSIS This analysis provides an inventory of existing and programmed City Administrative Facilities owned and leased by the City of Carlsbad. These facilities include both permanent and temporary structures. This analysis projects the build out demand for City Administrative Facilities and determines compliance with the adopted performance standard. Exhibit 20 shows the location of the existing and future City Administrative Facilities. 1. INVENTORY a. Existing: and Build Out City Administrative Demand: Citywide projected population and Zone 10 projected population comes from Exhibit 14. Performance Projected Standard Population Demand (Sq.Ft.) Existing ( 1 / 1 /OO) Citywide Zone 10 Build Out Citywide (2020) Zone 10 (2020) 83,420 125,130 0 0 1 12,284 168,426 2,480 3,720 September, 2005 VI- 1 Local Facilities Management Plan Zone 10 35,991 0 35,991 1,026 0 1,026 1,118 150 1,268 950 150 1,100 813 150 963 782 150 932 661 150 811 669 150 819 590 150 740 625 20 645 648 0 648 503 0 503 461 0 461 461 0 461 458 0 458 389 0 389 302 0 302 311 0 311 281 0 281 176 0 176 136 0 136 Status lxisting lpproved 'rojected luildout 83,420 125,130 222,157 97,027 85,798 128,697 222,157 93,460 88,737 133,106 222,157 89,052 91,287 136,931 222,157 85,227 93,519 140,279 222,157 81,879 95,679 143,519 222,157 78,639 97,559 146,339 222,157 75,819 99,457 149,186 222,157 72,972 101,172 151,758 222,157 70,399 102,685 154,028 222,157 68,130 104,187 156,281 222,157 65,877 105,353 158,030 222,157 64,128 106,422 159,633 222,15 7 62,524 107,490 161,235 222,15 7 60,922 108,552 162,828 222,157 59,329 109,453 164,180 222,157 57,978 110,153 165,230 222,157 56,928 110,874 166,311 222,157 55,846 111,526 167,289 222,157 54,868 111,934 167,901 222,157 54,256 112,249 168,374 222,157 53,784 Year 2000 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Totals IT 21 Philsing of CityAdmlnlstrab 've Fat* .. ... 15 0 151 112,284 168,426 222,157 53,731 47,366 1,070 48,436 112,284 168,426 222,157 53,731 Residential Dwelling Units Phasing Adequacy Analysis September, 2005 VI-6 Local Facilities Management Plan Zone 10 VII. LIBRARY FACILITIES A. PERFORMANCE STANDARD 800 square feet per 1,000 population must be scheduled for construction within a five year period. B. FACILITY PLANNING AND ADEQUACY ANALYSIS This analysis provides an inventory of existing and approved library facilities owned and leased by the City of Carlsbad. This analysis projects the build out demand for library facilities and determines compliance with the adopted performance standard. Future citywide library facility demand is projected based on the 2000-2001 Capital Improvement Program, adopted LFMP’s and Zone 10 LFMP’s projections. Exhibit 23 shows the location of existing and future library facilities. 1. INVENTORY a. Existing and Build Out Librarv Demand: Citywide projected population and Zone 10 projected population comes from Exhibit 14. Performance Projected Standard Population Demand (Sq.Ft.1 Existing (l/l/OO) Citywide Zone 10 Build Out Citywide (2020) Zone 10 (2020) 83,420 66,736 0 0 112,284 89,827 2,480 1,984 September, 2005 VII- 1 Local Facilities Management Plan Zone 10 Status lxisting ipproved 'rojected Iuildout Year 2000 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Totals ... rv Fadhes P Residential Dwelling Units Phasing Adequacy Analysis Projected Projected In Other InTotal City City Citywide Adequacy/ Zones In Zone 10 Zones Population Demand Admin Supply (Inadequacy) 35,991 0 35,991 83,420 66,736 88,600 21,864 1,026 0 1,0261 85,798 68,638 88,600 19,962 1,118 950 813 782 661 669 590 625 648 503 461 461 458 389 302 311 281 1 76 136 150 1,268 150 1,100 150 963 150 932 150 81 1 150 819 150 740 20 645 0 648 0 503 0 461 0 461 0 458 0 389 0 302 0 311 0 281 0 176 0 136 