HomeMy WebLinkAbout2011-02-02; Planning Commission; Resolution 67601 PLANNING COMMISSION RESOLUTION NO. 6760
2
A RESOLUTION OF THE PLANNING COMMISSION OF THE
3 CITY OF CARLSBAD, CALIFORNIA, RECOMMENDING
APPROVAL OF A HABITAT MANAGEMENT PLAN PERMIT
4 TO ALLOW THE INCIDENTAL TAKE OF SPECIES OF
5 CONCERN FOR THE SEWER LIFT STATION AND
ASSOCIATED PIPING (SLS), ON PROPERTY GENERALLY
6 LOCATED SOUTH OF CHINQUAPIN AVENUE TO THE
ENCINA WATER POLLUTION CONTROL FACILITY. THE
7 PROJECT WOULD BE LOCATED WITHIN EASEMENTS ON
PUBLIC AND PRIVATE PROPERTY AND WITHIN THE
8 RIGHT-OF-WAY OF AVENIDA ENCINAS IN LOCAL
9 FACILITIES MANAGEMENT ZONES 1, 3 AND 22.
CASE NAME: AGUA HEDIONDA SEWER LIFT STATION,
10 FORCE MAIN, AND GRAVITY SEWER
REPLACEMENT
11 CASE NO: HMP 10-03
12 WHEREAS, the City of Carlsbad, "Developer/Owner," has filed a verified
13
application with the City of Carlsbad regarding property described as
14
Approximately 500-feet south of Chinquapin Avenue,
immediately east of the Burlington Northern Santa Fe (BNSF)
16 railroad tracks, within the railroad right-of-way, south across
Agua Hedionda Lagoon to the Encina Power Station
17 (identified as Assessor's Parcel Number 210-010-09); and
1 R A portion of the Encina Power Station, located north of
in Cannon Road and west of Interstate 5 at 4600 Carlsbad
Boulevard (identified as Assessor's Parcel Numbers 210-010-26
20 & 210-010-41); and
21 A portion of SDG&E's property, located north of Cannon
Road and south and east of the Encina Power Station
(identified as Assessor's Parcel Number 210-010-42); and
23
Avenida Encinas, from just north of Cannon Road (identified
24 as Assessor's Parcel Number 210-011-05) and south to the
Encinas Wastewater Pollution Control Facility (south of
Palomar Airport Road)
26 ("the Property"); and
27
WHEREAS, the City of Carlsbad has received authorization to issue permits to
28
impact various sensitive species and habitats, including species listed as Threatened or
1 Endangered, by virtue of Incidental Take Permit No. TE022606-0 from the U.S. Fish and
2 Wildlife Service and Natural Community Conservation Planning Permit No. 2835-2004-001-05;
3
and
4
5
6
7
o
consistency with the HMP; and
9
WHEREAS, said verified application by Developer constitutes a request for a
10
Habitat Management Plan Permit pursuant to the City's authority as contained in Chapter
12
13
14
18
19
20
21
26
27
28
WHEREAS, the authority stated above is based on a plan titled Habitat
Management Plan for Natural Communities in the City of Carlsbad, Final Approval November
9, 2004, referred to as the HMP, and approval of all projects is contingent on a finding of
21.210 of the Zoning Ordinance, on file in the Planning Department; and
WHEREAS, the Planning Commission did on February 2, 2011, consider said
request; and
WHEREAS, at said hearing, upon hearing and considering all testimony and
16
arguments, if any, of all persons desiring to be heard, said Commission considered all factors
17
relating to the Habitat Management Plan Permit.
NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning
Commission as follows:
A) That the foregoing recitations are true and correct.
22 B) That the AGUA HEDONDA SEWER LIFT STATION, FORCE MAIN, AND
23 | GRAVITY SEWER REPLACEMENT project is consistent with the HMP as
described in the following findings.
24 (
C) That based on the evidence presented at the hearing, the Commission
25 ' RECOMMENDS APPROVAL of the Habitat Management Plan Permit, HMP
10-03, for the AGUA HEDONDA SEWER LIFT STATION, FORCE MAIN,
AND GRAVITY SEWER REPLACEMENT based on the following findings
and subject to the following conditions:
PC RESO NO. 6760 -2-
Findings:
2 1. That the AGUA HEDONDA SEWER LIFT STATION, FORCE MAIN, AND
3 GRAVITY SEWER REPLACEMENT is not shown in Figure 28 of the approved
HMP as an existing hardline, proposed hardline, proposed standards, core or linkage
area. Instead, the project is in a disturbed area and is identified as a "development
<- area" in Figure 28; however, there are sensitive vegetation communities within the
Area of Potential Effects (APE) and there will be some temporary and permanent
6 impacts to the biological resources. Specifically, the area of impact will be for the
installation of the south abutment for the proposed pipe support bridge.
