Loading...
HomeMy WebLinkAbout2011-02-02; Planning Commission; Resolution 67561 PLANNING COMMISSION RESOLUTION NO. 6756 2 A RESOLUTION OF THE PLANNING COMMISSION OF THE 3 CITY OF CARLSBAD, CALIFORNIA, RECOMMENDING APPROVAL OF REDEVELOPMENT PERMIT RP 10-26 FOR 4 THE PROPOSED SEWER LIFT STATION (SLS) AND ASSOCIATED PIPING ON THE ENCINA POWER STATION (EPS) AND ADJACENT PROPERTIES GENERALLY 6 LOCATED NORTH OF CANNON ROAD, WEST OF INTERSTATE 5 AND WITHIN THE BOUNDARIES OF THE 7 SOUTH CARLSBAD COASTAL REDEVELOPMENT 'AREA AND IN LOCAL FACILITIES MANAGEMENT ZONES 3 8 AND 22. 9 CASE NAME: AGUA HEDIONDA SEWER LIFT STATION, FORCE MAIN, AND GRAVITY SEWER 10 REPLACEMENT PROJECT CASE NO.: RP 10-26 11 WHEREAS, the City of Carlsbad, "Developer/Owner," has filed a verified 13 application with the City of Carlsbad Housing and Redevelopment Commission regarding 14 property described as 1 -* A portion of the EPS, located north of Cannon Road and west , f of Interstate 5 at 4600 Carlsbad Boulevard (identified as Assessor's Parcel Numbers 210-010-26 & 210-010-41). The 17 sewer lift station and associated piping are proposed on the grounds of the Power Station; and 18 A portion of the SDG&E storage lot directly south of the EPS and east of the railroad tracks (identified as Assessor's Parcel 2Q Number 210-010-42). Associated underground piping is proposed in this area; and 21 A portion of a public street identified as Assessor's Parcel 22 Numbers 210-010-05. Associated underground piping is „_ proposed in this area; and 24 A portion of Avenida Encinas, from just north of Cannon Road (on property identified as Assessor's Parcel Number 210- 25 011-05) to just south of Cannon Road. Associated underground piping is proposed in this area 26 27 ("the Property"); and 28 WHEREAS, said verified application constitutes a request for a Redevelopment Permit as shown and described in the "Encina Power Station Precise Development Plan PDP 1 00-02(C)" document dated February 2, 2011, on file in the Planning Department AGUA 2 HEDIONDA SEWER LIFT STATION, FORCE MAIN AND GRAVITY SEWER 3 REPLACEMENT PROJECT - RP 10-26 as provided and required by Sections 600 and 608 of 4 c the South Carlsbad Coastal Redevelopment Area (SCCRA) Plan; and 5 WHEREAS, the SLS consists of the sewer lift station facilities itself, which 7 includes three structures, the main lift station, a grinder facility, and a bio-filter facility, and o pipelines, which consists of sewer, recycled and potable water; and 9 WHEREAS, the proposed SLS buildings and a segment of pipelines are located 10 within the boundaries of the EPS, while the pipe support bridge and remaining pipelines extend 11 to the north and south of the EPS boundaries; and 13 WHEREAS, this Redevelopment Permit applies to the SLS and associated piping 14 located onsite and south of the EPS and within the boundaries of the SCCRA Plan; and 15 WHEREAS, Section 601 states the land uses permitted by the SCCRP shall be those permitted by the General Plan and zoning ordinance except that certain uses, including 17 those uses that transmit wastewater, may be permitted within the boundaries of the SCCRA plan 18 only if the Housing and Redevelopment Commission approves 1) a finding that the SLS serves 2Q an extraordinary public purpose; 2) a precise development plan which sets forth standards for 21 development of the SLS; and 3) a Redevelopment Permit for the Project; and 22 WHEREAS, processed concurrently with Redevelopment Permit RP 10-26 is 23 Precise Development Plan Amendment PDF 00-02(C), which establishes the development 24 standards for the SLS; and the MND, which provides location and other information on the pipe 25 support bridge and associated piping located offsite of the EPS and within the boundaries of the 26 27 SCCRA Plan; and 28 WHEREAS, the Planning Commission is the review body for recommending and processing land use permits proposed in the SCCRA; and PC RESO NO. 6756 -2- WHEREAS, the Planning Commission did on February 2, 2011, hold a duly 2 noticed public hearing as prescribed by law to consider said request; and 3 WHEREAS, at said public hearing, upon hearing and considering all testimony 4 <- and arguments, if any, of all persons desiring to be heard, said Commission considered all factors 5 relating to the Redevelopment Permit RP 10-26; and 7 WHEREAS, in its deliberations, the Planning Commission considered whether o the SLS serves an extraordinary public purpose. NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning 10 Commission of the City of Carlsbad as follows: 11 A) That the foregoing recitations are true and correct. 