88,737 91,287 93,519 95,679 97,559 99,457 101,172 102,685 104,187 105,353 106,422 107,490 108,552 109,453 110,153 110,874 11 1,526 111,934 112,249 70,990 73,030 74,815 76,543 78,047 79,566 80,938 82,148 83,350 84,282 85,138 85,992 86,842 87,562 88,122 88,699 89,221 89,547 89,799 88,600 88,600 88,600 109,155 109,155 109,155 109,155 109,155 109,155 109,155 109,155 109,155 109,155 109,155 109,155 109,155 109,155 109,155 109,155 i7,6ia i5,57a 13,785 32,612 31,108 29,589 28,217 27,007 25,805 24,873 24,017 23,163 22,313 21,593 21,033 20,456 19,934 19,608 19,356 15 0 151 112,284 89,827 109,155 19,328 47,366 1,070 48,436 112,284 89,827 109,155 19,328 September, 2005 Local Facilities Management Plan Zone 10 IX. PARK FACILITIES A. PERFORMANCE STANDARD Three acres of Community Park or Special Use Area per 1000 population within the park district must be scheduled for construction within a five-year period. B. FACILITY PLANMNG AND ADEQUACY ANALYSIS Park facilities are addressed on a Park District basis. There are four park districts which correspond to the four quadrants of the City. Zone 10 is located in Park District 4 as shown on Exhibit 30. 1. INVENTORY a. Existing and Build Out Park Demand: The projected population for Park District 4 comes from Exhibit 15. Performance Projected Standard Population Demand (SqFt.) Existing (l/l/OO) Park District 4 Zone 10 Build Out Park District 4(2020) Zone 10 (2020) 29,017 87.05 0 0 39,604 118.81 2,480 7.44 September, 2005 IX- 1 Local Facilities Management Plan Zone 10 6(SE) 10 11 12 17 18 7,688 0 1,885 1,252 0 1,694 40 0 80 125 0 0 Status I Year 12,519 29,0171 87.05 80.24 -6.81 245 3xistin 'rojected 0 0 0 0 0 0 8,019 1,070 3,694 1,665 918 1,713 tuildout 0 39,586 118.76 139.64 20.88 17,079 39,586 118.76 139.64 20.88 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Totals EXHIBIT 32 Phasing of Pa rk Facilities for District 4 29,5841 40 17 17 17 17 17 17 17 17 17 17 17 17 16 16 15 0 0 0 150 210 150 210 150 210 150 209 150 166 150 166 150 166 20 166 0 168 0 16 0 15 0 15 0 12 0 0 0 0 0 0 0 0 0 0 0 0 125 125 38 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 18 0 0 0 0 0 0 0 0 0 19 0 0 0 0 0 0 0 0 0 0 0 0 0 0 525 502 415 376 452 433 433 303 285 133 132 132 129 34 16 15 0 0 0 30,801 31,965 32,927 33,798 34,846 35,849 36,853 37,555 38,216 38,524 38,830 39,136 39,435 39,514 39,551 39,586 39,586 39,586 39,586 88.75 92.40 95.89 98.78 101.39 104.54 107.55 110.56 112.67 114.65 115.57 116.49 117.41 118.31 118.54 118.65 118.76 118.76 118.76 118.76 80.24 114.64 114.64 114.64 114.64 139.64 139.64 139.64 139.64 139.64 139.64 139.64 139.64 139.64 139.64 139.64 139.64 139.64 139.64 139.64 -8.51 22.24 18.75 15.86 13.25 35.10 32.09 29.08 26.97 24.99 24.07 23.15 22.23 21.33 21.10 20.99 20.88 20.88 20.88 20.88 September, 2005 IX-8 Local Facilities Management Plan Zone 10 XIV. SCHOOL FACILITIES A. PERFORMANCE STANDARD School capacity to meet projected enrollment within the zone as determined by the appropriate school district must be provided prior to projected occupancy. B. FACILITY PLANNING AND ADEQUACY ANALYSIS As shown on Exhibit 66, two school districts will serve students in Zone 10: San Marcos Unified School District (SMUSD) and Carlsbad Unified School District (CUSD). Since Zone 10 is served by two different school districts, analysis of school facility adequacy shall be addressed on an individual district basis. 