7 Additionally, the project will benefit adjacent preserved areas as it will remove
bridge support pilings from the channel between the middle and outer basins of
Agua Hedionda Lagoon, both of which are identified as existing hardline
9 conservation areas.
10 2. That authorization to take species of concern, through the take of sensitive species (see
Table 4 -Project Impacts to Vegetation Communities, which shows permanent and
temporary impacts to vegetation communities provided in the Preliminary
j2 Biological Assessment report prepared by Planning Systems, dated May 28, 2010
that was prepared for the project) is subject to continuous compliance with all
13 provisions of the Habitat Management Plan for Natural Communities in the City of
Carlsbad (HMP), the Citywide Incidental Take Permit issued for the HMP, the
14 Implementing Agreement, the Terms and Conditions of the Incidental Take Permit, and
. <. the Biological Opinion.
16 3. That authorization to impact sensitive habitats of species of concern is subject to
continuous compliance with all mitigation measures as stated in the Mitigated Negative
17 Declaration and mitigation Monitoring and Reporting Program and is subject to all
conditions contained in Planning Commission Resolutions No. 6753, 6754, 6755, 6756,
6757, 6758 and 6759 for those other approvals, including but not limited to recordation
j 9 of conservation easements over all conserved areas and management and monitoring in
perpetuity by a qualified conservation entity.
20
4. That authorization to impact sensitive habitats and take of species of concern is subject to
21 continuous compliance with the provisions of Volumes I, II and III of the Multiple
22 Habitat Conservation Program and the Final Environmental Impact
Statement/Environmental Impact Report for Threatened and Endangered Species Due to
23 Urban Growth within the Multiple Habitat Conservation Program Planning Area (SCH
No. 93121073).
24
5. That all impacts to habitat and all take of species will be incidental to otherwise lawful
activities related to construction and operation of the AGUA HEDONDA SEWER
26 LIFT STATION, FORCE MAIN, AND GRAVITY SEWER REPLACEMENT
project.
27
6. That the project design as approved by the City of Carlsbad has avoided and minimized
impacts to wildlife habitat and species of concern to the maximum extent practicable.
Specifically; most of the impacts are temporary construction impacts to disturbed
PC RESO NO. 6760 -3-
and developed lands. Furthermore, the project avoids impacts to sensitive habitats,
2 with the exception of minor slivers of Diego Coastal Sage Scrub (DCSS). The DCSS
is surrounded by a highly urbanized environment, and thus the minor slivers are
3 not rare habitat, nor are they especially valuable to the ecosystem which has already
been largely degraded by urbanization, industrialization and the adjacent railroad.
As a result of these factors, the project does not impact Environmentally Sensitive
Habitat Area (ESHA), a term applicable to properties in the Coastal Zone (as
defined in Coastal Act Section 30107.5) that contain rare or especially valuable
6 plant or animal life or their habitats that could easily be disturbed by human
activities and developments. Notwithstanding that the project will not impact
7 ESHA, it will mitigate for the 0.09 acres of sensitive biological habitats that will be
impacted through compliance with the mitigation measures identified in the
Mitigation, Monitoring and Reporting Program (MMRP).
9
7. That adequate funding has been provided to address changed circumstances and adaptive
10 management needs that may be reasonably anticipated in the future, consistent with the
HMP Implementing Agreement.
8. That the authorization to impact sensitive habitats and incidental take of species of
concern as a result of the project will not appreciably reduce the likelihood of survival
13 and recovery of the species in the wild due to compliance with all of the above stated
requirements, as well as ongoing monitoring and reporting to the wildlife agencies and
14 the public.
9. That the Planning Director is authorized to sign the Take Permit.
16
10. The Planning Commission hereby finds that all development in Carlsbad benefits from
17 the Habitat Management Plan, which is a comprehensive conservation plan and
implementation program that will facilitate the preservation of biological diversity and
provide for effective protection and conservation of wildlife and plant species while
continuing to allow compatible development in accordance with Carlsbad's Growth
Management Plan. Preservation of wildlife habitats and sensitive species is required by
20 the Open Space and Conservation Element of the City's General Plan which provides for
the realization of the social, economic, aesthetic and environmental benefits from the
21 | preservation of open space within an increasingly urban environment. Moreover, each
new development will contribute to the need for additional regional infrastructure that, in
turn, will adversely impact species and habitats. The In-Lieu Mitigation Fee imposed on
23 all new development within the City is essential to fund implementation of the City's
Habitat Management Plan.