13 B) That based on the evidence presented at the public hearing, the Commission RECOMMENDS APPROVAL of AGUA HEDIONDA SEWER LIFT 14 STATION, FORCE MAIN AND GRAVITY SEWER REPLACEMENT PROJECT - RP 10-26, based on the following findings and subject to the 15 following conditions: Findings: 17 1. The City of Carlsbad Planning Commission hereby finds the SLS serves an extraordinary 18 public purpose to the City of Carlsbad, the redevelopment area, and the citizens of Carlsbad as demonstrated by the following benefits: ~0 a. Improve reliability and functionality : The existing sewer lift station and pipelines, which were constructed in 1964 and rehabilitated in 1989, are under- 21 sized, outdated, and in some areas nearing the end of their useful life. These facilities also do not have sufficient capacity to convey future projected buildout 22 wastewater flows of the urbanized service areas of the cities of Carlsbad and Vista. The proposed project is designed of a size adequate to convey the future anticipated buildout demand for the two cities, and features modern components 24 to improve reliability and functionality. 25 b. Provide a recycled water supply: The project also includes the installation of a 12-inch recycled water line, which will run the length of the project. Eventually, 26 this line will provide adjacent commercial, industrial and office sites a reliable water supply for landscaping as an alternative to using potable water that is in short supply. 28 c. Facilitate Recreational Opportunities: The pipe support bridge over the lagoon channel is being constructed to accommodate the Coastal Rail Trail, a separate, PC RESO NO. 6756 -3- future project in this area, which will enhance recreational activities where none 2 currently exists. 3 d. Restore and Enhance the Marine Environment: The SLS will be located further to the east, will install modern equipment, and will replace the fragile wood 4 trestle bridge(s) that currently encroaches in the lagoon. The trestle bridge(s), including the removal of the pilings that are located in the lagoon channel, would be considered a beneficial impact to the lagoon. Furthermore, the new pipe support bridge will span the entire width of the channel and will not impact the lagoon. 7 e. Remove Blight: The proposed project will allow for the dismantling and 8 elimination of the existing lift station structure and over flow basin that was constructed in 1964. The new SLS will be constructed primarily underground and will not be visible as viewed from the east and south by motorists, passengers and pedestrians in the area. The structures will be stained earth-tone colors to blend in with the surrounding area. Furthermore, although adjacent to 11 the SCCRA plan boundaries, the existing trestle-style wood bridge(s) will be removed and replaced with a modern steel bridge with a weathered looking 12 guardrail, which will improve the visual character of the overall area. 13 That the proposed SLS use can be approved because the underlying Public Utilities (P-U) zoning district requires the approval of an official Precise Development Plan prior to the approval of building permits for allowed uses, and PDF 00-02(C), processed and 15 approved concurrently with RP 10-26, serves as the code-mandated regulatory document for the subject property. 16 , - 3. As demonstrated in Finding 1 above, the Project complies with several SCCRA Plan goals, which are listed in Section IV (400) of the Plan that seek to increase coastal g recreation opportunities, eliminate blight and environmental deficiencies, and strengthen the economic base of the project area through reliable, modern infrastructure. 19 Furthermore, the Project also complies with the following Plan goal: 20 a. Implement performance criteria to ensure quality site design and environmental standards to provide unity and integrity to the entire Redevelopment Plan area. The SLS complies with this goal by exhibiting a quality design and color (earth- 22 tones) that is sensitive to its environment and non-utility surroundings. As a regulatory document, the Precise Development Plan establishes development standards and review procedures for the EPS and the SLS. Further, the Project - . has been reviewed concurrently with the processing of the MND, compliant with the provisions of the California Environmental Quality Act (CEQA). 25 4. The Project is consistent with the General Plan in that it implements goals and policies 26 of the Land Use Element, as demonstrated by the following: 77 a. The proposed SLS is needed to ensure adequate provision of sewer service into 20 the future and will protect the quality of the lagoon and sensitive habitat in the area by locating the SLS further to the east, using modern equipment, and replacing the fragile wood trestle bridge(s) that currently encroaches in the PC RESO NO. 6756 -4- lagoon. These elements are consistent with Land Use Element Growth 2 Management and Public Facilities Goal A.I, which states, "A City which ensures the timely provision of adequate public facilities and services to preserve the 3 quality of life of residents." b. The proposed SLS will replace an existing sewer lift station that is old and not <- adequately sized to accommodate planned growth per the existing Carlsbad and Vista General Plans. In addition, the project would result in more efficient and 6 reliable wastewater transport to the EWPCF. The project is consistent with the Land Use Element Growth Management and Public Facilities Goal A.2, which 7 states, "A City which maintains a system of public facilities adequate for the projected population" and Goal A.3, which states, "A City that responsibly deals with the disposal of solid and liquid waste." 