1. CARLSBAD UNIFIED SCHOOL DISTRICT a. Inventory A majority of Zone 10 is within the Carlsbad Unified School District. There are currently seven elementary schools, two middle schools, one continuation high school and one high school within the Carlsbad Unified School District. The majority of the existing schools in CUSD are located within the Northwest Quadrant. According to CUSD all of the existing schools are operating at capacity. b. Build Out Assumptions Existing and Build Out Population: SFD Multi Total units Units Total Rate Population Existing 0 0 0 2.3 178 0 Build Out 502 180 682 2.3178 1,581 c. Phasing The CUSD has adopted a school location plan and is also in the process of developing a finance plan based on the Mello-Roos financing mechanism. The new school location plan projected September, 2005 XIV- 1 Local Facilities Management Plan Zone 10 General Plan Residential Dwelling Units Students Generation Rates Land Use Buildout Sub-area Future Projections K-5 6-8 9-12 ~~ ~~ EXHIBIT67 Sc hool Facility Demand Tab le - Carlsbad U nified Sc hool District Student Generation Totals K-5 6-8 9-12 RMH-5 96 180 96 180 0.244 0.214 0.120 0.093 0.148 0.153 23.4 38.5 11.5 16.7 14.2 27.5 Totals 502 180 502 180 122.50 38.50 60.3 16.7 74.2 27.5 September, 2005 XIV-5 Local Facilities Management Plan Zone 10 b. Technical Assumptions Carlsbad’s current sewer Master Plan establishes unit flow generation factors as a basis for projecting the average sewer flows. The average unit flow fiom the City of Carlsbad was projected using 220 gallons per day per equivalent dwelling unit (EDU). The La Golindrina pump station, located east of Zone 10, is a temporary pump station and will be abandoned at the time sewer facilities are constructed within Zone 10. C. Existing Demand The land within Zone 10 is presently undeveloped and contains no existing sewer demand. d. Build Out Proiections and Sewer Demand The projected build out sewer flows for each sewer district in Zone 10 can be determined by multiplying the build out projections as established in this plan by the average unit flow factors obtained fiom Carlsbad’s Sewer Master Plan and the Leucadia County Water Districts Planning Study. Projected build out x Average unit flow .Average projected build out sewer At buildout, the projected average sewer flow for Zone 10, by sewer district, is as follows: Carlsbad Sewer Service Area Land Proposed Average Build Out Sewer Flow Use Build out Unit Flow Residential 299 EDU 220 GPDEDU 65,780 GPD 2,200 GPD Park 10 EDU 220 GPDEDU 10 EDU 220 GPDEDU 2,200 GPD Facilities 2,200 GPD PI 10 EDU 220 GPDEDU Office 6.56 EDU 220 GPDEDU 1,443 GPD Community September, 2005 SUBTOTAL. 73,832 GPD xv-5 Local Facilities Management Plan Zone 10 Leucadia County Water District Land Proposed Average Build Out Build out Unit Flow Sewer Flow Residential 771 EDU 2 15 GPDEDU 165,765 GPD TOTAL 239,905 GPD The projected yearly average flow for each sewer district of Zone 10 is shown on Exhibit 7 1. EXHIBIT 71 Zone 10 Yearly Sewer Demand Carlsbad Sewer Service Leucadia County Water District District Projected Projected Number of Avg. Flow Number of Avg. Flow Yearly Cu mmulative Yearly Cummulative - - Year EDU (MGDI EDU (MGD) 2000 0 0.0000 0 0.0000 2001 150 0.0330 0 0.0000 2002 142 0.0660 0 0.0000 2003 7 0.0675 143 0.0307 2004 0 0.0675 150 0.0630 2005 0 0.0675 150 0.0952 2006 0 0.0675 150 0.1275 2007 0 0.0675 150 0.1597 2008 0 0.0675 28 0.1658 2009 0 0.0675 0 0.1658 2010 0 0.1815 0 0.1658 201 1 0 0.1815 0 0.1658 Build Out Subtotal 299 0.1815 771 0.1658 Park 10 0.0022 0 0.0000 Community Facilities 10 0.0022 0 0.0000 P/I 10 0.0107 0 0.0000 Office 6.5 0.0027 0 0.0000 BuildOut Total 335.5 0.1993 771 0.1658 Note: Average Unit Flow for the CSSD is 220 GPD per EDU as determined in Carlsbad’s Sewer Master Plan Average Unit Flow for the LCWD is 215 GPD as determined in the Leucadia County Water Districts Planning Study. September, 2005 XV-6 Local Facilities Management Plan Zone 10 5. A proposed 12-inch reclaimed water line in El Camino Real and paralleling the existing 18- inch line to the west in Zone 21. The location and size of