Loading...
HomeMy WebLinkAboutAECOM Technical Services Inc; 2014-03-27; UTIL1072AMENDMENT NO. 4 TO EXTEND AND AMEND AGREEMENT FOR PROFESSIONAL SERVICES FOR THE NORTHWEST QUADRANT STORM DRAIN PROGRAM AECOM TECHNICAL SERVICES, INC. UTIL 1072 Amendment No. 4 is entered into and effective as of the ~y of ~..,....~:......,<.---~....._L..>oooo~----· 2016, extending and amending the agreement dated March , 20 4 (the "Agreement") by and between the City of Carlsbad, a municipal corporation, ("City"), and AECOM Technical Services, Inc., a California corporation, ("Contractor") (collectively, the "Parties") for civil design services for the Northwest Quadrant Storm Drain Program -Roosevelt Street. RECITALS A On September 24, 2014, the Parties executed Amendment No.1 to the Agreement to extend the Agreement for a period of one (1) year ending September 26, 2015; and B. On September 16, 2015, the Parties executed Amendment No.2 to the Ag;eement to extend the Agreement for a period of one (1) year ending September 26, 2016 and to increase the scope of work to include replacing the storm drain pipeline; and C. On January 7, 2016, the Parties executed Amendment No.3 to the Agreement to increase the scope of work to fund additional civil engineering services; and D. The Parties desire to fund additional design services to address changes requested by the Carlsbad Municipal Water District and the City; and E. The Parties desire to extend the Agreement for a period of one (1) year ending September 26, 2017; and F. The Parties have negotiated and agreed to a supplemental scope of work and fee schedule, which is attached to and incorporated in by this reference as Exhibit "A", Scope of Services and Fee. NOW, THEREFORE, in consideration of these recitals and the mutual covenants contained herein, City and Contractor agree as follows: 1. In addition to those services contained in the Agreement, as may have been amended from time to time, Contractor will provide those services described in Exhibit "A". With this Amendment, the total annual Agreement amount shall not exceed twenty thousand dollars ($20,000). 2. City will pay Contractor for all work associated with those services described in Exhibit "A" on a time and materials basis not-to-exceed twenty thousand dollars ($20,000). Contractor will provide City, on a monthly basis, copies of invoices sufficiently detailed to include hours performed, hourly rates, and related activities and costs for approval by City. 3. Contractor will complete all work described in Exhibit "A" by September 26, 2017. 4. All other provisions of the Agreement, as may have been amended from time to time, will remain in full force and effect. City Attorney Approved Version 1/30/13 UTIL 1072 5. All requisite insurance policies to be maintained by the Contractor pursuant to the Agreement, as may have been amended from time to time, will include coverage for this Amendment. 6. The individuals executing this Amendment and the instruments referenced in it on behalf of Contractor each represent and warrant that they have the legal power, right and actual authority to bind Contractor to the terms and conditions of this Amendment. CONTRACTOR AECOM TECHNICAL SERVICES, INC., :~alijZ_lC, (s1gn here) Ray Hrenko I Vice President (print name/title) Brandenburg-Smith (print name/title) CITY OF CARLSBAD, a municipal corporation of the State of California By: ~ .t J~~--··· City Manag Mayor or Director Associate Vice President & Assistant Secretary If required by City, proper notarial acknowledgment of execution by Contractor must be attached. If a corporation, Agreement must be signed by one corporate officer from each of the following two groups: Group A Chairman, President, or Vice-President Group B Secretary, Assistant Secretary, CFO or Assistant Treasurer Otherwise, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate seal empowering the officer(s) signing to bind the corporation. APPROVED AS TO FORM: CELIA A. BREWER, City Attorney BY:_-~'-""~==-------=-­ Deputy City Attorney City Attorney Approved Version 1/30/13 2 AECOM Technical Services, Inc. 3995 Via Oro Avenue Long Beach, CA 90810 T 562.213.4139 F 562.420.2915 www.aecom.com AECOM TECHNICAL SERVICES. INC. CERTIFICATE OF ASSISTANT SECRETARY The undersigned, Sarah M. Sabunas, hereby certifies that she is now and at all times relevant hereto has been the duly elected and acting Assistant Secretary of AECOM Technical Services, Inc., a California corporation, and that the Board of Directors, by resolution dated June 6, 2014, has authorized Ray Hrenko, Vice President, may in accordance with established administrative procedure, execute various written agreements and instruments, including Amendment No. 1 to the Agreement for Professional Services for the Northwest Quadrant Storm Drain Program project by and between the City of Carlsbad and AECOM Technical Services, Inc. on behalf of the corporation or its divisions. · The undersigned does further certify that the foregoing resolution has not been revoked, amended or modified, and is in full force and effect as of the date hereof. IN WITNESS WHEREOF, the undersigned has executed this Certificate of Assistant Secretary and has affixed the corporate seal of this corporation this 11th day of September, 2014. AECOM TECHNICAL SERVICES, INC. By:~~--- Sarah M. Sabunas, Assistant Secretc:ry UTIL 1072 EXHIBIT "A" SCOPE OF SERVICES AND FEE The following Scope of Services and Fee amends the original Agreement's Scope