HomeMy WebLinkAboutAEL Construction Inc; 2016-01-07; PWM16-52PEMTracking#: PWM16-52PEM
CITY OF CARLSBAD
MINOR PUBLIC WORKS CONTRACT
COLE LIBRARY SOLATUBE INSTALLATION; CONT. NO. 4020
This agreement is made on the -=\-.xtA_ day of :f~AV\.v~ , 20 \{g by the
City of Carlsbad, California, a municipal corporation, (hereinafter called "City"), and AEL Construction, Inc.,
a California corporation, whose principal place of business is 505 State Place, Escondido, CA 92029
(hereinafter called "Contractor").
City and Contractor agree as follows:
DESCRIPTION OF WORK. Contractor shall perform all work specified in the Contract documents for the
project described by these Contract Documents (hereinafter called "Project").
PROVISIONS OF LABOR AND MATERIALS. Contractor shall provide all labor, materials, tools,
equipment, and personnel to perform the work specified by the Contract Documents unless excepted
elsewhere in this Contract.
CONTRACT DOCUMENTS. The Contract Documents consist of this Contract, exhibits to this Contract,
Contractor's Proposal, the Plans and Specifications, the General Provisions, addendum(s) to said Plans
and Specifications, and all proper amendments and changes made thereto in accordance with this Contract
or the Plans and Specifications, all of which are incorporated herein by this reference. When in conflict,
this Contract will supersede terms and conditions in the Contractor's proposal.
LABOR. Contractor will employ only skilled workers and abide by all State laws and City of Carlsbad
Ordinances governing labor.
GUARANTEE. Contractor guarantees all labor and materials furnished and agrees to complete the Project
in accordance with directions and subject to inspection approval and acceptance by:
Steve Didier
(City Project Manager)
WAGE RATES. The general prevailing rate of wages for each craft or type of worker needed to execute
the contract shall be those as determined by the Director of Industrial Relations pursuant to Sections 1770,
1773 and 1773.1 of the Labor Code. Pursuant to Section 1773.2 of the Labor Code, a current copy of the
applicable wage rates is on file in the Office of the City Engineer. The contractor to whom the contract is
awarded shall not pay less than the said specified prevailing rates of wages to all workers employed by him
or her in execution of the contract
The Prime Contractor shall be responsible for insuring compliance with provisions of section 1777.5 of the
Labor Code and section 4100 et seq. of the Public Contracts Code, "Subletting and Subcontracting Fair
Practices Act" The City Engineer is the City's "duly authorized officer" for the purposes of section 4107 and
4107.5.
The provisions of Part 7, Chapter 1, of the Labor Code commencing with section 1720 shall apply to the
Contract for work.
A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the
requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract
for public work, unless currently registered and qualified to perform public work pursuant to Section 1725.5.
This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
COLE LIBRARY SOLA TUBE
INSTALLATION; CONT. NO. 4020 Page 1 of 6 City Attorney Approved 10/6/15
Tracking #: PWM16-52PEM
of the Contract or work; or from any failure or alleged failure of Contractor to comply with any applicable
law, rules or regulations including those related to safety and health; and from any and all claims, loss,
damages, injury and liability, howsoever the same may be caused, resulting directly or indirectly from the
nature of the work covered by the Contract, except for loss or damage caused by the sole or active
negligence or willful misconduct of the City. The expenses of defense include all costs and expenses
including attorneys' fees for litigation, arbitration, or other dispute resolution method.
JURISDICTION. The Contractor agrees and hereby stipulates that the proper venue and jurisdiction for
resolution of any disputes between the parties arising out of this agreement is San Diego County,
California.
Start Work: Contractor agrees to start within ten (1 0) working days after receipt of Notice to Proceed.
Completion:
to Proceed.
Contractor agrees to complete work within twenty (20) working days after receipt of Notice
CONTRACTOR'S INFORMATION.
AEL Construction, Inc.
(name of Contractor)
681424
(Contractor's license number)
A, B 12/31/2017
(license class. and exp. date)
1000000321
(DIR registration number)
6/30/2016
(DIR registration exp. date)
Ill
Ill
Ill
Ill
Ill
/!/
Ill
Ill
COLE LIBRARY SOLA TUBE
INSTALLATION; CONT. NO. 4020
505 State Place
(street address)
Escondido, CA 92029
(city/state/zip)
760-432-8605
(telephone no.)
760-7 47-2167
(fax no.)
laina@aelconstruction.com
(e-mail address)
Page 3 of6 City Attorney Approved 1 0/6/15
Tracking#: PWM16-52PEM
EXHIBIT B
Supply and install (3) three 750 DSO 21" solatube units in the 2nd floor Staff Area in the Georgina Cole
Library, located at 1250 Carlsbad Village Drive, Carlsbad, CA 92008. 750 DSO 21" units include acrylic
dome, 11" self-mounted flashing, top angle tube and (1) one extension per unit, optiview diffuser, daylight
dimmer and open ceiling trim ring. Work includes layout, roof penetrations, solatubes and clean-up.
JOB QUOTATION
I.·ITEM UNIT QTY DESCRIPTION
No.·· ..
1 3 Supply and install solatubes
*Includes taxes, fees, expenses and all other costs.
COLE LIBRARY SOLA TUBE
INSTALLATION; CONT. NO. 4020 Page 6 of6
·. PRICE
.
$5,087.00
TOTAL* $5,087.00
City Attorney Approved 10/6/15