the major water facilities proposed for Zone 10 have been approximated only for the purposes of this plan. The actual location and sizes will be defined as Management Zone 10 develops and the major water facilities are analyzed per the Water District’s current standards. C. Build Out Assumptions: The section in this plan, entitled “Build Out Projections”, estimates the ultimate build out for Zone 10. These build out projections are listed below: Land Use Residential RLM RM RMH TOTAL Proiection Dwelling Units 750 44 276 1,070 Non-Residential : Park Site 34.4 Acres Planned Industrial 7.6 Acres Office 3.3 Acres Golf Course (Existing) 80.8 Acres Community Facilities 6.9 Acres September, 2005 XVI-5 Local Facilities Management Plan Zone 10 EXHIBIT 76 Zone 10 Yearlv Potable Water Demand Projected Yearly Year Dwelling Units Existing 8.1 2000 0 200 1 150 2002 150 2003 150 2004 150 2005 150 2006 150 2007 150 2008 20 Build Out Subtotal Elementary School 7.2 AC Park Site 27.2 AC Office 3.3 AC Com.Facilities 6.9 AC Industrial 7.7AC Cumulative Projected Yearly Demand Demand (in GPD) (in GPD) 1 1.664 1 1,664 0 1 1,664 51,250 62,914 71,250 1 34,164 124,625 258,789 130,200 388,989 187,500 576,489 144,375 720,864 0 720,864 0 720,864 720,864 13,680 13,680 39,168 39,168 2,714 2,714 20,700 20,700 15,400 15,400 Golf Course 80.8 AC 1 16,3 52 116,352 Build Out Total 928.878 September, 2005 XVI- 1 0 Local Facilities Management Plan Zone 10 EXHIBIT 77 Yearlv Reclaimed Water Demand Year Yearly No. Projected Yearly Average Unit Projected Build No. of Irrigated Demand C urn ulative Out Acres Acres Demand AFNR Existing 80.8 72.7 3.2 232.7 2000 0.0 0.0 0.0 232.7 200 1 0.0 0.0 0.0 232.7 2002 37.4 7.5 2.5 25 1.5 2003 48.1 9.6 2.5 275.5 2004 75.1 15.0 2.5 313.0 2005 94.6 18.9 2.5 360.2 2006 175.8 35.2 2.5 448.2 2007 154.0 30.8 2.5 525.2 2008 0.0 0.0 0.0 525.2 Build Out Subtotal 525.2 Elementary 7.2 4.3 3.8 16.1 School Office 3.3 .54 .3 5 .3 5 Community 6.9 1.2 2.5 3 .O Facilities Industrial 7.6 1.2 2.5 3 .O Park Site 27.2 21.8 2.5 54.5 Build Out Total 602.15 September, 2005 XVI-11 Local Facilities Management Plan Zone 10 e. Projected Build Out Demand: The projected build out average potable water demands can be projected for Management Zone 10 by multiplying the build out projections as established in this Plan to the average unit demand factors obtained from CMWD’s Master Plan. The projected average potable water demand for the build out of Management Zone 10 is as follows: Land Use Projected Build Out Average Demand Avg. Potable Water Residential RLM 750 du 625 GPD/du 468,750 GPD RM 44 du 400 GPD/du 17,600 GPD RMH 276 du 250 GPD/du 69,000 GPD Elem. School 7.2 AC 1,900 GPD/AC 13,680 GPD Gross Office 3.3 AC 820 GPD/AC 2,706 GPD Park Site 27.2 AC 1,440 GPD/AC 39,168 GPD Golf Course 80.8 AC 1,440 GPD/AC 116,352 GPD Industrial 7.6 AC 2,000 GPD/AC 15,200 GPD Community 6.9 AC 3,000 GPDIAC 20,700 GPD Demand Facilities TOTAL 763.156 GPD The projected average reclaimed water demand for the build out of Management Zone 10 is as follows: Land Use Projected Irrigated Acres Average Demand Avg. Reclaimed Build Out Water Demand Residential 365 AC 73.2 2.5 AFNWAC 183 AFNR Elem. School 7.2 AC 4.3 Office 3.3 AC .54 Park Site 27.2 AC 21.8 Golf Course 80.8 AC 72.7 Facilities Community 7.9 AC 1.2 3.7 ACNRIAC 15.9 AFNRIAC .35 AFNWAC .35 AFNWAC 2.5 AFNWAC 54.5 AFNR 3.2 AFNWAC 232.6 AFNR 2.5 AFNWAC 3.0 AFNR Industrial 7.9 AC 1.2 2.5 AFNRIAC 3.0 AFNR TOTAL 492.35 AFIYR f. Possible Use of Reclaimed Water: On March 21,1989, the City of Carlsbad adopted an interim Reclaimed Water Use Policy for new land development. This policy specifies that all new development within the City of Carlsbad shall use reclaimed water if it can be reasonably September, 2005 XVI-12