of Work Tasks. Task 4-Original Agreement Construction Phase Support Provide additional funding for design services to address changes requested by the Carlsbad Municipal Water District and the City. Fee to Fund Task 4 ............................................................................................................ $20,000 City Attorney Approved Version 1/30/13 3 AMENDMENT NO. 3 TO AGREEMENT FOR PROFESSIONAL SERVICES AECOM TECHNICAL SERVICES, INC. UTIL1072 //"Jrhis Amendment No. 3 is entered into and effective as of the 'l 22{ day of [/;1 Aft[ tl /' V , 20Ltz_, amending the agreement dated March 27, 2014 (th~i''Agr6ement") ~Y and between the City of Carlsbad, a municipal corporation, ("City"), and bECOM Technical Services, Inc., a California corporation, ("Contractor") (collectively, the nParties") for the Northwest Quadrant Storm Drain Improvement Program. RECITALS A. On September 24, 2014, the Parties executed Amendment No: 1 to the Agreement to extend the Agreement for a period of one (1) year ending September 26, 2015; and B. On September 16, 2015, the Parties executed Amendment No.2 to the Agreement to extend the Agreement for a period of one (1) year ending September 26, 2016 and increase the scope of work to include replacing the storm drain pipeline; and C. The Parties desire to alter the Agreement's scope of work to amend the original tasks and provide funding for construction support services; and · D. The Parties have negotiated and agreed to a supplemental scope of work and fee schedule, which is attached to and incorporated by this reference as Exhibit "A", Scope of Services and Fee. NOW, THEREFORE, in consideration of these recitals and the mutual covenants contained herein, City and Contractor agree as follows: 1. In addition to those services contained in the Agreement, as may have been amended from time to time, Contractor will provide those services described in Exhibit "A". With this Amendment, the total annual Agreement amount shall not exceed thirty thousand dollars ($30,000). 2. City will pay Contractor for all work associated with those services described in Exhibit "A" on a time and materials basis not-to-exceed ten thousand dollars ($1 0,000). Contractor will provide City, on a monthly basis, copies of invoices sufficiently detailed to include hours performed, hourly rates, and related activities and costs for approval by City. 3. Contractor will complete all work described in Exhibit "A" by September 26, 2016. 4. All other provisions of the Agreement, as may have been amended from time to time, will remain in full force and effect. City Attorney Approved Version 1/30/13 1 UTIL 1072 EXHIBIT "A" SCOPE OF SERVICES AND FEE The following Scope of Services and Fee amends the original Agreement's Scope of Work tasks. Amend Task 3 Prepare Plans, Specifications and Estimates as follows: Add installation of hardscape improvements. Add design two curb inlets. Fee to Amend Task 3 ......................................................................................................... $3,000 Add Task 3A Provide civil engineering support services during bid process including responding to RFI's and preparation of details as required. Fee to add Task 3A. ........................................................................................................... $2,000 Fund Task 4 Construction Phase Support Fee to Fund Task 4 ............................................................................................................ $5,000 Total not-to-exceed amount based on time and materials ......................................... $10,000 City Attorney Approved Version# 05.22.01 3 UTIL 1072 EXHIBIT "A" SCOPE OF SERVICES AND FEE Original project was scoped to install a new manhole and some new cleanouts. After initial hydraulic analysis, it was determined that the pipeline is undersized. The project now will be the replacement and upsizing of the entire pipeline. An additional $10,000 is being added to this time and materials professional services agreement to funds these additional design services. City Attorney Approved Version 1/30/13 AECOM SAN DIEGO 2015 Schedule of Fees and Charges (Rate Table) The following describes the basis for compensation for service performed during the fiscal year 2015. This Schedule of Fees and Charges will be adjusted annually on January I of each subsequent year to reflect merit and economic salary increases, and changes in the expected level and mode of operations for the new year: The new Schedule of Fees and Charges will apply to existing and new assignments. PERSONNEL CHARGES* The charge for all time required in the performance of the Scope of Service, including office, field and travel time, will be at the Unit Price Hourly rates set forth below for the labor classifications: Labor Classification Step Code Professional Staff Hourly Rate PRFl Graduate Engineer, Scientist, Architect $85 PRF2 Engineer, Scientist, Architect $110 PRF3 Senior Engineer, Scientist, Architect $125 PRF4 Project Engineer, Scientist, Architect $150 PRF5 Associate Engineer, Scientist, Architect $175 PRF6 Senior Associate, Project Manager, Contracts Manager PRF7 Principal Engineer, Scientist, Architect PRF8 Senior Principal Engineer, Program Manager $190 $205 $265 Step Code Technical Staff Hourly Rate TEH1 Drafter/GIS/Graphics TEH2 Senior Drafter/GIS/Graphics TEH3 Designer/GIS, Estimator, Scheduler TEH4 Senior Designer, Estimator, Scheduler TEH5 Lead Designer, Estimator, Scheduler $90 $120 $120 $150 $200 Step Code Field Staff Hourly Rate FLDI Technician I FLD2 Technician II FLD2 FLD3 FLD4 FLD4 Project Technician/Field Inspector Senior Project Technician/Field Inspector Lead Technician/Field Inspector Project Superintendent $65 $75 $85 $115 $135 $145 Step Code Project Support Staff Hourly Rate SUPl Office/Clerical/Word Processor SUP2 Project Assistant SUP3 Administrator/Contract SUP4 Project Administrator/Contract SUPS Senior Project Administrator/Contracts SUP6 Principal Project Administrator/Contracts $75 $80 $95 $125 $150 $175 Overtime (hours worked in excess of eight (8) hours per day) by exempt personnel will be charged at the above straight time rate. Overtime by non-exempt personnel will be charged at 1.5 times the above hourly rates. OTHER PROJECT CHARGES Subcontractors and Equipment Rental The cost of services subcontracted by AECOM to others and other costs incurred by AECOM will be charged at cost plus 15%. Communication The cost of communications including telephone, pagers, cell phones, network communications, facsimile, routine postage and incidental copying costs will be charged a flat rate of 3% of total gross labor charges. Computers Specialty software including modeling software (Geographic Information Systems, noise, air emtsstons, groundwater and other modeling applications), and similar software will be charged at $10.00 per hour. Plots The following charges will apply for plots generated by the CADD and GIS systems. Color Paper Plots: 24x36 $24.00 Color Paper Plots: 36x48 $36.00 BW Plots: $7.00 Mylar Prints: 24x36 $20.00 Mylar Prints: 36x48 $25.00 Document Reproduction In-house reproduction will be charged at $.10 a page for black and white and $1.25 a page for color. Vehicles and Mileage Leased field vehicles (pick-ups, vans, trucks, etc.) used on project assignments will be charged at $85 -$95 per day. The mileage charge for personal autos will be the current mileage rate established by the Internal Revenue Service *The above rates do not include prevailing wages as determined by the Department of Industrial Relations on Public Works projects. Prevailing wages and benefits are billed at a higher rate in comparison 10 the AECOMrute. When AECOM staff, appear as expert witnesses at court trials, mediation. arbitration hearings and depositions, their time will be charged at 1.0 times the standard rate. All time spent preparing for such trials, hearings and depositions will be charged at the standard labor rate. This fee schedule contailrs confidential business ilrjormati01r and is 1101 to be copied or distributed for ally purpose other than the use i1rte1rded ;, this co11tract or proposal. AS'COM UTIL1072 AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES (AECOM TECHNICAL SERVICES, INC.) THIS AGREEMENT is made and entered into as of the J^/^'^^ day of ^/^/f/yA/ , 2014, by and between the CITY OF CARLSBAD, a municipal corporation, ("City"), and AECOM TECHNICAL SERVICES, INC., a California corporation, ("Contractor"). RECITALS A. City requires the professional sen/ices of a consultant that is experienced in Civil Engineering. B. Contractor has the necessary experience in providing professional services and advice related to preparation of improvement plans, specifications and cost estimates. C. Contractor has submitted a proposal to City and has affirmed its willingness and ability to perform such work. NOW, THEREFORE, in consideration of these recitals and the mutual covenants contained herein, City and Contractor agree as follows: 1. SCOPE OF WORK City retains Contractor to perform, and Contractor agrees to render, those services (the "Services") that are defined in attached Exhibit "A", which is incorporated by this reference in accordance with this Agreement's terms and conditions. 2. STANDARD OF PERFORMANCE While performing the Services, Contractor will exercise the reasonable professional care and skill customarily exercised by reputable members of Contractor's profession practicing in the Metropolitan Southem California Area, and will use reasonable diligence and best judgment while exercising its professional skill and expertise. 3. TERM The term of this Agreement will be effective for a period of six (6) months from the date first above written. The City Manager may amend the Agreement to extend it for three (3) additional one (1) year periods or parts thereof in an amount not to exceed thirty thousand dollars ($30,000) per Agreement year. Extensions will be based upon a satisfactory review of Contractor's performance, City needs, and appropriation of funds by the City Council. The parties will prepare a written amendment indicating the effective date and length of the extended Agreement. 4. TIME IS OF THE ESSENCE Time is ofthe essence for each and every provision of this Agreement. 