HomeMy WebLinkAbout2011-02-02; Planning Commission; Resolution 67591 PLANNING COMMISSION RESOLUTION NO. 6759
2 A RESOLUTION OF THE PLANNING COMMISSION OF THE
3 CITY OF CARLSBAD, CALIFORNIA, APPROVING A
FLOODPLAIN SPECIAL USE PERMIT TO REMOVE PILINGS
4 FROM THE EXISTING TRESTLE BRIDGE STRUCTURE(S)
5 AS A COMPONENT OF THE SEWER LIFT STATION (SLS)
PROJECT ON PROPERTY GENERALLY LOCATED WITHIN
6 THE AGUA HEDIONDA LAGOON CHANNEL BETWEEN
THE OUTER AND MIDDLE LAGOONS IN LOCAL
7 FACILITIES MANAGEMENT ZONE 1
CASE NAME: AGUA HEDIONDA SEWER LIFT STATION,
8 FORCE MAIN, AND GRAVITY SEWER
9 REPLACEMENT
CASE NO: SUP 10-02
10
WHEREAS, the City of Carlsbad, "Developer/Owner," has filed a verified
12 application with the City of Carlsbad regarding property described as
13 Immediately east of the Burlington Northern Santa Fe (BNSF)
railroad tracks, within the railroad right-of-way, and
14 extending over the Agua Hedionda Lagoon channel between
the middle and outer lagoons on a portion of property
identified by Assessor's Parcel Number 210-010-09
16
("the Property"); and
17
WHEREAS, said verified application constitutes a request for a Floodplain18
jg Special Use Permit as shown on Exhibits "A" - "Y" dated February 2, 2011, and as shown
20 and described in the Mitigated Negative Declaration (MND) on file in the Planning
21 Department, AGUA HEDIONDA SEWER LIFT STATION, FORCE MAIN AND
22 GRAVITY SEWER REPLACEMENT - SUP 10-02, as provided by Chapter 21.110 of the
23
Carlsbad Municipal Code; and
24
WHEREAS, the Planning Commission did on February 2, 2011, hold a duly
26 noticed public hearing as prescribed by law to consider said request; and
27 WHEREAS, at said public hearing, upon hearing and considering all testimony
o Ozo and arguments, if any, of all persons desiring to be heard, said Commission considered all factors
relating to the Floodplain Special Use Permit.
1 NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning
2 Commission of the City of Carlsbad as follows:
3
A) That the foregoing recitations are true and correct.
4
- B) That based on the evidence presented at the public hearing, the Commission
APPROVES AGUA HEDIONDA SEWER LIFT STATION, FORCE MAIN
6 AND GRAVITY SEWER REPLACEMENT - SUP 10-02, based on the
following findings and subject to the following conditions:
7
Findings:8
9 1. The site is reasonably safe from flooding in that the project does not propose any
structures within the 100-year flood hazard area. The project will remove the
10 existing trestle bridge structure(s), which supports the existing 42-inch sewer pipe
(optionally, the structure supporting the 12-inch high pressure natural gas
transmission line may be removed). Furthermore, the eight bridge support (8)
12 pilings (possibly two (2) support pilings for the natural gas line), that are located in
the lagoon channel, will also be removed. The removal of the pilings will reduce the
13 amount of water friction through this narrow channel and allow water to flow faster
through this area should a 100-year flood occur.
14
2. The project as proposed has been designed to minimize the flood hazard to the habitable
portions of the structure in that no habitable structure is proposed.
16
3. The proposed project does not create a hazard for adjacent or upstream properties or
17 structures in that the removal of the bridge pilings will reduce the amount of water
friction and allow the water to flow faster into the outer lagoon and eventually into
the Pacific Ocean, which would prevent any water in the lagoon channel from
19 creating a hazard to any structures upstream of the bridge structure(s).
20 4. The proposed project does not create any additional hazard or cause adverse impacts to
downstream properties or structures in that the bridge structure(s) are located over and
21 within the lagoon channel that flows into the Pacific Ocean. The removal of the
~~ bridge pilings and structure(s) will not have an adverse impact on properties or
structures downstream from the bridge structure(s).
23
5. The proposed project does not reduce the ability of the site to pass or handle a base flood
24 of 100-year frequency in that the removal of the bridge pilings within the narrow
lagoon channel will better accommodate a 100-year flood through this area.