24
Conditions:25
1 • If any of the following conditions fail to occur; or if they are, by their terms, to be
implemented and maintained over time, if any of such conditions fail to be so
27 implemented and maintained according to their terms, the City shall have the right to
revoke or modify all approvals herein granted; deny or further condition issuance of all
28 future building permits; deny, revoke or further condition all certificates of occupancy
issued under the authority of approvals herein granted; record a notice of violation on the
PC RESO NO. 6760 -4-
property title; institute and prosecute litigation to compel their compliance with said
2 conditions or seek damages for their violation. No vested rights are gained by Developer
or a successor in interest by the City's approval of this Habitat Management Plan
3 Permit.
2. Staff is authorized and directed to make, or require the Developer to make, all corrections
c- and modifications to the Habitat Management Plan Permit documents, as necessary to
make them internally consistent and in conformity with the final action on the project.
6 Development shall occur substantially as shown on the approved Exhibits. Any proposed
development different from this approval, shall require an amendment to this approval.
7
3. If any condition for construction of any public improvements or facilities, or the payment
of any fees in-lieu thereof, imposed by this approval or imposed by law on this Project are
9 challenged, this approval shall be suspended as provided in Government Code Section
66020. If any such condition is determined to be invalid this approval shall be invalid
10 unless the City Council determines that the project without the condition complies with
all requirements of law.
j2 4. This approval is granted subject to the adoption and approval of the Mitigated Negative
Declaration and Mitigation Monitoring and Reporting Program, PDP 00-02(C), SP
13 144(C), RP 10-26, CDP 10-17, HDP 10-05 and SUP 10-02 and is subject to all
conditions contained in Planning Commission Resolutions No. 6753, 6754, 6755, 6756,
14 6757, 6758 and 6759 for those other approvals incorporated herein by reference.
5. As a condition of this approval, applicant must comply with the requirements of all
16 regulatory agencies having jurisdiction over the project and any mitigation requirements
of the environmental documents for the project. Pursuant to Government Code section
17 65871 and Carlsbad Municipal Code Title 20, Chapter 20.04, section 20.04.140 applicant
shall grant a conservation easement for the conservation, protection, and management of
fish, wildlife, native plants and the habitat necessary for biologically sustainable
Ip, populations of certain species thereof, in accordance with the City's adopted Habitat
Management Plan.
20 !
6. Developer shall implement, or cause the implementation of, the MND and Project
21 MMRP.
22 |7. This approval shall become null and void if the Notice to Proceed is not issued or
23 commencement of construction does not occur for this project within two (2) years of
the final discretionary approval, including the discretionary approvals of the
24 California Coastal Commission or other agencies.
8. Developer shall comply with all applicable provisions of federal, state, and local laws and
26 regulations in effect at the time of the issuance of a Notice to Proceed or
commencement of construction, whichever occurs first.
27
9. This project has been found to result in impacts to wildlife habitat or other lands, such as
agricultural land, non-native grassland, and disturbed lands, which provide some benefits
to wildlife, as documented in the City's Habitat Management Plan and the environmental
PC RESO NO. 6760 -5-
analysis for this project. Mitigation Measures are included to require debiting the
2 appropriate acreage from the Lake Calavera Mitigation Parcel at the ratios
indicated in Table 4 of the MMRP under Biological Resources, except that
3 Conservation Standards 7-8 and 7-9 (p. D-115) of the HMP require that Diegan
coastal sage scrub mitigation acreage must include a minimum 1:1 creation
component (minimum of 0.05 acre creation). Therefore, project mitigation for
DCSS will include a minimum of 0.05 acres of credit debiting from the Lake
Calavera Mitigation Parcel, and also an additional 0.09 acre of revegetation
(creation) of DCSS on or near the impact location. The 0.09 acres of revegetation
(creation) of DCSS is expected to occur within and around the eastern half of the
demolished, filled-in existing lift station overflow basin, but could occur in a
different location in the area.
o
9 Code Reminders;
10 10. Developer shall exercise special care during the construction phase of this project to
prevent offsite siltation. Planting and erosion control shall be provided in accordance
11 with Carlsbad Municipal Code Chapter 15.16 (the Grading Ordinance) to the satisfaction
of the City Engineer.12
11. Approval of this request shall not excuse compliance with all applicable sections of the
Zoning Ordinance and all other applicable City ordinances in effect at time of building
14 permit issuance, except as otherwise specifically provided herein.
15 PASSED, APPROVED AND ADOPTED at a regular meeting of the Planning
Commission of the City of Carlsbad held on February 2, 2011, by the following vote, to wit:
17
AYES: Chairperson L'Heureux, Commissioners Black, Dominguez,
18 Montgomery, Nygaard and Siekmann
19 NOES:
20 ABSENT: Commissioner Schumacher
21
ABSTAIN:
22 "
23
24 STEPHEN "rfAP" L'HEUREUX, Chairperson
CARLSBAD PLANNING COMMISSION
25
ATTEST:26
27 (LX.
28 DON NEU
Planning Director
PC RESO NO. 6760 -6-