5. COMPENSATION The total fee payable for the Services to be performed during the initial Agreement term will be nineteen thousand eighty dollars ($19,080). No other compensation for the Services will be allowed except for items covered by subsequent amendments to this Agreement. The City resen/es the right to withhold a ten percent (10%) retention until City has accepted the work and/or Services specified in Exhibit "A". Incremental payments, if applicable, should be made as outlined in attached Exhibit "A". City Attorney Approved Version 1/30/13 6. STATUS OF CONTRACTOR Contractor will perfonn the Sen/ices in Contractor's own way as an independent contractor and in pursuit of Contractor's independent calling, and not as an employee of City. Contractor will be under control of City only as to the result to be accomplished, but will consult with City as necessary. The persons used by Contractor to provide services under this Agreement will not be considered employees of City for any purposes. The payment made to Contractor pursuant to the Agreement will be the full and complete compensation to which Contractor is entitled. City will not make any federal or state tax withholdings on behalf of Contractor or its agents, employees or subcontractors. City will not be required to pay any workers' compensation insurance or unemployment contributions on behalf of Contractor or its employees or subcontractors. Contractor agrees to indemnify City within thirty (30) days for any tax, retirement contribution, social security, overtime payment, unemployment payment or workers' compensation payment which City may be required to make on behalf of Contractor or any agent, employee, or subcontractor of Contractor for work done under this Agreement. At the City's election, City may deduct the indemnification amount from any balance owing to Contractor. 7. SUBCONTRACTING Contractor will not subcontract any portion of the Services without prior written approval of City. If Contractor subcontracts any of the Sen/ices. Contractor will be fully responsible to City for the acts and omissions of Contractor's subcontractor and of the persons either directly or indirectly employed by the subcontractor, as Contractor is for the acts and omissions of persons directly employed by Contractor. Nothing contained in this Agreement will create any contractual relationship between any subcontractor of Contractor and City. Contractor will be responsible for payment of subcontractors. Contractor will bind every subcontractor and every subcontractor of a subcontractor by the terms of this Agreement applicable to Contractor's work unless specifically noted to the contrary in the subcontract and approved in writing by City. 8. OTHER CONTRACTORS The City resen/es the right to employ other Contractors in connection with the Sen/ices. 9. INDEMNIFICATION Contractor agrees to indemnify and hold hannless the City and its officers, officials, employees and volunteers from and against all claims, damages, losses and expenses including attorneys fees arising out of the perfonnance of the work described herein caused by any negligence, recklessness, or willful misconduct of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable. The parties expressly agree that any payment, attorney's fee, costs or expense City incurs or makes to or on behalf of an injured employee under the City's self-administered workers' compensation is included as a loss, expense or cost for the purposes of this section, and that this section will survive the expiration or eariy termination of this Agreement. 10. INSURANCE Contractor will obtain and maintain for the duration of the Agreement and any and all amendments, insurance against claims for injuries to persons or damage to property which may arise out of or in connection with perfonnance of the sen/ices by Contractor or Contractor's agents, representatives, employees or subcontractors. The insurance will be obtained from an insurance carrier admitted and authorized to do business in the State of California. The insurance can-ier is required to have a cun-ent Best's Key Rating of not less than "A-:VH". OR City Attorney /\pproved Version 1/30/13 with a surplus line insurer on the State of California's List of Eligible Surplus Line Insurers (LESLI) with a rating in the latest Best's Key Rating Guide of at least "AiX". 10.1 Coverages and Limits. Contractor will maintain the types of coverages and minimum limits indicated below, unless Risk Manager or City Manager approves a lower amount. These minimum amounts of coverage will not constitute any limitations or cap on Contractor's indemnification obligations under this Agreement. City, its officers, agents and employees make no representation that the limits of the insurance specified to be candied by Contractor pursuant to this Agreement are adequate to protect Contractor. If Contractor believes that any required insurance coverage is inadequate, Contractor will obtain such additional insurance coverage, as Contractor deems adequate, at Contractor's sole expense. 10.1.1 Commercial General Liabilitv Insurance. $1,000,000 combined single-limit per occurrence for bodily injury, personal injury and property damage. If the submitted policies contain aggregate limits, general aggregate limits will apply separately to the wori^ under this Agreement or the general aggregate will be twice the required per occun'ence limit. 10.1.2 Automobile Liability, (if the use of an automobile is involved for Contractor's work for City). $1,000,000 combined single-limit per accident for bodily injury and property damage. 10.1.3 Wori<ers' Compensation and Emplover's Liabilitv. Wori<ers' Compensation limits as required by the California Labor Code. Wori<ers' Compensation will not be required if Contractor has no employees and provides, to City's satisfaction, a declaration stating this. 10.1.4 Professional Liabilitv. Enrors and omissions liability appropriate to Contractor's profession with limits of not less than $1,000,000 per claim. Coverage must be maintained for a period of five years following the date of completion of the work. I I If box is checked, Professional Liability City's Initials Contractor's Initials Insurance requirement is waived. 