9 c. The proposed SLS will be constructed within the existing hillside away from the 10 lagoon and will not be visible from the south and east, nor will it block lagoon or ocean views. Furthermore, the proposed pipe support bridge will be constructed to allow for the Coastal Rail Trail, a separate, future project in the area. These elements are consistent with Land Use Element Environmental Implementing Policies and Action Programs C-5, which states, "Limit future development 13 adjacent to the lagoons and beach in such a manner so as to provide to the greatest extent feasible the physical and visual accessibility to these resources for 14 public use and enjoyment. d. The Project is consistent with the Public Utility (U) land use designation of the ,/- EPS, which permits wastewater treatment facilities. In addition, sewer and water pipelines are permitted in any land use designation. Further, the SLS 17 structures will have a flat roof and the buildings are a series of square and rectangular shapes architecturally articulated to vary building elevations and facade and will be partially below grade and stained with earth-tones to comply with the sensitive design objective of Overall Land Use Pattern Policy C.6, which states, "Review the architecture of buildings with the focus on ensuring the 2Q quality and integrity of design and enhancement of the character of each neighborhood. 21 5. The Project is consistent with the Encina Specific Plan 144 in that: 22 _~ a. It complies with applicable Specific Plan standards and requirements adopted over the years regarding architectural review, building height, exterior lighting, 24 and rooftop mechanical equipment. 25 b. Since the Project proposes no changes to the operation of the EPS, the Project does not conflict with Specific Plan standards and requirements regarding power station operations. 27 c. The proposed amended Encina Specific Plan, SP 144(L), incorporates the land 28 use designations of the City of Carlsbad General Plan, with which the Project is consistent. Additionally, SP 144(L) would incorporate by reference PDF 00- 02(C). PC RESO NO. 6756 -5- 6. The Project is in conformance with the Agua Hedionda Land Use Plan and all applicable 2 policies in that the Project has been reviewed for consistency with relevant coastal policies including land use, habitat protection, grading and drainage, stormwater 3 management, recreation, shoreline access, and visual resources. In particular, the Project complies with the Land Use Plan building height limitation of 35 feet. Furthermore, the Project has been conditioned to obtain a coastal development <- permit from the California Coastal Commission. 5 7. The Project is consistent with the City's adopted Scenic Corridor Guidelines, which apply to Carlsbad Boulevard and the North County Transit District railroad corridor, in 7 that the lift station walls on the north and east will be constructed as retaining walls, and thus hidden from view except for a 5-foot section of the top of the cured-in- place (CIP) concrete structure. The structure will have a flat roof. As such, the building is a series of square and rectangular shapes architecturally articulated to vary building elevations and facade from the view of the rail passengers travelling 10 through the city. Furthermore, the lift station will be virtually imperceptible to motorists on Carlsbad Boulevard or on the Carlsbad beach due to the distances involved, design of structures into the bluff, and material and colors that will blend in with the surrounding area. 13 8. The Project is consistent with the Citywide Facilities and Improvements Plan, the Local Facilities Management Plan for Zones 3 and 22 and all City public facility policies and 14 ordinances. The City's fire, schools, libraries and parks and recreation performance standards were developed assuming population growth occurs through the construction of additional dwelling units. However, the proposed project does not , f include residential land uses, and does not include any components that would result in an increase in population or any public facility or infrastructure demand that 17 might result from commercial or other non-residential land uses. Furthermore, project operations will not result in any increased traffic and will thus not result in 18 any substantial deterioration of the public roadway system, nor generate a need for other governmental services, such as emergency services. Replacement of the existing sewer lift station and force main is designed of a size adequate to convey the 2Q future anticipated build-out demand of the service area. 21 9. The Planning Commission has reviewed each of the exactions imposed on the Developer contained in this resolution, and hereby finds, in this case, that the exactions are imposed 22 to mitigate impacts caused by or reasonably related to the Project, and the extent and the degree of the exaction is in rough proportionality to the impact caused by the Project. 