26 6. The proposed project taken together with all the other known, proposed, and anticipated
projects will not increase the water surface elevation of the base flood more than one foot
27 at any point in that the removal of the bridge pilings from the narrow lagoon channel
will improve the flow of the lagoon, thereby increasing floodwater capacity.
28
PC RESO NO. 6759 -2-
7. All other required state and federal permits have been obtained or will be obtained prior
2 to the issuance of a Notice to Proceed or commencement of construction, whichever
occurs first.
3
Conditions;4
<- Note: Unless otherwise specified herein, all conditions shall be satisfied prior to the issuance of
a Notice to Proceed or commencement of construction, whichever occurs first.
6
1. If any of the following conditions fail to occur, or if they are, by their terms, to be
7 implemented and maintained over time, if any of such conditions fail to be so
implemented and maintained according to their terms, the City shall have the right to
revoke or modify all approvals herein granted; deny or further condition issuance of all
9 future building permits; deny, revoke, or further condition all certificates of occupancy
issued under the authority of approvals herein granted; record a notice of violation on the
10 property title; institute and prosecute litigation to compel their compliance with said
conditions or seek damages for their violation. No vested rights are gained by Developer
or a successor in interest by the City's approval of this Special Use Permit.
12 2. Staff is authorized and directed to make, or require the Developer to make, all corrections
13 and modifications to the Special Use Permit documents, as necessary to make them
internally consistent and in conformity with the final action on the project. Development
14 shall occur substantially as shown on the approved Exhibits. Any proposed development,
.. different from this approval, shall require an amendment to this approval.
16 3. Developer shall comply with all applicable provisions of federal, state, and local laws and
regulations in effect at the time of the issuance of a Notice to Proceed or
17 commencement of construction, whichever occurs first.
18 4. This approval is granted subject to the adoption and approval of the Mitigated Negative
19 Declaration and Mitigation Monitoring and Reporting Program, PDP 00-02(C), SP
144(L), RP 10-26, CDP 10-17, HDP 10-05, and HMP 05-03 and is subject to all
20 conditions contained in Planning Commission Resolutions No. 6753, 6754, 6755, 6756,
6757, 6758 and 6760 for those other approvals incorporated herein by reference.
22 5. Approval is granted for Special Use Permit 10-02 as shown and described in the
Mitigated Negative Declaration (MND) and Mitigation Monitoring and Reporting
23 Program (MMRP) on file in the Planning Department and incorporated herein by
reference. Development shall occur substantially as shown unless otherwise noted in
24 these conditions.
25 6. Developer shall implement, or cause the implementation of, the MND and Project
26 MMRP.
27 7. This approval shall become null and void if the Notice to Proceed is not issued or
commencement of construction does not occur for this project within two (2) years of
the final discretionary approval, including the discretionary approvals of the
California Coastal Commission or other agencies.
PC RESO NO. 6759 -3-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
8. Developer shall submit to Planning Director a reproducible 24" x 36" mylar copy of the
Site Plan reflecting the conditions approved by the final decision-making body.
9. Developer shall include, as part of the plans submitted for any permit plancheck, a
reduced legible version of all approving resolution(s) in a 24" x 36" blueline drawing
format (including any applicable Coastal Commission approvals).
Code Reminders;
10. Developer shall exercise special care during the construction phase of this project to
prevent offsite siltation. Planting and erosion control shall be provided in accordance
with Carlsbad Municipal Code Chapter 15.16 (the Grading Ordinance) to the satisfaction
of the City Engineer.
11. Approval of this request shall not excuse compliance with all applicable sections of the
Zoning Ordinance and all other applicable City ordinances in effect at time of building
permit issuance, except as otherwise specifically provided herein.
PASSED, APPROVED, AND ADOPTED at a regular meeting of the planning
Commission of the City of Carlsbad, California, held on February 2, 2011 by the following
vote, to wit:
AYES:
NOES:
Chairperson L'Heureux, Commissioners Black, Dominguez,
Montgomery, Nygaard and Siekmann
ABSENT: Commissioner Schumacher
ABSTAIN:
STEPHEN "HAP" L'HEUREUX, Chairperson
CARLSBAD PLANNING COMMISSION
[TEST:
DON NEU
Planning Director
PCRESONO. 6759 -4-