10.2. Additional Provisions. Contractor will ensure that the policies of insurance required under this Agreement contain, or are endorsed to contain, the following provisions: 10.2.1 The City will be named as an additional insured on Commercial General Liability which shall provide pnmary coverage to the City. 10.2.2 Contractor will obtain occun'ence coverage, excluding Professional Liability, which will be written as claims-made coverage. 10.2.3 This insurance will be in force during the life of the Agreement and any extensions of it and will not be canceled without thirty (30) days prior written notice to City sent by certified mail pursuant to the Notice provisions of this Agreement. 10.3 Providing Certificates of Insurance and Endorsements. Prior to City's execution of this Agreement, Contractor will furnish certificates of insurance and endorsements to City. 10.4 Failure to Maintain Coverage. If Contractor fails to maintain any of these insurance coverages, then City will have the option to declare Contractor in breach, or may purchase replacement insurance or pay the premiums that are due on existing policies in order to City Attomey Approved Version 1/30/13 maintain the required coverages. Contractor is responsible for any payments made by City to obtain or maintain insurance and City may collect these payments from Contractor or deduct the amount paid from any sums due Contractor under this Agreement. 10.5 Submission of Insurance Policies. City resen/es the right to require, at anytime, complete and certified copies of any or all required insurance policies and endorsements. 11. BUSINESS LICENSE Contractor will obtain and maintain a City of Carlsbad Business License for the term of the Agreement, as may be amended from time-to-time. 12. ACCOUNTING RECORDS Contractor will maintain complete and accurate records with respect to costs incurred under this Agreement. All records will be clearly identifiable. Contractor will allow a representative of City during nonnal business hours to examine, audit, and make transcnpts or copies of records and any other documents created pursuant to this Agreement. Contractor will allow inspection of all work. data, documents, proceedings, and activities related to the Agreement for a period of three (3) years from the date of final payment under this Agreement. 13. OWNERSHIP OF DOCUMENTS All work product produced by Contractor or its agents, employees, and subcontractors pursuant to this Agreement is the property of City. In the event this Agreement is tenninated. all wori< product produced by Contractor or its agents, employees and subcontractors pursuant to this Agreement will be delivered at once to City. Contractor will have the right to make one (1) copy of the work product for Contractor's records. 14. COPYRIGHTS Contractor agrees that all copyrights that arise from the services will be vested in City and Contractor relinquishes all claims to the copyrights in favor of City. 15. NOTICES The name of the persons who are authorized to give written notices or to receive written notice on behalf of City and on behalf of Contractor under this Agreement. For Citv For Contractor Name Sherri Howard Name Alfred Pedroza Title Associate Engineer Title Project Manager Department Public Works-Utilities Address 7807 Convoy Court, Suite 200 City of Carlsbad San Diego. CA 92111 Address 1635 Faraday Avenue Phone No. 858-300-2711 Carisbad, Ca 92008 Email alfred. pedroza@aecom.com Phone No. 760-602-2756 ' Each party will notify the other immediately of any changes of address that would require any notice or delivery to be directed to another address. City Attorney Approved Version 1/30/13 16. CONFLICT OF INTEREST Contractor shall file a Confiict of Interest Statement with the City Clerk in accordance with the requirements of the City of Carisbad Conflict of Interest Code. The Contractor shall report investments or interests in all four categories. 17. GENERAL COMPUANCE WITH LAWS Contractor will keep fully infonned of federal, state and local laws and ordinances and regulations which in any manner affect those employed by Contractor, or in any way affect the performance of the Sen/ices by Contractor. Contractor will at all times obsen/e and comply with these laws, ordinances, and regulations and will be responsible for the compliance of Contractor's services with all applicable laws, ordinances and regulations. Contractor will be aware of the requirements ofthe Immigration Refonn and Control Act of 1986 and will comply with those requirements, including, but not limited to. verifying the eligibility for employment of all agents, employees, subcontractors and consultants whose services are required by this Agreement. 