24 10. As conditioned, the Project is consistent with the City's Landscape Manual (Carlsbad Municipal Code Section 14.28.020 and Landscape Manual Section I B). 25 Conditions: 26 Note: Unless otherwise specified herein, all conditions shall be satisfied prior to the issuance of a Notice to Proceed or commencement of construction, whichever occurs first. 28 PC RESO NO. 6756 -6- General 2 1. If any of the following conditions fail to occur, or if they are, by their terms, to be 3 implemented and maintained over time, if any of such conditions fail to be so implemented and maintained according to their terms, the City of Carlsbad Housing and 4 Redevelopment Commission shall have the right to revoke or modify all approvals herein granted; deny or further condition issuance of all future building permits; deny, revoke, or further condition all certificates of occupancy issued under the authority of approvals r herein granted; record a notice of violation on the property title; institute and prosecute litigation to compel their compliance with said conditions or seek damages for their 7 violation. No vested rights are gained by Developer or a successor in interest by the City of Carlsbad's Housing and Redevelopment Commission approval of this Redevelopment 8 Permit RP 10-26. Q 2. Staff is authorized and directed to make, or require Developer to make, all corrections I A and modifications to the Redevelopment Permit RP 10-26 documents, as necessary to make them internally consistent and in conformity with final action on the project. I1 Development shall occur substantially as shown in the approved Exhibits. Any proposed development, different from this approval, shall require an amendment to this approval. 12 3. Prior to approval of the Redevelopment Permit, the Developer shall apply for and obtain approval of a Coastal Development Permit issued by the California Coastal Commission 14 or its successor in interest, which substantially conforms to this approval. A signed copy of the Coastal Development Permit must be submitted to the Planning Director. If the 15 approval is substantially different, an amendment to the Redevelopment Permit RD 10- 26 shall be required.16 , 7 4. This approval is granted subject to the adoption and approval of the Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program, PDP 00-02(C), SP 18 144(C), CDP 10-17, HDP 10-05, SUP 10-02 and BMP 05-03 and is subject to all conditions contained in Planning Commission Resolutions No. 6753, 6754, 6755, 6757, 19 6758, 6759 and 6760 for those other approvals incorporated herein by reference. 20 5. Approval is granted for Redevelopment Permit 10-26 as shown and described in the 2\ "Encina Power Station Precise Development Plan" document dated February 2, 2011, and the Mitigated Negative Declaration (MND) and Mitigation Monitoring 22 and Reporting Program (MMRP) on file in the Planning Department and incorporated herein by reference. Development shall occur substantially as shown unless otherwise 23 noted in these conditions. 24 6. Developer shall comply with all applicable provisions of federal, state, and local laws and 25 regulations in effect at the time of the issuance of a Notice to Proceed or commencement of construction, whichever occurs first. 26 7. Developer shall implement, or cause the implementation of, the MND and Project 27 MMRP. 28 PC RESO NO. 6756 -7- 8. As a condition of this approval, applicant must comply with the requirements of all 2 regulatory agencies having jurisdiction over the project and any mitigation requirements of the environmental documents for the project. 3 9. Developer shall submit to the Planning Director a reproducible 24" x 36" mylar copy of 4 the Redevelopment Permit reflecting the conditions approved by the final decision- <. making body. 5 10. Developer shall submit to the Planning Director a design depicting how the pipes on the pipe support bridge will be screened from view. 7 11. Developer shall include, as part of the plans submitted for any permit plan check, a reduced legible version of all approving resolution(s) in a 24" x 36" blueline drawing o format (including any applicable Coastal Commission approvals and the MMRP). 