18. DISCRIMINATION AND HARASSMENT PROHIBITED Contractor will comply with all applicable local, state and federal laws and regulations prohibiting discrimination and harassment 19. DISPUTE RESOLUTION If a dispute should arise regarding the perfonnance of the Services the following procedure will be used to resolve any questions of fact or interpretation not othenwise settled by agreement between the parties. Representatives of Contractor or City will reduce such questions, and their respective views, to writing. A copy of such documented dispute will be fonwarded to both parties involved along with recommended methods of resolution, which would be of benefit to both parties. The representative receiving the letter will reply to the letter along with a recommended method of resolution within ten (10) business days. If the resolution thus obtained is unsatisfactory to the aggrieved party, a letter outlining the disputes will be fonwarded to the City Manager. The City Manager will consider the facts and solutions recommended by each party and may then opt to direct a solution to the problem. In such cases, the action ofthe City Manager will be binding upon the parties involved, although nothing in this procedure will prohibit the parties from seeking remedies available to them at law. 20. TERMINATION In the event of the Contractor's failure to prosecute, deliver, or perform the Services, City may terminate this Agreement for nonperfonnance by notifying Contractor by certified mail of the termination. If City decides to abandon or indefinitely postpone the work or services contemplated by this Agreement, City may terminate this Agreement upon written notice to Contractor. Upon notification of termination. Contractor has five (5) business days to deliver any documents owned by City and all work in progress to City address contained in this Agreement. City will make a determination of fact based upon the work product delivered to City and of the percentage of work that Contractor has performed which is usable and of worth to City in having the Agreement completed. Based upon that finding City will determine the final payment of the Agreement. Either party upon tendering thirty (30) days written notice to the other party may terminate this Agreement. In this event and upon request of City. Contractor will assemble the work product and put it in order for proper filing and closing and deliver it to City. Contractor will be paid for work perfonned to the termination date; however, the total will not exceed the lump sum fee City Attorney Approved Version 1/30/13 payable under this Agreement. City will make the final determination as to the portions of tasks completed and the compensation to be made. 21. COVENANTS AGAINST CONTINGENT FEES Contractor warrants that Contractor has not employed or retained any company or person, other than a bona fide employee working for Contractor, to solicit or secure this Agreement, and that Contractor has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage, brokerage fee, gift, or any other consideration contingent upon, or resulting from, the award or making of this Agreement. For breach or violation of this warranty. City will have the right to annul this Agreement without liability, or, in its discretion, to deduct from the Agreement price or consideration, or othenwise recover, the full amount of the fee, commission, percentage, brokerage fees, gift, or contingent fee. 22. CLAIMS AND LAWSUITS By signing this Agreement, Contractor agrees that any Agreement claim submitted to City must be asserted as part of the Agreement process as set forth in this Agreement and not in anticipation of litigation or in conjunction with litigation. Contractor acknowledges that if a false claim is submitted to City, it may be considered fraud and Contractor may be subject to criminal prosecution. Contractor acknowledges that California Government Code sections 12650 et seo.. the False Claims Act applies to this Agreement and, provides for civil penalties where a person knowingly submits a false claim to a public entity. These provisions include false claims made with deliberate ignorance of the false information or in reckless disregard of the truth or falsity of information. If City seeks to recover penalties pursuant to the False Claims Act. it is entitled to recover its litigation costs, including attomey's fees. Contractor acknowledges that the filing of a false claim may subject Contractor to an administrative debamnent proceeding as the result of which Contractor may be prevented to act as a Contractor on any public work or improvement for a period of up to five (5) years. Contractor acknowledges debarment by another jurisdiction is grounds for City to tenninate this Agreement. 23. JURISDICTIONS AND VENUE Any action at law or in equity brought by either of the parties for the purpose of enforcing a right or rights provided for by this Agreement will be tried in a court of competent jurisdiction in the County of San Diego, State of California; and the parties waive all provisions of law providing for a change of venue in these proceedings to any other county. 24. SUCCESSORS AND ASSIGNS It is mutually understood and agreed that this Agreement will be binding upon City and Contractor and their respective successors. Neither this Agreement or any part of it nor any monies due or to become due under it may be assigned by Contractor without the prior consent of City, which shall not be unreasonably withheld. 25. ENTIRE AGREEMENT This Agreement, together with any other written document referred to or contemplated by it. along with the purchase order for this Agreement and its provisions, embody the entire Agreement and understanding between the parties relating to the subject matter of it. In case of confiict. the tenns of the Agreement supersede the purchase order. Neither this Agreement nor any of its provisions may be amended, modified, waived or discharged except in a writing signed by both parties. City Attorney Approved Version 1/30/13 26. AUTHORITY The individuals executing this Agreement and the instruments referenced in it on behalf of Contractor each represent and wan'ant that they have the legal power, right and actual authority to bind Contractor to the terms and conditions of this Agreement. CONTRACTOR AECOM TECHNICAL SERVICES, INC., a California corporation (sign here) RAY ^^\<e>. i\C^ fKP<\&^i (print name/title) CITY OF CARLSBAD, a municipal corporation of the State of California as/authorized by the City Manager Jim Howell By: ^ (sign here) / (print name/title) If required by City, proper notarial acknowledgment of execution by contractor must be attached. If a corporation. Agreement must be signed by one corporate officer from each of the following two groups. Group A Chairman. President, or Vice-President Group B Secretary. Assistant Secretary. CFO or Assistant Treasurer Otherwise, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate seal empowering the officer(s) signing to bind the corporation. APPROVED AS TO FORM: CELIAA. BREWER. City Attorney Assistant City Attorney City Attomey Approved Version 1/30/13 ABCONi AECOM Technical Services, Inc 3995 Via Oro Avenue Long Beach, CA 90810 T 562 213 4139 F 562 420 2915 www aecom com AECOM TECHNICAL SERVICES. INC. CERTIFICATE OF SECRETARY The undersigned, Sarah M Sabunas, hereby certifies that she is now and at all times relevant hereto has been the duly elected and acting Assistant Secretary of AECOM Technical Services, Inc , a California corporation, and that the Board of Directors, by resolution dated July 10, 2013, has authonzed Ray Hrenko, Vice President, to execute vanous written agreements and instruments, including the Agreement for Professional Engineering Services - Roosevelt Street Storm Dram Improvements by and between the City of Carlsbad and AECOM Technical Services, Inc on behalf of the corporation or its divisions The undersigned does further certify that the foregoing resolution has not been revoked, amended or modified, and is in full force and effect as of the date hereof IN WITNESS WHEREOF, the undersigned has executed this Certificate of Secretary and has affixed the corporate seal of this corporation this 20**^ day of March, 2014 AECOM TECHNICAL SERVICES, INC. By Sarah M Sabunas, Assistant Secretary AECOM 7807 Convoy Court Suite 200 SanDlego.CA 92111 www.aecom com 858 268 8080 858 292 7432 tel lax March 4,2014 Ms. Sherri Howard /^sociate Engineer City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 Subject: Roosevelt Street Storm Drain Improvements Project Dear Ms. Howard: The purpose of this letter is to provide the scope of work and fee associated with the Roosevelt Street Storm Drain Improvements Project. The work generally consists of preparing design plans and specifications forthe construction of storm drain improvements including new curb inlets, new storm drain cleanouts as well as raising an existing storm drain cleanout to grade. Project Understanding The Roosevelt Street Storm Drain Improvements Project (Project) begins at the intersection of Laguna Drive and Roosevelt Street in Carlsbad, west of Interstate 5, and goes south along Roosevelt Street for approximately 550 feet. The work involved includes two new curb inlets, one new cleanout, replacement of a cleanout, as well as raising the northern clenout to grade. Scope of Work Task 1 - Project Management and Administration Project management tasks shall include invoicing, budget and schedule tracking, and providing updates. Schedule Task / Deliverable Schedule Review existing info, obtain required additional info. Site Visit Within 1 week following NTP Prepare 100% Submittal Finish 2 weeks after NTP Final Submittal Finish 2 weeks following 100% City Comments AsCOM l^s- Shem Howard March 4.2014 Page 2 of 4 Ta.sk 2 - Review Existing information and Field Visit Review pertinent information provided by the City of CaHsbad (City). Identify and request additional information required to complete the evaluation. Evaluate the site conditions with City staff to confirm the limits of improvements required for the project. This would include pipeline, pavement, sidewalk, and curb and gutter improvements. Task 3 - Prepare Plans, Specificalioiis and Estimate Prepare a 100% Draft PS&E submittal. The following 4 sheets are proposed to be included in the 100% design submittal: • Title Sheet • General Notes, Abbreviations and Details • Storm Drain Improvement Site Plan • Storm Drain Details The draft supplemental special provisions (SSPs) will be comprised of technical sections using the CSI format. AECOM will submit two hard copies and a MS Word file to the City for review and comment. The Engineer's opinion of construction cost will be developed using general unit cost factors at a level of detail corresponding to the design level. Attend one meeting to receive/discuss City comments on design requirements and submittals. Following receipt of City comments on the prior submittal, prepare a final PS&E submittal comprised of final speciflcations (as Word and PDF flies), flnal bid schedule, plans (one set of signed mylars and one CD with electronic files; AutoCAD-drawings, and MS Word-Speciflcations), and an updated Engineer's opinion of construction cost. AECOM will attend the pre-bid meeting and will help the City evaluate the bids received for responsiveness once the bidding period closes. Task 4 - Construction Phase Support It is AECOM's understanding that the City will serve as the construction manager for the overall construction project, with primary responsibility for contract administration, for