10 12. Developer shall submit and obtain Planning Director approval of a Final Landscape and Irrigation Plan showing conformance with the conditions herein and the City's Landscape 11 Manual. Developer shall construct and install all landscaping as shown on the approved Final Plans, and maintain all landscaping in a healthy and thriving condition, free from weeds, trash, and debris. 13 13. This approval shall become null and void if the Notice to Proceed is not issued or 14 commencement of construction does not occur for this project within two (2) years of the final discretionary approval, including the discretionary approvals of the •* California Coastal Commission or other agencies. Engineering: 17 14. Prior to hauling dirt or construction materials to or from any proposed construction site 18 within this project, the hauler shall apply for and obtain approval from, the city engineer for the proposed haul route. .->.-. 15. City shall comply with the city's Stormwater Regulations, latest version, and shall implement best management practices at all times. Best management practices include 21 but are not limited to pollution control practices or devices, erosion control to prevent silt runoff during construction, general housekeeping practices, pollution prevention and 22 educational practices, maintenance procedures, and other management practices or devices to prevent or reduce the discharge of pollutants to stormwater, receiving water or stormwater conveyance system to the maximum extent practicable. City shall notify 24 prospective owners and tenants of the above requirements. 25 16. City shall complete and submit to the city engineer a Project Threat Assessment Form (PTAF) pursuant to City Engineering Standards. Concurrent with the PTAF, city shall 26 also submit the appropriate Tier level Storm Water Compliance form and appropriate Tier level Storm Water Pollution Prevention Plan (SWPPP) as determined by the 27 completed PTAF. 28 17. This project is subject to 'Priority Development Project' requirements. City shall prepare and process a Storm Water Management Plan (SWMP) to demonstrate how this project meets new/current storm water treatment requirements per the city's Standard Urban PC RESO NO. 6756 -8- Storm Water Management Plan (SUSMP), latest version. In addition to new treatment 2 control BMP selection criteria in the SUSMP, the city shall use low impact development (site design) approaches to ensure that runoff from impervious areas (roofs, pavement, 3 etc) are drained through landscaped (pervious) areas prior to discharge. 4 18. City acknowledges upcoming hydromodification (runoff reduction) requirements may impact how this project treats and/or retains storm runoff. Hydromodification involves detailed site design and analysis to reduce the amount of post-development run-off by mimicking the natural hydrologic function of the site, preserving natural open-spaces and natural drainage channels, minimizing use of new impervious surfaces, and promoting 7 onsite infiltration and evaporation of run-off. 8 19. City is responsible to ensure that all final design plans (grading plans, improvement plans, landscape plans, building plans, etc) incorporate all source control, site design, treatment control BMP, applicable hydromodification measures, and Low Impact Design 10 (LID) facilities. \ \ 20. City shall submit documentation demonstrating how this project complies with Interim Hydromodification requirements per the city's SUSMP, latest version. Documentation 12 shall be included within the Storm Water Management Plan (SWMP). 21. City shall provide all-weather maintenance access roads to the public drainage facilities (e.g.: headwalls, rip-rap field, etc.) for this project. Where maintenance access roads are not practical and/or permitted, city shall incorporate low-maintenance design features. 15 Code Reminders: 22. Developer shall exercise special care during the construction phase of this project to 17 prevent offsite siltation. Planting and erosion control shall be provided in accordance with Carlsbad Municipal Code Chapter 15.16 (the Grading Ordinance) to the satisfaction 18 of the City Engineer. 19 23. Approval of this request shall not excuse compliance with all applicable sections of the 2Q Zoning Ordinance and all other applicable City ordinances in effect at time of building permit issuance, except as otherwise specifically provided herein. 21 24. The project shall comply with the latest nonresidential disabled access requirements 22 pursuant to Title 24 of the California Building Code. 23 24 25 26 27 28 PC RESO NO. 6756 -9- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED, AND ADOPTED at a regular meeting of the Planning Commission of the City of Carlsbad, California, held on February 2, 2011, by the following vote, to wit: AYES: NOES: Chairperson L'Heureux, Commissioners Black, Dominguez, Montgomery, Nygaard and Siekmann ABSENT: Commissioner Schumacher ABSTAIN: STEPHEPT'HAP" L'HEUREUX, Chairperson CARLSBAD PLANNING COMMISSION ATTEST: DON NEU Planning Director PCRESONO. 6756 -10-