formal interaction with the construction contractor, and for all matters related to or affecting Project schedule, budget/cost, and acceptance of the work. AECOM will provide office engineering support sen/ices for the construction. ^ During the construction phase ofthe project, AECOM will respond up to 5 RFIs and review up to 5 submittals. Prepare clariflcation sketches, if required, during construction to address issues resulting from unanticipated field conditions or other fleld changes. Up to three (3) sketches are assumed. fiSCONi ^^^''^ Howard March 4, 2014 Page 3 of 4 Make record changes to the drawings based upon contractor-furnished record of construction changes. Cost Proposal We will complete the sen/ices outlined in Tasks 1 through 4 of this Scope of Services for a not-to exceed fee of $19,080, on a time-and-materials basis in accordance with the attached fee estimate budget (Exhibit "A"). Other Assumptions 1. The City will provide front-end documents, including construction contract, bidder instructions, general and special provisions. AECOM will be responsible for preparing supplemental special provisions that AECOM deems necessary for this project. AECOM will prepare the Bid Schedule and bid item description. 2. This Scope of Services is based on AECOM's current understanding of the project and discussions. If the actual work required is significantly different from what is anticipated, it is agreed that the scope and fee will be revised accordingly. 3. AECOM will be entitled to rely upon the accuracy of data and information provided to us without independent review or evaluation except as described in the scope. 4. Environmental work is not included as part of this base scope and fee. 5. Any permits, fees or inspection costs required by other agencies will be acquired and paid for by the City. 6. Trafflc Control Plans are not included as part of this base scope and fee. 7. Coordination with HOAs and utilities will be done by the City. 8. Any Engineer's Opinion of Construction Cost prepared by AECOM represents its judgment as a design-professional and is supplied for the general guidance of City. Since AECOM has no control over the cost of labor and material, or over competitive bidding or market conditions, AECOM does not guarantee the accuracy of such opinions as compared to contractor bids or actual cost to City. 9. Notwithstanding anything in this Scope of Sen/ices, AECOM shall have no responsibility for the discovery, presence, handling, removal or disposal of, or exposure to persons to hazardous materials in any form, at the project site. 10. Any reuse of AECOM prepared documents, except for the speciflc purpose intended hereunder, will be at District's sole risk and without liability or legal exposure to AECOM or its subconsultants. 11. No utility coordination will be required. 12. It is recognized, though, that due to the nature of fleld construction and the highly variable conditions and circumstances that may be encountered, it is very difficult to accurately predict the exact level of construction phase services and fee which will be needed. If the AsCOiVI Sberri Howard March 4,2014 Page 4 of 4 construction contractor is cooperative and the Project proceeds smoothly, a reduced level of effort may be appropriate. Conversely, difflcult field conditions or relations with the contractor or an extended construction period could require additional effort and fee. Therefore, key assumptions and budgetary amounts are provided for Construction Phase Services tasks, based on past experience. The extent of construction phase services is based upon the following construction schedule assumptions: a. It is assumed that the construction contract will require 1 month for completion. b. It is our understanding that the City will act as the construction manager for the Project and will be responsible for disseminating information such as RFIs and shop drawings for review during construction. Thank you for the opportunity to submit this scope and fee. If you have any questions, please contact me at (858) 300-2711. Sincerely, Alfred Pedroza, PE Project Manager Enclosures: Exhibit A - Fee Estimate Design Project Budget Roosevelt Street Storm Drain Improvements City of Carlsbad Task Description Personnel Hours Budget Task Description Principal Engineer Senior Engineer Senior Designer Administrative Total Hours Labor Non-Labor Fee (2 Task 1 - Proiect Manaeement and Administration Prepare Bnef Status Reports and Invoices 0 4 4 8 S 1,020 S 25 S 1.045 QA/QC Adnunutialion 1 4 5 $ 875 I 25 $ 900 Subtotal 8 0 4 13 % 1,895 S 50 S 1,945 Task 2 - Review Existins Info and Field Visit Obtain and Review Info 0 t 1 I 3 S 385 $ 50 S 435 Field Visit 2 2 4 $ 590 S SO S 640 Subtotal 0 3 3 1 7 S 975 S 100 S 1,075 Task 3 - Preoare Plans. Soecifications and Engineer's Opinion of Constniction Cost Prepare 100% PS&E Submittal 1 4 50 55 $ 7475 S 100 $ 7,475 Pre^ Final PS&E Submittal I 4 24 29 S 3,995 S 100 $ 4,095 Subtotal 2 8 74 0 84 S IU70 S 200 S 11,570 Task 4 - Construction Phase Support Respond lo up to five (5) RFIs and up lo ten (5) Subnuttals/Resubnuttals 1 9 4 2 16 $ 2,400 s so $ 2,450 Prepare up to three (3) Clanfication Sketches 0 4 4 S 520 $ so $ 570 Prepare Record Drawings 2 8 10 $ 1,370 $ 100 $ 1,470 Subtotal I 11 16 2 30 S 4,290 S 2001S 4,490 Total 4 30 93 7 134 S 18,530 S 5501S 19,080 Amounts shown are fee Principal Engineer S Senior Engmeer $ Senior Designer $ Admaustrteve I 21500 165 00 13000 9000